PERENCANAAN :
PERENCANAAN :
GREEN SITE KAMPUS
GREEN SITE KAMPUS
KEMENTERIAN PEKERJAAN UMUM ,
KEMENTERIAN PEKERJAAN UMUM ,
D
D
AN
AN
GEDUNG UTAMA
GEDUNG UTAMA
KEMENTERIAN PEKERJAAN UMUM
KEMENTERIAN PEKERJAAN UMUM
PEMILIK DAN PEMBERI TUGAS PEMILIK DAN PEMBERI TUGAS
PERENCANA PERENCANA
MANAJEMEN KONSTRUKSI MANAJEMEN KONSTRUKSI KONSIL
KONSIL GREEN GREEN BUILDINGBUILDING
PELAKSANA / KONTRAKTOR PELAKSANA / KONTRAKTOR
PEMBANGUNAN GEDUNG UTAMA
PEMBANGUNAN GEDUNG UTAMA
KEMENTERIAN PEKERJAAN UMUM
KEMENTERIAN PEKERJAAN UMUM
SEBAGAI :
SEBAGAI :
LANDMARK
LANDMARK
KEBANGGAAN
KEBANGGAAN NASIONAL
NASIONAL ,,
D
D
AN
AN
BENCHMARK
BENCHMARK
BANGUNAN
BANGUNAN GEDUNG
GEDUNG NEGARA
NEGARA
REPUBLIK INDONESIA
REPUBLIK INDONESIA
BERBASIS KONSEP BERBASIS KONSEP
GREEN SITE & GREEN BUILDING
GREEN SITE & GREEN BUILDING
SEHINGGA MENJADI
SEHINGGA MENJADI LOW ENERGY CONSUMPTION BUILDINGLOW ENERGY CONSUMPTION BUILDING
SERT
SERTA BERPERAN A BERPERAN MENGURANGIMENGURANGI DAMPAK
Green Site Design
Green Site Design
Kampus Kementerian Pekerjaan Umum
LEGENDA : A. GED UTAMA (4 LT.) B. 1. CIPTA KARYA & GED. MENTERI (8 LT.) 2.GED.BALIBANG & BPKSDM (8 LT.) 3.GEDUNG BINA MARGA (8 LT.) C. GED. KEPEGAWAIAN (4 LT.) D. GED. TATA RUANG (3 LT.) E. GED. SDA (2 LT.) F. GED. SDA (2 LT.) G. GED. SDA & FASUM (2 LT.) H. GED. TATA RUANG (2 LT.) I. GED. BIRO KEUANGAN (2 LT.) J. GED. PUSDATA (1 & 2 LT.) K. KANTIN (1 LT.) L. POLIKLINIK (2 LT.) M. MASJID (2 LT.) N. GARDU PLN O. POWER HOUSE P. GED. SDA &TARU (8LT)
A B1 B2 B3 C D E F G H I J K L M N O P Luas Total : 5,3846 Ha
Luas Ruang Terbangun : 19.827,70 M² (36,82 %) Luas Ruang Terbuka (dengan perkerasan) : 22.210,27 M² (41,25 %) Luas Ruang Hijau : 11.808,02 M² (21,93 %)
FILOSOFI
‘GREEN ENVIRONMENT’
ZERO RUN OFF:Meminimalkan buangan air hujan
ke luar kawasan Pembuatan detention pond/ swale Pembuatan resapan setempat Optimalisasi jaringan saluran drainase keliling THERMAL CONTROL : Membentuk mikro klimat Dari tatanan pola & pemilihan vegetasi
Membentuk sirkulasi udara ruang luar yang mengalir
Pengelolaan O2 & CO2 dengan
penanaman
tanaman bertajuk padat & lebar
ECO FRIENDLY: Pemilihan material secara tepat Meminimalkan material alami Memilih produk finishing yg. poreus
Menyediakan & melengkapi sarana bagi pejalan kaki (termasuk penyandang cacat) RECYCLE REDUSE REUSE : Penerapan sistem pengelolaan sampah tanaman Penerapan pengelolaan air tanah dengan baik
Mengurangi penggunaan air siram dgn. meminimalkan tanaman perdu Efisiensi penggunaan daya listrik utk. Pencahayaan ruang luar dg. Pemilihan jenis lampu & sensor
Kawasan Campus
Green Campus Development
Green Site Concept Applications
“Green Site / Garden City” Concept:
• High density development • More greenery (RTH)
• Restrict movement of motorized vehicle • Interconnected walkways
• Zero Runoff
• Integrated Waste Management • Integrated MEP system.
