ANTI CORRUPTION ACTION PLAN (ACAP)

RENCANA TINDAK ANTI KORUPSI (RTAK)

LAPORAN PEMANTAUAN KEGIATAN PRE-BID MEETING DAN SITE VISIT

PENGADAAN JASA PEKERJAAN KONSTRUKSI

Oleh:

WAKIL PENGAMAT DARI MASYARAKAT (WPM)

Nama WPM

: Syaiful Amri, SST., MT

Nama Paket : 12, Kambang – Indrapura

(2)

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT(WINRIP) IBRD LOAN No. 8043-ID

RENCANA TINDAK ANTI KORUPSI (RTAK)

ANTI-CORRUPTION ACTION PLAN (ACAP)

LAPORAN HASIL PENGAMATAN

PROSES PENGADAAN JASA KONSTRUKSI

Nama WPM

:

SYAIFUL AMRI, SST.,MT

Nomor Paket

:

12

Nama Paket

:

Kambang-Indrapura

Provinsi

:

Sumatera Barat

KEMENTERI AN PEKERJ AAN UMUM

D AN PERUM AH AN R AKY AT

DIREKTORAT JENDERAL BINA MARGA

D I R E K T O R A T B I N A P R O G R A M

(3)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Pekerjaan Konstruksi

i

DAFTAR ISI

DAFTAR ISI

i

I.

PENDAHULUAN

1

II.

DATA PAKET, PQ DAN PENGUMUMAN PELELANGAN

3

III.

PENGAMATAN PELAKSANAAN RAPAT PENJELASAN AWAL

DAN KUNJUNGAN LAPANGAN/PRE-BID MEETING AND SITE VISIT 4

1. Pelaksanaan Rapat Penjelasan Awal/Pre-Bid Meeting

4

2. Kunjungan Lapangan/Site Visit

5

IV.

PENUTUP

7

(4)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Western Indonesia National Roads Improvement Project (WINRIP)IBRD Loan No: 8043-ID

1

LAPORAN HASIL PENGAMATAN PROSES PENGADAAN JASA

KONSTRUKSI

TAHAP PERTAMA

BAGIAN I

PENDAHULUAN

Pemerintah Indonesia dengan Bank Dunia telah menandatangani Naskah Perjanjian Pinjaman (Loan Agreemnet) untuk Western Indonesia National Roads Improvement Project (WINRIP) IBRD Loan No. 8043-ID pada tanggal 14 Desember 2011. Loan efektif 12 Maret 2012 dan akan berakhir pada tanggal 31 Desember 2017, senilai USD250 juta. Porsi sharing Loan dan GOI adalah 70:30 untuk Civil Works, dimana Pemerintah Indonesia menyediakan Dana USD 100 juta, sehingga total nilai proyek adalah USD 350 juta. Pinjaman tersebut akan digunakan untuk mendukung penguatan berkelanjutan Sistem Jaringan Jalan Nasional di wilayah Indonesia Barat,yaitu untuk pekerjaan jalan dan jembatan.

Tujuan utama proyek WINRIP adalah untuk meningkatkan status jaringan yang sebelumnya berfungsi sebagai jalan provinsi atau jalan non status agar sesuai dengan standar yang baru yaitu jalan nasional; memastikan bahwa jaringan jalan nasional tersebut menjadi lebih lancar dan berkeamanan; dan mampu mendukung peningkatan ekonomi daerah. Sesuai dengan Schedule 2 Section IC Naskah Perjanjian Pinjaman WINRIP,dan Bab 11 Project Management Manual (PMM) WINRIP, Pemerintah Indonesia dan Bank Dunia menyepakati pelaksanaan Anti-Corruption Action Plan (ACAP) atau Rencana Tindak Anti Korupsi (RTAK) dalam pelaksanaan proyek.

Adapun tujuan RTAK adalah untuk;

1. Mengidentifikasi resiko bagi pemerintah dan langkah-langkah pencegahan sehingga mencapai standard sistem kendali yang lebih baik dari yang telah dilakukan pada program-program sebelumnya.

2. Mengatasi semua resiko dalam bentuk rencana tindak yang dikendalikan oleh Ditjen. Bina Marga.

3. Mencapai pelaksanaan RTAK WINRIP yang sejalan dengan Pedoman Bank Dunia tentang Pencegahan dan Upaya Memerangi Penipuan dan Tindak Korupsi pada program-program yang didanai oleh Bank Dunia.

Pelaksanaan komponen RTAK WINRIP pada dasarnya adalah dalam rangka peningkatan transparansi dalam proses pelaksanaan proyek dengan menarik pelajaran dan pengalaman dari pelaksanaan RTAK pada proyek-proyek sebelumnya agar lebih kuat dan efektif, dengan melakukan langkah-langkah pencegahan dan meningkatkannya pada pelaksanaan rencana tindak-nya. Berdasarkan pelajaran dan pengalaman pada proyek sebelumnya, maka RTAK yang akan dilakukan meliputi

(5)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Western Indonesia National Roads Improvement Project (WINRIP)IBRD Loan No: 8043-ID

2

lima area sebagaimana diformulasikan dalam Matrik Pemetaan Resiko Korupsi dan Rencana Tindak yaitu:

a. Meningkatkan Penyebarluasan Informasi dan Transparansi

b. Meningkatkan Pemantauan yang dilakukan oleh Masyarakat Madani c. Meningkatkan Mekanisme Penanganan Pengaduan

d. Pencegahan Kolusi serta Pemalsuan dan Resiko Penipuan, dan e. Penerapan Sanksi dan Tindakan Hukum

Sedangkanruanglinkup pelaksanaan RTAK atau ACAP meliputi komponen-komponen berikut:

1. Pelibatan Wakil Pengamat dari Masyarakat (WPM) / Community Representative Observers (CROs) dalam pemantauan atau pengamatan terhadap proses pelelangan / pengadaanjasakonstruksi.

