• Tidak ada hasil yang ditemukan

CNRA and NRA database 2017 12 21

N/A
N/A
Protected

Academic year: 2017

Membagikan "CNRA and NRA database 2017 12 21"

Copied!
3
0
0

Teks penuh

(1)

LEGEND

Approved (C)NRA or NRA NRA CNRA with network partner CNRA without network partner

Description of the engagement in the Risk

Assessment process

Category ● Start date

CW

Consultant

CNRA

Current status

Upcoming consultation Approval date

Cat. 1 ● 01/10/2015 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Nepcon CNRA draft under translation for international consultation January-February 2018 by end-2018 Cat. 4 ● 01/10/2015 ● Nepcon

Cat. 5 ● 01/10/2015 ● Nepcon

Cat. 1 ● 01/07/2015 ● Nepcon CNRA draft under FSC review once cat. 3 + 4 are developed by end-2018

Cat. 2 ● 01/07/2015 ● WOLF CNRA draft under FSC review once cat. 3 + 4 are developed by end-2018

Cat. 3 ● 01/06/2017 ● FSG CNRA draft under development by end-2018

Cat. 4 ● 01.06.2017 ● FSG CNRA draft under development by end-2018

Cat. 5 ● 01.07.2015 ● Nepcon CNRA draft under FSC review once cat. 3 + 4 are developed by end-2018

ALL 26/09/2016 -- CNRA cat. 1, 2, 5: approved▼ [Closed] by mid-2018

(will be incorporated in the NRA)

CNRA approved

CNRA approved

Cat. 1 ● 01/07/2016 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Nepcon CNRA draft under translation for international consultation January-February 2018 by end-2018 Cat. 4 ● 01/07/2016 ● Nepcon

Cat. 5 ● 01/07/2016 ● Nepcon

ALL 16/11/2016 -- CNRA cat. 1, 2, 5: approved▼ by mid-2018

CNRA approved

ALL 22/07/2016 -- CNRA cat. 1, 2, 5: approved▼ March-April 2018 by end-2018

Cat. 1 ● 01/05/2015 ● Nepcon Cat. 2 ● 01/05/2015 ● WOLF

Cat. 3 ● 15/02/2016 ● Nepcon CNRA final draft under FSC review [Closed] by mid-2018

Cat. 4 ● 01.05.2015 ● Nepcon Cat. 5 ● 01.05.2015 ● Nepcon

ALL 17/03/2016 Nepcon November 2017-January 2018 by mid-2018

Cat. 1 ● 01/07/2016 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Daemeter CNRA draft under translation for international consultation January-February 2018 by end-2018 Cat. 4 ● 01/07/2016 ● Nepcon

Cat. 5 ● 01/07/2016 ● Nepcon

CNRA cat. 1: approved

Cat. 2 ● 2015 ● WOLF

Cat. 3 ● 15.02.2016 ● Nepcon CNRA final draft under FSC review [Closed] by mid-2018

Cat. 4 ● 01.06.2015 ● Nepcon

CNRA cat. 5: approved

CNRA approved

ALL 26/07/2016 -- NRA draft under development TBC by end-2018

CNRA approved

CNRA cat. 1: approved CNRA cat. 2: approved

Cat. 3 ● 01/06/2017 ● Nepcon CNRA first draft under consultant improvement by end-2018

Cat. 4 ● 01.06.2015 ● Nepcon CNRA draft under FSC review CNRA cat. 5: approved

ALL 20/06/2016 -- CNRA cat. 1, 2, 5: approved [Closed] by mid-2018

ALL 24/08/2016 -- NRA final draft under development [Closed] by mid-2018

May 2018

NRA draft (Guangxi, Shandong) under public consultation

Canada

● ●

Denmark

CNRA developed by FSC International with no engagement of an FSC partner at the national level.

Colombia

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner. NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International.

China

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

Czechia

stakeholder consultation by an FSC partner in the country.CNRA development by FSC International and national CNRA developed by FSC International with engagement of an

FSC partner at the national level.

Bulgaria

Belgium

CNRA developed by FSC International with engagement of an FSC partner at the national level.

Austria

Brazil

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

● ●

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International.

