PONDASI KONSTRUKSI SARANG LABA - LABA

KSLL

GEDUNG SENTRA PEMUDA Jl. PEMUDA KAV.. 61 No. 38

RAWAMANGUN – JAKARTA TIMUR 13220 Telp. (021) 4703550, 47864046 fax (021) 47862149 Email : katama_ksll@yahoo.co.id

METODE KERJA

(2)

FOTO JOINT SURVEY

(3)

FOTO GALIAN TANAH RIB KONSTRUKSI

(4)

FOTO PEMADATAN TANAH DI BAWAH RIB KONSTRUKSI

(5)

GALIAN TANAH RIB SETTLEMENT

14 CM

275 CM

40 CM

40 CM

15 CM

150 CM

120 CM

80 CM

15 CM

14 CM

150 CM

120 CM

275 CM

(6)

GALIAN TANAH RIB SETTLEMENT

(7)

FOTO GALIAN TANAH RIB KONSTRUKSI

(8)

DIAGRAM ALIR PEKERJAAN RIB ( FLOW CHART )

START

PERSIAPAN PEMBESIAN - SURVEY

- SHOP DRAWING PERSIAPAN

PANEL BEKISTING

BONGKAR BEKISTING PASANG

TULANGAN

DIPERBAIKI ENGINEERCEK

FABRIKASI

DIPERBAIKI DIPERBAIKI INSPEKSI

1

PASANG BEKISTING

INSPEKSI 2

A YA

YA YA

TIDAK

TIDAK TIDAK

PENGECORAN PEMBERSIHAN

DIPERBAIKI

PERAWATAN A

FINISH INSPEKSI

3

TIDAK

YA

(9)

PERSPEKTIF LT. KERJA RIB & BETON DECKING

h-t

POTONGAN A-A

pengunci dari blk usuk 5/7 dipasang tiap 60-75 cm pen Ø 10 mm

pen Ø 10 mm

pen Ø 10 mm acuan rib

multiplek 9 mm rib KSLL

balok penahan

lt. kerja rib t = 3 cm beton dekking ( 10 x 7 x b )

50 - 60

10

10

PERSPEKTIP LT. KERJA RIB DAN BETON DEKK

b

34

b

(10)

FOTO BETON DECKING

(11)

FOTO LANTAI KERJA RIB

(12)

BESTAT TULANGAN BEUGEL

TULANGAN BEUGEL RIB TENGAH 2

TULANGAN BEUGEL RIB TEPI

1

TULANGAN BEUGEL RIB BEDA PEIL RENDAH 3

(13)

FABRIKASI RIB KSLL

(14)

DENAH ACUAN KSLL

GB. DENAH ACUAN KSLL

DG SISTEM PEMASANGAN ACUAN TANPA PAKU pelebaran kolom

KOLOM

acuan ujung acuan standar

rib KSLL acuan pengunci atasacuan pengunci

acuan ujung

multiplek 9 mm

blk penahan patok penahan baji pen Ø 10 mm

A

A

(15)

SISTEM PEMASANGAN & PEMBONGKARAN ACUAN

acuan ujung acuan standar acuan pengunci

acuan ujung

catatan : a : 244 cm a1 : 249 cm

b : disesuaikan dg kebutuhan c : 30 cm

d : > 20 cm

* urutan pemasangan : 1. acuan ujung 2. acuan pengunci 3. acuan standar keterangan :

* urutan pembongkaran : 1. acuan standar 2. acuan pengunci 3. acuan ujung

GAMBAR

- SISTEM PEMASANGAN DAN PEMBONGKARAN ACUAN.

