STUDI G EO LISTRIK DA N G EO LO G I PA DA DA ERA H RA WA N G ERA KA N TA NA H
Abdul Mukaddas *
Abstrac t
The purpose of this research, which was done in Cilebak Kuningan West Java, is to look for the cause of factors of the happening masswasting to be identified and predicted on stability of slope in this area. In this research, applied resistivity method of Wenner-Schlumberger configuration is applied to know thickness of coat decay and deepness of slip.
Data processing of geoelectric was done constructively Res2Dinv program to narrate the condition of subsurface. Its result interpreted by pursuant value of resistivity rock type. From cross section trajectory of measurement with direction of C – D and E – F, there are rock coat with the value of resistivity about 3,1 Ωm – 4,5 Ωm and 3,7 Ωm – 6,7 Ωm with the deepness reach 10 – 20 metre. This coat was predicted by as impermeable claystone of area personating able to slip. It was predicted as thick moudly coat reach about 6 – 10 metre.
From the evaluation on some aspects of related to cause of the happening masswasting like hydrology, geology, topography, layout of area farm and geophysics aspect, is estimated to cause of the happening masswasting in Cilebak, for example high precipitation, slope bevel inclination, situation slip and influence layout of area.
Ke ywords: Geoelectric, masswasting
A b stra k
Te la h d i la kuka n p e ne litia n d i C ile b a k Kuning a n Ja wa Ba ra t g una m e nc a ri fa kto r – fa kto r p e nye b a b te rja d inya g e ra ka n ta na h untuk d iid e ntifika si d a n d ip re d iksi te rha d a p ke sta b ila n le re ng d i d a e ra h te rse b ut. Pa d a p e ne litia n ini d ite ra p ka n m e to d e g e o listrik ta ha na n je nis d e ng a n ko nfig ura si e le ktro d a We nne r – Sc hlum b e rg e r untuk m e ng e ta hui ke te b a la n la p isa n p e la p uka n d a n ke d a la m a n b id a ng g e linc ir.
Pe ng o la ha n d a ta g e o listrik d ila kuka n d e ng a n b a ntua n Pro g ra m Re s2Dinv untuk m e nc itra ka n ko nd isi d i b a wa h p e rm uka a n. Ha silnya d ita fsirka n b e rd a sa rka n nila i ta ha na n je nis b a tua n. Da ri p e na m p a ng ta ha na n je nis untuk linta sa n p e ng ukura n d e ng a n a ra h C – D d a n E – F te rd a p a t la p isa n b a tua n d e ng a n nila i ta ha na n je nis se kita r 3.1 Ωm – 4.5 Ωm d a n 3.7 Ωm – 6.7 Ωm d e ng a n ke d a la m a n m e nc a p a i 10 – 20 m e te r. La p isa n ini d id ug a se b a g a i b a tule m p ung ke d a p a ir ya ng d a p a t b e rp e ra n se b a g a i b id a ng g e linc ir. La p isa n b a tua n ya ng d id ug a se b a g a i la p isa n la p uk ke te b a la nnya m e nc a p a i se kita r 6 – 10 m e te r.
Da ri e va lua si te rha d a p b e b e ra p a a sp e k ya ng b e rka ita n d e ng a n p e nye b a b te rja d inya g e ra ka n ta na h se p e rti a sp e k hid ro lo g i, g e o lo g i, to p o g ra fi, ta ta g una la ha n d a n a sp e k g e o fisika , d ip e rkira ka n se b a g a i p e nye b a b te rja d inya g e ra ka n ta na h d i C ile b a k, a nta ra la in c ura h huja n ya ng ting g i, ke m iring a n le re ng p e rb ukita n ya ng te rja l, le ta k b id a ng g e linc ir ya ng d a la m d a n p e ng a ruh ta ta g una la ha n d a e ra h.