Green Campus development plan
More greenery, walkways
PUSAT DATA & PUSKOMPU GED. Utama GED. TATA RUANG GED. SDA GED. PARKIR MASJID GED. CIPTA KARYA BINA MARGA BPKSDM BALITBANG & GED. PARKIR SERBAGUNA GED. Herigage 2 1 3 5 6 7 8 4
“Green Site / Garden City” concept:
• High density development • More greenery (RTH)
• Restrict movement of motorized vehicle • Interconnected walkways
• Zero Runoff
• Integrated Waste Management • Integrated MEP system.
Luas Total : 5,3846 Ha
Luas Ruang Terbangun : 19.827,70 M² (36,82 %) Luas Ruang Terbuka
(dengan perkerasan) : 22.210,27 M² (41,25 %) SEBELUM (MASTERPLAN AWAL)
Luas Total : 5,3846 Ha
Luas Ruang Terbangun : 18.243,64 M² (33,88 %) Luas Ruang Terbuka
(dengan perkerasan) : 17.541,20 M² (32,58 %) SESUDAH (PENYESUAIAN – 2009)
Green Campus development plan
More trees, better microclimate
100 Pohon menyerap CO2 8 ton / tahun (Simpson and Mc Pherson)
Perpohon dapat menyerap 75% Partikel debu
½ ha RTH, dapat menahan aliran permukaan akibat hujan dan meresapkan air ke dalam tanah 10,219 m3/tahun (Urban forest 2002)
Menyerap 80 % dari radiasi matahari evaporasi dan transpirasi
“Green Site / Garden City” concept:
• High density development • More greenery (RTH)
• Restrict movement of motorized vehicle • Interconnected walkways
• Zero Runoff
• Integrated Waste Management • Integrated MEP system.
Iklim Micro
THERMAL CONTROL :
Pola Tata Vegetasi membentuk mikro klimat , mereduksi radiasi matahari & memberi kontribusi
suplai O2.
100 Pohon menyerap CO2 8 ton / tahun (Simpson and Mc Pherson)
Perpohon dapat menyerap 75% Partikel debu
½ ha RTH, dapat menahan aliran permukaan akibat hujan dan meresapkan air ke dalam tanah 10,219 m3/tahun (Urban forest 2002)
Legenda
:
Jalur pedestrian dengan canopy Jalur pedestrian terbuka
Jalur Kendaraan & Ged Parkir
P
P
More greenery, walkways
•
Restrict movement of motorized vehicle
•
Interconnected walkways
“Green Site/Garden City” concept:
• High density development • More greenery (RTH)
• Restrict movement of motorized vehicle • Interconnected walkways
• Zero Runoff
• Integrated Waste Management • Integrated MEP system.
Green Campus development plan
More greenery, walkways
PUSAT DATA & PUSKOMPU GED. MENTRI GED. TATA RUANG GED. SDA GED. PARKIR MASJID GED. CIPTA KARYA BINA MARGA BPKSDM BALITBANG & GED. PARKIR SERBAGUNA GED. UTAMA 2 1 3 5 6 7 8 4
Drainage air hujan kawasan menggunakan ring sistem, dialirkan ke area / taman resapan dan sumur resapan
= POND / AREA RESAPAN AIR HUJAN = SUMUR RESAPAN
Green Campus development plan
Zero Runoff
“Green Site/Garden City” concept:
• High density development • More greenery (RTH)
• Restrict movement of motorized vehicle • Interconnected walkways
• Zero Runoff
• Integrated Waste Management • Integrated MEP system.
Sampah basah, sampah organik seperti ; daun, sisa sayur, sisa makanan, daging, tulang –tulang ikan/ayam, kulit buah-buahan,
direncanakan di olah dengan menggunakan komposter
Integrated waste management
recycle
“Green Site/ Garden City” concept:
• High density development • More greenery (RTH)
• Restrict movement of motorized vehicle • Interconnected walkways
• Zero Runoff
• Integrated Waste Management • Integrated MEP system.
Sampah kering, sampah anorganik, tidak dapat di daur ulang secara alami dan cepat oleh tanah seperti ;
1. Botol kaca, gelas, piring. 2. Kain, plastik, styrofoam. 3. Kaleng. 4. B3 (Bahan Beracun Berbahaya)
Integrated MEP system
more effective & efficient
Local Security Control
Master Security Control
Local Security Control
Local Security Control
Local Security Control Local Security Control
Local Security Control Local Security Control
Local Security Control
“Green Site/ Garden City” concept:
• High density development • More greenery (RTH)
• Restrict movement of motorized vehicle • Interconnected walkways
• Zero Runoff
• Integrated Waste Management • Integrated MEP system.
