• Tidak ada hasil yang ditemukan

PRODUCT KNOWLEDGE KOMPLEKS RUKO PATIH

N/A
N/A
Protected

Academic year: 2021

Membagikan "PRODUCT KNOWLEDGE KOMPLEKS RUKO PATIH"

Copied!
26
0
0

Teks penuh

(1)

KOMPLEKS RUKO PATIH

PRODUCT KNOWLEDGE

(2)

Company Overview

• Developer: PT. PATIH JAYA DEVELOPERINDO (Anggota REI)

• Projects: Kompleks Ruko Patih, Patih Regensi, Patih Residence, The Patih

Apartment, Sentra Patih, dll.

• Luas Area Kawasan: 5,400 m2 RUKO/ Area Niaga

• Faldo Andreo (Managing Director), more than 6 years experience in design

consultancy, founder & CDO of SEEKPLAN.com, former Building Information

Modelling Instructor, former R&D Director of PT.INKERIN, commissioner of PT. Asean

Alltrade Indonesia, Architectural Books (Writer) and many more.

• Backed up by the owner of diversified manufacturing companies, including, Steel

Manufacturer, Plastic and Moulding Manufacturer, Paper Industry, Paper

Packaging Manufacturer, Furniture and Filing Cabinet Manufacturer, Supermarket

Equipment Manufacturer, Steel Chroming Workshop, Chair Manufacturer

(3)

MASTER

PLAN

(4)

PETA LOKASI

- Jalan Raya Kepatihan, Gresik -

Pekerjaan

Badan Jalan Pekerjaan Saluran

Jalan ClusterPekerjaan Pekerjaan

Lokasi strategis berada didaerah dekat perumahan dan industri

KEPADATAN PENDUDUK TINGGI

(5)

FOTO LOKASI

- Jalan Raya Kepatihan, Gresik -

Pekerjaan

Badan Jalan Pekerjaan Saluran

(6)

The Patih Shophouse Overview

• Total area: 2.450,88 m

2

,

Jl. Raya Kepatihan, Gresik

• Terdiri dari: 17 unit

• Tipe Ruko :

Blok A (3 Lantai) : Tipe Standar & Tipe Hook (hadap jalan raya)

Blok B (3 Lantai) : Tipe 2 Usaha & Hook 2 Usaha (hadap jalan raya)

Blok C (2 Lantai) : Tipe 2 Lantai

• Serah Terima: end January 2018

• Akses :

Jalur Lingkar Luar Barat (JLLB/ OERR) – 6 km, ± 15 menit

Jalur Lingkar Dalam Barat (JLLB/ IERR) – 11 km, ± 30 menit

18 menit menuju RSUD Bhakti Dharma Husada

• Fasilitas Kawasan:

parkir luas, air bersih, listrik 2200 watt, dekat fasilitas

umum (misal: pom bensin, RS) dan industri/ pabrik

(7)

8 Keunggulan THE PATIH SHOPHOUSE:

-LOKASI: Kepadatan Penduduk Tinggi

-LOKASI: Akses Mudah

-LOKASI: Langsung JALAN RAYA UTAMA, Jalan Provinsi

-ARSITEKTUR: Desain (long-lasting), Estetika, Fungsi dan Flow

-ARSITEKTUR: Spesifikasi Bangunan (Granite Tiles, Ikatan Galvalum, dll)

-HARGA: Bandingkan per meter persegi! Siap bertanding!

-HARGA: Unit terbatas, produk bagus. HARGA PASTI NAIK!

-UNIQUE SELLING POINT: KONSEP 1 RUKO 2 USAHA

(8)
(9)
(10)
(11)

Tipe Standar

(hadap jalan raya)

BLOK A

Unit A1, A2, A3

LT: 76m

2

/ LB: 228m

2

(4x19)

3 lantai

2 kamar mandi

(12)

Tipe Hook Standar

(hadap jalan raya)

BLOK A

Unit A5

LT: 104,5m

2

LB: 313,5m

2

(5,5x19)

3 lantai

2 kamar mandi

(13)

Tipe Hook 2 Usaha

(hadap jalan raya)

BLOK B

Unit B1

LT: 104,5m

2

LB: 313,5m

2

(5,5x19)

3 lantai

2 kamar mandi

(14)

Tipe Unit 2 Usaha

(hadap jalan raya

)

BLOK B

Unit B2,B3,B5,B6*

LT: 76m

2

/ LB: 228m

2

LT: 75,4m

2

/ LB: 226,3m

2*

(4x19)

3 lantai

2 kamar mandi

(15)

Tipe Unit 2 Lantai

BLOK C

Unit C1,C2,C3,C5*

LT: 70m

2

/ LB: 140m

2

LT: 69,8m

2

/ LB: 139,5m

2*

(4x17,5)

2 lantai

2 kamar mandi

(16)

Tipe Unit 2 Lantai

BLOK C

Unit C6 & C7*

LT: 71,1m

2

/ LB: 142,2m

2

LT: 73,3m

2

/ LB: 146,6m

2*

(4x18,122)

2 lantai

2 kamar mandi

(17)

Tipe Unit 2 Lantai

BLOK C

Unit C8 & C9*

LT: 75,5m

2

/ LB: 151m

2

LT: 77,7m

2

/ LB: 155,3m

2*

(4x19,671)

2 lantai

2 kamar mandi

(18)

SPESIFIKASI

No.