- HUBUNGAN MULTIPLEK DAN RANGKA ACUAN.

d

C a b c

c

(16)

FABRIKASI BEGESTING

(17)

TEST STRENGTH BESI

(18)

JOB MIX FORMULA MUTU BETON K300

(19)

TEST LABORAT SF TANAH URUG & PASIR URUG

(20)

CONTOH PERCOBAAN SLUMP TEST

(21)

CONTOH PEMBUATAN KUBUS BETON

(22)

DETAIL RIB TEPI

12

12

130

(23)

DETAIL RIB TENGAH

2 DETAIL RIB K1 15/150 TENGAH 80 CM

150

15

14

(24)

DETAIL RIB BEDA PEIL

14

150

40 CM

15

14X 40 CM

(25)

DETAIL PIT LIFT

40 CM

150150

40 CM

150150 20

(26)

PENGECORAN RIB SETTLEMENT SAMPAI DASAR RIB KONSTRUKSI

LANTAI KERJA BO BETON DECKING PENULANGAN

BEKISTING

TIMBUNAN TANAH DIPADATKAN

PER LAPIS S/D DASAR RIB KONSTRUKSI

RIB SETTLEMENT LANTAI KERJA BO

BETON DECKING RIB KONSTRUKSI

RIB SETTLEMENT

(27)

FOTO PEKERJAAN BEGESTING & PEMBESIAN RIB SETTLEMENT

(28)

FOTO PENGECORAN RIB SETTLEMENT

(29)

LANTAI KERJA RIB KONSTRUKSI

(30)

PEKERJAAN PEMBESIAN & BEGESTING RIB KONSTRUKSI

(31)

FOTO PEKERJAAN BEGESTING & BESI STEK KOLOM

(32)

FOTO PENGECORAN RIB KONSTRUKSI

(33)

BETON PERTEBALAN KOLOM

(34)

BETON RIB

(35)

URUGAN TANAH & PASIR DI PADATKAN

RIB KONSTRUKSI

TIMBUNAN TANAH DIPADATKAN PER LAPIS

TIMBUNAN PASIR DIPADATKAN PER LAPIS

RIB SETTLEMENT

(36)

GAMBAR PRINSIP PENGURUGAN TANAH, PASIR DAN LANTAI KERJA

RIB SETTLEMENT

RIB KONSTRUKSI RIB SETTLEMENT

LANTAI KERJA PLAT KSLL TULANGAN PLAT LANTAI KSLL PLAT LANTAI KSLL

(37)

URUGAN TANAH & PASIR

(38)

PEMADATAN TANAH & PASIR

(39)

TEST KEPADATAN

(40)

ISOMETRIK PONDASI KSLL

(41)

DETAIL PENULANGAN DAERAH KOLOM TENGAH

2 DAN RIB PADA DERAH PERTEMUAN RIB S DAN RIB K DI KOLOM TENGAH











1

PRINSIP PENULANGAN KOLOM DENGAN BEDA RIB

PRINSIP PENULANGAN KOLOM DAN RIB PADA DAEAH KOLOM

(42)

PEMBESIAN PLAT KSLL DAERAH KOLOM TENGAH

(43)

DETAIL PENULANGAN PLAT PADA DAERAH KOLOM BEDA PEIL













 





DETAIL PENULANGAN PLAT 1 PADA DAERAH KOLOM BEDA PEIL

RIB KONSTRUKSI 15/150

(44)

PEMBESIAN PLAT PADA KOLOM TENGAH BEDA PEIL

(45)

DETAIL PENULANGAN PLAT PADA DAERAH KOLOM SUDUT





DETAIL PENULANGAN PLAT 1

PADA DAERAH KOLOM SUDUT RIB KONSTRUKSI 15/150

(46)

PEMBESIAN PLAT DAERAH KOLOM SUDUT

(47)

DETAIL PENULANGAN PLAT PADA DAERAH KOLOM TEPI









DETAIL PENULANGAN PLAT 2 PADA DAERAH KOLOM TEPI

RIB KONSTRUKSI 15/150

(48)

FOTO PENULANGAN PADA DAERAH KOLOM TEPI

(49)

DETAIL PENULANGAN PLAT PADA DAERAH PERTEMUAN RIB









DETAIL PENULANGAN PLAT 1 PADA DAERAH PERTEMUAN RIB

RIB KONSTRUKSI 15/150

(50)

FOTO PENULANGAN PLAT PADA DAERAH PERTEMUAN RIB

(51)

DETAIL PENULANGAN TANGGA





 





 

