• Tidak ada hasil yang ditemukan

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

N/A
N/A
Protected

Academic year: 2021

Membagikan "Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)"

Copied!
7
0
0

Teks penuh

(1)

Page 1 of 7

Public Disclosure Copy

Public Disclosure Copy

Implementation Status & Results

Indonesia

FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Operation Name:FOURTH NATIONAL PROGRAM FOR COMMUNITY

EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Project Stage: Implementation Seq.No: 1 Status:ARCHIVED Archive Date: 24-Mar-2012

Country: Indonesia Approval FY: 2012

Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument:Specific Investment Loan

Implementing Agency(ies):

Key Dates

Board Approval Date 14-Jul-2011 Original Closing Date 30-Jun-2014 Planned Mid Term Review Date 18-Mar-2013 Last Archived ISR Date

Effectiveness Date 01-Sep-2011 Revised Closing Date 30-Jun-2014 Actual Mid Term Review Date

Project Development Objectives

Project Development Objective (from Project Appraisal Document)

For villagers in PNPM-Rural locations to benefit from improved socio-economic and local governance conditions

Has the Project Development Objective been changed since Board Approval of the Project?

Yes No

Component(s)

Component Name Component Cost

Kecamatan grants 1097.58

Facilitation support 110.75

Implementation Support and Technical Assistance 36.77

Project Management Support 38.51

Overall Ratings

Previous Rating Current Rating

Progress towards achievement of PDO Moderately Satisfactory

Overall Implementation Progress (IP) Moderately Satisfactory

Overall Risk Rating Moderate

Implementation Status Overview

Although PNPM Rural IV only recently became effective, it is already making good progress because it is designed as a continuation of the existing, nationwide PNPM program and uses the same implementation modalities. The program benefits about 39 million people in 57,000 villages throughout Indonesia. The project’s model of giving communities direct

Public Disclosure Authorized

Public Disclosure Authorized

(2)

Public Disclosure Copy

Public Disclosure Copy

control of decision making and resources is continuing to help improve socio-economic conditions and strengthen governance and accountability at the local level. PNPM IV will also seek to further strengthen the management and governance aspects of the program, which emerged as implementation challenge during the program's rapid scale up in recent years. Locations

Country First Administrative Division Location Planned Actual

Indonesia North Sumatra North Sumatra

Indonesia Aceh Provinsi Nanggroe Aceh Darussalam

Indonesia Aceh Provinsi Nanggroe Aceh Darussalam

Indonesia Daerah Istimewa Yogyakarta Daerah Istimewa Yogyakarta

Indonesia South Sumatra Provinsi Sumatera Selatan

Indonesia West Sumatra West Sumatra

Indonesia North Sulawesi Provinsi Sulawesi Utara

Indonesia Propinsi Sulawesi Tenggara Provinsi Sulawesi Tenggara

Indonesia Central Sulawesi Provinsi Sulawesi Tengah

Indonesia South Sulawesi Provinsi Sulawesi Selatan

Indonesia Riau Provinsi Riau

Indonesia East Nusa Tenggara Provinsi Nusa Tenggara Timur

Indonesia Propinsi Nusa Tenggara Barat Propinsi Nusa Tenggara Barat

Indonesia Propinsi Lampung Provinsi Lampung

Indonesia East Kalimantan Provinsi Kalimantan Timur

Indonesia Propinsi Kalimantan Tengah Provinsi Kalimantan Tengah

Indonesia South Kalimantan Provinsi Kalimantan Selatan

Indonesia West Kalimantan Provinsi Kalimantan Barat

Indonesia East Java Provinsi Jawa Timur

Indonesia Central Java Provinsi Jawa Tengah

Indonesia West Java Provinsi Jawa Barat

Indonesia Propinsi Jambi Provinsi Jambi

(3)