2. Keterbukaaninformasikepada public / Public Disclosure.

3. Penanganandan pengelolaan Pengaduan dari Masyarakat / Complaint Handling Mechanism System (CHS).

4. Pelibatan Pemantauan oleh Pihak Ketiga / Third Party Monitoring (TPM) dalam pemantauan proses konstruksi.

WPM berperan sebagai komponen yang mewakili masyarakat madani dalam mengamati dan mencermati proses pelelangan / pengadaan jasa konstruksi untuk mencegah terjadinya praktek korupsi, kolusi, dan nepotisme, serta tindak pemalsuan dan resiko penipuan.

(6)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Western Indonesia National Roads Improvement Project (WINRIP)IBRD Loan No: 8043-ID

3

BAGIAN II

DATA PAKET DAN PENGUMUMAN PELELANGAN

1. DATA POKOK

No Paket : 12

Nama Paket : Kambang-Indrapura Lokasi Paket : Kabupaten Pesisir Selatan Provinsi : Sumatera Barat

Satuan Kerja : Satuan Kerja Pelaksanaan Jalan Wilayah II, Provinsi Sumatera Barat

2. PENGUMUMAN PELELANGAN

Apakah diumumkan di Website? v Ya Tidak

Bila ‘Ya’ sebutkan website institusi: LPSE PU ,http://www.pu.go.id Tanggal dimuat : 28 Mei 2015

Apakah pengumuman di website tersebut lengkap dan jelas? v Ya kurang lengkap

Apakah informasi pelelangan diumumkan pada papan pengumuman? Ya v Tidak

Apakah ada pihak (calonpeserta) yang mengalami kesulitan mendapatkan dokumen pelelangan? Ya v Tidak

Apakah ada pemungutan biaya diluar ketentuan yang telah ditetapkan di dalam dokumen lelang.

Sepengetahuan WPM tidak ada pemungutan biaya diluar ketentuan yang telah ditetapkan di dalam dokumen lelang.

Apakah ada proses registrasi untuk bisa mengikuti pelelangan ini? Ada, dengan cara:

websitehttp://www.pu.go.id

“Full e-Procurement”

“Tahun Anggaran”

“Provinsi”

“Direktorat Jenderal Bina Marga”

“Satminkal”

“Tanggal

Pendaftaran”

“User ID”

“Password”

“Login”

“Nama Paket” “Pendaftaran”

(7)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Western Indonesia National Roads Improvement Project (WINRIP)IBRD Loan No: 8043-ID

4

BAGIAN III

PENGAMATAN PELAKSANAAN RAPAT PENJELASAN AWAL DAN

KUNJUNGAN LAPANGAN / PRE-BID MEETING AND SITE VISIT

1. PELAKSANAAN RAPAT PENJELASAN AWAL / PRE-BID MEETING (Aanwijzing)

Rapat Penjelasan Awal /Pre-Bid Meeting (aanwizjing dilaksanakan pada hari Senin tgl. 15 Juni 2015 dibuka pada jam 9.30 s.d jam 15.00 bertempat di Kantor Balai Besar Pelaksanaan Jalan Nasional II, Jl. Jati No. 109 Kota Padang.

Pembukaan rapat oleh Ir. Elvi Roza,MT sebagai Ketua Pokja WINRIP Satker Pelaksanaan Jalan Nasional Wilayah II Provinsi Sumatera Barat mewakili pejabat Kepala Balai Besar Pelaksanaan Jalan Nasional .

Rapat dihadiri unsur-unsur instansi terkait yaitu:

1. BBPJN II : Ir. Elvi Roza, MT (Kepala Bidang Pelaksanaan/Ketua Pokja) 2. Pokja:

a. Julmadian Abda, ST., MT (Sekretaris) b. Filino Kalani, ST (Anggota)

c. Deri Haryadi, ST (Anggota)

d. Fachmi Fajar Kurniawan, SST., MT (Anggota) e. Suriyatno, ST (Anggota)

f. Mayda Citra Resmi Budi Pratiwi, ST (Anggota) 3. Satker PJN Wilayah II : Rama Senjaka

4. PPK 15 : Paides Tasril

5. CTC WINRIP : M. Edhi Fachri (Procurement Specialist 2) 6. DSC WINRIP : Amir Yuwono (Co-Team Leader)

7. WPM : Syaiful Amri/PNP

Rekanan atau calon peserta lelang yang hadir pada rapat Aanwijzingt tersebut 18 utusan perusahan (absen terlampir).

Ringkasan penjelasan/arahan yang disampaikan oleh:

1. Kepala Balai Besar Pelaksanaan Jalan Nasional (BBPJN)/Unit Layanan Pengadaan (ULP), tentang:

- Jenis Pelelangan: Pelelangan tanpa prakualifikasi, Pelelangan Internasional (ICB)

- Nama Paket : Kambang-Indrapura - LokasiPaket : Kabupaten Pesisir Selatan 2. Ketua Pokja Pengadaan tentang:

 Ringkasan data paket-paket yang akan ditenderkan - Nomor dan nama paket : 12/ Kambang-Indrapura

 Panjang efektif 55,2 Km, titik awal Km 130,00 dan titik akhir proyek Km 130,00

(8)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Western Indonesia National Roads Improvement Project (WINRIP)IBRD Loan No: 8043-ID

5

 Jenis pekerjaan (peningkatan / pelebaran jalan, overlay,

perbaikan/penambahan drainase, pekerjaan jembatan, dll.)

 Kondisi existing jalan lama dan rencana peningkatannya dengan pelabaran dan overlay

 Nilai Owner Estimate (HPS) Rp. 457.568.535.000,- Durasi pelaksanaan 720 hari kalender

 Tata cara dan persyaratan mengikuti pelelangan.  Dan lain-lain

Tuliskan ringkasan tanya jawab pada rapat penjelasan/aanwizjing: Seperti terlampir pada berita acara.