DETAIL PENULANGAN STEK TANGGA 1

POTONGAN A - A

SKALA 1 : 20

1

(52)

PEMBESIAN STEK TANGGA

(53)

PEMBESIAN & BEGESTING PLAT BEDA PEIL

(54)

PEMBESIAN PLAT KSLL

(55)

DIAGRAM ALIR PEKERJAAN STEK KOLOM ( FLOW CHART )

START

PERSIAPAN PEMBESIAN - SURVEY

- SHOP DRAWING PERSIAPAN

PANEL BEKISTING

PASANG TULANGAN

DIPERBAIKI CEK

ENGINEER

FABRIKASI

DIPERBAIKI DIPERBAIKI INSPEKSI

1

PASANG BEKISTING

INSPEKSI 2

YA YA YA

TIDAK

TIDAK TIDAK

PEMBERSIHAN

INSPEKSI

3 DIPERBAIKI

TIDAK

YA FINISH

(56)

PRINSIP PENULANGAN KOLOM DAN RIB PADA DAERAH KOLOM DENGAN BEDA PEIL

BILA TERJADI BEDA PEIL LANTAI PERTEMUAN RIB KONSTRUKSI

1

PRINSIP PENULANGAN KOLOM DAN VOUTE PADA











(57)

PRINSIP PENULANGAN KOLOM DAN RIB PADA DAERAH PERTEMUAN RIB S DAN RIB K DI KOLOM TENGAH

2 DAN RIB PADA DERAH PERTEMUAN RIB S DAN RIB K DI KOLOM TENGAH PRINSIP PENULANGAN KOLOM

(58)

PRINSIP PENULANGAN KOLOM DAN VOUTE PADA PERTEMUAN RIB K BILA TERJADI BEDA PEIL LANTAI

BILA TERJADI BEDA PEIL LANTAI PERTEMUAN RIB KONSTRUKSI

1

PRINSIP PENULANGAN KOLOM DAN VOUTE PADA











(59)

PRINSIP PENULANGAN KOLOM DAN VOUTE PADA PERTEMUAN RIB KONSTRUKSI & RIB SETTLEMENT

PERTEMUAN RIB SETTELEMENT & KONSTRUKSI PRINSIP PENULANGAN KOLOM DAN VOUTE PADA

1







CATATAN : POSISI TUL RIB DIDALAM TULANGAN KOLOM

(60)

PENGECORAN PLAT KSLL

(61)

BETON PLAT KSLL

(62)

BETON PLAT KSLL

(63)

TEST LABORAT KUBUS BETON

Referensi

Dokumen terkait

Ya Bapa, Pencipta dan Raja semesta. Kami bersyukur karena Engkau layakkan kami hadir dalam perjamuan kudus ini untuk mengingat-rayakan kematian dan kebangkitan Kristus demi

c) Sebarang permohonan untuk kursus/program/jabatan baru bagi tahun 2010 dan 2011 ianya mestilah mendapat kelulusan dari Senat Universiti atau LPU atau Kementerian

Rata-Rata Kekerasan Permukaan Semen Ionomer Kaca Modifikasi Resin Pada Kelompok Kontrol, 3 Hari dan 7 Hari Aplikasi Karbamid Peroksida 16%.. Personalia

penulis menganalisa jenis dan fungsi Scaffolding Talk yang ditemukan dalam naskah film The Great Debaters arahan sutradara Denzel Washington. Ini merupakan

Ruddell mengklasifikasikan tujuh subketerampilan utama dari keterampilan komprehensi yang dapat digolongkan dalam tingkat komprehensi faktual, interpretif, dan

Oleh karena itu, dapat disimpulkan bahwa diantara kondisi perlakuan yang dilakukan pada penelitian ini, kondisi optimum adsorpsi ion logam tembaga oleh zeolit

The major research question of this study says “Is there a significant difference between the listening achievement of second grade Junior High School students taught by

Friedlander dalam Fahrudin (2012) mendefinisikan kesejahteraan sosial sebagai sistem yang terorganisasi dari pelayanan-pelayanan sosial dan institusi-institusi yang dirancang