Public Disclosure Copy

Public Disclosure Copy

Country First Administrative Division Location Planned Actual

Indonesia Bengkulu Propinsi Bengkulu

Indonesia Bali Provinsi Bali

Indonesia Banten Provinsi Banten

Indonesia Propinsi Gorontalo Propinsi Gorontalo

Indonesia Bangka-Belitung Provinsi Kepulauan Bangka Belitung

Indonesia Propinsi Maluku Utara Provinsi Maluku Utara

Indonesia Propinsi Maluku Utara Provinsi Maluku Utara

Indonesia Provinsi Irian Jaya Barat Provinsi Papua Barat

Indonesia Provinsi Sulawesi Barat Provinsi Sulawesi Barat

Indonesia Riau Islands Riau Islands

Results

Project Development Objective Indicators

Indicator Name Core Unit of Measure Baseline Current End Target

Direct project beneficiaries Number Value 49000000.00 39000000.00 49000000.00

Date Comments

14-Jun-2011 01-Dec-2011

Data not yet broken down by gender

30-Jun-2014

Female beneficiaries Percentage

Sub Type Supplemental

Value 24000000.00 0.00 24000000.00

>80% satisfaction levels from beneficiaries regarding improved services and local level governance (impacts taken from representative sample).

Percentage Value 80.00 80.00 80.00

Date

Comments Based on outcome of KDP2

01-Dec-2011

Data from KDP2. New data will be available soon from Infrastructure Census and Technical Evaluation

30-Jun-2014

EIRRs >30 % for main rural infrastructure categories

Percentage Value 39.00 39.00 30.00

(4)

Public Disclosure Copy

Public Disclosure Copy

Comments Data from 2005. New study to

be launched soon Improved HH expenditure rates and improved

access to economic and social services in a minimum of 4,800 sub-districts in 2011 (impacts taken from representative sample)

Percentage Value 2.00 2.00 2.00

Date Comments

14-Jun-2011

The impact evaluation was intended to cover the PNPM engagement from 2007-2012 and not only the one cycle of block grants which will be financed by PNPM-Rural IV. However results for this indicator are available only for 2007-2010 due to the loss of the control group which occurred when the program went to national scale in 2009/2010. While no additional analysis will be generated for the period 2011-2013, the previous results are considered representative of expected project impact

01-Dec-2011

see comment on baseline data

30-Jun-2014

Intermediate Results Indicators

Indicator Name Core Unit of Measure Baseline Current End Target

All oversight consultants and facilitators paid on time, in full every month

Percentage Value 80.00 95.00 80.00

Date Comments

14-Jun-2011 01-Dec-2011 30-Jun-2014

Kecamatan Grants disbursed and accounted for

Percentage Value 75.00 72.00 80.00

Date Comments

01-Jan-2009

Disbursement percentage for annual block grant

01-Dec-2011

Disbursement percentage for annual block grant

30-Jun-2014

Disbursement percentage for annual block grant

Number of project management units established by March every year

Number Value 350.00 379.00 400.00

Date Comments

01-Jan-2009 01-Dec-2011

Data for March 2011 (PNPM-III).

(5)

Public Disclosure Copy

Public Disclosure Copy

>70% of sampled villages receive socialization material packages for PNPM in 2011 onward.

Percentage Value 70.00 0.00 70.00

Date Comments

01-Dec-2011 01-Dec-2011

data not available Audit sample size increases to min. of 20% of

all sub-districts and audit results are made public.

Percentage Value 13.50 19.70 20.00

Date Comments

14-Jun-2011 01-Dec-2011

By 2012, 90% of planned facilitators positions are filled (sub-district/district levels).

Percentage Value 85.00 86.00 90.00

Date Comments

14-Jun-2011 01-Dec-2011

By 2011, >90% of local government councils provide funds and/or oversee PNPM

Percentage Value 70.00 90.00 90.00

Date Comments

01-Dec-2011

Through the MDG/Community Conditional Cash Transfers pilot, improvements in priority health and education indicators.

