• Tidak ada hasil yang ditemukan

Strategi Perawatan Mesin Kapal Terhadap Efektivitas Operasional MT. Citra Bintang (Studi Kasus: PT. Citra Bintang Samudra Line, Medan)

N/A
N/A
Protected

Academic year: 2017

Membagikan "Strategi Perawatan Mesin Kapal Terhadap Efektivitas Operasional MT. Citra Bintang (Studi Kasus: PT. Citra Bintang Samudra Line, Medan)"

Copied!
4
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

Ahmed, S., Hassan, M. H., & Taha, Z. (2005). TPM can go beyond maintenance: excerpt from a caseimplementation. Journal of Quality in Maintenance Engineering.

Ahmed, T., Ali, S. M., Allama, M. M., & Parvez, M. S. (2010). A Total

Productive Maintenance(TPM)Approach to Improve Production

Efficiency and Development of Loss Structure in aPharmaceutical Industry. Global Journal of Management and Bussiness Research.

Ahuja, I. P. S., & Khamba, J. S. (2008). Total Productive Maintenance: Literature Review andDirections. International Journal of Quality & Reliability Management.

Al-Turki, U. (2011). A Framework For Strategic Planning in Maintenance.

Journal of Quality in Maintenance Engineering.

Amalia, R. R. (2006). Pengukuran dan Perbaikan Overall Equipment Effectiveness Handling Equipment(Studi Kasus TPK Tanjung Emas

Semarang). S-1 Teknik Industri, Universitas Sebelas MaretSurakarta.

Anvari, F., & Edwards, R. (2011). Performance Measurement Based on a Total Quality Approach.International Journal of Productivity and Performance Management.

Ben-Daya, M., & Duffuaa, S. O. (1995). Maintenance and Quality : the missing link. Journal of Quality in Maintenance Engineering.

Borris, S. (2006). Total Productive Maintenance. United State of America: McGraw-Hill Companies,Inc.

Chodariyanti. (2009). Analisis kecacatan produk merk Aqua sebagai upaya perbaikan kualitas denganmetode DMAIC (Studi kasus pada PT. Tirta

Investama, Klaten). S-1 Teknik Industri,Universitas Muhammadiyah

Surakarta.

Corder, A. S. (1996). Teknik Manajemen Pemeliharaan. Jakarta: Penerbit Erlangga.

Dal, B., Tugwell, P., & Greatbanks, R. (2000). Overall equipment effectiveness as a measure ofoperational improvement - A practical analysis.

International Journal of Operations &Production Management.

Daryus, A. (2007). Manajemen Pemeliharaan Mesin. Jakarta: Universitas Dharma Persada.

(2)

Fotopoulos, C., Kafetzopoulos, D., & Gotzamani, K. (2011). Critical factors for effective implementationof the HACCP system: a Pareto analysis.

British Food Journal.

Gazperzs, V. (2007). Organizational Excellence. Jakarta: PT. Gramedia.

Hansen, R. (2001). Overall equipment effectiveness : a powerfull production /

maintenance tool forincreased profits. New York: Industrial Press Inc.

Ireland, F., & Dale, B. G. (2001). A study of Total Productive

Maintenanceimplementation. Journal ofQuality in Maintenance

Engineering.

Jeong, K.-Y., & Phillips, D. T. (2001). Operational efficiency and effectiveness measurement.International Journal of Operations & Production Management.

Jonsson, P., & Lesshammar, M. (1999). Evaluation and improvement of manufacturing performancesystems - the role of OEE. International Journal of Operations & Production Management.

Kennedy, R. 2005. Introduction to TPM and TPM3(TPM3 : an enhanced and expanded Australasianversion of 3rd Generation TPM focusing on the

entire Supply Chain)[Online].

Lazim, H. M., & Ramayah, T. (2010). Maintenance strategy in Malaysian manufacturing companies: aTotal Productive Maintenance(TPM) approach. Journal Quality in Maintenance Engineering.

Ljungberg, O. (1998). Measurement of Overall Equipment EffectivenessAs a Basis for TPM Activities. International Journal of Operations & Production Management.

Mohideen, P. B. A., Ramachandran, M., & Narasimmalu, R. R. (2011). Construction plant breakdown critically analysis - part 1 : UAE perspective. Benchmarking An International Journal.

Parida, A., & Kumar, U. (2006). Maintenance Performance Measurement (MPM) : issues and challenges. Journal of Quality in Maintenance Engineering.

