• Tidak ada hasil yang ditemukan

Green Building - Kementerian PU

N/A
N/A
Protected

Academic year: 2021

Membagikan "Green Building - Kementerian PU"

Copied!
46
0
0

Teks penuh

(1)

PERENCANAAN :

PERENCANAAN :

GREEN SITE KAMPUS

GREEN SITE KAMPUS

KEMENTERIAN PEKERJAAN UMUM ,

KEMENTERIAN PEKERJAAN UMUM ,

D

D

AN

AN

GEDUNG UTAMA

GEDUNG UTAMA

KEMENTERIAN PEKERJAAN UMUM

KEMENTERIAN PEKERJAAN UMUM

(2)
(3)

PEMILIK DAN PEMBERI TUGAS PEMILIK DAN PEMBERI TUGAS

PERENCANA PERENCANA

MANAJEMEN KONSTRUKSI MANAJEMEN KONSTRUKSI KONSIL

KONSIL GREEN GREEN BUILDINGBUILDING

PELAKSANA / KONTRAKTOR PELAKSANA / KONTRAKTOR

PEMBANGUNAN GEDUNG UTAMA

PEMBANGUNAN GEDUNG UTAMA

KEMENTERIAN PEKERJAAN UMUM

KEMENTERIAN PEKERJAAN UMUM

(4)

SEBAGAI :

SEBAGAI :

LANDMARK

LANDMARK

KEBANGGAAN

KEBANGGAAN NASIONAL

NASIONAL ,,

D

D

AN

AN

BENCHMARK

BENCHMARK

BANGUNAN

BANGUNAN GEDUNG

GEDUNG NEGARA

NEGARA

REPUBLIK INDONESIA

REPUBLIK INDONESIA

BERBASIS KONSEP BERBASIS KONSEP

GREEN SITE & GREEN BUILDING

GREEN SITE & GREEN BUILDING

SEHINGGA MENJADI

SEHINGGA MENJADI LOW ENERGY CONSUMPTION BUILDINGLOW ENERGY CONSUMPTION BUILDING

SERT

SERTA BERPERAN A BERPERAN MENGURANGIMENGURANGI DAMPAK

(5)

Green Site Design

Green Site Design

Kampus Kementerian Pekerjaan Umum

(6)

LEGENDA :  A. GED UTAMA (4 LT.) B. 1. CIPTA KARYA & GED. MENTERI (8 LT.) 2.GED.BALIBANG & BPKSDM (8 LT.) 3.GEDUNG BINA MARGA (8 LT.) C. GED. KEPEGAWAIAN (4 LT.) D. GED. TATA RUANG (3 LT.) E. GED. SDA (2 LT.) F. GED. SDA (2 LT.) G. GED. SDA & FASUM (2 LT.) H. GED. TATA RUANG (2 LT.) I. GED. BIRO KEUANGAN (2 LT.) J. GED. PUSDATA (1 & 2 LT.) K. KANTIN (1 LT.) L. POLIKLINIK (2 LT.) M. MASJID (2 LT.) N. GARDU PLN O. POWER HOUSE P. GED. SDA &TARU (8LT)

A B1 B2 B3 C D E F G H I J K L M N O P Luas Total : 5,3846 Ha

Luas Ruang Terbangun : 19.827,70 M² (36,82 %) Luas Ruang Terbuka (dengan perkerasan) : 22.210,27 M² (41,25 %) Luas Ruang Hijau : 11.808,02 M² (21,93 %)

(7)

FILOSOFI

‘GREEN ENVIRONMENT’

ZERO RUN OFF:

Meminimalkan buangan air hujan

ke luar kawasan Pembuatan detention pond/ swale  Pembuatan resapan setempat  Optimalisasi  jaringan saluran drainase keliling THERMAL CONTROL : Membentuk mikro klimat  Dari tatanan pola & pemilihan vegetasi

