• Tidak ada hasil yang ditemukan

Operator komponen menyiapkan polibox kosong

N/A
N/A
Protected

Academic year: 2022

Membagikan "Operator komponen menyiapkan polibox kosong"

Copied!
28
0
0

Teks penuh

(1)

Nomer

Operator komponen menyiapkan polibox kosong

Jumlah Polibox

Waktu Perpolibox

1

27.4

4 6.85

2 26.6 4 6.65

3 45.9 8 5.7375

4 73.5 9 8.166666667

5 98.7 11 8.972727273

6 102.3 15 6.82

7 41.5 5 8.3

8 76.2 9 8.466666667

9 10 11 12 13 14 15 16 17 18

Total 7.495445076

(2)

Nomer

Operator komponen mengisi polibox kosong dengan komponen

Jumlah Polibox

Waktu Perpolibox

1 12.3 1 12.3

2 11.5 1 11.5

3 12.3 1 12.3

4 7.4 1 7.4

5 6.6 1 6.6

6 8.3 1 8.3

7 10.6 1 10.6

8 11.6 1 11.6

9 7.7 1 7.7

10 7.4 1 7.4

11 11.7 1 11.7

12 8.1 1 8.1

13 8.3 1 8.3

14 15 1 15

15 9.3 1 9.3

16 10.1 1 10.1

17 10.6 1 10.6

18 10 1 10

19 12.4 1 12.4

20 9.9 1 9.9

21 11.3 1 11.3

22 15.3 1 15.3

23 14.3 1 14.3

24 11.3 1 11.3

25 10 1 10

26 15.8 1 15.8

27 11.8 1 11.8

28 10.6 1 10.6

29 11.7 1 11.7

30 13.8 1 13.8

31 11.8 1 11.8

32 12.8 1 12.8

33 14 1 14

34 9.6 1 9.6

35 10.9 1 10.9

36 11.6 1 11.6

(3)

41 7.8 1 7.8

42 12.6 1 12.6

43 10.4 1 10.4

44 9.7 1 9.7

45 13.5 1 13.5

46 13.7 1 13.7

47 12.6 1 12.6

48 12.5 1 12.5

49 13.4 1 13.4

50 13.3 1 13.3

51 12.5 1 12.5

52 12.1 1 12.1

53 12.3 1 12.3

54 10.3 1 10.3

55 13.9 1 13.9

56 21.5 1 21.5

57 15.7 1 15.7

58 8.7 1 8.7

59 14.2 1 14.2

60 14.3 1 14.3

61 12.5 1 12.5

62 63 64 65

Total 11.61639344

(4)

Nomer Operator komponen menimbang masing-masing polibox

Jumlah Polibox

Waktu Perpolibox

1 6.9 1 6.9

2 8.1 1 8.1

3 6.1 1 6.1

4 7.2 1 7.2

5 10.1 1 10.1

6 7.9 1 7.9

7 6.9 1 6.9

8 7.7 1 7.7

9 9.5 1 9.5

10 8.5 1 8.5

11 7.2 1 7.2

12 10.3 1 10.3

13 7.2 1 7.2

14 7.1 1 7.1

15 6.3 1 6.3

16 6.4 1 6.4

17 6.8 1 6.8

18 6.9 1 6.9

19 6.5 1 6.5

20 6.4 1 6.4

21 6.8 1 6.8

22 5.3 1 5.3

23 5.9 1 5.9

24 8.1 1 8.1

25 6 1 6

26 7.1 1 7.1

27 8.5 1 8.5

28 6.7 1 6.7

29 6.4 1 6.4

30 6.8 1 6.8

31 7.5 1 7.5

32 5.8 1 5.8

33 8.6 1 8.6

34 10.2 1 10.2

35 7.9 1 7.9

36 6.1 1 6.1

37 8.2 1 8.2

(5)

