NATIONAL ENERGY SITUATION AND

STUDY OF BIOMASS POTENTIAL FOR

SUSTAINABLE

ELECTRIC POWER GENERATION

INDONESIAN CASE

Energy Conversion Research Group

Institute Technology of Bandung

Makuhari, Oct 13, 2006

Aryadi Suwono

(2)

OUTLINE

• INDONNESIAN ENERGY SITUATION AND POLICY

• STUDY ON BIOMASS ENERGY POTENSIAL FOR

(3)

INDONNESIAN

(4)

ENERGY DATA UPDATE

TYPE ENERGY SOURCE THEORETICAL RESOURCE PROVEN RESERVE PRODUCTION RES/PROD RATIO Oil 86.9 billion barrels 5.8 billion barrels 0.5 billion barrels/year 11 Years Natural Gas 384.7 TSCF 90 TSCF 2.9 TSCF/year 30 Years Coal 50 billion tones 5 billion tones 0.1 billion tones/year 50 Years

TYPE OF ENERGY SOURCE

THEORETICAL RESOURCE

EQUIVALENT UTILIZATION INSTALLED CAPACITY Hydro 75,670 MW 845 Millions BOE 6,851 GWh 4,200 MW Geothermal 27,000 MW 219 Million BOE 2,593.5 GWh 800 MW

Mini/Micro hydro 712 MW 206 MW

Biomass 49,810 MW 302 MW

Solar 4.8 kWh/m2/day 5 MW

(5)

BALANSE OF FOSSIL ENERGY

PRODUKSI

1125

EKSPOR

514

PASOKAN

DALAM NEGERI

611

IMPOR

487

PETROLEUM 2004 (MBOEPD)

PRODUKSI

8.35

EKSPOR

4.88

DOMESTIK

3.47

NATURAL GAS 2004 (BSCFPD)

PRODUKSI

131,72

EKSPOR

92,50

DOMESTIK

32,91

(6)

Grissik Palembang Semarang Pacific AUSTRALIA Indian Ocean Bangkok Phnom Penh Ban Mabtapud Ho Chi Minh City CAMBODIA VIETNAM THAILAND LAOS Khanon Songkhla Erawan Bangkot Lawit Jerneh WEST MALAYSIA Penang Kerteh Kuala Lumpur Manila Philipines South China Sea NatunaAlpha Kota Kinibalu BRUNEI Bandara Seri Begawan Bintul u EAST MALAYSIA Kuching Banda Aceh Lhokseumawe Medan Duri S U M A T R A Jambi Bintan SINGAPORE Samarinda Balikpapan Bontang Attaka Tunu Bekapai KALIMANTAN Banjarmasin Manado SULAWESI BURU SERAM Ternate Sorong IRIA Jakarta J A V A Surabaya Bangkalan BALI SUMBAWA LOMBOK FLORES SUMBA TIMOR Duyong West Natuna Mogpu Dumai Batam Guntong MADURA

OIL REFINERY AND TRANSPORTATION

Bandung Yogyakarta

Transit Terminal

Pipeline Distributi

Tanker

Oil Refinery

P. Brandan: 5 MBOPD Balongan : 125 MBOPD Kasim : 10 MBOPD Musi 135.20 MBOPD Balikpapan : 260 MBOPD Ujung Pandang Pagerungan HALMAHERA

TOTAL REFINERY CAPACIT

1,057,000 BOPD

Cepu : 3.80 MBOPD S.Pakning : 50 MBOPD Cilacap: 348 MBOPD Dumai : 120 MBOPD Padang Port Klang Port Dickson

I N D O N E S I A

(7)

Grissik Palembang

Semarang

NATURAL GAS RESERVE AND PIPING

TRAN

Pacific AUSTRALIA Indian Ocean Bangkok Phnom Penh Ban Mabtapud Ho Chi Minh City CAMBODIA VIETNAM THAILAND LAOS Khanon Songkhla Erawan Bangkot Lawit Jerneh WEST MALAYSIA Penang Kerteh Kuala Lumpur Manila Philipines South China Sea Sin g ap o re G as Tru n klin e NatunaAlpha Kota Kinibalu BRUNEI Bandara Seri Begawan Bintul u EAST MALAYSIA Kuching Banda Aceh Lhokseumawe Medan Duri Padang S U M A T R A Jambi Bintan SINGAPORE Samarinda Balikpapan Bontang LNG Plant