Finland

stakeholder consultation by an FSC partner in the country.CNRA development by FSC International and national

NRA final draft under development

Georgia

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous CNRA by FSC International.

France

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ●

(will be incorporated in the NRA)

● ●

Bolivia

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Belarus

CNRA developed by FSC International with engagement of an FSC partner at the national level.

NRA draft under public consultation

(will be incorporated in the NRA)

NRA draft under development

(will be incorporated in the NRA)

December 2017-February 2018

Estonia

CNRA developed by FSC International with engagement of an FSC partner at the national level.

Underlined = changes since last update

Current timetable for CNRA and NRA development

FSC Risk Assessments have been scheduled for all countries by 31.12.2017

Australia

stakeholder consultation by an FSC partner in the country.CNRA development by FSC International and national

Argentina

CNRA development and international stakeholder consultation by FSC International with no engagement of an FSC partner.

Chile

CNRA development by FSC International and national stakeholder consultation by an FSC partner in the country. NRA

development proposal awaits for approval, NRA would incorporate CNRA.

March-April 2018 Last updated: 21.12.2017

▼ CNRA is being prepared for publication. Where NRA takes place, CNRA will be incorporated in the NRA. ► Start date for CNRA is the date of consultant contract. Start date for NRA is the date of the proposal approval.

NRA final draft under FSC review

Ecuador

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

(2)

LEGEND

Approved (C)NRA or NRA NRA CNRA with network partner CNRA without network partner

Description of the engagement in the Risk

Assessment process

Category ● Start date

CW

Consultant

CNRA

Current status

Upcoming consultation Approval date

Underlined = changes since last update

Current timetable for CNRA and NRA development

FSC Risk Assessments have been scheduled for all countries by 31.12.2017

Last updated: 21.12.2017

ALL 23/09/2016 -- NRA final draft under development [Closed] March 2018

Cat. 1 ● 01.12.2015 ● Nepcon Cat. 2 ● 01/05/2015 ● WOLF

Cat. 3 ● 15/02/2016 ● Daemeter CNRA final draft under FSC review [Closed] by mid-2018

Cat. 4 ● 01/12/2015 ● Nepcon Cat. 5 ● 01/12/2015 ● Nepcon Cat. 1 ● 01/12/2015 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Daemeter CNRA draft under translation for international consultation January-February 2018 by end-2018 Cat. 4 ● 01/12/2015 ● Nepcon

Cat. 5 ● 01/12/2015 ● Nepcon

ALL 01/05/2017 -- CNRA draft under FSC review for international consultation January-February 2018 by end-2018

CNRA approved

Cat. 1 ● 01/07/2015 ● Nepcon CNRA draft under consultant review for national consultation February / March 2018 Cat. 2 ● 01/05/2015 ● WOLF

Cat. 3 ● 15/02/2016 ● Nepcon CNRA final draft under FSC review [Closed] by end-2018

Cat. 4 ● 01/07/2015 ● Nepcon Cat. 5 ● 01.07.2015 ● Nepcon

CNRA approved

ALL 23/09/2016 -- NRA final draft under FSC review [Closed] by mid-2018

ALL 18/04/2016 -- CNRA cat. 1, 2, 5: approved [Closed] by mid-2018

CNRA approved

CNRA approved

CNRA approved

ALL 23/03/2017 -- NRA draft under development March-April 2018 by end-2018

Cat. 1 ● 01/06/2015 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 01/06/2015 ● Nepcon CNRA final draft under FSC review [Closed] by mid-2018 Cat. 4 ● 01/06/2015 ● Nepcon

Cat. 5 ● 01/06/2015 ● Nepcon Cat. 1 ● 01/12/2015 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Daemeter CNRA draft under translation for international consultation January-February 2018 by end-2018 Cat. 4 ● 01/12/2015 ● Nepcon

Cat. 5 ● 01/12/2015 ● Nepcon Cat. 1 ● 01/06/2015 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Daemeter CNRA final draft under consultants development [Closed] by mid-2018 Cat. 4 ● 01/06/2015 ● Nepcon

