USULAN PERBAIKAN LAYOUT PRODUKSI OBLONG PADA DIVISI GARMEN LOKAL DI PT MKF, LTD.
Fendi
Staf Produksi, Industri Manufaktur, PT ASTRA DAIHATSU MOTOR HEAD OFFICE, Jln. Gaya Motor III No. 5, Sunter II, Jakarta 14350
[email protected]
ABSTRACT
Irregular layout of machinery in the local garment division at PT Mulia Knitting Factory Ltd. Has resulted in delay of transfer of materials therefore indirectly affecting production capacity This study aims the design new layout based on product material flow-shirts using routing sheets, priority scales, from to chart the cost, from to chart inflow, activity relationship charts, activity relationship diagram, and allocation activity diagram. The proposed layout of material handling is expected to enable the division to be more organized, lowering costs and increasing production capacity. Results show that daily transfer material handling costs has decreased into only 7% of the costs before the implementation of the new layout and production capacity has increased 8%
compared to previous capacity.
Keywords: machinery layout, routing sheet, priority scales, activity relationship
ABSTRAK
Layout mesin yang tidak teratur pada divisi garmen lokal di PT Mulia Knitting Factory Ltd. telah menyebabkan terhambatnya perpindahan material sehingga secara tidak langsung mempengaruhi kapasitas produksi. Penelitian ini bertujuan untuk merancang layout baru berdasarkan aliran material produk oblong dengan menggunakan routing sheet, skala prioritas, from to chart the cost, from to chart inflow, activity relationship chart, activity relationship diagram, dan allocation activity diagram. Layout usulan ini diharapkan membuat material handling menjadi lebih teratur, menurunkan biaya dan meningkatkan kapasitas produksi. Hasil penelitian menunjukkan bahwa biaya perpindahan material handling telah berkurang menjadi hanya 7% dari biaya yang dikeluarkan sebelum penerapan layout baru, dan kapasitas produksi meningkat 8% dibandingkan dengan kapasitas sebelumnya.
Kata kunci: layout mesin, routing sheet, skala prioritas, activity relationship
PENDAHULUAN
Selama beberapa tahun terakhir ini, perlahan-lahan perekonomian dalam negeri mampu tumbuh lagi setelah sempat hancur lebur dihantam krisis ekonomi. Terutama dalam industri tekstil atau garmen, persaingan antara produk-produk lokal maupun impor semakin ketat. PT Mulia Knitting Factory Ltd. merupakan sebuah perusahaan industri tekstil dan salah satu pemasok pakaian dalam terbesar di Indonesia. Untuk dapat tetap bertahan dalam persaingan pada industri tekstil ini, perusahaan berusaha melakukan perbaikan dalam hal efesiensi dan efektivitas produksinya. Pengaturan tata letak pada lantai produksi merupakan salah satu cara untuk mempersingkat waktu produksi dan biaya sehingga target produksi yang ditetapkan oleh perusahaan dapat tercapai.
Berdasarkan pengamatan yang dilakukan selama penelitian di perusahaan, ditemukan bahwa tata letak mesin pada lantai produksi yang ada masih belum optimal dan efektif. Hal ini dapat dilihat dari mesin yang memiliki fungsi yang sama, tidak dikelompokkan dalam satu kelompok mesin. Letak mesin juga tidak sesuai dengan susunan proses produksi dari produk yang ada sehingga mengakibatkan perpindahan material menjadi lebih jauh dan waktu perpindahan menjadi lama, yang akan menyebabkan terhambatnya aliran perpindahan material oleh asisten operator dari mesin yang satu ke mesin yang lain.
Menurut Apple (1990: 3), perancangan tata letak fasilitas berperan penting sebagai (1) Suatu perencanaan aliran barang yang efisien merupakan prasyarat untuk mendapatkan produksi yang ekonomis; (2) Pola aliran barang yang merupakan dasar bagi perencanaan fasilitas fisik yang efektif; (3) Perpindahan barang merubah pola aliran statis menjadi suatu kenyataan yang dinamis, menunjukkan cara bagaimana suatu barang dipindahkan; (4) Susunan fasilitas yang efektif di sekitar pola aliran barang dapat menghasilkan pelaksanaan yang efisien dapat meminimumkan biaya produksi; (5) Biaya produksi minimum dapat memberikan keuntungan maksimum.