& Export Terminal Attaka Tunu Bekapai KALIMANTAN Banjarmasin Manado SULAWESI Ujung Pandang BURU SERAM Ternate HALMAHERA Sorong IRIA Jakarta J A V A SurabayaBangkalan BALI SUMBAWA Pagerungan LOMBOK Cirebon FLORES SUMBA TIMOR

I N D O N E S I A

Duyong West Natuna Port Dickson Port Klang Mogpu Dumai Batam Guntong 52,081 3,896 728 3,220 14,260 5,190 31,814 3,654 14,782

GAS RESERVE 2P (BSCF)

TOTAL RESERVES

2P : 134,015.5 BSCF

0,11 3,00Resources Ardjuna Fields MADURA 4,289 Existing Pipelin Planned Pipeli

(8)

TRANS ASEAN GAS PIPELINE (TAGP)

INDONESIA MALAYSIA PHILIPPINES VIETNAM THAILAND LAOS MYANMAR CAMBODIA

South China Sea

Banda Sea Celebes Sea Andaman Sea Gulf of Thailand Straits of Malacca INDIAN OCEAN Java Sea CHINA 3 1 2 5 4 Philippine Sea PACIFIC OCEAN LEGENDS Existing Pipeline Future Pipline Possible Interrconnections Trans-ASEAN Interconnections 1. Dumai to Malacca 2. West Natuna to Duyong

3. East Natuna to Bangkok via Duyong and Bongkot

4. East Natuna to Luzon via Brunei 5. Block B to Bangkok via Bongkot 6. Pauh to Arun

6

(9)

COAL RESERVE AND TERMINAL

KALIMANTAN SULAWESI IRIAN J

S

U

M

A

T

R

A

JAVA Tarahan 40.000 Pulau Baai 35.000 Kertapati 10.000 Teluk Bayur 35.000 Tanjung Redep* 5.000 Tanjung Bara 200.000 B l o r o* 8.000 Loa Tebu* 8.000 Balikpapan 60.000 Tanah Merah 20.000

North Pulau Laut 150.000 IBT – 70.000

Sembilang* 7.500 Air Tawar* 7.500 Banjarmasin* 10.000

South Pulau Laut 200.000 S a t u i* 5.000 Kelanis* 10.000

Catatan :

* River Terminal

55.1

5.0

9.3

10.6

12.2

COAL RESERVE (%)

THERETICAL = 58 BILLION TON PROVEN = 6.9 billion ton MEASURED = 12.4 billion ton TOTAL = 19.3 billion ton R/P = 147 years

(10)

Grissik Palembang Semarang Pacific AUSTRALIA Indian Ocean Bangkok Phnom Penh Ban Mabtapud Ho Chi Minh City CAMBODIA VIETNAM THAILAND LAOS Khanon Songkhla Erawan Bangkot Lawit Jerneh WEST MALAYSIA Penang Kerteh Kuala Lumpur Manila Philipines South China Sea NatunaAlpha Kota Kinibalu BRUNEI Bandara Seri Begawan Bintul u EAST MALAYSIA Kuching Banda Aceh Lhokseumawe Medan Duri Padang S U M A T R A Jambi Bintan SINGAPORE Samarinda Balikpapan Bontang Attaka Tunu Bekapai KALIMANTAN Banjarmasin Manado SULAWESI Ujung Pandang BURU SERAM Ternate HALMAHERA Sorong IRIA Jakarta J A V A Surabaya Bangkalan BALI SUMBAWA Pagerungan LOMBOK FLORES SUMBA TIMOR