Number Value 0.03 0.03 0.03

Date

Comments from PNPM Generasi 2007

baseline survey; average standardized effects for health and education targets

01-Dec-2011

from PNPM Generasi 2007 baseline survey; average standardized effects for health and education targets

from PNPM Generasi 2007 baseline survey; average standardized effects for health and education targets

By 2011, 4,500 sub-districts with completed subprojects (#/type of infrastructure works, economic, education, health, revolving loans and environmental management, etc.)

Number Value 4100.00 4452.00 4800.00

Date Comments

01-Jan-2010 01-Dec-2011 30-Jun-2014

O&M arrangements are in place and/ or functioning for >85% of infrastructure works.

Percentage Value 85.00 85.00 85.00

Date Comments

14-Jun-2011 01-Dec-2011

From previous survey. New survey currently underway

30-Jun-2014

Min. 50% participation rate of women and poorest community members in planning and decision-making meetings Percentage Value 48.00 50.00 50.00 Date Comments 02-Jun-2008 data collected in 2008, 48% for women and 56% for poorest community members

01-Dec-2011 30-Jun-2014

By 2011, 90% of facilitators receive the agreed upon number of pre and in service training days

Percentage Value 85.00 90.00 90.00

Date Comments

01-Dec-2011

>70% of infrastructure works are evaluated as of high quality

Percentage Value 65.00 65.00 70.00

(6)

Public Disclosure Copy

Public Disclosure Copy

Comments PMPM Rural annual report PNPM Rural annual report

2009. New survey currently underway.

>85% of agreed work plans completed each year

Percentage Value 95.00 67.00 85.00

Date Comments

01-Jan-2006 01-Dec-2011

Data on Financial Performance (as of 24-Feb-2012)

Financial Agreement(s) Key Dates

Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date

P122810 IBRD-80790 Effective 14-Jul-2011 27-Jul-2011 01-Sep-2011 30-Jun-2014

Disbursements (in Millions)

Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed

P122810 IBRD-80790 Effective USD 531.19 531.19 0.00 346.10 185.09 65.00

Disbursement Graph

Key Decisions Regarding Implementation

None at this point

(7)

Public Disclosure Copy

Public Disclosure Copy

Restructuring History

There has been no restructuring to date.

Related Projects

Referensi

Dokumen terkait

Untuk itu, pada tugas akhir ini akan dilakukan pemodelan untuk mempelajari dan menganalisa pengaruh laju aliran influen dengan dimensi reaktor UASB yang tersedia terhadap

Berdasarkan hasil penelitian yang telah dilakukan dalam periode 2005-2009 pada perusahaan industri dasar dan kimia, maka penulis dapat mengambil kesimpulan dari empat

Alasan peneliti memilih Ustadzah Ucik karena, Ustadzah Ucik memenuhi kriteria subjek penelitian yang cocok dengan masalah yang diteliti tentang diksi pesan dakwah.

Untuk mendapatkan berapa besar daya pompa untuk kebutuhan pemilihan pompa yang dibutuhkan dalam sistem , maka perhitungan daya pompa dilakukan dengan persamaan

dalam ruang ujian. Proktor dan teknisi dapat berasal dari sekolah/madrasah pelaksana UNBK. Proktor dan teknisi dapat berasal dari sekolah/madrasah pelaksana UNBK. Proktor

tegangan akan mengangkat keluaran menuju ke tegangan tinggi.. !erbang , dapat mempun"ai jumlah masukan seban"ak "ang dikehendaki dengan penambahan sebuah

Berdasarkan survei pendahuluan yang dilakukan pada tanggal 17-19 Februari 2014 melalui wawancara terhadap 17 orang pasien umum yang sudah 3 hari rawat inap di ruang penyakit

Ada beberapa pengertian untuk transportasi berkelanjutan, (Richardson,2000), menyatakan bahwa : Pada prinsipnya, keberlanjutan dari sistim transportasi umum