• Tidak ada hasil yang ditemukan

isprsarchives XL 4 W1 13 2013

N/A
N/A
Protected

Academic year: 2017

Membagikan "isprsarchives XL 4 W1 13 2013"

Copied!
5
0
0

Teks penuh

(1)

K

KEY WORDS:

ABSTRACT:

This paper descr sion-support pro years, reducing focus of public c tified in urban a ties, environmen databases found idents and muni are related to wa

1.1 General co

One of the main companies is th relation departm problems arise, development and to solve proble adapt and impr citizens identifie public participa concept for rep network, with t utilities infras characteristics i government str communication decision-making Some institution implementation such as: public procedures rela willingness to solutions (both s nature of their visibility. In terms of impl can identify s indifference in implementation; disruption in org case of incorrec company image that the main be citizen, who in

Urban Enginee

122

: citizen, municip

ribes the develo ocess of water c material and eco companies in Ro areas, more analy

ntal protection o ded in public com

icipal companies ater distribution

1. INTRO

ontext

n problems, iden he poor informa ments and citize

such as poor d reliable conne ems arising from

rove traditional ed in the public ation will be a porting problem the possibly of structure. Bas identified at the ructure, the pro

with residents, g process. nal aspects and

of web-GIS so c company age ated to their m

acquire new k socially and tech clients, promo

lementing new s some particular

some cases; ; higher or low ganization’s ope ct solution impl e”. In the same eneficiary of wa

addition to reg

ering and Regio

2-124 Lacul Te

pal companies, c

opment of a web ompanies, in ord onomic losses, r omania. Due to p yzes were requir or financial mana mpanies, and con s has required th networks with th

ODUCTION

ntified in the Ro ation exchange ens. From here spatial database ection to web sol

m collecting in l solutions of companies. In archived using ms related to w

extending to th sed on dec e municipal ope oposed solution along with their

components cou lutions within t e, promoted va main beneficiarie knowledge and hnologically), ch oting necessity,

olutions to publ r risks: citize requested time wer implementa eration; organiza lementation in t e time it must b ater supply and gular use of se

M.

onal Developm

ei Ave, 020396

communication,

b-GIS solution in der to reduce wa recorded in the e problems comple red related to we agement. Anothe nnection to web he use of concep

he possibility of

omanian’s public between public another type o es infrastructure lutions. One way nformation is to interaction with n this process

“citizen-sensor” ater distribution he entire public cision makers

erator and loca n will improve r involvement in

uld influence the these institutions alues, operating es (households)

implement new haracteristics and credibility and

ic companies we ns interest, or period for its ation costs; any ation discredit in terms of “public e borne in mind sewerage is the rvices, wants a

Şercăianu

ment, Technical

6, Romania - m

web-GIS

n which urban re ater losses, by c entire municipal exity that arise in eb-GIS solution er important pro platforms. Deve pt “citizen-senso f covering the en

c

different p certain ser

Figure 1.

1.2 Publi

Given the communic sewerage bidirection Buzău – autonomou Energiei T one elec bidirection service, bidirection companies unidirectio communic citizen's a

l University of

mihai.sercaianu@

esidents, from B collecting inform l networks mana n collecting info s used in areas s oblem is the poor eloping the entire or” in the entire ntire public utiliti

period of time rvices to be impr

. Identified direc b

ic companies se

range of servic cation adopted w

companies (S nal communicat

bidirectional co us company ( Termice Bucure trical distribut nal communicat (Regia Autono nal communicat s and citizens onal and bidirec cations, the co attention differe

f Civil Enginee

@utcb.ro

Buzau City, coul mation directly fr agement process ormation from ci such as local gov r infrastructure d e communication reporting proce ies infrastructure

certain problem roved (Figure 1.)

ctions for solving by the citizens

election

ces offered to ci were analyzed in S.C. Apa Nova

ion, and S.C. C ommunication), (Regia Autonom eşti – unidirecti

ion company tion) and one u

omă de Tran

tion). Communi is achieved b ctional (Figure ompany is offe ent information

ering Bucharest

ld be involved in from citizens. In s has become the itizens and issue

vernment, publi development of n process betwe ss. Reported pro e.