Sedangkan menurut Sritomo (1992: 110-117), terdapat 4 tipe dasar dari suatu tata letak pabrik yaitu (1) Tata letak fasilitas berdasarkan aliran produksi (production line product atau product layout); (2) Tata letak fasilitas berdasarkan lokasi material tetap (fix material location product layout atau fix position layout); (3) Tata letak fasilitas berdasarkan kelompok produk (product family product layout atau group technology layout); dan (4) Tata letak fasilitas berdasarkan fungsi atau macam proses (functional atau process layout).
PEMBAHASAN
Pengumpulan Data
Pertama, data jumlah produksi oblong saat ini. Jumlah produk oblong yang dihasilkan
tercatat pada periode bulan Januari hingga April 2007 (Tabel 1). Kedua, data layout permesinan
dan jumlah mesin saat ini (Tabel 2). Ketiga, data waktu pengerjaan. Data waktu pengerjaan setiap
tipe oblong (218, 222, 223, 226, dan 227).
Tabel 1 Data Jumlah Produksi Oblong Saat Ini
218 222 223 226 227
Januari 3268 15651 39337 13276 11272
Februari 0 16035 78653 3480 4070
Maret 275 0 85874 4073 7606
April 2266 13385 61340 6053 7176
Rata‐rata 1453 11268 66301 6721 7531
Bulan Oblong Type (piece )
Tabel 2 Data Layout Permesinan dan Jumlah Mesin Saat Ini
Panjang (m) Lebar (m)
1 Ms Jahit Pasang Merek 1.2 0.6 3
2 Ms Jahit Pasang Pundak - 1 1.2 0.6 3
3 Ms Jahit Pasang Pundak - 2 1.2 0.6 4
4 Ms Bis 1.2 0.6 8
5 Ms Obras Tangan 1.2 0.6 19
6 Ms Jahit Hazo 1.2 0.6 4
7 Ms Jahit Bartex 1.2 0.6 2
8 Ms Jahit Cubit 1.2 0.6 1
44 Nama Mesin
No Jumlah
Total
Ukuran mesin
Pengolahan Data
Pertama, Uji Kecukupan Data
( ) ( )
( )
data 29 646 . 28
620 . 3
620 . 3 ) 445 . 0 ( 30 40 X
X X
N ' 40 N
2 2 2
i
2 i 2
i
=
=
⎟ ⎟
⎠
⎞
⎜ ⎜
⎝
⎛ −
=
⎟⎟
⎟ ⎟
⎠
⎞
⎜⎜
⎜ ⎜
⎝
⎛ −
= ∑ ∑ ∑
Karena N ' < N = 29 < 30, maka data yang dikumpulkan sudah cukup.
Kedua, Perhitungan Waktu Baku.
Waktu Normal
) P 1 ( rata Rata Siklus Waktu Normal
Waktu = − × +
= 0.121 x (1 + 0.06)
= 0.128 Menit.
Waktu Baku
% A
% 100
% Normal 100
Waktu Baku
Waktu
× −
=
menit 187 .
% 0 60 . 20
% 100
% menit 100
128 .
0 =
× −
=
Ketiga, perhitungan Routing Sheet. Routing Sheet dibuat untuk menentukan jumlah mesin yang dibutuhkan dan untuk menghitung jumlah part yang harus dipersiapkan, dalam usaha untuk memperoleh sejumlah produk jadi yang diinginkan (lampiran 1).
Keempat, perhitungan jumlah mesin (Tabel 3). Setelah melakukan perhitungan Routing Sheet, maka dilanjutkan dengan menghitung berapa jumlah mesin teoritis yang dibutuhkan untuk memenuhi kapasitas produksi yang direncanakan di awal.
Contoh perhitungan:
Nama Mesin = Mesin jahit pasang pundak - 2.
Jumlah total kebutuhan mesin teoritis = Penjumlahan jumlah mesin teoritis oblong 218, 222, 223, 226 dan 227 = 0.08 + 0.69 + 3.11 + 0.42 + 0.41 = 4.717 mesin.
Kebutuhan jumlah mesin = 4.717 ≈ 5 mesin.
Kelima, perhitungan luas lantai produksi. Setelah mengetahui berapa jumlah mesin teoritis yang dibutuhkan, maka selanjutnya dilakukan perhitungan luas lantai produksi. Dalam perhitungan luas lantai produksi ini, factor-faktor yang perlu diperhitungkan seperti ukuran mesin, jumlah mesin, operator, tempat input, dan tempat output (lampiran 2).