44 9.6 1 9.6

45 10.5 1 10.5

46 9.1 1 9.1

47 6.9 1 6.9

48 8.5 1 8.5

49 10.1 1 10.1

50 7.3 1 7.3

51 6.1 1 6.1

52 6.4 1 6.4

53 9.1 1 9.1

54 9.3 1 9.3

55 6.9 1 6.9

56 5.9 1 5.9

57 6.7 1 6.7

58 7.5 1 7.5

59 7.1 1 7.1

60 9.2 1 9.2

61 5.6 1 5.6

62 9.2 1 9.2

63 9 1 9

64 6.9 1 6.9

65 6.7 1 6.7

66 6.3 1 6.3

67 6.7 1 6.7

68 8.8 1 8.8

69 6.1 1 6.1

70 5.8 1 5.8

71 10.3 1 10.3

72 10.1 1 10.1

73 8.2 1 8.2

74 10.6 1 10.6

75 6 1 6

76 6.1 1 6.1

77 8.9 1 8.9

78 6.7 1 6.7

79 6.8 1 6.8

80 7.1 1 7.1

81 6.2 1 6.2

82 7.5 1 7.5

83 8.1 1 8.1

(6)

Nomer

Operator komponen Memindahkan Polibox isi kedalam motor delivery

Jumlah Polibox

Waktu Perpolibox

1 12.8 1 12.8

2 17.6 1 17.6

3 22.2 2 11.1

4 24.1 2 12.05

5 17.8 1 17.8

6 28 1 28

7 13.1 1 13.1

8 24 1 24

9 37.9 2 18.95

10

Total 17.26666667

(7)

Nomer

Operator Komponen memasukan polibox pada motor

Jumlah Polibox Waktu Perpolibox

1 13.9 3 4.633333333

2 14.6 3 4.866666667

3 25.4 3 8.466666667

4 109.1 8 13.6375

5 22.9 3 7.633333333

6 37.4 3 12.46666667

7 30.2 3 10.06666667

8 22 3 7.333333333

9 31.2 3 10.4

10 37.6 6 6.266666667

11

Total 8.577083333

(8)

Nomer

Operator Delivery mengirim Polibox komponen dari Plan 1 menuju Plan 2

Jumlah Polibox

Waktu Perpolibox

1 57.1 1 57.1

2 59.6 1 59.6

3 60.4 1 60.4

4 58.4 1 58.4

5 59.2 1 59.2

6 58.7 1 58.7

7 59.3 1 59.3

Total 58.95714286

(9)

Nomer

Operator Delivery menurunkan Polibox komponen pada rak yang sudah disediakan

Jumlah Polibox

Waktu Perpolibox

(Detik)

1 34 3 11.33333333

2 34.8 1 34.8

3 35 1 35

4 58.3 3 19.43333333

5 13.8 1 13.8

6 34.3 1 34.3

7 46.6 1 46.6

8 52 3 17.33333333

9 36.8 2 18.4

10 37.3 2 18.65

11 73.7 4 18.425

12 31.2 1 31.2

13 27 2 13.5

14 54.8 2 27.4

15 25.8 3 8.6

16 32.1 2 16.05

17 33.3 2 16.65

18 48.3 2 24.15

19 42.1 3 14.03333333

20 32.4 3 10.8

21 26.9 2 13.45

22 38 2 19

23 28.8 2 14.4

24 37.2 3 12.4

25 31.7 2 15.85

Total 20.22233333

(10)

Nomer

Operator Delivery

memasukan komponen pada mesin Assembling

Jumlah Polibox

Waktu Perpolibox

1 105.9 3 35.3

2 32.8 1 32.8

3 36.6 1 36.6

4 138.9 6 23.15

5 147.2 7 21.0285714

6 161.7 8 20.2125

7 23.2 1 23.2

8 149.9 7 21.4142857

9 148.5 7 21.2142857

10 223.3 12 18.6083333

11 182.2 8 22.775

12 209.4 8 26.175

13 165.8 8 20.725

14 166.8 8 20.85

15 174.6 11 15.8727273

16 124 4 31

17 108.4 5 21.68

18 141.1 7 20.1571429

19 144.9 7 20.7

20 176.7 8 22.0875

21 185.2 9 20.5777778

22 190.2 11 17.2909091

23 209.2 12 17.4333333

24 226.6 8 28.325

25 110.4 6 18.4

26 204.5 10 20.45

27 156.1 6 26.0166667

28 256.3 11 23.3

Total 23.1194298

(11)