Catatan Khusus/Tambahan:

Berdasarkan hasil pengamatan Saudara, apakah ada catatan khusus/tambahan?

Aanwijzing kantor dan Aanwijzing lapangan/site visit berjalan sesuai dengan aturan yang berlaku dan kondusif.

2. KUNJUNGAN LAPANGAN / SITE VISIT

2.1. Jelaskan kapan pelaksanaan kunjungan lapangan/ site visit dilaksanakan :

Tanggal 16 Juni 2015.

2.2. Jelaskan tentang pertemuan persiapan kunjungan lapangan, lokasi pertemuan, yang memimpin pertemuan, unsur-unsur terkait yang mengikuti kunjungan lapangan:

Pertemuan dilasnakan di awal, tengah dan akhir STA, yang dihadiri oleh Pokja, PPK, WPM dan rekanan.

2.3. Daftar rekanan yang mengikuti kunjungan lapangan :

12 rekanan (absen terlampir).

2.4. Siapa yang memimpin kunjungan lapangan tersebut :

Pokja.

2.5. Jelaskan kronologis kegiatan kunjungan lapangan mulai dari berangkat sampai kembali kekantor Satker/PPK:

Tanggal 16 Juni 2015 Jam 8.30 berangkat ke lapangan, jam 12.30 tiba di KM 130.00 (awal STA), jam 16.05 tiba di Akhir KM 180.00, dan jam 17.30 tiba di Tapan. Jam 23.40 tiba kembali di Padang.

2.6. Catat lokasi titik awal proyek, pada KM 130+00 (Lapangan Sepak Bola Kambang) dan titik akhir pada KM 180 + 00 (Tikungan maut Indrapura).

2.7. Catat kondisi existing jalan atau jembatan yang ada seperti:

 Lebar existing jalan, apakah sama sepanjang ruas proyek ataau bervariasi, kondisi pondasi dan perkerasannya, jenis konstruksi, kondisi drainase dan pembuangan limpasan air, ketersediaan quarry material di lokasi proyek, dll.

Lebar 6,00 m relative sama lebar sepanjang jalan, kondisi pondasi jalan 25 % rusak, drainase 80% tidak ada.

 Kondisi topografi/konturnya (daerah datar rendah/dataran tinggi, gambut/ berawa/tanah lunak, perbukitan/ pegunungan, rawan bencana/longsor/banjir/abrasi, tanah labil, dll);

(9)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Western Indonesia National Roads Improvement Project (WINRIP)IBRD Loan No: 8043-ID

6

 Kondisi rona lingkungan kiri/kanan jalan (pemukiman, lokasibisnis/pasar, kebun, sawah,

hutan, cagarbudaya, kelompok masyarat adat/indigenous people, hutan lindung, daerah koservasi, kemungkinan dampak negatif terhadap masyarakat, dll)

Kondisi rona lingkungan kiri/kanan jalan 15 % daerah pemukiman dan selebihnya daerah konservasi dan hutan lindung

2.8. Catat semua penjelasan dari pemimpin kunjungan dan pertanyaan dari para rekanan.

Dokumen cukup jelas dan detail.

2.9. Buatlah foto dokumentasi tentang kondisi lapangan proyek, terutama yang menjadi critical points, titik awal dan akhir.

(terlampir)

2.10. Catat perbedaan/ketidak-sesuaian antara gambar desain dan kondisi lapangan.

Sementara cukup jelas dan detail

2.11. Hal-hal lain yang dirasakan perlu disampaikan.

Supaya rekanan lebih aktif dan pro aktif memahami dokumen sebelum Site visit, sehingga semua potensi dan kendala lapangan di ketahui.

2.12. Mintalah copyan daftar hadir pada kegiatan pre-Bid Meeting maupun pada kegiatan sitevisit.

(10)

Laporan Hasil Pengamatan Proses Pengadaan Jasa Konstruksi

Western Indonesia National Roads Improvement Project (WINRIP)IBRD Loan No: 8043-ID

7

BAGIAN IV

PENUTUP

1. KESIMPULAN

Kesimpulan hasil pengamatan pada kegiatan Pre-Bid Meeting dan Site Visit, apakah ada pelanggaran yang terjadi atau hal-hal yang berhubungan dengan prosedur pelelangan berdasarkan prinsip-prinsip ACAP.

Kesimpulan mengacu pada Berita Acara Aanwijzing / Menutes of Pre-Bid Meeting. Pokja/Panitia sudah melaksanakan kegiatan dengan baik, tapi rekanan kurang aktif dan mungkin belum memahami dokumen dengan baik dan detail. Sehingga terkesan Aanwijzing belum mencapai sasaran, dan hamper seperti acara seremonial saja.

2. CATATAN DAN SARAN

Catatan dari kegiatan Pre-Bid Meeting dan Site Visit yang telah berlangsung, dan berilah saran-saran berdasarkan catatan-catatan tersebut.

Untuk Rekanan :

Aanwijzing merupakan kegiatan yang sangat penting, sebagai acuan dalam melakukan penawaran. Pada kegiatan Aanwijzing dapat lebih memahami dokumen rencana, dan dapat mengetahui peluang/kemudahan, serta mengetahui tantangan dan kendala lapangan. Lokasi kegiatan merupakan jalan antar kabupaten dan propinsi. Jadi harus memahami strategi pelaksanaan, supaya tidak berdampak signifikan pada kelancaran lalu lintas nantinya.

Untuk Panitia :

Disamping rekanan dapat mengajukan pertanyaan tertulis dan dijawab panitia tertulis melalui email, juga sebaikmya diberi kesempatan rekanan untuk bertanya secara langsung pada saat Aanwijzing kantor.