Ka ta kunc i:G e o listrik, G e ra ka n ta na h
* Sta f Pe ng a ja r Jurusa n Te knik Sip il Fa kulta s Te knik Unive rsita s Ta d ula ko , Pa lu
1. Pe nd a hulua n
G e ra ka n ta na h m e rup a ka n p ro se s a la m ya ng se ring ka li m e m b a wa b e nc a na ya ng m e rug ika n e ko no m i d a n jiwa . Aktivita s g e ra ka n ta na h te rja d i p a d a Ap ril 2004 d i Da e ra h C ile b a k
Fa kto r g e o m e tri (K) untuk
ko nfig ura si ini a d a la h K = π n(n+1)a ,
d im a na a a d a la h sp a si e le ktro d a d a n n a d a la h p e rb a nd ing a n ja ra k e le ktro d a
C1-P1 a ta u P2-C2 d e ng a n d e ng a n sp a si
“ a ” (G a m b a r 2.) 3. Me to d e Pe ne litia n 3.1 p e nye lid ika n la p a ng a n
Pe nye lid ika n ini d ia wa li d e ng a n ke g ia ta n o b se rva si la p a ng a n m e lip uti p e ng a m a ta n ko nd isi g e o lo g i, ke a ira n, ve g e ta si d a n ta ta g una la ha n d i Da e ra h C ile b a k ya ng d ila njutka n d e ng a n surva i g e o fisika d e ng a n m e to d e g e o listrik ta ha na n je nis susuna n We nne r – Sc hlum b e rg e r. Pe ng o la ha n d a ta g e o listrik d ila kuka n d e ng a n b a ntua n p ro g ra m Re s2Dinv ya ng d ile ng ka p i d e ng a n Do ng le ka re na d a ta ya ng d io la h te rd a p a t d a ta to fo g ra fi.
3.2 Lo ka si d a n ko nd isi G e o lo g i d a e ra h C ile b a k
Lo ka si te rja d inya lo ng so ra n te rle ta k d i De sa C ile b a k Ke c a m a ta n C ile b a k Ka b up a te n Kuning a n Ja w a Ba ra t se c a ra
g e o g ra fis te rle ta k p a d a ko o rd ina t 108°
34’ 45” BT d a n 07° 08’ 12” LS. Se c a ra
m o rfo lo g i Da e ra h C ile b a k m e rup a ka n d a e ra h p e rb ukita n ya ng m e m b e nta ng se kita r a ra h Tim ur te ng g a ra - Ba ra t b a ra t la ut d e ng a n ke m iring a n le re ng
se kita r 9° - 40° hing g a te rja l. Lo ng so ra n
te rja d i p a d a le re ng se b e la h uta ra
d e ng a n ke m iring a n se kita r 45°.
Se c a ra re g io na l b e rd a sa rka n p e ta g e o lo g i le m b a r Ma je na ng ska la 1:100.000 (Ka sto wo d a n N. Suwa rna , 1996), b a tua n d i d a e ra h p e ne litia n d isusun o le h b a tua n Fo rm a si Ha la ng (Tm p h). Fo rm a si b a tua n te rse b ut te rd iri a ta s : b a tup a sir tufa a n, b a tule m p ung , ko ng lo m e ra t, b re ksi b e rsisip a n a nd e sit. Pe rse ling a n b a tule m p ung - b a tup a sir te rsing ka p d i d a e ra h te b ing Sung a i C im o nte d e ng a n ke d ud uka n b a tua n N
89˚E / 25˚ m iring ke a ra h Se la ta n.Struktur
g e o lo g i ya ng te rd a p a t d i d a e ra h ini a d a la h se sa r na ik d a n a ntiklin ya ng
b e ra ra h Ba ra t – Tim ur.
G a m b a r 2. Be rb a g a i ko nfig ura si e le ktro d a d a n fa kto r g e o m e trinya untuk
2004, d im a na b a nya k se ka li la ha n hija u ya ng d ia lihfung sika n se b a g a i la ha n untuk m e m e nuhi ke b utuha n p e nd ud uk. Alihfung si itu b e rup a ke p e rlua n p e rm ukim a n, la ha n p e rsa wa ha n, p e rke b una n, d a n a ktivita s la innya ya ng m e m b utuhka n la ha n ko so ng .
Alih fung si la ha n b e rup a la ha n p e rsa wa ha n d a p a t m e nja d i d a e ra h sum b e r a ir p e rm uka a n. Air huja n ya ng d ita m p ung la ha n p e rsa wa ha n se c a ra p e rla ha n a ka n m e ng a lir ke d a la m la p isa n ta na h, ha l ini b e rp e ng a ruh te rha d a p m e ning ka tnya g a ya d o ro ng ta na h p a d a le re ng te rse b ut. Untuk ke g ia ta n p e rke b una n um um nya d ita na m i je nis ta na m a n ya ng m e m iliki ka ra kte ristik a ka r ya ng tid a k kua t se p e rti p o ho n ke te la , ja g ung d a n p isa ng . De ng a n je nis ta na m a n se p e rti itu tid a k c ukup kua t untuk m e na ha n a ir te ruta m a p a d a sa a t c ura h huja n ting g i.