Cat. 5 ● 01/06/2015 ● Nepcon

ALL 13/10/2016 -- NRA draft under preparation for public consultation February-March 2018 by end-2018

Cat. 1 ● 01/10/2015 ● Nepcon Cat. 2 ● 01/07/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Daemeter CNRA draft under consultants review March 2018 by end-2018

Cat. 4 ● 01/10/2015 ● Nepcon Cat. 5 ● 01.10.2015 ● Nepcon

ALL 14/11/2016 -- NRA final draft under development [Closed] by mid-2018

Mexico

(will be incorporated in the NRA) NRA final draft under FSC review ●

Start date for CNRA is the date of consultant contract. Start date for NRA is the date of the proposal approval. ▼ CNRA is being prepared for publication. Where NRA takes place, CNRA will be incorporated in the NRA.

Norway

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

New Zealand

stakeholder consultation by an FSC partner in the country. CNRA development by FSC International and national

Myanmar

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Netherlands

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

Malaysia

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Lithuania

CNRA developed by FSC International with no engagement of an FSC partner at the national level.

Luxembourg

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous CNRA by FSC International.

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

● ●

Latvia

CNRA developed by FSC International with no engagement of an FSC partner at the national level.

Lao People's

Democratic

Republic

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

India

stakeholder consultation by an FSC partner in the country.CNRA development by FSC International and national

Indonesia

stakeholder consultation by an FSC partner in the country.CNRA development by FSC International and national

Germany

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

Honduras

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Guatemala

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner

except for category 3.

Hungary

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner. ● ●

Japan

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

Italy

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ●

(3)

LEGEND

Approved (C)NRA or NRA NRA CNRA with network partner CNRA without network partner

Description of the engagement in the Risk

Assessment process

Category ● Start date

CW

Consultant

CNRA

Current status

Upcoming consultation Approval date

Underlined = changes since last update

Current timetable for CNRA and NRA development

FSC Risk Assessments have been scheduled for all countries by 31.12.2017

Last updated: 21.12.2017

Cat. 1 ● 01/07/2016 ● Nepcon Cat. 2 ● 01/07/2016 ● WOLF

Cat. 3 ● 01/01/2018 ● SustaInt Ltd CNRA draft to be developed May 2018 by end-2018

Cat. 4 ● 01/07/2016 ● Nepcon [Closed]

Cat. 5 ● 01/07/2016 ● Nepcon Cat. 1 ● 01/07/2016 ● Nepcon Cat. 2 ● 01/07/2015 ● WOLF

Cat. 3 ● 15/02/2016 ● Nepcon CNRA draft under translation for international consultation January-February 2018 by end-2018 Cat. 4 ● 01/07/2016 ● Nepcon

Cat. 5 ● 01/07/2016 ● Nepcon

CNRA cat. 1: approved

Cat. 2 ● 2015 ● WOLF

Cat. 3 ● 15/02/2016 ● Nepcon CNRA final draft under FSC review [Closed] by mid-2018 Cat. 4 ● 01/06/2015 ● Nepcon

CNRA cat. 5: approved

ALL 18/02/2016 -- NRA draft under preparation for public consultation January-February 2018 by mid-2018

CNRA approved

CNRA approved

ALL 23/09/2016 -- CNRA cat. 2, 5: approved [Closed] by mid-2018

CNRA approved

ALL 01/05/2017 FSG CNRA draft under FSC review for international consultation January-February 2018 by end-2018

ALL 30/11/2016 -- CNRA cat. 1, 2, 5: approved [Closed] by mid-2018

ALL 09/01/2017 -- CNRA cat. 1, 5: approved January-February 2018 by mid-2018

Cat. 1 ● 01/03/2016 ● Nepcon Cat. 2 ● 01/01/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Daemeter CNRA final draft under FSC review [Closed] by mid-2018 Cat. 4 ● 01/03/2016 ● Nepcon

ALL 10/01/2018 FSG CNRA to be developed August 2018 by end-2018

Cat. 1 ● 01/02/2016 ● Nepcon Cat. 2 ● 01/07/2016 ● WOLF

Cat. 3 ● 15/02/2016 ● Nepcon CNRA final draft under FSC review [Closed] by mid-2018 Cat. 4 ● 01/02/2016 ● Nepcon

Cat. 5 ● 01/02/2016 ● Nepcon

NRA approved

ALL 13/09/2016 -- NRA draft under preparation for public consultation January-March 2018 by end-2018

ALL 03/06/2016 -- CNRA cat. 1, 5: approved ▼ by mid-2018

ALL ● 22/03/2017 ● -- NRA final draft under development [Closed] by mid-2018

CNRA approved

Start date for CNRA is the date of consultant contract. Start date for NRA is the date of the proposal approval.