(11)

ii Laporan Hasil Pengamatan Proses Pengadaan Jasa Pekerjaan Konstruksi

DAFTAR LAMPIRAN

Lampiran 1. Pengumuan Undangan Lelang

Lampiran 2. Undangan Pre-Bid Meeting dan Site Visit

Lampiran 3. Berita Acara Aanwijzing / Minutes of Pre-Bid Meeting + Site Visit Lampiran 4. Dokumentasi

(12)

REPUBLIC OF INDONESIA

M I N I S T R Y O F P U B L I C W O R K S

D I R E C T O R A T E G E N E R A L O F H I G H W A Y S

WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (IBRD Loan No. 8043-ID)

Invitation for Bids

International Competitive Bidding

Date

: May 28, 2015

Loan N

o

: 8043-ID

IFB N

o

: 003/WINRIP/POKJA/PJN2PROV.SUMBAR/V/2015

1.

The

Republic of Indonesia

has received a loan from the International Bank for

Reconstruction and Development (IBRD) in various currencies towards the cost of Western

Indonesia National Roads Improvement Project (WINRIP). It is intended that part of the

proceeds of this loan will be applied to eligible payments under the following contract:

Package No.

: 12

Package Name

: Kambang - Inderapura

2.

The Government of the Republic of Indonesia, Ministry of Public Works (MPW),

Directorate General of Highways (DGH)

now invites sealed bids from interested eligible bidders

for the construction and completion of the construction of the above project (“the Works”).

3.

Interested eligible Bidders may download a complete set of bidding documents in the

English language, after login as described below (free of charge).

4.

All bidders -Foreign and Domestic– interested to bid must use the e-procurement system.

In order to use this system, the Bidders must register in the system electronically through the

Ministry Public Works website, (www.pu.go.id) under the procurement section to obtain

access code to the system. In particular, for international Bidders, this access code will only be

valid for WINRIP Project. Local bidders will follow as usual registration process for the

project financed by government own budget (APBN).

The two step registration process is explained below:

I.

To obtain access code

a.

The Bidder can obtain from whether click in the banner of “LPSE or Layanan

Pengadaan Secara Elektronik” on the box-command of “Full E-Procurement”, or

b.

Click on direct link

http://www.pu.go.id/site/view/67

then click on “Registrasi”. By this

access code, the Bidder can register to the specific package that interested in. Please

follow the instruction hereafter

c.

The procedures to obtain the User-ID and Password are as follows:

i.

Open the MPW website at http://www.pu.go.id

ii. Click the “Full e-procurement”

iii. Select the Language as necessary

iv. Click “Registrasi bagi Penyedia Jasa yang belum memiliki User-ID”

(Registration for Participant who has yet no User- ID).

(13)

v. Click “Klik Disini” in the right side of “Untuk Penyedia Jasa (Badan Usaha)

Nasional” (For Domestic Participants (Entities))

vi. Click “Click Here” in the right side of “For Foreign Vendors WINRIP

Project”.

vii. Click “Agree” and then fill the data. Finally, Click “send”

viii. For Joint Venture (JV), Joint Operation (JO), Consortium or Association,

click “Klik Disini” in the right side of “Untuk Joint Operation (JO), Joint

Venture (JV) dan Association”

ix. For Domestic Bidder as leading member, fill the user-ID and password, then

click “Login”

x. For the Foreign Bidder as leading member, click “Klik Disini”, then fill

the user-ID and password, and finally click “Login”

xi. The User-ID and Password will be sent to the Bidder by email.

II.

To register to specific package

The procedures to register the related package and download the bidding documents are

as follows:

i.

Open the MPW website at http://www.pu.go.id

ii.

Click the “Full e-Procurement”

iii.

Select the Language as necessary

iv.

Select “Tahun Anggaran” (Fiscal Year), select “Provinsi” (Province) and

choose “Direktorat Jenderal Bina Marga” (Directorate General of

Highways) in the menu of “Satminkal” (Administration Based Unit). All

in the left column. The registration period can be seen in the right column

of “Tanggal Pendaftaran” (Registration Date).

v.

Fill the “User ID” and “Password” in the left column, and click “Login”

vi.

Select the Package Name in the column of “Nama Paket” (Package

Name)

vii.

Click the icon of “Pendaftaran” (Registration)

viii.

Fill the registration form completely, especially for “Kualifikasi”

(Qualification):

a.

Bidang (maximum 50 characters) : Civil Works

b.

Sub-bidang (maximum 50 characters) : Road and Bridge Works

c.

Lingkup Layanan (maximum 50 characters): Construction Works

and for asterisk (*) in red color may be filled or unfilled as necessary.

ix.

Click “Pendaftaran” (Registration). The registration receipt will appear and

print it as an evident, and Click “Kembali” (back).

x.

To download the bidding documents, click the file name of bidding

documents in the right side of “Dokumen Lelang” (Bidding Documents).

xi.

Click “Save” to save the file into the Hard Disk without change the file name

(14)

xii.

Click “Pemasukan Admtek” (Upload of Technical Administration Documents).

All files must be in format ZIP/RAR.

xiii.

Click “Kirim” (Send Files Submission of Technical Administration

Documents).

xiv.

Click “Pemasukan Biaya” (Input Bid Price).

xv.

Click “Ok”. Upload Bid Price Documents as upload of Technical

Administration Documents.

xvi.

Click “Dokumen Berita Acara Aanwijzing” (Download Minutes of Pre-Bid

Meeting).

xvii.

Click “Pelelangan yang Sedang Berlangsung” (Bidding process), and then click

“Pembukaan Penawaran Harga” (Bid Opening). Bidder can also download

Minutes of Bid Opening (click “Dokumen Berita Acara Pembukaan

Penawaran”).

xviii. Click “Hasil Evaluasi Penawaran” (Result of Bid Evaluation).

xix.

Click “Pemenang Pelelangan” (Notification of Award). If the bidder is not

satisfied with it’s the award, then the bidder can do the complain.

xx.

