• Tidak ada hasil yang ditemukan

1. Underground Infrastructure Mapping in Chicago

N/A
N/A
Protected

Academic year: 2017

Membagikan "1. Underground Infrastructure Mapping in Chicago"

Copied!
11
0
0

Teks penuh

(1)

Chicago Underground Project

Objectives and Approach

(2)

About UI Labs - City Digital

I N N O V A T I O N A T T H E P H Y S I C A L - D I G I T A L C O N V E R G E N C E I N S M A R T C I T I E S

City Digital is a

collaborative partnership

among leading

corporations, research institutions, and the public sector

that:

Establishes and

prioritizes critical areas

of need

Develops

innovative

solutions

Deploys

solutions leveraging Chicago

as a pilot

test-bed

Facilitates

scale-up and global implementation

(3)

Underground Infrastructure Mapping

A R E A L P R O B L E M W I T H A R E A L M A R K E T

$1.6

Billion

Annual Cost from Accidents

(4)

The Challenge

The problem is due to:

Existing records are typically 15-30% off mark

Existing records are incomplete (in Chicago, 90%

do ’t have depth di e sio )

Maps are not updated after relocation of assets

Underground assets are not mapped and

(5)

Return on Investment

O f A c c u r a t e l y M a p p i n g t h e U n d e r g r o u n d I n f r a s t r u c t u r e

The rate of return for underground mapping projects ranges from 3.4X to 21X

21X

PennDOT 2007

16X

Milan Expo 2015

4.6X

U.S. DOT 1999

4.3X

Toronto 2010

3.4X

(6)

Chicago Pilot Overview

Solution Partners:

Objective:

The Pilot project will deliver a self-building, self-maintaining, engineering grade,

common, secure data platform of 2D/3D utility data scalable to support a city the size

of Chicago.

(7)

Chicago Pilot Overview

Digital

GIS Data Platform

Standardized GIS data

Cloud-based

Secure

2D/3D GIS

User Interface

view the infrastructure in the

geographic area in 3D format

(8)
(9)

Process & Governance

Documents City Existing

(10)

Value Proposition

Value Tree

Current issue of…

causes…

resulting in the following pain points…

•High amount of time spent on information retrieval •Project approval delays

•Design costs (due to delays)

•Design costs (due to additional survey/ testing/ platting services)

•Liability concerns for approving projects

•High effort of coordination among parties working on the same data set

•Higher construction bids

•Construction cost (due to delays)

•Construction costs (due to non-labor related services) •Adverse economic impact

• Increase in change orders

•Increased time required for conflict resolution based on disparate plan formats

•Risk to public and worker safety

•Higher insurance costs

•Higher raw material costs

Accidental damage to underground and above ground infrastructure Inability for multiple stakeholders to

efficiently coordinate to make decisions

Inaccurate and incomplete

existing underground asset

(11)

Referensi

Dokumen terkait

[r]

Studi Deskriptif Pembelajaran Seni Tari Melalui Model Inquiry DalamN Implementasi Kurikulum 2013 Pada Siswa Kelas VII SMP Negeri 3

B.. Mengajar adalah mengembangkan potensi kognitif siswa melalui proses belajar bermakna. Mereka yang berada pada tingkat pendidikan dasar, akan lebih bermanfaat jika

Penelitian ini bertujuan untuk menganalisis apakah penghitungan Pajak Penghasilan Pasal 21 terutang atas gaji yang diterima oleh pegawai tetap golongan IV di SMK Negeri

Pemanfaatan limbah pertanian sebagai pakan ternak merupakan salah satu.. cara pemecahan masalah biaya tinggi pada

Pada poyek akhir ini dibuat suatu alat pemanggil perawat tanpa kabel yang terdiri dari bagian transmitter pada pasien, bagian receiver pada perawat dan bagian repeater yang di

he objective of this study was to isolate and identify nontuberculous mycobacteria species from cattle of local herds in the south region of the State of Mexico through

dried egg dari telur umur 1 hari, T 2 adalah freeze dried egg dari telur umur 7 hari, dan T 3 adalah freeze dried egg dari telur umur 14 hari.Parameter yang diamati