I-60
DAFTAR PUSTAKA
Agarwal, Ajay Kumar. 2013. Flowshop Scheduling Problem for Job,
10-Machines By Heuristics Models Using Makespan Criterion. RIMT dan
SDITM, Israna, India.
Bagchi, Tapan P. 1999. Multiobjective Scheduling by Genetic Algorithms. Kluwer Academic Publishers, New York.
Bames, Ralph M. 1980. Motion and Time Study and Work Measurement, New York: John Wiley & Sons Inc.
Emmons, Hamilton. 2013. Flow Shop Scheduling Theoretical Result, Algorithms,
and Applications. Springer Science+Business Media, New York.
Hakim N, Arman. 1999. Perencanaan dan Pengendalian Produksi. Guna Widya, Surabaya.
Ginting, Rosnani. 2009. Penjadwalan Mesin. GrahaIlmu, Yogyakarta. Ginting, Rosnani. 2008. Sistem Produksi. Graha Ilmu, Yogyakarta.
Gozali, Lina, dkk.2013. Perencanaan Penjadwalan Produksi pada PT. Harapan
Widyatama Pertiwi untuk Produk Pipa PVC. Jakarta Barat.
Lopez, Pierre, dkk. 2008. Production Scheduling. ISTE Ltd. And John Wiley & Sons, Inc.
Malik, Amar, dkk. 2013. Comparative Analysis of Heuristics for Mkespan
Minimising in Flow Shop Scheduling. Haryana, India.
I-61
DAFTAR PUSTAKA (LANJUTAN)
Morton, Thomas E. 1993. Heuristic Scheduling System : with Applications to
Production System and Project Management. John Wiley & Sons, Inc.,
Canada.
Pinedo, Michael L. 2012. Scheduling, Theory, Algorithms, and System. Edisi keempat. New York, USA.
Sinulingga, Sukaria. 2011. Metodologi Penelitian. USU Press, Medan.
Sutalaksana, Iftikar Z. 1979. Teknik Tata Cara Kerja. Bandung: Jurusan Teknik Industri Institut Teknologi Bandung.
Tannady, Hendy. 2013. Modifikasi Mekanisme Penentuan Penjadwalan Job pada
Metode Dannenbring. Universitas Bunda Mulia, Jakarta.