I N D O N E S I A

Duyong West Natuna Port Dickson Port Klang Mogpu Dumai Batam Guntong MADURA

ELECTRIC POWER GENERATION AND TRANSMISION GRID

TOTALCAPACITY

24,000 MW

Total Jawa Bali : 18,500 MW Total Sumatera : 3,200 MW Total Kalimantan : 800 MW Total Sulawesi : 650 MW Existing Transm Planned Transm Power Plant

(11)

ROADMAP OF NUCLEAR ENERGY DEVELOPEMENT 2000-2025

2000

2020

Erection

NPP-1

Energy

Planning with

Inclusion of

Nuclear

Energy

Decission

Go for NPP

Tender

NPP 1&2

Operate

NPP-1

2005

2010

2015

Sosializatio of NPP

2025

Konstruksi

PLTN-2

Establishment

“Owner”

Operate

NPP-2

Operate

NPP-4

Operate

NPP-3

Erection

NPP-3

Konstruksi

PLTN-4

Tender

NPP 3&4

(12)

TARGET OF NATIONAL ENERGY MIX IN 2025

ENERGI MIX NASIONAL TAHUN 2025 (SKENARIO BaU) Minyak bumi 41.7% Gas bumi 20.6% Batubara 34.6% PLTA 1.9% Panas bumi 1.1% PLTMH 0.1%

ENERGI MIX NASIONAL TAHUN 2025 (SKENARIO OPTIMALISASI) PLTMH 0.216% Biofuel 1.335% Tenaga surya 0.020% Tenaga angin 0.028% Fuel cell 0.000% Biomassa 0.766% Nuklir 1.993% Gas bumi 30.6% Minyak bumi 26.2% Other 4.4% Panas bumi 3.8% PLTA 2.4% Batubara 32.7% OPTIMALISASI PENGELOLAAN ENERGI

ENERGI (PRIMER) MIX NASIONAL TAHUN 2003

Minyak bumi 54.4% Gas bumi 26.5% Batubara 14.1% PLTA 3.4% Panas bumi 1.4% EBT Lainnya 0.2%

(13)

STUDY ON BIOMASS ENERGY

POTENSIAL FOR ELECTRICAL POWER

GENERATION

(14)

BACKGROUND

• Increasing demand of electricity, presently electrification ratio

0.53

• Need for decreasing the consumption of fossil fuel

• High potentially available renewable energy sources:

• Approx. 160.000 MW (excluding solar energy)

• Only 5200 MW has been utilized

• Approx. 45.000 MW biomass energy potential

• Willingness of Indonesian Government and PLN to utilize the

renewable energy sources

(15)

POTENTIAL OF NEW & RENEWABLE ENERGY

SOURCES IN INDONESIA

NO

ENERGY SOURCES

POTENTIAL

INSTALLED

CAPACITY

%

1

Hydro (Incl. small

scale)

75.450 MW

4.264 MW

±

5,6 %

2

Geothermal

20.000 MW

802 MW

±

4,1 %

3

Alternative Energy

Biomass

Equivalent

50.000 MW

302 MW

Solar

4,8 kWh/m2/day

Equivalent

± 5 MW

Wind

Equivalent

450 MW

Equivalent

± 0,5 MW

Sea wave

10 – 35 MW per

(16)

PLN FUTURE PLAN

Tonny Agus, Deputy Director for Primary Energy, Workshop on Biomass

for Sustainable Electric Power Generation, March 1, 2005

1. To empower current PLN renewable energy generator

2. To build renewable energy power plant based on current

studis

3. To construct commercially potential renewable energy

map

4. To study the renewable energy feasibility, technically and

economically, to replace fossil fuel energy

(17)

RENEWABLE ENERGY DEVELOPMENT POLICY

Tonny Agus, Deputy Director for Primary Energy, Workshop on Biomass for

Sustainable Electric Power Generation, March 1, 2005

Ministry of Energy and Mineral Resources Regulation No.1122

K/30/MEM/2002 about Small Scale Power Plant (up to 1000

kW) has already been published --Æ

updated to 15 MW

Developer has to fulfill technical and operational requirement

of local PLN

If future development location has already been studied by

PLN, further discussion with fair partnership spirit has to be

held

PLN is supporting the developer which will develop the small

scale power plant potential as long as fulfilling the technical

and operational requirement of PLN

It is preferable for PLN that the capacity can be flexibly

increased, for example from 1000 kW to 10.000 kW

The consequence is that the Ministry Regulation may be

revised.