ms to be solve ).

g problems requ

itizens and the t n detail: two wat a Bucureşti S Compania de Ap one heat distri ma de Distribu onal communic

(Enel Munten urban public tra

nsport Bucure cation between by two main 2.). In unidirec ering / imposin on service pro

t,

n deci-recent e main s iden-c utili-spatial en res-oblems

ed and

uested

type of ter and S.A. – pa S.A.

ibution uţie a cation),

nia – ansport eşti –

utility ways: ctional ng for

(2)

t

tariffs and way accept an agreem to refuse it due t bidirectional co citizens on pay improve the ser web portals by t The challenge involvement in complexity. Loc development tr positioning.

Figure 2. Main

Before designi technology in n the ultimate go logistical implic application that which data sets user. Whether w planning, mana conditions and d followed in real

2. BUZ

2.1 Buzau City

Figure.3. Urban McPherson a

y of payments, ment for provid to commercial m ommunication a yment services, rvice provided, the company thro lies in providin a clear and sig cation request o rend of a city

n ways of commu municipal ing and using necessary to expr oal of the proje cations of custo is compatible. can be interpret we discuss an agement servic development tre

time

ZAU CITY WE

y Characteristic

n water cycle (A and Schneider,19 sensor”

etc. Citizen on ding services by monopole of som allows also a questions and interactivity of ough digital map ng information gnificant way d n a particular se area parallel

unication: betwe companies g an applicati

ress in a more c ect, which is th omers, respectiv Also should be ted, processed or

application des ces or public ends of GIS solu

EB-GIS APLIC

cs

dapted from: Mc 973) and forewor

concept)

nly choice is to the operator, or me companies. A feedback from d suggestions to ffered by certain

ps usage. and community due to problems ervice offers the to the accurate

een citizens and

ion using GIS coherent manner he financial and vely the type o

defined exactly r replaced by the igned for urban awareness the utions should be

ATION

cPherson, 1973; rd to

"citizen-o

During th parameters using diffe Urban ar function, r and a set o urban util services is limited sp satisfactio water dist cases is m sensor" th operator u 2.2 Desig

2.2.1 G Because i sufficient possibility area of 3. database strictly urb The geod informatio necessary study area consists in characteris terms of platform, possible.

No M

he operation of s and equipmen erent sensors or m

eas have as m respectively pop of required urba lity network. A s a high level of pace as shown

n or dissatisfac tribution service missing. This r hat can transm using interactive

gning

"Citizen-Geodatabase Stru it was necessa information off y of performing .4km2 in Buzău contains both ban area, and bu database and ap on management tools in process a. The proposed n seven modules stics (Table 1). future visual id the database wa

Module Urban

omponent

Urban structure haracteristics Water network

Water network haracteristics Citizens

equests Operator

ntervention Documents

able 1. Database

water distribut nt status are mo

measuring devic main characteri pulation density t an services such At the local lev

f interaction bec in figure.3. In ction of the pop e, are collected

requires the use mit in real-time web-GIS platfor Sensor" Buzau

ucture

ary to analyze fered by public various analyz u City. As a ge high-density da uffer information pplication repre that came from ing and visualiz d architecture of s structured acco For the study t dentity made by

as designed with

D Describe the ometry such parcels, buil etc. Contains pun er informatio that are takin Describe geo water netwo manholes, b drants, etc. Contains pun er informati network oper Contains pun information r quests Contains pun information r terventions Contains pub can be offere or free cadast e architecture (M

tion network, p onitored and rec ces located on-si istic density h that reside in tha

as public transp vel among all cause they opera

formation, expr pulation on the in a low and in e of concept "c e the informati rms.