Item/ Ruang

Tipe/ Material

1.

Pondasi

Tiang Pancang

2.

Struktur

Beton Bertulang

3.

Dinding

Bata Merah

4.

Cat Dinding Luar

Dulux Weathershield ICI

5.

Cat Dinding Dalam

Catylac ICI

6.

Lantai

Granite Tile 600 x 600

7.

Pintu Depan

Kaca Rangka Aluminium

8.

Sanitasi

Closet Duduk, Wastafel

(ex. Toto)

9.

Listrik/ Air

2200 Watt/ PDAM

10. Rangka Atap

Baja Ringan

11. Atap

Galvalum Roof

12. Foot Walk

Lebar 3 meter / Side 1,5 meter

13. Area Parkir

± 48%

(19)

DAFTAR HARGA

KPR

R E S I D E N T I A L . C O M M E R C I A L A R E A . I N D U S T R I A L

PRICE LIST DASAR KPR

per 12 Januari 2017

No.

Kav Type

Harga

(Include PPN) DP 30%

Angsuran DP

Per bulan (9x) Sisa KPR

A-1 STANDARD 1,993,233,000 597,969,900 66,441,100 1,395,263,100 A-2 STANDARD 1,993,233,000 597,969,900 66,441,100 1,395,263,100 A-3 STANDARD 1,993,233,000 597,969,900 66,441,100 1,395,263,100 A-5 HOOK STANDARD 2,740,695,375 822,208,613 91,356,513 1,918,486,763 B-1 HOOK 2 USAHA 2,861,695,375 858,508,613 95,389,846 2,003,186,763 B-2 UNIT 2 USAHA 2,114,233,000 634,269,900 70,474,433 1,479,963,100 B-3 UNIT 2 USAHA 2,114,233,000 634,269,900 70,474,433 1,479,963,100 B-5 UNIT 2 USAHA 2,114,233,000 634,269,900 70,474,433 1,479,963,100 B-6 UNIT 2 USAHA 2,099,283,753 629,785,126 69,976,125 1,469,498,627 C-1 Unit 2 Lantai 1,468,698,000 440,609,400 48,956,600 1,028,088,600 C-2 Unit 2 Lantai 1,468,698,000 440,609,400 48,956,600 1,028,088,600 C-3 Unit 2 Lantai 1,468,698,000 440,609,400 48,956,600 1,028,088,600 C-5 Unit 2 Lantai 1,463,872,278 439,161,683 48,795,743 1,024,710,595 C-6 Unit 2 Lantai 1,491,567,726 447,470,318 49,718,924 1,044,097,408 C-7 Unit 2 Lantai 1,537,516,992 461,255,098 51,250,566 1,076,261,894 C-8 Unit 2 Lantai 1,583,466,258 475,039,877 52,782,209 1,108,426,381 C-9 Unit 2 Lantai 1,629,415,524 488,824,657 54,313,851 1,140,590,867 Keterangan :

Tanda Jadi Rp 10 juta; DP 30% dicicil 9 kali (9 bulan) Cicilan KPR sesuai ketentuan masing-masing Bank

Harga termasuk : PPN, IMB, Biaya Pecah Sertifikat, Pemasangan air dan listrik 2200 Watt serta Biaya PPJB Harga tidak termasuk : Biaya Balik Nama, Bea Perolehan Hak atas Tanah dan Bangunan (BPHTB) dan AJB

(20)

CARA PEMBAYARAN

Harga KPR

DP 30% - 9x cicilan + KPR 70% atau cash

Illustrasi :

- Hari ini Tanda jadi Rp. 10 juta

- 1 minggu lagi DP 30% dibagi 9 x cicilan – (untuk cicilan I

dikurangi tanda jadi Rp. 10 juta)

- Serah terima unit dilakukan setelah pelunasan pembayaran

di bulan ke-10 baik menggunakan KPR atau Cash

(21)

KERJA SAMA BANK

(22)

DAPATKAN HARGA PROMO &

PENAWARAN HEBOH

CARA BAYAR CASH PERDANA

!!!