Click “Sanggah” (Complain). Enter your complain on the fields and then send

by click “Kirim” (Send).

xxi.

Click “Penunjukan Pemenang” (Bidding award). The award of bidder can

download notify the successful bidder.

xxii.

To see other additional information from the Procurement Committee, bidders

can download by click “1,2,3,…” (Number) in the column “Info Lain”

5.

A complete set of bidding documents may be obtained by interested eligible bidders by

downloading from the Ministry of Public Works website

(www.pu.go.id). In addition to bidding documents, the detail of bidding information can be obtained from the Procurement Committee (by request) at the addresses as stated below from June 1, 2015 to July 10, 2015 between

09:00 hr to 16:00

hr Local Time.

Procurement Committee (Pokja) of the Western Indonesia National Roads

Improvement Project (WINRIP) Satker Pelaksanaan Jalan Nasional Wilayah II,

Provinsi Sumatera Barat - ULP Sumatera Barat – Kementerian Pekerjaan Umum

dan Perumahan Rakyat.

Address: Jalan S. Parman No. 129

City: Padang

ZIP Code: 25136

Country: Indonesia

Telephone: +62 751 443231

Facsimile number: +62 751 443231

(15)

6. Foreign applicants who are interested to work in Indonesia are required to have a

working license certification “Badan Usaha Jasa Konstruksi Asing - BUJKA” from the

Minister of Public Works Regulation (PERMEN PU) No. 05/PRT/M/2011 prior to signing the

contract (but not a pre-condition for bidding). With respect to the working license certification

requirement under the above regulation, the requirement for the foreign firms to form mandatory

associations (joint ventures/joint operations/sub-contracting) with local firms will not be

applicable to this contract. Bidders may however form such associations if they themselves

choose to do so.

7.

Deadline of submission of the bids on or before 10.00 a.m. local time on July 13, 2015

and must be accompanied by a security of IDR 11,500,000,000.00.

8.

Bids will be opened in the presence of bidders’ representatives who choose to attend at

10.15 a.m. local time on

July 13, 2015 at the offices of:

Procurement Committee (Pokja) of the Western Indonesia National Roads Improvement Project

(WINRIP) Satker Pelaksanaan Jalan Nasional Wilayah II, Provinsi Sumatera Barat, ULP

Sumatera Barat – Kementerian Pekerjaan Umum dan Perumahan Rakyat.

Address: Jalan S. Parman No. 129

City: Padang

ZIP Code: 25136

Country: Indonesia

Telephone: +62 751 443231

9.

No margin of preference for the domestic Bidder in Bid evaluation shall be given.

Procurement Committee (Pokja) of the

Western

Indonesia

National

Roads

Improvement Project (WINRIP) Satker

Pelaksanaan Jalan Nasional Wilayah II,

Provinsi Sumatera Barat - ULP Sumatera

Barat, Kementerian Pekerjaan Umum dan

Perumahan Rakyat.

Chairman,

(Ir. Elvi Roza, MT.)

NIP. 19631023 199203 1 002

(16)

Nomor

:

009/WINRIP/POKJA/PJN2PROV.SUMBAR/V/2015

Padang, 12 Juni 2015

Lampiran

:1 (satu) lembar

Kepada Yth,

(daftar undangan terlampir)

di

tempat

Perihal : Undangan Mengikuti Pre Bid Meeting (Anwizing) Paket WINRIP AWP-II

Sehubungan dengan telah dimulainya proses lelang paket-paket WINRIP AWP II, dengan ini

kami sampaikan hal-hal sebagai berikut:

1. Kami mengundang Bapak/Ibu untuk hadir dalam acara pre bid meeting (anwizing) yang

akan dilaksanakan pada:

Hari/ tanggal

: Senin/ 15 Juni 2015

Waktu

: 09.30 WIB s.d selesai

Tempat : Aula Kantor Balai Besar Pelaksanaan Jalan Nasional II, Jalan Jati

No.109, Kota Padang

2. Adapun paket-paket yang dimaksud pada acara tersebut adalah sebagai berikut:

a. Paket 07: Inderapura - Tapan (NCB)

b. Paket 12: Kambang - Inderapura (ICB)

Demikian kami sampaikan, atas perhatian dan kehadirannya diucapkan terima kasih.

POKJA WINRIP Satker Pelaksanaan Jalan

Nasional Wilayah II Provinsi Sumatera Barat

Ketua,

Ir. ELVI ROZA, MT

NIP. 19631023 199203 1 002

Tembusan disampaikan Kepada Yth,

1. Kepala Balai Besar Pelaksanaan Jalan Nasional II di Padang (sebagai laporan); 2. Kepala ULP Provinsi Sumatera Barat Kementerian PUPR, di Padang;

3. Pertinggal.

(17)

LAMPIRAN

Surat Ketua POKJA WINRIP Satker Pelaksanaan Jalan Nasional Wilayah II

Provinsi Sumatera Barat

No

:

009/WINRIP/POKJA/PJN2PROV.SUMBAR/V/2015

Tanggal

: 12 Juni 2015

Undangan disampaikan kepada Yth:

1. Julmadian Abda, ST., MT, sebagai Sekretaris merangkap Anggota

POKJA WINRIP PJN II;

2. Filino Kalani, ST, sebagai Anggota POKJA WINRIP PJN II;

3. Husna Fauzia, ST., MT, sebagai Anggota POKJA WINRIP PJN II;

4. Deri Haryadi, ST, sebagai Anggota POKJA WINRIP PJN II;

5. Agung Ginanjar, ST., MT, sebagai Anggota POKJA WINRIP PJN II;

6. Fachmi Fajar Kurniawan, SST., MT, sebagai Anggota POKJA WINRIP PJN II;

7. Kepala Satuan Kerja Pelaksanaan Jalan Nasional Wilayah II Provinsi Sumatera Barat;

8. PPK 15 – Penanganan Jalan Nasional Wilayah Inderapura dan Sekitarnya, Satker PJN

Wilayah II Provinsi Sumatera Barat.