▼ CNRA is being prepared for publication. Where NRA takes place, CNRA will be incorporated in the NRA.

Spain

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

● ●

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International.

United

Kingdom

December 2017-February 2018 NRA development and national stakeholder consultation by the

national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

Poland

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Turkey

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Switzerland

stakeholder consultation by an FSC partner in the country.CNRA development by FSC International and national CNRA final draft under FSC review [Closed] by mid-2018

Sweden

CNRA final draft under FSC review [Closed] by mid-2018

CNRA development and international stakeholder consultation

by FSC International with no engagement of FSC partner. ● ●

Thailand

Romania

CNRA developed by FSC International with engagement of an FSC partner at the national level.

Republic of

Korea

South Africa

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International. ● ●

NRA final draft under development

(will be incorporated in the NRA)

Slovakia

CNRA developed by FSC International with no engagement of an FSC partner at the national level.

● ●

Slovenia

Peru

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Papua New

Guinea

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

CNRA draft under FSC review [Closed]

Portugal

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International.

United States

of America

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

Russia

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous CNRA by FSC International.

CNRA development by FSC International and national stakeholder consultation by an FSC partner in the country.

Swaziland

CNRA development and international stakeholder consultation by FSC International with no engagement of FSC partner.

CNRA development and international stakeholder consultation

by FSC International with no engagement of FSC partner. ●

CNRA draft under FSC review

Viet Nam

CNRA developed by FSC International with no engagement of an FSC partner at the national level.

Uruguay

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

CNRA by FSC International.

NRA final draft under development

(will be incorporated in the NRA)

NRA draft under preparation for public consultation

(will be incorporated in the NRA)

● ●

(will be incorporated in the NRA) NRA draft under public consultation

Ukraine

NRA development and national stakeholder consultation by the national working group. NRA draft often based on previous

Referensi

Dokumen terkait

Ayat-ayat berikut menunjukkan kebolehan membaca Shad menjadi Sin, perhatikan pada kata bergaris bawah.. Huruf Dhad pada ayat berikut, boleh dibaca dengan harakat fathah atau

Ketika Allah menyuruh Nabi Musa as mengikuti petunjuk-Nya, tersirat di dalamnya sebuah pesan abadi, pelajaran yang mahal dan kesan yang mendalam: “Dan telah

• Dengan demikian akan sulit untuk menentukan apakah memang satu rumah sakit berbeda dengan rumah sakit lain, atau hasil analisis hanya akan menemukan nilai normal dalam sampel

• Pada tahun 1961 organisasi kepanduan di Indonesia terpecah menjadi 100 organisasi kepanduan dan terhimpun dalam 3 federasi organisasi yaitu IPINDO (Ikatan Pandu. Indonesia)

,VBMJUBT ,*& CJEBO EJ QFOFMJUJBO JOJ NBZPSJUBT CBJL )BOZB CJEBO ZBOH NFNJMJLJ ,*& LBUFHPSJ LVSBOH 1FOFMJUJBO JOJ NFOVOKVLLBOBEBIVCVOHBOTJHOJGJLBOBOUBSB UJOHLBU QFOEJEJLBO

The implications of this research with the existence of large and medium industry then North Sumatra provincial government should increase the allocation of

pengertian bank adalah badan usaha yang menghimpun dana dari masyarakat.. dalam bentuk simpanan dan menyalurkannya kepada masyarakat dalam

Tabel 3.2 Peletakan Bahan Baku Dan Peralatan Yang Jarang Digunakan Sesuai Dengan Frekuensi Pemakaian. No Frekuensi pemakaian