(18)

Ministry of Energy and Mineral Resources

Regulation No. 1122.K/30/MEM/2002

About Small Scale Power Plant (scattered PSK)

Operator

: Small scale business (as shown in UU No.9, 1995 )

Energy Sources : Renewable Energy (wind, sun, mini/micro hydro, waste,

geothermal, etc.)

Capacity

: max. 1 MW/power plant ---Æ

currently is updated to 15 MW

Location

: reachable by PLN network on medium/low voltage (on-grid)

Electric power selling price as shown in paragraph 13 Ministry of Energy and

Mineral Resources Decree No. 1122.K/30/MEM/2002, are :

a. 0.8 times HPP medium voltage if interconnected to Medium Voltage Network

b. 0.6 times HPP low voltage if interconnected to Low Voltage Network

(19)

STUDY ON BIOMASS AS ALTERNATIVE ENERGY

FOR ELECTRIC POWER PLANT

Data and

information

Collection

Survey on Biomass

Energy Potential

Evaluation on

Biomass Utilization

Technology

Evaluation on

financial assistant

scheme

Workshop: Inputs

from related

institutions

Analysis

Output:

Biomass Energy map

Design requirement

of Biomass Power

Generation plant

(PLTBM)

Business Plan of

PLTBM

Policy and

Regulation Required

Data base for FS

(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)

Comparison of Exisiting Electric Power Generation and Biomass Electric Energy Potential 0 10000 20000 30000 40000 50000 60000 70000

Maluku Papua Bali NTB NTT Sulaw esi Kalimantan Sumatera Jaw a

GW

h

(30)

Comparison of Existing Install Capacity and Biomass Electric Energy Potential 0 1000 2000 3000 4000 5000 6000

Maluku Papua Bali NTB NTT Sulaw esi Kalimantan Sumatera Jaw a

MW

Potensi Kapasitas Listrik Biomassa Kapasitas Terpasang PLTD 2002 Kapasitas Terpasang PLTU 2002

Kapasitas Terpasang PLTA 2002 Kapasitas Terpasang PLTG 2002 Kapasitas Terpasang PLTP 2002

(31)

Referensi

Dokumen terkait

Pengelolaan wilayah perbatasan, termasuk pulau-pulau kecil terluar, selama ini belum terintegrasi dengan baik, di mana tiap kementrian/lembaga cenderung

Pembuktian Kualifikasi, Klarifikasi, serta Negosiasi teknis dan harga dilakukan pada tanggal 13 Januari 2017 pukul 08.00 sampai dengan pukul 16.00 WIB di Sekretariat ULP

Karena berada pada tataran bunyi bahasa yang konkret (parole), kajian fonetik lazimnya menjelaskan bunyi pada dimensi artikulasi, akustik, dan persepsi.. Dimensi fonetik

ri kesempatan untuk mengkaji rencana pengadaan a dampak harus sepakat atas ganti rugi yang ditetap nah secara sukarela hanya dapat dilakukan bila : n manfaat yang lebih

Sistem layanan Pasien Terpadu Berbasis SMS Gateway (Studi Kasus Pro Clinic Surabaya) diimplementasikan agar dapat menjadi sarana penunjang yang dapat memberikan informasi dan

Penulis dapat menyelesaikan dengan baik Karya Tulis Ilmiah ini disusun guna untuk memenuhi salah satu syarat dalam memperoleh gelar Ahli Madya Analis Kesehatan Program Studi

Bagian lengkung pada permukaan kedua desain yang tidak sama memberikan tampilan desain yang berbeda, khususnya keseluruhan permukaan belakang dari Desain KARTU

Suatu klub kesegaran jasmani ingin mengevaluasi program diet, kemudian dipilih secara acak 10 orang anggotanya untuk mengikuti program diet tersebut selama 3 bulan.. Uji