1. DISCOUNT HINGGA RATUSAN JUTA RUPIAH

2. FREE BIAYA BALIK NAMA, AJB DAN BPHTB

Note :

Penawaran berlaku hanya selama pameran tgl. 16 Januari

(23)

DAFTAR HARGA

CASH PERDANA

R E S I D E N T I A L . C O M M E R C I A L A R E A . I N D U S T R I A L

PRICE LIST CASH PERDANA

per 12 Januari 2017

No. Kav Type Harga (Include PPN) Tanda Jadi Harga Setelah Tanda Jadi Cicilan Tunai 4 X A-1 STANDARD 1,812,030,000 10,000,000 1,802,030,000 450,507,500 A-2 STANDARD 1,812,030,000 10,000,000 1,802,030,000 450,507,500 A-3 STANDARD 1,812,030,000 10,000,000 1,802,030,000 450,507,500 A-5 HOOK STANDARD 2,491,541,250 10,000,000 2,481,541,250 620,385,313 B-1 HOOK 2 USAHA 2,601,541,250 10,000,000 2,591,541,250 647,885,313 B-2 UNIT 2 USAHA 1,922,030,000 10,000,000 1,912,030,000 478,007,500 B-3 UNIT 2 USAHA 1,922,030,000 10,000,000 1,912,030,000 478,007,500 B-5 UNIT 2 USAHA 1,922,030,000 10,000,000 1,912,030,000 478,007,500 B-6 UNIT 2 USAHA 1,908,439,775 10,000,000 1,898,439,775 474,609,944 C-1 Unit 2 Lantai 1,335,180,000 10,000,000 1,325,180,000 331,295,000 C-2 Unit 2 Lantai 1,335,180,000 10,000,000 1,325,180,000 331,295,000 C-3 Unit 2 Lantai 1,335,180,000 10,000,000 1,325,180,000 331,295,000 C-5 Unit 2 Lantai 1,330,792,980 10,000,000 1,320,792,980 330,198,245 C-6 Unit 2 Lantai 1,355,970,660 10,000,000 1,345,970,660 336,492,665 C-7 Unit 2 Lantai 1,397,742,720 10,000,000 1,387,742,720 346,935,680 C-8 Unit 2 Lantai 1,439,514,780 10,000,000 1,429,514,780 357,378,695 C-9 Unit 2 Lantai 1,481,286,840 10,000,000 1,471,286,840 367,821,710 Keterangan :

Harga berlaku selama pameran tanggal 16 Januari 2017 – 15 Pebruari 2017 Tanda Jadi Rp 10 juta; Cicilan tunai 4x

Harga termasuk : PPN, IMB, Biaya Pecah Sertifikat, Pemasangan air dan listrik 2200 Watt serta Biaya PPJB

(24)

CARA PEMBAYARAN

Harga CASH PERDANA

Harga Perdana plus PPN – 10 jt Tanda Jadi : 4x (cicilan tunai)

Illustrasi :

- Hari ini Tanda jadi Rp. 10 juta

- 1 minggu lagi Harga setelah tanda jadi dibagi 4x cicilan tunai

- Khusus Cash Perdana dapat serah terima lebih awal*

(25)

JADWAL LAUNCHING

JANUARY

• 12 Januari 2016

Product Knowledge, Somerset Hotel Ballroom

• 16 Januari – 15 Pebruari

Pameran di PGS (Pusat Grosir Surabaya)

• 16 Januari– 15 Pebruari

Pameran di JMP (Jembatan Merah Plaza)

APRIL

- End of sales, New Project

(26)

TERIMA KASIH

-MARKETING OFFICE

RAYA PRADAH INDAH 105, SURABAYA 60216

www. patih-development.com

Gambar

FOTO LOKASI

Referensi

Dokumen terkait

Title Sub Title Author Publisher Publication year Jtitle Abstract Notes Genre URL.. Powered by

Penetapan Kinerja Kabupaten Mandailing Natal Tahun Anggaran 2013 94.. NO SASARAN STRATEGIS INDIKATOR

Indikator dari kegagalan itu berupa ketidak mampuan untuk menyesuaikan diri atau perilaku bermasalah, atau malasuai (maladjustment). Tujuan layanan ini dapat juga

Setelah suasana lebih kondusif berhasil diciptakan, peserta didik diberi kesempatan untuk bertanya terkait materi yang dibahas dan mengungkapkan pendapatnya dari

dan integritas moral orang yang profesionai. Kode etik mempengaruhi profesi, ketentuan ini dikenakan oleh organisasi profesi terhadap para anggotanya yang dengan sukarela

Penelitian yang berjudul Upaya da‟i dalam menjalin kerukunan umat Islam (Study Kasus Pada Pon-Pes Bahrul Ulum dan Sabilil Qorin An-Najah di Desa Lesung Bhakti Jaya)

Dengan ini saya menyatakan bahwa dalam skripsi yang berjudul “A Study of Tzvetan Todorov Narrative Structure in Marc Webb’s 500 Days of Summer” ini tidak

Puji syukur penulis panjatkan kepada Allah SWT yang telah melimpahkan rahmat, hidayah dan karunia-Nya sehingga penulis dapat menyelesaikan skripsi ini dengan judul