Nomer

Operator Delivery

memasukan polibox kosong pada motor delivery

Jumlah Polibox Waktu Perpolibox

1 5.8 1 5.8

2 8.6 2 4.3

3 14.2 2 7.1

4 21.7 3 7.233333333

5 16.9 3 5.633333333

6 15.4 2 7.7

7 19.3 4 4.825

8 21.5 3 7.166666667

9 7.4 1 7.4

10 14.3 2 7.15

11 13.9 2 6.95

12 21.9 3 7.3

13 21.3 3 7.1

14 10.9 2 5.45

15 12.2 1 12.2

16 19.3 3 6.433333333

17 17.4 2 8.7

18 19.9 3 6.633333333

19 20.5 2 10.25

20 15.3 3 5.1

21 8.3 1 8.3

22 6.1 1 6.1

Total 7.0375

(12)

Nomer

Operator Delivery mengirim Polibox komponen dari Plan 2 menuju Plan 1

Jumlah Polibox

Waktu Perpolibox

1 53.5 1 53.5

2 52.9 1 52.9

3 53.5 1 53.5

4 48.5 1 48.5

5 49.8 1 49.8

6 48.3 1 48.3

Total 51.08333333

(13)

Nomer

Operator komponen menurunkan Polibox kosong

Jumlah Polibox

Waktu Perpolibox

1 108.6 8 13.575

2 64.9 9 7.211111111

3 179.4 13 13.8

4 84.8 13 6.523076923

5 145.3 17 8.547058824

6 95.3 11 8.663636364

7 69.4 7 9.914285714

8 167.6 14 11.97142857

9 36.6 5 7.32

10 129.6 15 8.64

11 73.1 4 18.275

12 139.5 15 9.3

13 149.8 11 13.61818182

Total 10.56605995

(14)

108 Link

70 PCS

215 Rpm

2 BOX 3 BOX

Gram KG Kg Kg

ILP

2.127

0.002127 108 16.08 470.15 7560 35.16 16.08 10.72

OLP

1.844

0.001844 107 13.81 542.30 7490 34.84 13.81 9.21

PIN

1.407

0.001407 106 10.44 710.73 7420 34.51 10.44 6.96

BUSH

0.836

0.000836 108 6.32 1196.17 7560 35.16 6.32 4.21

ROLLER

0.97

0.00097 108 7.33 1030.93 7560 35.16 7.33 4.89

Waktu mesin (Menit)

BERAT PerKomponen

komponen Needed

Berat Komponen

(Kg)

jumlah PCS

unt 1 Kg Total PCS Panjang

Jumlah

Kecepatan Mesin:

Komponen 420 SB

(15)

108 Link

70 PCS

215

2 BOX 3 BOX

Gram KG Kg Kg

ILP

1.679

0.001679 108 12.69324 595.59261 7560 35.1628 12.69 8.46

OLP

1.451

0.001451 107 10.86799 689.17988 7490 34.8372 10.87 7.25

PIN

1.289

0.001289 106 9.56438 775.79519 7420 34.5116 9.56 6.38

BUSH

0.82

0.00082 108 6.1992 1219.5122 7560 35.1628 6.20 4.13

ROLLER

0.97

0.00097 108 7.3332 1030.9278 7560 35.1628 7.33 4.89 Waktu

mesin (Menit)

BERAT PerKomponen

komponen Needed

Berat Komponen

(Kg)

jumlah PCS

unt 1 Kg Total PCS Panjang

Jumlah

Kecepatan Mesin:

Komponen 420 AD

(16)