 Membentuk sirkulasi udara ruang luar yang mengalir

 Pengelolaan O2 & CO2 dengan

penanaman

tanaman bertajuk padat & lebar

ECO FRIENDLY: Pemilihan material secara tepat  Meminimalkan material alami   Memilih produk finishing yg. poreus

  Menyediakan & melengkapi sarana bagi pejalan kaki (termasuk penyandang cacat) RECYCLE REDUSE REUSE :  Penerapan sistem pengelolaan sampah tanaman  Penerapan pengelolaan air tanah dengan baik

 Mengurangi penggunaan air siram dgn. meminimalkan tanaman perdu  Efisiensi penggunaan daya listrik utk. Pencahayaan ruang luar dg. Pemilihan  jenis lampu & sensor

(8)

Kawasan Campus

Green Campus Development

Green Site Concept Applications

“Green Site / Garden City” Concept:

• High density development • More greenery (RTH)

• Restrict movement of motorized vehicle • Interconnected walkways

• Zero Runoff

• Integrated Waste Management • Integrated MEP system.

(9)

Green Campus development plan

 

 More greenery, walkways

PUSAT DATA & PUSKOMPU GED. Utama GED. TATA RUANG GED. SDA GED. PARKIR MASJID GED. CIPTA KARYA BINA MARGA BPKSDM BALITBANG & GED. PARKIR SERBAGUNA GED. Herigage 2 1 3 5 6 7 8 4

“Green Site / Garden City” concept:

• High density development • More greenery (RTH)

• Restrict movement of motorized vehicle • Interconnected walkways

• Zero Runoff

• Integrated Waste Management • Integrated MEP system.

Luas Total : 5,3846 Ha

Luas Ruang Terbangun : 19.827,70 M² (36,82 %) Luas Ruang Terbuka

(dengan perkerasan) : 22.210,27 M² (41,25 %) SEBELUM (MASTERPLAN AWAL)

Luas Total : 5,3846 Ha

Luas Ruang Terbangun : 18.243,64 M² (33,88 %) Luas Ruang Terbuka

(dengan perkerasan) : 17.541,20 M² (32,58 %) SESUDAH (PENYESUAIAN – 2009)

(10)

Green Campus development plan

 

 More trees, better microclimate

 100 Pohon menyerap CO2 8 ton / tahun (Simpson and Mc Pherson)

 Perpohon dapat menyerap 75% Partikel debu

 ½ ha RTH, dapat menahan aliran permukaan akibat hujan dan meresapkan air ke dalam tanah 10,219 m3/tahun (Urban forest 2002)

 Menyerap 80 % dari radiasi matahari evaporasi dan transpirasi

“Green Site / Garden City” concept:

• High density development • More greenery (RTH)

• Restrict movement of motorized vehicle • Interconnected walkways

• Zero Runoff

• Integrated Waste Management • Integrated MEP system.

(11)

Iklim Micro

THERMAL CONTROL :

 Pola Tata Vegetasi membentuk mikro klimat , mereduksi radiasi matahari & memberi kontribusi

suplai O2.

 100 Pohon menyerap CO2 8 ton / tahun (Simpson and Mc Pherson)

 Perpohon dapat menyerap 75% Partikel debu

 ½ ha RTH, dapat menahan aliran permukaan akibat hujan dan meresapkan air ke dalam tanah 10,219 m3/tahun (Urban forest 2002)

(12)

Legenda

:

Jalur pedestrian dengan canopy Jalur pedestrian terbuka

Jalur Kendaraan & Ged Parkir

P

P

 

 More greenery, walkways

Restrict movement of motorized vehicle

Interconnected walkways

“Green Site/Garden City” concept:

• High density development • More greenery (RTH)

• Restrict movement of motorized vehicle • Interconnected walkways

• Zero Runoff

• Integrated Waste Management • Integrated MEP system.