Tabel 3 Perhitungan Jumlah Mesin Total
1 Ms Jahit Pasang Merek 0.00 0.40 1.80 0.25 0.25 2.702 3 3
2 Ms Jahit Pasang Pundak - 1 0.07 0.62 2.76 0.37 0.36 4.184 5 3
3 Ms Jahit Pasang Pundak - 2 0.08 0.69 3.11 0.42 0.41 4.717 5 4
4 Ms Bis 0.13 1.07 4.81 1.60 1.55 9.163 10 8
5 Ms Obras Tangan 0.36 2.94 13.17 0.00 0.00 16.467 17 19
6 Ms Jahit Hazo 0.11 0.95 4.25 0.60 0.58 6.498 7 4
7 Ms Jahit Bartex 0.04 0.36 1.62 0.38 0.37 2.767 3 2
8 Ms Jahit Cubit 0.00 0.52 0.00 0.33 0.00 0.847 1 1
51 44
Jumlah Mesin Teoritis Oblong 227
Jumlah Total Kebutuhan
Mesin Teoritis
Jumlah Mesin Sebenarnya No
Total Nama Mesin
Kebutuhan Jumlah
Mesin Teoritis Jumlah
Mesin Teoritis Oblong 218
Jumlah Mesin Teoritis Oblong 222
Jumlah Mesin Teoritis Oblong 223
Jumlah Mesin Teoritis Oblong 226
Keenam, perhitungan Material Handling Planning Sheet (MHPS). MHPS adalah tabel yang digunakan untuk menghitung besarnya biaya dari tiap-tiap penanganan atau perpindahan bahan atau material berdasarkan peralatan material handling yang digunakan (lampiran 3).
Ketujuh, perhitungan From To Chart (FTC). From To Chart (FTC) Biaya dapat dilihat pada lampiran 4, From To Chart (FTC) Inflow dapat dilihat pada lampiran 4, dan From To Chart (FTC) Outflow dapat dilihat pada lampiran 4.
Kedelapan, perhitungan skala prioritas (Tabel 4).
Tabel 4 Perhitungan Skala Prioritas
A E I O U
1 Lokasi Buffer In 2 1.000 3 0.28 ‐ ‐ ‐
2 Ms Jahit Pasang Merek 3 0.53 4 0.14 ‐ ‐ ‐
3 Ms Jahit Pasang Pundak - 1 4 0.86 ‐ ‐ ‐ ‐
4 Ms Bis 5 1.00 3 0.19 ‐ ‐ ‐
5 Ms Jahit Pasang Pundak - 2 6 1.00 7 0.07 ‐ ‐ ‐
6 Ms Obras Tangan 7 0.93 ‐ ‐ ‐ ‐
7 Ms Jahit Bartex 8 1.00 ‐ ‐ ‐ ‐
8 Ms Jahit Hazo 9 1.00 10 0.84 ‐ ‐ ‐
9 Ms Jahit Cubit 10 0.16 ‐ ‐ ‐ ‐
10 Lokasi Buffer Out ‐ ‐ ‐ ‐ ‐
No Nama Area Hubungan
Kesembilan, Activity Relationship Chart (ARC). ARC dibuat berdasarkan pada perhitungan skala prioritas. Hasilnya dapat dilihat pada lampiran 5.
Kesepuluh, Activity Relationship Diagram (ARD). ARD menjadi dasar perencanaan keterkaitan antara pola aliran barang dan lokasi kegiatan pelayanan dihubungkan dengan kegiatan produksi. Berikut adalah gambar Activity Relationship Diagram (ARD) dapat dilihat pada lampiran 5.
PENUTUP
Berdasarkan hasil analisis dan pembahasan pada bagian sebelumnya, dapat ditarik beberapa kesimpulan sebagai berikut. Pertama, besarnya kapasitas produksi per hari saat ini adalah 4519 pieces atau 377 lusin. Sedangkan besarnya kapasitas produksi per hari, yang dibutuhkan untuk memenuhi target produksi yang sudah ditetapkan perusahaan, yaitu sebesar 4897 pieces atau 409 lusin. Hal ini mengakibatkan target produksi belum tercapai. Kedua, berdasarkan perhitungan, jumlah mesin yang dibutuhkan secara teoritis adalah 51 mesin sehingga perlu untuk dilakukan penambahan sekitar 7 mesin dari jumlah mesin yang ada saat ini. Ketiga, berdasarkan perhitungan, dapat diperkirakan biaya perencanaan material handling yang dikeluarkan untuk rancangan layout usulan adalah sebesar Rp 116,497.92. Sedangkan biaya material handling yang dikeluarkan untuk layout saat ini adalah sekitar Rp 1,588,792.30. Keempat, pada rancangan layout permesinan saat ini, mesin-mesin dengan fungsi yang sama masih belum tersusun dalam satu kelompok mesin dan mesin-mesin tidak disusun berdasarkan urutan proses produksi keseluruhan produk oblong. Kelima, pada rancangan layout permesinan usulan, mesin-mesin dengan fungsi yang sama sudah disusun dalam satu kelompok mesin dan mesin-mesin sudah disusun berdasarkan urutan proses produksi keseluruhan produk oblong.