100 Link

1410 PCS

155 Rpm

2 BOX 3 BOX

Gram KG Kg Kg

ILP

0.218

0.000218 100 30.74 4587.16 141000 909.68 15.37 10.25

OLP

0.198

0.000198 99 27.64 5050.51 139590 900.58 13.82 9.21

PIN

0.231

0.000231 100 32.57 4329.00 141000 909.68 16.29 10.86

BUSH

0.13

0.00013 100 18.33 7692.31 141000 909.68 9.17 6.11

Panjang Jumlah Kecepatan Mesin:

BERAT PerKomponen

Komponen 25

Waktu mesin (Menit)

komponen Needed

Berat Komponen (Kg)

jumlah PCS unt 1

Kg

Total PCS

(17)

100 Link

1410 PCS

155 Rpm

2 BOX 3 BOX

Gram KG

Kg Kg

ILP

0.298 0.000298 100 42.02 3355.70 141000 909.68 21.01 14.01

OLP

0.28 0.00028 99 39.09 3571.43 139590 900.58 19.54 13.03

PIN

0.281 0.000281 100 39.62 3558.72 141000 909.68 19.81 13.21

BUSH

0.14 0.00014 100 19.74 7142.86 141000 909.68 9.87 6.58

komponen Needed

Berat Komponen (Kg)

jumlah PCS unt 1

Kg

Total PCS

Waktu mesin (Menit)

BERAT PerKomponen

Panjang Jumlah

Kecepatan Mesin: Komponen 25 H

(18)

428H 420 SB 420 AD 25 25H 100%*Men

it

100%*Men it

100%*Men it

100%*Men it

100%*Men it

ILP

35.16 35.16 35.16 909.68 909.68

OLP

34.88 34.84 34.84 900.58 900.58

PIN

34.60 34.51 34.51 909.68 909.68

BUSH

35.16 35.16 35.16 909.68 909.68

ROLLER

35.16 35.16 35.16

(19)

0:35 Durasi Start End Durasi Start End 0:10:00

0:40:00 0:35 7:00:00 7:35:38

2 1:11 7:35:38 8:46:54

1:21 8:46:54 10:08:10 1:11 10:08:10 11:19:26 1:51 11:19:26 13:10:42 1:11 13:10:42 14:21:58 1:21 14:21:58 15:43:14

1:11 15:43:14 16:54:30 1:21 16:54:30 18:15:46 1:11 18:15:46 19:27:02 1:51 19:27:02 21:18:18 1:21 21:18:18 22:39:34 1:11 22:39:34 23:50:50

Jalan Mesin Drive chain LD 5-8

Durasi

Istirahat 10 men

SHIFT 1

Istirahat Makan Jumlah set

SHIFT 2

(20)

ILP 39.72 3 13.24 ILP 30.74 2 15.37

OLP 35.01 3 11.67 OLP 27.64 2 13.82

PIN 34.22 2 17.11 PIN 32.57 2 16.29

BUSH 18.33 2 9.16 BUSH 18.33 2 9.17

ROLLER 21.35 2 10.67

ILP 32.16 3 10.72 ILP 42.02 3 14.01

OLP 27.62 2 13.81 OLP 39.09 3 13.03

PIN 20.88 2 10.44 PIN 39.62 2 19.81

BUSH 12.64 2 6.32 BUSH 19.74 2 9.87

ROLLER 14.67 2 7.33

ILP 25.39 2 12.69 ILP 42.0 3 14.01

OLP 21.74 2 10.87 OLP 28.9 2 14.45

PIN 19.13 2 9.56 PIN 30.5 2 15.23

BUSH 12.40 2 6.20 BUSH 28.6 2 14.31

ROLLER 14.67 2 7.33

Berat Perpolibox Berat

Perpolibox

Berat Perpolibox

25 H

Berat Komponen

yang dibutuhkan

Jumlah Polibox

Berat Perpolibox Berat

Komponen yang dibutuhkan

Jumlah Polibox

PENGIRIMAN KOMPONEN

420 AD

Berat Komponen yang

dibutuhkan

Jumlah Polibox

Berat Perpolibox

25 428H

420 SB

Berat Komponen yang

dibutuhkan

Jumlah Polibox Berat

Komponen yang dibutuhkan

Jumlah Polibox

Berat Perpolibox

25 SH

Berat Komponen

yang dibutuhkan

Jumlah Polibox

(21)