9. PMU WINRIP di Jakarta;

10. DSC WINRIP di Padang;

11. Wakil Pengamat Masyarakat (WPM)/Community Representative Observers (CRO) Paket

07 (Inderapura – Tapan) dan Paket 12 (Kambang – Inderapura)

(18)

MINUTES OF PRE BID MEETING

Number : 007/WINRIP/POKJA/PJN2PROV.SUMBAR/VI/2015 Held On June 15, 2015

For Civil Works Packages 12: Kambang-Indrapura WINRIP IBRD Loan No. 8043–ID

IFB: 003/WINRIP/POKJA/PJN2PROV.SUMBAR/V/2015

Description of Works : The Carriageway of 55,20 km is being widening to 7 m plus 1.0 – 2.0

m hard shoulders on both sides. Drainage is being provide along the entire lenght of the project road. The project starts at Km.131+334 from Kambang and ends at Km.186+534 in Indrapura (Link N 03.044), West Sumatera Province. The road works consist of road betterment, asphalt overlay, drainage improvement and road widening.

Work Unit : Satker Pelaksanaan Jalan Nasional Wilayah II Prov. Sumatera Barat Activity : PPK 15 Indrapura dan Sekitarnya

Location : Kambang-Indrapura

I. PRE BID MEETING

1. Place and Time of the Pre – Bid Meeting

Place : Balai Besar Pelaksanaan Jalan Nasional II Jalan Jati No. 109 Padang Time : 09.30 to finish local time

Date : June 15, 2015

2. Attendance

A. From Employer : Procurement Commitee

- Ir. Elvi Roza, MT / Chairman

- Julmadian Abda, ST, MT / Secretary - Filino Kalani, ST / Member

- Deri Haryadi, ST / Member

- Fahmi Fajar Kurniawan, SST, MT / Member - Suriyatno, ST/ Member

- Mayda Citra Resmi Budi Pratiwi, ST/ Member

Jl. S. Parman No. 129, Padang 25133 Telp:.(0751) 443231 Fax: (0751) 443231 email: pokjawinrip.wildua.sumbar@gmail.com

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT

BALAI BESAR PELAKSANAAN JALAN NASIONAL II

POKJA WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP) SATKER PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI SUMATERA BARAT - ULP SUMATERA BARAT

(19)

B. From DGH:

- Paides Tabril, ST / Pejabat Pembuat Komitmen 15 (Indrapura Cs)

C. Other Participants :

- Ir. M. Edhi Fachri / CTC Winrip (Procurement Specialist 2) - Dhea Devira / CTC WINRIP (Assistant Procurement)

- Amir Yuwono/ DSC WINRIP

D. Òbserver:

Syaiful Amri

E. From Prospective Bidders:

21 (Twenty One) Bidders

II. RECORD OF THE PRE BID MEETING

- Opening on 10.00 a.m local time,

- The pre bid meeting was opened by Ir. Elvi Roza, MT, chairman of Procurement Commitee (POKJA) WINRIP Satker Pelaksanaan Jalan Nasional II Provinsi Sumatera Barat-ULP Sumatera Barat;

- An opening remarks was conducted by chairman of Procurement Committee to examine the Technical requirement that bidders must consider in their bids for package 12: Kambang - Indrapura. He state that the purpose of the pre bid meeting is to inform the bidder the complete requirement of the work to avoid any mis-interpretation.

- Explanation of the Official Commitment Maker (PPK 15) regarding the scope of work for Package No: 12;

- Presentation of the bidding procedures of WINRIP as well as emphasis were highlighted on the requirement of the bid document by Ir. M. Edi Fachri (Procurement Specialist 2 CTC WINRIP)

- A Prospective Bidder requiring clarification shall contact the comittee in writing at the comittee’s email address stated in the bid document to be submitted no later than 22 Juni 2015;

- The result of clarification by POKJA will be uploaded with this Minutes of Pre Bid Meeting by LPSE system on date June 25, 2015;

- Deadline of Bid submission will be at 10.00 a.m on date July 13, 2015 . Late bids will be automatically rejected by LPSE system (the bidder cannot upload the bids after the deadline);

(20)

- For an explanation of the field will be conducted on Tuesday dated June 16, 2015 with the rallying point in the office of Balai Besar Pelaksanaan Jalan Nasional II at 08:00 a.m local time.

III. SITE VISIT

Time : 08.00 a.m. local time

1. Place and time of the site visit

Meeting point : Office of Balai Besar Pelaksanaan Jalan Nasional II Padang Time : 08.00 a.m. local time

Date : Tuesday, June 16, 2015

2. Attendance

A. From Employer :

Procurement Commitee

- Ir. Elvi Roza, MT / Chairman

- Julmadian Abda, ST, MT / Secretary - Filino Kalani, ST / Member

- Deri Haryadi, ST / Member

- Fahmi Fajar Kurniawan, SST, MT / Member - Suriyatno, ST/ Member

- Mayda Citra Resmi Budi Pratiwi, ST/ Member

B. From DGH :

- Paides Tabril, ST / Official Commitment Maker (PPK 15 Indrapura Cs)

C. Observer:

Syaiful Amri

D. From Prospective Bidders:

(21)

The Procurement Team declared that minutes of pre bid meeting of Package 12 Kambang – Indrapura, AWP-2 WINRIP IBRD loan No. 8043 – ID made and provided in the duly completed are complete, true, and correct.