(13)

Green Campus development plan

 

 More greenery, walkways

(14)

PUSAT DATA & PUSKOMPU GED. MENTRI GED. TATA RUANG GED. SDA GED. PARKIR MASJID GED. CIPTA KARYA BINA MARGA BPKSDM BALITBANG & GED. PARKIR SERBAGUNA GED. UTAMA 2 1 3 5 6 7 8 4

Drainage air hujan kawasan menggunakan ring sistem, dialirkan ke area / taman resapan dan sumur resapan

= POND / AREA RESAPAN AIR HUJAN = SUMUR RESAPAN

Green Campus development plan

 

 Zero Runoff

“Green Site/Garden City” concept:

• High density development • More greenery (RTH)

• Restrict movement of motorized vehicle • Interconnected walkways

• Zero Runoff

• Integrated Waste Management • Integrated MEP system.

(15)

Sampah basah, sampah organik seperti ; daun, sisa sayur, sisa makanan, daging, tulang –tulang ikan/ayam, kulit buah-buahan,

direncanakan di olah dengan menggunakan komposter

Integrated waste management

 

 recycle

“Green Site/ Garden City” concept:

• High density development • More greenery (RTH)

• Restrict movement of motorized vehicle • Interconnected walkways

• Zero Runoff

• Integrated Waste Management • Integrated MEP system.

Sampah kering, sampah anorganik, tidak dapat di daur ulang secara alami dan cepat oleh tanah seperti ;

1. Botol kaca, gelas, piring. 2. Kain, plastik, styrofoam. 3. Kaleng. 4. B3 (Bahan Beracun Berbahaya)

(16)

Integrated MEP system

 

 more effective & efficient

Local Security Control

Master Security Control

Local Security Control

Local Security Control

Local Security Control Local Security Control

Local Security Control Local Security Control

Local Security Control

“Green Site/ Garden City” concept:

• High density development • More greenery (RTH)

• Restrict movement of motorized vehicle • Interconnected walkways

• Zero Runoff

• Integrated Waste Management • Integrated MEP system.

Power grid

Water waste/grey water Fire fighting system Clean water

Security system

(17)

Identifikasi Infrastruktur Bawah Tanah & Disain

Lansekap Kampus Kementerian Pekerjaan Umum

LED

AVAILABLE SPACE

PARKING

Identifikasi Infrastruktur Bawah Tanah & Disain

Lansekap Kampus Kementerian Pekerjaan Umum

Rencana

(18)

Sundial

Identifikasi Infrastruktur Bawah Tanah & Disain

Lansekap Kampus Kementerian Pekerjaan Umum

SUNDIAL

 JAM - MATAHARI

Identifikasi Infrastruktur Bawah Tanah & Disain

Lansekap Kampus Kementerian Pekerjaan Umum

Rencana

(19)

Parkir Sepeda

Identifikasi Infrastruktur Bawah Tanah & Disain

Lansekap Kampus Kementerian Pekerjaan Umum

Rencana

(20)

Bangku Taman

Tempat Sampah

Identifikasi Infrastruktur Bawah Tanah & Disain

Lansekap Kampus Kementerian Pekerjaan Umum

Rencana

(21)

Rencana

Drinking Water Facilities

Fasilitas Penyediaan Air Minum pada :

Interior :

 bisa sbg elemen pendukung desain Interior

(22)
(23)
(24)

GREEN BUILDING

DESIGN

GEDUNG UTAMA

(25)

Original block plan:

Larger area of the building is oriented to

east and west

(26)

Horizontal roof Vertical South Vertical East & West Vertical North

(27)

Original building form

Modified building form

Modified Building form:

1. Reduced surface exposure of the working spaces to east and west sun

2. Narrow building form

 improve daylight performance

(28)

Building form & orientation

 orienting windows to north and south

(29)

Return air

thermal insulation

(30)
(31)

Sinar matahari

Sinar matahari

14000.00

Daylight sensor

PEMBANGUNAN GEDUNG MENTERI

KEMENTERIAN PEKERJAAN UMUM

PEMANFAATAN SINAR MATAHARI

Dengan dikombinasikan daylight sensors untuk area kerja dan motion sensors untuk

(32)
(33)

0 10 20 30 40 50 60 70 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 Pre-Design Design01 Design02 Design03 Design04