Power grid
Water waste/grey water Fire fighting system Clean water
Security system
Identifikasi Infrastruktur Bawah Tanah & Disain
Lansekap Kampus Kementerian Pekerjaan Umum
LED
AVAILABLE SPACE
PARKING
Identifikasi Infrastruktur Bawah Tanah & Disain
Lansekap Kampus Kementerian Pekerjaan Umum
Rencana
Sundial
Identifikasi Infrastruktur Bawah Tanah & Disain
Lansekap Kampus Kementerian Pekerjaan Umum
SUNDIAL
JAM - MATAHARI
Identifikasi Infrastruktur Bawah Tanah & Disain
Lansekap Kampus Kementerian Pekerjaan Umum
Rencana
Parkir Sepeda
Identifikasi Infrastruktur Bawah Tanah & Disain
Lansekap Kampus Kementerian Pekerjaan Umum
Rencana
Bangku Taman
Tempat Sampah
Identifikasi Infrastruktur Bawah Tanah & Disain
Lansekap Kampus Kementerian Pekerjaan Umum
Rencana
Rencana
Drinking Water Facilities
Fasilitas Penyediaan Air Minum pada :
Interior :
bisa sbg elemen pendukung desain InteriorGREEN BUILDING
DESIGN
GEDUNG UTAMA
Original block plan:
Larger area of the building is oriented to
east and west
Horizontal roof Vertical South Vertical East & West Vertical North
Original building form
Modified building form
Modified Building form:
1. Reduced surface exposure of the working spaces to east and west sun
2. Narrow building form
improve daylight performance
Building form & orientation
orienting windows to north and south
Return air
thermal insulation
Sinar matahari
Sinar matahari
14000.00
Daylight sensor
PEMBANGUNAN GEDUNG MENTERI
KEMENTERIAN PEKERJAAN UMUM
PEMANFAATAN SINAR MATAHARI
Dengan dikombinasikan daylight sensors untuk area kerja dan motion sensors untuk
0 10 20 30 40 50 60 70 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 Pre-Design Design01 Design02 Design03 Design04
Solar Gain Exterior Windows (kW)
0 (Pre-Design) Clear Glass no Insulation
1 Clear Glass no Insulation
2 Stopsol Darkblue no Insulation 3 Stopsol Darkblue + Insulation
Total Cooling (kW)
-180 -160 -140 -120 -100 -80 -60 -40 -20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47Pre-Design
Design01
Design02
Design03
Design04
0 (Pre-Design) Clear Glass no Insulation
1 Clear Glass no Insulation
2 Stopsol Darkblue no Insulation 3 Stopsol Darkblue + Insulation
TIME SCHEDULE , DAY LIGHT (LUX SENSOR) &
MOTION SENSOR
LAYOUT ZONE AC
PEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUM
sink
Clean water tank
shower
wudhu
Grey water tank
toilet Grey water Roof tank garden Bio tank
To the ground
Rain Makeup cooling tower Pemakaian / Kebutuhan air bersih (A) :180 m3/hari
Recycling air kotor dan buangan (B)
dari STP (120 m3/hari) : 80 m3/hari
Air condensate dari AC : 5 m3/hari
Air hujan : 40 m3/hari
Air wudhu : 25 m3/hari
Total : 150 m3/hari
Penggunaan kembali air buangan
Flushing WC, urinoir : 45 m3/hari
Siram taman/landscape : 15 m3/hari
Total : 60 m3/hari
Sisa air buangan masuk ke resapan
Air Bersih yang dihemat B : A = 83% (termasuk air hujan).
Air Bersih yang dihemat = 61% (tanpa air hujan
)Material & resources : use environmentally friendly materials
•
Local products
•
Sustainable
•
Low energy
•
Recyclable / eco friendly
•
Non toxic
Most building materials meet
ISO 14001 standards and
requirements
LIFT DIFABEL
TOILET DIFABEL
GENDER
JALUR DIFABLE
LIFT SERVICE
PEMBANGUNAN GEDUNG MENTERI
PEMBANGUNAN GEDUNG MENTERI
KEMENTERIAN PEKERJAAN UMUM
P O T O N G A N
Jalur pejalan kaki dan difabel Jalur pencapaian dr gedung Parkir