u Application

an urban area institutions, wi zes, we chose a eneral concept, ata located in n of adjacent elem esents the supp m citizens, offeri zations the entire f the support da ording to their de to be as conclus y citizens in th h accuracy as h

Description e urban structur h as street net ldings, green sp nctual, linear, or

on related to e ng place in the ar

ometric element ork pipelines, n branching points nctual, linear, or ion related to ration. nctual and descr

related to citize nctual and descr related to operat blics document ed to users, such

tral plans MCD Modules)

process corded ite.

ousing at area, port or urban ate in a ressing entire n some spatial Buzău ments. port of

ing the e urban atabase efining sive in

events rea riptive ens

(3)

L cadastral plans f they did not con The new data s “Rehabilitation, distribution and through ISPA characteristics network length o

Figure 4. Water

This interactive pilot study case at citizen’s hom people can view the urban are representation o used to locate structures in geo 2.2.2 Designi

Figure In the process o citizen-sensor w citizens will not take into consid Storing these ty the proposal of

construction o from the first ph ntain enough inf set was based on

extension, mod d sewerage netw

Program. Thi and properties of 9.7 km.

r distribution net application inc and a reporting me. Along with w previous requ ea. This base of build objects

water mains, ographical coord

ing the web-GIS

e 5. Web applica of designing the was used, becaus

t have a technica deration and ana ypes of informat f new solutions

of water distrib hase could not b formation to be

n project 2002/R dernization of th works” in Buză s data set co in a unitary

twork, pilot area cludes a base m solution from th h reporting iden

ests made by ot map provide and land eleme street network dinates. S Application

ation for the stud web application e some informat al description bu alyzed by the co tion from citizen

directed to citiz

bution network be used, because

interpreted later RO/16/P/PE/021 e drinking water

ău City financed ontains network structure for a

a, Buzău City; map built for the

he field, directly ntified problems

ther residents o es a graphica ents that can be k, parcels, and

dy case n, the concept o

tion provided by ut will need to be mpany operator ns might lead to zen, whether we k,

discuss for urban res application citizen wi could eas report p recommen operation By submit his own ap ter compan

• Assign future solu with other lem);

• Unassig and the us quest is as

• Closed charge.

Figure 6 Based on based on (Newman, field by th included i categories networks involveme private act 2.3 Estim

To identify tion about the water 02.06-09.0 tained in t related to ed, compa ents, bills down (tab to express future dec tional one.

r a public policy idents. For pub n, we used the th Internet acce ily view their problems from ndations/solution

(Figure 5). tting an online r pplication but al ny, classified int ed – the reques ution (further the r comments and gned – the requ ser will not be ab ssigned;

– the request w

6. Citizen request approach classi n citizen invo , G. et al, 2011 hem, the pilot in "collaborative

(long-term visu analysis, real-ti ent), and with th tivities sectors. mation of citizen

fy the type of ben t the possibility o company, we c 06.2012 based o the questionnaire

Water Company any services, co

collection syste ble 2). In additio s the possibility cision process, u

.

y or services imp blishing and vi e ArcGIS Serv ess, who lives in

own neighborh m the field, ns for water distr

request, the citiz lso the past inter to three categori t is assigned at e citizen can com

recommendatio est is unassigne ble to post new c was solved by th

t solution for Bu fication in term lvement in co ), and also rep application from e" "contributory ualization, report ime reports and he possibility of

ns’ perception f

neficiaries and a of implementing conducted a fiel on statistical app e aimed to quant y by categories: ompany commun em and ways to on, a set of ques and ways of inv using online sol

provement provi iewing maps in ver 10 software

n the pilot study ood map in or , or to pr ribution network

zen will be able rventions from th

es (Figure 6) the operator lev mplete his own r ons related to his d at the operato comments until he network oper

uzau web-applica ms of solutions th ollecting inform porting problems

m Buzau City c y" and "co-deve

ting, water distri d feedback, vol extension to pu

from study area

assess people's p g web-GIS platfo

d study during proach. Question tify public perce water quality p nication related solve network stions were intro volving citizens lutions based co