108 Link

70 PCS

215 Rpm

Gram KG

ILP 2.127 0.002127 108 16.08 470.15 7560 35.16 400 12.4 874.69 14.58

OLP 1.844 0.001844 107 13.81 542.30 7490 34.84 399 14.4 1006.41 16.77

PIN 1.407 0.001407 106 10.44 710.73 7420 34.51 387 18.5 1279.32 21.32

BUSH 0.836 0.000836 108 6.32 1196.17 7560 35.16 382 30.2 2125.29 35.42

ROLLER 0.97 0.00097 108 7.33 1030.93 7560 35.16 394 26.9 1889.24 31.49 Jumlah

pengiriman Waktu

mesin (Menit)

Total Waktu Habis ASF

(Menit)

Komponen 420 SB

Jumlah Komponen

ASF Panjang

Jumlah Kecepatan Mesin:

Total Waktu Habis ASF

(Jam)

BERAT PerKomponen

kompone n Needed

Berat Komponen

(Kg)

jumlah PCS unt

1 Kg

Total PCS

(22)

108 Link

70 PCS

215 Rpm

Gram KG

ILP 1.679 0.001679 108 12.69 595.59 7560 35.16 400 15.8 1108.08 18.47

OLP 1.451 0.001451 107 10.87 689.18 7490 34.84 399 18.4 1278.99 21.32

PIN 1.289 0.001289 106 9.56 775.80 7420 34.51 387 20.2 1396.43 23.27

BUSH 0.82 0.00082 108 6.20 1219.51 7560 35.16 382 30.8 2166.76 36.11

ROLLER 0.97 0.00097 108 7.33 1030.93 7560 35.16 394 26.9 1889.24 31.49

BERAT PerKomponen

kompone n Needed

Berat Komponen

(Kg)

jumlah PCS unt

1 Kg

Total PCS

Jumlah pengiriman Waktu

mesin (Menit)

Total Waktu Habis ASF

(Menit)

Total Waktu Habis ASF

(Jam)

Komponen 420 AD

Jumlah Komponen

ASF Panjang

Jumlah Kecepatan Mesin:

(23)

100 Link

410 PCS

155 Rpm

Gram KG

ILP

0.218

0.000218 100 8.94 4587.16 41000 264.52 400 22.4 11837.82 197.30

OLP

0.198

0.000198 99 8.04 5050.51 40590 261.87 399 24.8 13000.98 216.68

PIN

0.231

0.000231 100 9.47 4329.00 41000 264.52 387 20.4 10808.55 180.14

BUSH

0.13

0.00013 100 5.33 7692.31 41000 264.52 382 35.8 18957.82 315.96 Total Waktu

Habis ASF (Menit)

Total Waktu Habis ASF

(Jam) Jumlah

pengiriman Waktu

mesin (Menit)

BERAT PerKomponen komponen Needed

Panjang Jumlah

Kecepatan Mesin:

Komponen 25

Jumlah Komponen

ASF Berat

Komponen (Kg)

jumlah PCS unt

1 Kg

Total PCS

(24)

100 Link

410 PCS

155 Rpm

Gram KG

ILP 0.298 0.000298 100 12.22 3355.70 41000 264.52 400 16.4 8659.88 144.33

OLP 0.28 0.00028 99 11.37 3571.43 40590 261.87 399 17.6 9193.55 153.23

PIN 0.281 0.000281 100 11.52 3558.72 41000 264.52 387 16.8 8885.32 148.09

BUSH 0.14 0.00014 100 5.74 7142.86 41000 264.52 382 33.3 17603.69 293.39 Jumlah

pengiriman Jumlah

Komponen ASF

komponen Needed

Total Waktu Habis ASF

(Menit)

Total Waktu Habis ASF

(Jam)

Komponen 25 H

Berat Komponen

(Kg)

jumlah PCS unt

1 Kg

Total PCS

Waktu mesin (Menit) Panjang

Jumlah Kecepatan Mesin:

BERAT PerKomponen

(25)

100 Link

410 PCS

155 Rpm

Gram KG

ILP

0.298 0.000298 100 12.22 3355.70 41000 264.52 400 16.4 8659.88 144.33

OLP

0.207 0.000207 99 8.40 4830.92 40590 261.87 399 23.7 12435.72 207.26

PIN

0.216 0.000216 100 8.86 4629.63 41000 264.52 387 21.8 11559.14 192.65

BUSH

0.203 0.000203 100 8.32 4926.11 41000 264.52 382 22.9 12140.47 202.34 Jumlah

pengiriman

BERAT PerKomponen komponen Needed

Berat Komponen

(Kg)

jumlah PCS unt

1 Kg

Total PCS

Waktu mesin (Menit)

Jumlah Komponen

ASF

Total Waktu Habis ASF

(Menit)

Total Waktu Habis ASF

(Jam)

Komponen 25 SH

Panjang

Jumlah

Kecepatan Mesin:

(26)

No. BAAN

No. Coil QTY Material

(Kg)

No Prosess Date Shift ORP/NRP No Line Cont kosong

(Kg) QTY (Kg) Status Reject (Kg) Lot Ke- Remarks

1 Raw Material OK / NG

2 Pin Cutting OK / NG

3 Barrel+Drying A OK / NG

4 QC Inspection BHD OK / NG

5 Heat Treatment OK / NG

6 QC Inspection AHD OK / NG

7 Barrel+Drying B OK / NG

8 Sortir OK / NG

9 Finish Good

Inspection OK / NG

10 Tranfer PWAP OK / NG

Admin Remark

PT. FSCM Manufacturing Indonesia

Component Card For PIN Component Name and

Type Component Part

Lot Number

No Container

Jam Masalah Keterangan

(27)

No. BAAN No. Coil QTY Material

(Kg)

No Prosess Date Shift ORP/NRP No Line Cont kosong

(Kg) QTY (Kg) Status Reject (Kg) Lot Ke- Remarks

1 Raw Material OK / NG

2 Press OK / NG

3 QC Inspection BHD OK / NG

4 Heat Treatment OK / NG

5 QC Inspection AHD OK / NG

6 Shoot Peening OK / NG

7 Finish Good

Inspection OK / NG

8 Tranfer PWAP OK / NG

Masalah Admin Remark

Keterangan Jam

PT. FSCM Manufacturing Indonesia

Component Card For PLATE Component Name and

Type Component Part

Lot Number

(28)

Referensi

Dokumen terkait

Dalam Pasal 1754 KUH Perdata disebutkan, bahwa pinjam meminjam ialah perjanjian dengan mana satu pihak yang satu memberikan kepada pihak yang lain suatu jumlah tertentu barang-

T he objectives of this study are:to explain the influence of Internet ease toward Internet usefulness on undergraduate students of Business Administration

2011, maka Proses Pelelangan ini dengan sendirinya tidak dapat dilaksanakan, Peserta pelelangan tidak dapat menuntut Panitia, SKPD dan Pemerintah Kota Sungai Penuh..

Sehubungan dengan pengadaan Jasa Konsultansi paket Jasa Pengawasan Pembangunan Gedung Kantor UPTD Taman Budaya pada Dinas Pendidikan dan Kebudayaan Provinsi Sulawesi Tenggara,

adres unik global berbasis Internet rotocol (IP) atau ekstensi-nya;. Ø  mampu menunjang komunikasi

Also Suleiman (2010) aimed at evaluating practices followed by the faculty members in assessing the academic achievement of their students through a questionnaire included

Gangguan kualitas tidur pada pasien post operasi akibat nyeri dapat diatasi dengan terapi farmakolofis dan nonfarmakologi, untuk terapi farmakologi atau terapi komplementer

Saat ini cabang Freemasonry tersebar di 164 negara dengan 5 juta anggota dimana 3 juta diantaranya ada di Amerika Serikat. Namun sepertinya apa yang disebut