Berikut adalah beberapa saran yang dapat menjadi bahan pertimbangan bagi perusahaan.
Pertama, untuk mencapai target produksi berdasarkan kapasitas produkai sebesar 409 lusin per
hari, sebaiknya perusahaan menggunakan rancangan layout usulan yang sudah dibuat. Kedua,
selain itu, berdasarkan perhitungan untuk mencapai target produksi berdasarkan kapasitas produkai
sebesar 409 lusin per hari, sebaiknya perusahaan juga perlu menambah mesin produksinya sesuai
jumlah perhitungan mesin teoritis.
DAFTAR PUSTAKA
Apple, J.M. (1990), Tataletak pabrik dan pemindahan bahan, Bandung: Penerbit Institut Teknologi Bandung.
Sutalaksana, I.Z., Anggawisastra, R., dan Tjakraatmadja, J.H. (1979). Teknik tata cara kerja, Bandung: Jurusan Teknik Industri, Institut Teknologi Bandung.
Tim Penyusun Modul Studio Perancangan Tata Letak Fasilitas. (2005). Modul studio perancangan tata letak fasilitas. Jakarta: Jurusan Teknik Industri, Universitas Bina Nusantara.
Wignjosoebroto, S. (1995). Ergonomi studi gerak dan waktu: Teknik analisis untuk peningkatan produktivitas kerja, Surabaya: Guna Widya.
Wignjosoebroto, S. (1996). Tata letak pabrik dan pemindahan bahan, edisi kedua, Surabaya: Guna
Widya.
LAMPIRAN 1
:
82 unit / hari
:
86.42%
Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin
( Detik ) Operasi Efisien ( % ) Teoritis
1 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 105.97 111.55 129.08 95% 0.07
2 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 100.67 105.97 122.63 95% 0.08
3 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 95.64 100.67 116.49 95% 0.08
4 Jahit Bis Tangan Ms. Bis 11.709 2433.99 5% 100.67 105.97 122.63 95% 0.05
5 Obras Tangan Ms. Obras 33.847 842.03 5% 90.86 95.64 110.67 95% 0.14
6 Pasang Tangan Ms. Obras 53.024 537.49 5% 90.86 95.64 110.67 95% 0.22
7 Bartex Ms. Bartex 11.213 2541.66 5% 86.32 90.86 105.14 95% 0.04
8 Hazo Ms Hazo 31.067 917.37 5% 82 86.32 99.88 95% 0.11
LAMPIRAN 21 Routing Sheet Oblong 218 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi
Efisiensi
2 Unit Produksi
Bagian A - 1 1 Unit Produksi 1 Unit Produksi Bagian Body
Nama Operasi
No. Nama Mesin
Bagian Tangan
:
644 unit / hari
:
86.31%
Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin
( Detik ) Operasi Efisien ( % ) Teoritis
1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 922.19 970.73 1124.70 95% 0.40
2 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 876.08 922.19 1068.46 95% 0.62
3 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 832.28 876.08 1015.04 95% 0.63
4 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 790.66 832.28 964.29 95% 0.69
5 Jahit Bis Tangan Ms. Bis 11.709 2433.99 5% 832.28 876.08 1015.04 95% 0.44
6 Obras Tangan Ms. Obras 33.847 842.03 5% 751.13 790.66 916.07 95% 1.15
7 Pasang Tangan Ms. Obras 53.024 537.49 5% 751.13 790.66 916.07 95% 1.79
8 Bartex Ms. Bartex 11.213 2541.66 5% 713.57 751.13 870.27 95% 0.36
9 Hazo Ms. Hazo 31.067 917.37 5% 677.89 713.57 826.76 95% 0.95
10 Cubit Ms. Cubit 17.8765 1594.27 5% 644.00 677.89 785.42 95% 0.52
LAMPIRAN 22 Routing Sheet Oblong 222 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi
Efisiensi
No. Nama Operasi Nama Mesin
Bagian Body 1 Unit Produksi
Bagian Tangan 2 Unit Produksi
Bagian A - 1 1 Unit Produksi
: 3364 unit / hari : 95.57%
Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis / har Tiap yang yang dengan Mesin Mesin ( Detik ) Operasi Diharapkan Disiapkan Efisiensi ( % ) Teoritis