ided to n web e. Any y area, rder to ropose k good

to see he wa-vel for request s prob-mation s from can be eloped"

ibution luntary ublic or

a

percep-form in

period ns con-eptions

provid-to cli- break-oduced

(4)

onven-In terms of solution applicability at the institutional level, some issues take into account citizens' perception, for example their motivation to engage in an online environment by generating field requests. A simple presentation of the application will not automatically lead citizens to use it unconditionally. Project results prove valuable for a much wider range of users who use the internet daily, hold a high quantity of local information and are willing to communicate with responsible institution (whether we are talking about a company or public authority). Practical purpose of the application is more than to provide for citizens, located in urban areas, or for the municipal water company the opportunity to interact and to request information in case of field breakdown.

Question: Answers:

... 6. How do you want to get involved in the future decision process?

1. Using classical tools such as phone/fax/printed mail.

yes | no | I can’t decide 2. Directly at the public authority

head-quarter thought a printed form.

yes | no | I can’t decide 3. Using web application with online

forms.

yes | no | I can’t decide 4. Using web application, online maps

and graphical tools that contain street, zip and cadastral number reference.

yes | no | I can’t decide 5. Using web-mobile application. yes | no | I can’t

decide Location

Postal code ... Age category?* ... Table 2. Field questionnaire for Buzau Study Case (selection)

3. CONCLUSIONS

By increasing public participation in reporting problems process identified in the water distribution network, community interest will increase related to work carried out by municipal compa-nies, where requests will be solved in short time and lower costs. If companies or local authorities will not develop solu-tions that improves institutional transparency the amount of in-formation collected will be lower due to lack of public confi-dence. In addition to problems requested by the citizens, the application should contain technical information of general in-terest, for example the possible source of water losses. New applications for citizens, implemented at the water compa-ny level, should have a similar structure and interface to appli-cations already used by people, regardless of their internet con-nection speed

Analyzing municipal companies in Romania at department level can draw some important conclusions. For companies serving small and medium urban areas ITC technologies use is not a priority due to internal financial policy and monopole. For this type of company is more important the field network develop-ment or breakdown limitation. Therefore, dissatisfied citizens are forced to keep their current provider in absence of other

al-ternatives. For companies serving large sized urban areas, where the citizens’ mobility is high and access to ICT technolo-gies is growing, customer relations departments have a higher degree of development. From the perspective of the customer relations department modern technologies are used to a mini-mum and limited to simple complaints. Prolonged or incom-plete response time leads to loss of public confidence in the company. Filling out simple online forms does not automatical-ly lead to department’s development.

Visual image of the water distribution company can be improved by eliminating aspects that characterize them now, namely inefficiency and focus strictly on the financial aspect. Such image is not positive for customer relations and for the citizens generally. Timely solution implementation with lower costs will create a positive and a modern image to the main beneficiary from urban areas: the citizen. In the regionalization or reorganization context the water supply, company that worked so far only locally, must adapt to new customers requirements that include access to information more quickly. The company must be known to customers and to update relations with other urban operators. This requires public relations campaigns and customer information adapted to local aspects. A larger company leads to increased professionalism with better service with the risk of excessive secrecy related to some public information. For a company to attract the interest of the main beneficiaries, in a possible involvement of data collection, must take place prior various information campaigns such as: customer letters, brochures, websites, media advertisements (print, audio or video), posters in public places (front desks or water company headquarters), promotion trough their personnel (own staff need to be well trained before the campaign), active and exposure at public events (fairs or water days), sponsoring local and regional events , water open days, etc.

So that the solution can work, identity of the beneficiary must be unique. Errors that may occur must be avoided due to duplication of postal codes or the use of mistaken contract numbers and names. Customer identification indicates preferably the direct geographical location of the customer, prior to other types of information. Maintaining contact with the public and with commercial beneficiaries of the service is of vital importance for Water Supply Company. This means listening and inviting citizens to make suggestions and requests measured by different indicators.