G a m b a ra n ko nd isi ke a ira n d i lo ka si d a e ra h p e ne litia n d ip e ro le h d a ri
p e ng a m a ta n te rha d a p b e b e ra p a sum ur g a li wa rg a se te m p a t ya ng m e m p e rliha tka n ke d a la m a n ra ta – ra ta 4 – 6 m e te r. Pa d a le re ng b a g ia n a ta s d i se kita r d a e ra h te rke na lo ng so ra n te rd a p a t m a ta a ir ya ng m e ng a lir se c a ra lia r te rus m e ne rus m e ng isi re ta ka n ta na h, d a n ha l ini a ka n m e m p e rc e p a t ta na h p a d a le re ng te rse b ut je nuh a ir. Be rd a sa rka n d a ta c ura h huja n ta huna n d a ri ta hun 2003 - 2004 ya ng d ip e ro le h d a ri sta siun p e na ka r Wa d uk Da rm a m e nunjukka n c ura h huja n b ula na n te rting g i te rja d i a nta ra b ula n No ve m b e r sa m p a i Ap ril ya itu 225 - 242 m m / b ula n. Ang ka ini m e la m p a ui c ura h huja n no rm a l untuk d a e ra h te rse b ut ya itu 172,3 m m / b ula n. Be sa rnya c ura h huja n, ting g i m uka a ir ta na h d a n a d a nya m a ta a ir se p e rti te rc a ntum d i a ta s, b e rp e ng a ruh te rha d a p te rja d inya lo ng so ra n d i C ile b a k.
Bidang gelincir Lapisan mengandung air
C D
Se la ta n b a ra t
daya
Uta ra tim ur la utG a m b a r 2. Pe na m p a ng ta ha na n je nis linta sa n C – D d e ng a n to p o g ra fi
Da ri p e ng a m a ta n se c a ra visua l d i la p a ng a n te rliha t ta na h p e nutup
b e rup a le m p ung p a sira n, g e m b ur d a n
m ud a h m e re sa p ka n a ir, se hing g a b e rp e ng a ruh te rha d a p p e nya lura n a ir sa m p a i ke b id a ng g e linc ir. Ko nd isi ini p a d a a khirnya d a p a t m e nye b a b ka n ta na h ya ng b e ra d a d i a ta s b id a ng
g e linc ir je nuh a ir d a n la b il. Da ri ko nd isi
g e o lo g i, b e rd a sa rka n p e ta g e o lo g i le m b a r Ma je na ng Ska la 1 : 100.000, d ip e ro le h g a m b a ra n ke m iring a n p e rla p isa n b a tua n d i d a e ra h p e ne litia n m iring ke a ra h se la ta n . Se la in itu, jug a te rd a p a t sing ka p a n d i te b ing Sung a i C im o nte ya ng m e m p e rliha tka n p e rse ling a n b a tup a sir b a tule m p ung
d e ng a n ke d ud uka n N 89˚E / 25˚. Ata s
d a sa r ini, d ip e rkira ka n ke m iring a n p e rla p isa n b a tua n d i d a e ra h lo ng so ra n tid a k se a ra h ke m iring a n le re ng , d a n ha l ini d a p a t m e ng ha m b a t te rja d inya lo ng so ra n.
Be rd a sa rka n ha sil p e ng o la ha n d a ta g e o listrik untuk linta sa n p e ng ukura n C – D te rliha t b e b e ra p a la p isa n ta na h/ b a tua n d e ng a n va ria si
nila i ta ha na n je nis se kita r 0.6 Ωm – 39.7
Ωm . Um um nya la p isa n te rse b ut p o ro s
b e risi a ir. Be rd a sa rka n nila i ta ha na n je nis d a n d a ta g e o lo g i d a e ra h te rse b ut, la p isa n d e ng a n nila i ta ha na n je nis
se kita r 0.6 Ωm – 2.1 Ωm d id ug a se b a g a i
b a tup a sir tufa a n d e ng a n ka nd ung a n a ir ya ng c ukup ting g i. La p isa n d e ng a n nila i
ta ha na n je nis 3.7 Ωm – 6.7 Ωm d id ug a
se b a g a i le m p ung . La p isa n ini d a p a t b e rp e ra n se b a g a i b id a ng g e linc ir, d a n ke d a la m a nnya m e nc a p a i se kita r 10 m e te r. La p isa n d e ng a n nila i ta ha na n
je nis 12.2 Ωm – 22 Ωm d id ug a te rd iri d a ri
le m p ung p a sira n d a n so il (la p isa n la p uk) d e ng a n ke te b a la n se kita r 6 m e te r.