Sharma, A., Yadava, G. S., & Deskmukh, S. G. (2011). A Literature Review and Future Perspectives on Maintenance Optimization. Journal of Quality in Maintenance Engineering.

Simoes, J. M., Gomes, C. F., & Yasin, M. M. (2011). A literature review of maintenance performancemeasurement : A conceptual framework and directions for future research. Journal of Quality inMaintenance Engineering.

(3)

Siringoringo, H., & Sudiyantoro. (2004). Analisis Pemeliharaan Produktif Total Pada PT. Wahana Eka Paramitra GKD Group. Jurnal Teknologi & Rekayasa,

Sukwadi, R. (2008). Analisis Perbedaan Antara Faktor – Faktor Kinerja Perusahaan Sebelum Dansudah Menerapkan Strategi Total Productive Maintenance(Studi Kasus pada PT. HartonoIstana

Teknologi Divisi Produk Home Appliances). S-2 Magister

Manajemen, Universitas Diponegoro Semarang.

Susetyo, J. (2009). Analisis pengendalian kualitas dan efektivitas dengan integrasi konsep failure mode & effect analysis dan fault tree analysis serta overall equipment effectiveness. Jurnal Teknologi Technoscientia.

Takahashi, K., & Nakamura, N. (2000). Agile control in JIT ordering systems.

International Journal of Agile Management Systems.

Thomas, A. J., Chard, J., John, E., Davis, A., & Francis, M. (2011). Defining a bearing replacement strategy using Monte Carlo methods.

International Journal of Quality & Reliability Management

Tsang, A. H. C. (2002). Strategic Dimensions of Maintenance Management.

Journal of Quality in Maintenance Engineering.

Wahjudi, D., Tjitro, S., & Soeyono, R. (2009). Studi Kasus Peningkatan Overall Equipment Effectiveness (OEE) Melalui Implementasi Total Productive Maintenance(TPM).

Blanchard, S.Benjamin. (1997), “An Enhanced Approach for Implementing Total

Productive Maintenancein the Manufacturing Environment”, Journal

of Quality in Maintenance Engineering, Volume 3.

Nakajima, Seiichi. (1988), “Introduction to Total Productive Maintenance”, 1st Edition, Productivity Press, Inc, Cambridge, Massachusetts.

Nebl and Pruess. (2006), “Theodor and Henning puess, anlagenwirtschaft, oldenbourgverlag”, http://www.emeraldinsight.com/content_images /fig/1060230501011.png, diakses tanggal 30 September 2013.

Stephens, Matthew.P. (2004), Productivity and Reliability Based Maintenance Management,Pearson Education Inc, New Jersey.

Sudradjat, Ating. (2011), Pedoman PraktisManajemen Perawatan Mesin Industri, RetikaAditama, Bandung.

Sudradjat, Ating. (2011), Pedoman PraktisManajemen Perawatan Mesin Industri, RetikaAditama, Bandung.

(4)

Parida, Kumar (2006), Maintenance Performance Measurement system: Application of ICT and e-Maintenance Concepts, Journal of Quality in Maintenance Engineering, Volume 12, Number 3, pp. 239-251.

Referensi

Dokumen terkait

Dalam pengertian klinik, ND adalah komplikasi yang terjadi pada 40% dari seluruh pasien DM tipe 1 dan DM tipe 2 dan merupakan penyebab utama penyakit ginjal

As to which of the procurement options can be used to achieve price competition for projects up to N100 million (Naira), public clients believe it is the lump sum contracts,

Perlakuan feeding rate 3% dan 5% memperlihatkan laju pertumbuhan harian dan pertumbuhan bobot mutlak yang meningkat meskipun pertumbuhannya lebih rendah dari

penulis tertarik untuk melakukan penelitian dengan judul “Implementasi Kebijakan Sistem Pelayanan Informasi dan Perizinan Investasi Secara Elektronik (SPIPISE) di Dinas

Objek dalam penelitian ini adalah keseluruhan proses dan hasil dari implementasi pembelajaran kooperatif tipe TGT (Teams Games Tournament) pada pelajaran matematika

Keywords : manning coefficient, open channel, uniform flow, composite

Penelitian ini bertujuan untuk menyumbangkan gagasan dan ide pemikiran tentang perlunya penenerapan sistem informasi Administrasi di Kantor Kelurahan Peneleh, yang notabene adalah

You could not should spend often times to check out the book Emotional Truth By Ronald De Sousa Merely set aside numerous times in our extra or free times while having dish or in