PROCUREMENT TEAM

1 Ir. Elvi Roza, MT Chairman 1...

2 Julmadian Abda, ST, MT Secretary 2...

3 Filino Kalani, ST Member 3...

4 Deri Haryadi, ST Member 4...

5 Fachmi Fajar Kurniawan, SST, MT Member 5...

6 Suriyatno, ST Member 6...

(22)

Queries for Package No.12 : Kambang-Indrapura (during Pre-Bid Meeting and

received in writing by POKJA)

No Questions Answers

1. Is the bid security form must be in accordance with the format of the document procurement?

Please refer to ITB Clause 19.3: ... the bid

security shall be submitted either using the Bid Security Form included in Section IV, Bidding Forms, or in another substantially similar format approved by the Employer prior to bid submission…….

2. Regarding the experience of similar work. If in the case of JV whether minimum contract value may be a combined value of the contract between the members of JV? please explain.

In the case of JV, the minimum contract value for similar work can not be combined, must be meet by the main contractor.

3. For the credit facility is listed in the bidding documents? and what is the nominal value of the Line of Credit?

The credit facility could not be as the requirement, otherwise, the remaining balance available may be counted as part of the cash flow. Please see Page 79 Form FIN -.3: Financial Resources for more explanation. 4. For the 2014 financial statements were not

audited, whether it can attach a letter being audited? ( reference letter signed by the person in charge of the company)

Financial statements for 2014 must be audited

5. Please explain the addresss of employer to submit the bid security and how long bid security validity period ?

The Employer:

Directorate General of Highways, Ministry of Public Works, Republic of Indonesia.

Att:

Procurement Committee (POKJA) of the Western Indonesia Nastional Roads Improvement Project (WINRIP) Satker Pelaksanaan Jalan Nasional Wilayah II Provinsi Sumatera Barat-ULP Sumatera Barat Kementerian Pekerjaan Umum dan

Perumahan Rakyat.

Address: Jalan S. Parman No.12 9, Padang The bid security validity period is refer to Bidding Document Section I, ITB 19.3

6. Which ones form of bid security used, option 1 ICC 0758 or option 2 clause 1832 of Indonesian Civil law ?

Please select one of the 2 options

7. Please explain for perforated pipe work items (Perforated Pipe) for subsurface drainage work / Perforated or Porous Pipe For Sub-surface Drainage Works, for the job is the location where? Please give us the picture.

Please see Drawings page Typical Cross Section Type-1 and Standard Drawing Detail Drainage – Ditch (1)

8. Please explain, whether it can use a number more than one unit of equipment to meet the minimum capacity requirements?

The minimum requirements the total capacity of equipment, so it can use more than one equipment

(23)

schedule in Bidding Document 10. Please confirm the official to whom the letter

of bid security is quoted ?

The Employer:

Directorate General of Highways, Ministry of Public Works, Republic of Indonesia.

Attention:

Procurement Committee (POKJA) of the Western Indonesia Nastional Roads Improvement Project (WINRIP) Satker Pelaksanaan Jalan Nasional Wilayah II Provinsi Sumatera Barat-ULP Sumatera Barat Kementerian Pekerjaan Umum dan

Perumahan Rakyat.

Address: Jalan S. Parman No.12 9, Padang 11. Segmentation of Treatment in drawing

documents is different with site visit information.

Please use Segmentation of Treatment in Drawings for reference.

12. What about land acquisition progress? Is it already 100%?

The process of land acquisition is still on going. The process will be complete before site take over.

13. Are the bridges in the project links that have a short or long span only get overlay?

There are only routine maintenance works for the existing bridges as listed in Division 10.1.5 and only AC-WC overlay

14. Are there licensing assistance from the committee (Environmental Permit) to basecamp, in order to facilitate our work, if we win the tender?

The committee does not have authority to provide the assistance.

15. Is the equipment capacity can be lowered (stone crusher), by adding the equipment to keep producing material needed?

Please see answer number 8

16. Does the experience of carrying out the work of asphalt concrete and aggregate base with production value indicated on the document during the last 5 years become the administrative requirements that must be met?

Please see page 44 Section III Evaluation and Qualification Criteria (Without Prequalification) Point 4. Experience

17. How is progress of land Acquisition ? Please see answer number 12 18. In Contract data Point 13.8 : “The Price

Adjustment shall be payable after 13 months from commencement of works. But, at the statement below in “Pn : Not applicable”. Why are these contradictive ? because Pn is the adjustment multiplier to be applied to the estimated contract value in the relevant currency of the work carried out in period ?

Please see page 172 Section VIII. General Condition Point 13.8:

―Pn is the adjustment multiplier to be applied to the estimated contract value in the relevant currency of the work carried out in period “n”, this period being a month unless otherwise stated in the Contract Data.

19. Price Adjustment. When will date calculated as “Base date” ?

Please see page 111 Section VIII. General Condition Point 1.1.3. Dates, Tests, Periods and Completion

20. Scope of Work. Are there some bridges widening work in this project ?

(24)
(25)

ATTENDANCE

LIST

Package

:

Kambang-lndrapura

Day/Date

: Monday/July 15, 2015

Time

: 09.30 Local time to finish

Place

:Office

of Balai Besar Pelaksanaan Jalan Nasional

ll

Padang, Jl. Jati No. 109 Padang, West Sumatera, Indonesra

Program

: Pre-Bid Meeting

No Name Company

7€ign

sY,qA4(tlu L4WlrJAl

P|

NMilA

KAEA

qr

2.

(gNU

*aiq?.

PI.

BpANI44 hEtPP4Y*

fuN>

v,

\r/a^T

R,

b.tk

Exc

%

\

Rupi

HAou^l

l'f.

N

[r,ll

u(n

ir.ti [co-t] R i

il6

[r

Rulr,{t

.

Ttlc.

A

.24

-c.

frhe,1h'lrLrr,

f

Pr,4/li

hry.[/n,)

L

(yarrwt

7.Grua"or)os

.NV

7

/,Bt

AAvs

r'

a''h..:

0f

.