Pe ng ukura n g e o listrik linta sa n E – F (Te ng g a ra – Ba ra t la ut) d ila kuka n d i d a e ra h p e rsa wa ha n ya ng m e ng a la m i re ta ka n d a n rusa k a kib a t g e ra ka n ta na h. Pe ng ukura n untuk linta sa n ini b e rtujua n m e ng e ta hui a d a tid a knya la p isa n b a tua n ya ng d id ug a se b a g a i b id a ng g e linc ir p a d a a ra h te rse b ut, se hing g a d e ng a n m e m b a nd ing ka n a ra h ke d ua linta sa n d a p a t d ip e rkira ka n ke c e nd e rung a n a ra h g e ra ka n ta na h d i lo ka si d a e ra h p e ne litia n. Da ri p e na m p a ng ta ha na n je nis (G a m b a r 3) G a m b a r 3. Pe na m p a ng ta ha na n je nis linta sa n E – F d e ng a n to p o g ra fi
E
F
E Te ng g a ra
te rd a p a t la p isa n b a tua n d e ng a n nila i
ta ha na n je nis se kita r 3.1Ωm – 4.5Ωm .
La p isa n ini d id ug a se b a g a i le m p ung d a n d a p a t b e rp e ra n se b a g a i b id a ng g e linc ir. Ke d a la m a nnya m e nc a p a i se kita r 20 m e te r . La p isa n d e ng a n nila i
ta ha na n je nis se kita r 6.5 Ωm – 9.3 Ωm
d id ug a te rd iri d a ri le m p ung p a sira n d a n so il (la p isa n la p uk), d e ng a n ke te b a la n se kita r 10 m e te r. Po sisi b id a ng g e linc ir ya ng le ta knya d a la m d a p a t m e nye b a b ka n zo na le m a h la p isa n ta na h/ b a tua n ya ng b e ra d a d ia ta snya .
5. Ke sim p ula n
Se c a ra ring ka s ke sim p ula n d a ri p e ne litia n ini se b a g a i b e rikut :
1) Be rd a sa rka n p e ng a m a ta n d i
la p a ng a n, d ip e rkira ka n se b a g a i p e nye b a b te rja d inya g e ra ka n ta na h d i C ile b a k, a nta ra la in p e ng a ruh c ura h huja n ya ng ting g i, ke m iring a n le re ng p e rb ukita n ya ng c ukup te rja l, p e ng a ruh p o la p e ng g una a n la ha n d a n a d a nya ta na h p e la p uka n ya ng re la tif te b a l ( se kita r 6 – 10 m e te r) b e ra d a d i a ta s b id a ng g e linc ir ya ng ke d a la m a nnya m e nc a p a i se kita r 10 – 20 m e te r. Dug a a n ke te b a la n la p isa n p e la p uka n d a n ke d a la m a n b id a ng g e linc ir d id a sa rka n p a d a p e na m p a ng ta ha na n je nis ha sil p e ng o la ha n d a ta g e o listrik untuk d ua linta sa n p e ng ukura n (linta sa n C – D d a n E – F).
2) Se c a ra um um g e ra ka n ta na h ya ng
te rja d i d i d a e ra h ini se la in je nis ja tuha n (fa lls), lo ng so ra n, jug a je nis ra ya p a n ta na h ya ng d ita nd a i d e ng a n re ka ha n d a n a m b la sa n d e ng a n ke d a la m a n b id a ng g e linc ir m e nc a p a i p uluha n m e te r.
3) G e ra ka n ta na h ini c e nd e rung
b e rg e ra k ke a ra h Sung a i C im o nte ya ng b e ra d a d i se b e la h Uta ra tim ur la ut lo ka si d a e ra h p e ne litia n.
6. Da fta r Pusta ka
C ho wd hury, R.N., 1978, Slope
Analysis,Else vie r Am ste rd a m
Ka sto wo d a n N. Suwa rna ., 1996, Peta
Geologi Lembar Majenang. Pusa t
Pe ne litia n d a n Pe ng e m b a ng a n G e o lo g i Ba nd ung
Lo ke , M.H., Ba rke r, R.D., 1995, Least –
square deconvolution of apparent
resistivity pseudosection,
G e o p hysic s vo l. 60, p . 155 - 164
Sa nto so , D., 2002, Pengantar Teknik
Geofisika, ITB Ba nd ung
Ta ib , M.I.T., 2000, Dasar metoda
Eksplorasi Tahanan Jenis Galvanik,
Jurusa n Te knik G e o fisika FIKTM ITB Ba nd ung
Va rne s, D.J., 1978, Slope Movement
Types and Processes, Landslide
analysis and Control, Sp e c ia l
Re p o rt 176, e d . By R.L Sc huste r & R.J Krize k, Na tio na l Ac a d e m y o f Sc ie nc e s Wa shinto n, D.C , p . 11- 33
Wija ya nty, M., 2003, Analisis Kelongsoran
Lereng Pada Jalur Kereta Api KM 107 Ciganea Dengan Menggunakan Metoda Elemen
Hingga, Te sis Ma g iste r, Institut