Solar Gain Exterior Windows (kW)

0 (Pre-Design) Clear Glass no Insulation

1 Clear Glass no Insulation

2 Stopsol Darkblue no Insulation 3 Stopsol Darkblue + Insulation

(34)

Total Cooling (kW)

-180 -160 -140 -120 -100 -80 -60 -40 -20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Pre-Design

Design01

Design02

Design03

Design04

0 (Pre-Design) Clear Glass no Insulation

1 Clear Glass no Insulation

2 Stopsol Darkblue no Insulation 3 Stopsol Darkblue + Insulation

(35)
(36)

TIME SCHEDULE , DAY LIGHT (LUX SENSOR) &

MOTION SENSOR

(37)

LAYOUT ZONE AC

PEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUM

(38)
(39)

sink

Clean water tank

shower

wudhu

Grey water tank

toilet Grey water Roof tank garden Bio tank

To the ground

Rain Makeup cooling tower

(40)

 Pemakaian / Kebutuhan air bersih (A) :180 m3/hari

 Recycling air kotor dan buangan (B)

 dari STP (120 m3/hari) : 80 m3/hari

  Air condensate dari AC : 5 m3/hari

  Air hujan : 40 m3/hari

  Air wudhu : 25 m3/hari

Total : 150 m3/hari

 Penggunaan kembali air buangan

 Flushing WC, urinoir : 45 m3/hari

 Siram taman/landscape : 15 m3/hari

Total : 60 m3/hari

Sisa air buangan masuk ke resapan

 Air Bersih yang dihemat B : A = 83% (termasuk air hujan).

 Air Bersih yang dihemat = 61% (tanpa air hujan

)

(41)

 Material & resources : use environmentally friendly materials

Local products

Sustainable

Low energy

Recyclable / eco friendly

Non toxic

Most building materials meet

ISO 14001 standards and

requirements

(42)

LIFT DIFABEL

TOILET DIFABEL

GENDER

JALUR DIFABLE

LIFT SERVICE

PEMBANGUNAN GEDUNG MENTERI

(43)
(44)

PEMBANGUNAN GEDUNG MENTERI

KEMENTERIAN PEKERJAAN UMUM

P O T O N G A N

Jalur pejalan kaki dan difabel Jalur pencapaian dr gedung Parkir

(45)
(46)

Referensi

Dokumen terkait

Dari hasil analisis mikrostruktur ini dapat dinyatakan bahwa karakter paduan AlMgSi baik digunakan sebagai kelongsong dari pelat elemen bakar (PEB) densitas 4,8 gU/cm 3..

penggunaan sumbersumber pembangunan yang terbatas untuk mencapai tujuan keadaan sosial ekonomi yang lebih baik secara lebih efektif dan efisien... Hatta), yang dituju dengan

Keputusan Menteri Negara Pendayagunaan Aparatur Negara Nomor 5g/MENPAN l!987 tanggal 31 Juni 1987 tentang Angka Kredit bagi Jabatan Tenaga.. Pengajar Perguruan

Permasalahan yang diteliti di dalam penelitian ini adalah bagaimana pelaksanaan kalibrasi jam waktu salat di Masjid Agung Baitunnur Pati dan Masjid Jami’ Kajen serta

Glaser dan Zunin (dalam Corey, 2006) menyatakan mereka percaya bahwa masing-masing individu memiliki suatu kekuatan ke arah kesehatan atau pertumbuhan. Pada

Berdasarkan fenomena inilah penelitian ini dilakukan untuk mendapat pemahaman yang jelas mengenai pengelompokan penggunaan jajanan tradisional oleh masyarakat serta

a) Aplikasi IndoLista memfasilitasi database tempat wisata di Indonesia yang dapat terus ditambah oleh pengguna, saat ini database tempat wisata yang ada terbatas pada

Namun dalam pelaksanaannya penegakan hukum jinayat Aceh belumlah terlaksana dengan baik, masih adanya penyelesaian perkara yang seharusnya merupakan kewenangan aparat