Druur

Yal-lA

BesRtz,

M"J)

n

6'

(M. \Oail

(tD

t

nt&t

tl

\9(av-e^-

kv

9

frve

for'.A

f(.trrhtlrrft

kr/t

lw

b

h't4oft

)rl-

.Y,',-g

?f

.

trlart.l^

l%

Utsf-il.

im

rF

-

lr

Yuotl0

O

,Sc-

\irjztrjPlP

hry

l>

Ln*

,

W

I

n"-'v--

|----{eo

6

e\,c

:z

lo t>

Wwpr

. .a

WW

}{a

rl/

hFlt

v4tnA

tr-Pt

[,5'

frWog

?rrnh

rC.?Y

m.

lb

hiltr\

w?f4

hn*

h c.-44

r?

ff,;

f.,t

fn

t^i

t^l

P

/a,

p"!^*

I

e-

f;

I8

h*il,

(26)

o

o

No Name Company Sign

\q

A*o.L

\"*.

A.A'

h. \r

V\.

Yorro

P"h*i*

a<

2o

tl,r.

Po.hr".^

y

?t

.Yrs.

?.+;.

mrhf

dtl

Roh^lll'on

P*'o

PI

pX.

?eu*7

U

l)r

tt:

Otr

o

2?

Pavv

'fuoNb

vti

i++UW

COfzporr*riOru

24

Atn,a

Wlt

ca

LeWo h6-1iot

'/)nn

w

+M4

4

M.Nqrsyai+(

futiw

r!t?u

?atulo

s

w-?L

(a,hmn

ktni

K.

hnbo

(craolun

2?

(asrnattleLbr

ft.

A*bo

("tao^

r-P

DAAIEu.

Vf

LHr((

L1

td,

i

A\*n

?.'\,,^

PT,

9rArr

rCo

itn (

@q^--\

w

Doud

Yhrp

z'tt

0r

fun-

bt.,

3t

IV\q.HAMAD

fATON

I

flY ,lYo koprnr,tui

(1

sL

PrtsBY

twuAt^,Ailrro

?T.lnyn loNrrctah''

-KA

5j

H Wt

Ntlgusrd

N.NV

w

'-7

++

u.l\{E

34

ffrIDEt

Ttffi.rL

FPt<

-

/-f-

.4

s{

6ir-,^,

loLn

-/a

\r

t

\-{

3T

DUE'

H^&yno,l

?u'n-*

.t

u

7T

)U

[r'n"Or'n^-.

A1*^^

?ot-\x

th

ry)

vq

WDJI

ilJIDJAJA

ff

-

MULTI

m,{YvVW,

\

(27)

No Name Company

X'nn

--qo.

le+

t)[^,

4t

'tA.E7th

fuaw

cTa

vlt'JW

kruL-tz.

tsl"i

lb=.-

\{D&^

(

oU.-

,'ad

v

L_

(28)

ATTENDANCE LIST

Package Day/Date Time Place Program Kambang - Indrapura Tuesday/July 16,2015

08.00 Local time to finish Kambang - Indrapura Slte Visit

No Name Gompany

W"

ly*"t^,^-

Aan

rt

\^,

P/^

7

10\uoa-'*

[L)u

laLtN

n,fr/

\

tpr

wYqo,

Vri,

V&

4.

t{'ul.sAr,.l

tF

Attf\foFsTl^$d

+{---€

T&lDer

Pr.

,rv

r.g

A

+14^

/"'

l.P

rT

A/l'r'/q*

@at'.1,

1

A.'rqnt^"tvti,.

,&/l-

PT.

P?

V

8,

flfnt

I

fivft(

fr

,NrNnlr /qfty,

g

Jt

rVa-o,

|Dr'

h,r*srrn

.f4qr6

'w

t0.

JVAUSG

L

WDrdrli

Fr

-

(,rurJrr{fi Kfia{/k

N

l1

l'lenlro

T

ft

YE, Pqru

f

tr

(29)

DOKUMENTASI KEGIATAN SITE VISIT PAKET 12: KAMBANG - INDRAPURA

Tim Aanwijzing Lapangan Wilayah II Berkumpul di Balai Jalan (16 Juni 2015- jam 8.30)

(30)

Penjelasan pada Calon rekanan di

KM 131+00 (Jam 12.00)

Terlihat Tanda Batas Pelebaran Jalan

Yang Mengenai Bangunan Penduduk

(31)

Referensi

Dokumen terkait

Berdasarkan latar belakang penelitian tersebut diatas, maka perumusan masalah dalam penelitian ini adalah yang pertama apakah faktor– faktor kesalahan customer service,

• Klinik Konsumen : eksperimen lab dimana partisipan diberi sejumlah uang tertentu dan diminta membelanjakannya dalam suatu toko simulasi dan mengamati bagaimana reaksi mereka

- Bagi yang mampu menambah lebih banyak dari itu semua, maka akan menuai kebaikan berlimpah insya Allah.. Menunaikan shalat Dluha walau hanya

Secara praktis diharapkan penelitian ini diharapkan dapat memberikan informasi tambahan dan gambaran tentang pengaruh perilaku kewirausahaan, pengalaman dan biaya pemasaran

mengusulkan pemberian sanksi atas pelanggaran Kode Etik yang dilakukan oleh pejabat struktural dan/atau pejabat fungsional dan/atau pengelola Pengadaan Barang dan Jasa

Hal ini dapat dilihat pada hasil yang telah diperoleh peneliti dari lama waktu penyaringan, dimana semakin tinggi suhu pencucian waktu yang dibutuhkan semakin

Fraksi Partai Demokrat meminta pemerintah memperhatikan realisasi pertumbuhan ekonomi, Penerimaan Negara (Pajak dan PNBP) serta implikasinya dari perlambatan ekonomi

JABATAN PENYUSUN BAHAN AKREDITASI JASA KONSTRUKSI JALAN REL DAN TANAH PENDIDIKAN TEKNIK SIPIL. PENEMPATAN SEKSI JALAN REL DAN TANAH WILAYAH II DIT