4. FUTURE DEVELOPMENT

(5)

Another element that will require attention is represented by the fact that database and all application will be secured against theft of confidential information or overloading the system with false claims. Finally it should be noted that the research is interdisciplinary and complex enabling the development of future studies according to technological developments.

5. REFERENCES

Arctur, D., Zeiler, M., 2004. Designing Geodatabases. Case Studies in GIS Data Modeling. ESRI Press.

Danielson, L. and White, N., 1998-2012. Using GIS in public policy analysis: North Carolina. Raleigh, N. C.: Design Research Laboratory, North Carolina State University, http://www.ces.ncsu.edu/depts/design/research/WECO/policyG IS/index.html (3 March 2012)

Gerull, L., 2005. External services în. The GIS Guide for Local Government Officials in. Ed. by Cory Fleming. International City/Country Management Association (ICMA). ESRI Press, Chapter 5, pp.81-104.

Kingstom, R. 2007. Public Participation in Local Policy Decision-making: The Role of Web-Based Mapping. The Cartographic Journal vol.44 no.2, pp.138-144.

Marsalek J., Cisneros J., Karamouz M., Malmquist P.A., Goldenfum J., Chocat B., eds. 2008 - Urban Water Cycle Processes and Interactions, UNESCO Publishing; Chapter. 1, , pp.9-18

McPherson, M.B., 1973. Need for metropolitan water balance inventories. Journal of Hydraulics Div., ASCE, Vol. 99, No.HY19, , pp.1837-1838.

McPherson, M.B., Schneider, W.J., 1974. Problems in model-ing urban watersheds. Water Resources, Vol.10, No.3, pp.434-440.

Newman,G., Graham,J., Crall, A., Laituri, M., 2011. The art and science of multi-scale citizen science support. Ecological Informatics.

Petrescu, F., 2007. Geographic Informatics Systems in Urban and Regional Planning. Bucharest, ed. Matrix Rom.

Pricopie, R., 2010. Public Participation. Communications for sustainable development, (Participarea publică, Comunicare pentru dezvoltare durabilă), Ed. Comunicare.ro.

Gambar

Figure 1.. Identified direcbctions for solvingby the citizens  g problems requuested
Figure 2. Mainn ways of commumunicipal unication: betwecompanies een citizens and
Figure 4. FWaterr distribution nettwork, pilot areaa, Buzău City;
Table 2. Field questionnaire for Buzau Study Case (selection)

Referensi

Dokumen terkait

Juggling adalah teknik yang meskipun sangat jarang digunakan ketika pertandingan, tapi tetap penting karena beberapa alasan berikut.Pertama, dengan tahu cara juggling, Anda tahu

Oleh karena keterbatasan dana, APTFI tidak dapat membiayai perjalanan dan akomodasi Bapak/Ibu sekalian, dan untuk itu mohon dapat dibiayai oleh masing-masing

kemampuan absorbsi oleh akar pada konsentrasi yang rendah dari tanah merupakan proses yang sangat efektif... Beberapa elemen yang

Pengaruh Waktu Pemanasan Serbuk Gergaji yang Berukuran Lebih Besar dari 355 µm yang Dipanaskan pada Suhu 300 o C dan Didinginkan dengan Es Selama 30 Menit terhadap

Disusun untuk Memenuhi Salah Satu Syarat Guna Memperoleh Gelar Sarjana Pendidikan (S.Pd.) pada Program Studi Pendidikan Manajemen Perkantoran, Fakultas Pendidikan.. Ekonomi dan

Di dalam pelaksanaan program kerja terdapat berbagai hambatan, diantaranya waktu pelaksanaan PPL bersamaan dengan re-organisasi dirjen yang menaungi PPPPTK Seni dan

[r]

Pada hari ini Rabu Tanggal Sembilan Belas Bulan Juni Tahun Dua Ribu Tiga Belas, kami yang bertanda tangan di bawah ini Panitia Pengadaan Barang/Jasa ULP RSUD