RENCANA UMUM PENGADAAN
Melalui Swakelola
K/L/D/I
: KEMENTERIAN PERTANIAN
SATUAN KERJA
: BALAI PEMBIBITAN TERNAK UNGGUL KAMBING, DOMBA, DAN ITIK PELAIHARI
TAHUN ANGGARAN
: 2015
No
Kegiatan
Volume
Pagu
Sumber
Dana
Pelaksanaan
Pekerjaan
Keterangan
U
1 Belanja Barang Kandang Jepit di Kaltim (APBN-P) 450 Unit Rp. 225.000.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Belanja Barang Kandang Jepit di Kaltim (9 Kab x 10 Lokasi x 5 Unit)
2 Sewa Kendaraan Operasional Kalsel (APBN-P) 144 OH Rp. 101.088.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Sewa Kendaraan Operasional Kalsel (12 Kab x 4 Kegiatan x 3 Hari)
3 Belanja Barang Kandang Jepit di Kalteng (APBN-P) 700 Unit Rp. 350.000.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Belanja Barang Kandang Jepit di Kalteng (14 Kab x 10 Lokasi x 5 Unit)
4 Belanja Bahan Konsumsi di Kalteng (APBN-P) 140 Paket Rp. 210.000.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Belanja Bahan Konsumsi di Kalteng (14 Kab x 10 Lokasi x 1 Paket)
5 Belanja Bahan Konsumsi di Kaltim (APBN-P) 90 Paket Rp. 135.000.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Belanja Bahan Konsumsi di Kaltim (9 Kab x 10 Lokasi x 1 Paket)
6 Land Clearing (APBN-P) 1 Paket Rp. 50.000.000,00 APBNP awal:
akhir:
01/08/2015 31/10/2015
Land Clearing Lokasi Pengembangan Kandang Closed House Itik
7 Belanja Bahan Konsumsi di Kalsel (APBN-P) 120 Paket Rp. 180.000.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Belanja Bahan Konsumsi di Kalsel (12 Kab x 10 Lokasi x 1 Paket)
8 Sewa Kendaraan Operasional Kalteng (APBN-P) 168 OH Rp. 137.760.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Sewa Kendaraan Operasional Kalteng (14 Kab x 4 Kegiatan x 3 Hari)
9 Sewa Kendaraan Operasional Kaltim (APBN-P) 108 OH Rp. 87.372.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Sewa Kendaraan Operasional Kaltim (9 Kab x 4 Kegiatan x 3 Hari)
10 Belanja Barang Kandang Jepit di Kalsel (APBN-P) 600 Unit Rp. 300.000.000,00 APBNP awal: akhir:
01/08/2015 31/10/2015
Belanja Barang Kandang Jepit di Kalsel (12 Kab x 10 Lokasi x 5 Unit)