1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 4576.30 4817.16 5040.45 95% 1.80
2 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 4347.48 4576.30 4788.43 95% 2.76
3 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 4130.11 4347.48 4549.00 95% 2.85
4 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 3923.60 4130.11 4321.55 95% 3.11
5 Jahit Bis Tangan Ms. Bis 11.709 2433.99 5% 4130.11 4347.48 4549.00 95% 1.97
6 Obras Tangan Ms. Obras 33.847 842.03 5% 3727.42 3923.60 4105.48 95% 5.13
7 Pasang Tangan Ms. Obras 53.024 537.49 5% 3727.42 3923.60 4105.48 95% 8.04
8 Bartex Ms. Bartex 11.213 2541.66 5% 3541.05 3727.42 3900.20 95% 1.62
9 Hazo Ms Hazo 31.067 917.37 5% 3364.00 3541.05 3705.19 95% 4.25
LAMPIRAN 23 Routing Sheet Oblong 223 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi
Efisiensi
No. Nama Operasi Nama Mesin
Bagian Body 1 Unit Produksi
Bagian Tangan 2 Unit Produksi
Bagian A - 1 1 Unit Produksi
: 390 unit / hari
: 82.52%
Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin
( Detik ) Operasi Efisien ( % ) Teoritis
1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 558.47 587.86 712.39 95% 0.25
2 Jahit Bis Tangan Ms. Bis 48.679 585.46 5% 530.55 558.47 676.77 95% 1.22
3 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 504.02 530.55 642.93 95% 0.37
4 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 478.82 504.02 610.78 95% 0.38
5 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 454.88 478.82 580.24 95% 0.42
6 Bartex Ms. Bartex 18.669 1526.62 5% 432.13 454.88 551.23 95% 0.38
7 Hazo Ms Hazo 31.067 917.37 5% 410.53 432.13 523.67 95% 0.60
8 Cubit Ms. Cubit 17.8765 1594.27 5% 390.00 410.53 497.49 95% 0.33
LAMPIRAN 24 Routing Sheet Oblong 226 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi
Efisiensi
No. Nama Operasi Nama Mesin
Bagian 226 1 Unit Produksi
: 417 unit / hari
: 86.54%
Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin
( Detik ) Operasi Efisien ( % ) Teoritis
1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 567.28 597.13 690.01 95% 0.25 2 Jahit Bis Tangan Ms. Bis 48.679 585.46 5% 538.91 567.28 655.51 95% 1.18 3 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 511.97 538.91 622.73 95% 0.36 4 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 486.37 511.97 591.60 95% 0.37 5 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 462.05 486.37 562.02 95% 0.41 6 Bartex Ms. Bartex 18.669 1526.62 5% 438.95 462.05 533.91 95% 0.37
7 Hazo Ms Hazo 31.067 917.37 5% 417.00 438.95 507.22 95% 0.58
LAMPIRAN 25 Routing Sheet Oblong 227 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi
Efisiensi
No. Nama Operasi Nama Mesin
Bagian 227
1 Unit Produksi
LAMPIRAN 2
Panjang (m)
Lebar (m)
1 Lokasi Buffer In 1 1.20 0.60 1.20 0.60 0.72 4.26 4.98
2 Ms Jahit Pasang Merek 3 1.20 0.60
Kursi Operator 3 0.80 0.25
Tempat Bahan Baku (Input) 3 0.30 0.50 Tempat Bahan Baku (Output) 3 0.30 0.50 3 Ms Jahit Pasang Pundak ‐ 1 5 1.20 0.60
Kursi Operator 5 0.80 0.25
Tempat Bahan Baku (Input) 5 0.30 0.50 Tempat Bahan Baku (Output) 5 0.30 0.50 4 Ms Jahit Pasang Pundak ‐ 2 5 1.20 0.60
Kursi Operator 5 0.80 0.25
Tempat Bahan Baku (Input) 5 0.30 0.50 Tempat Bahan Baku (Output) 5 0.30 0.50
5 Ms Jahit Bis 10 1.20 0.60
Kursi Operator 10 0.80 0.25
Tempat Bahan Baku (Input) 10 0.30 0.50 Tempat Bahan Baku (Output) 10 0.30 0.50
6 Ms Obras Tangan 17 1.20 0.60
Kursi Operator 17 0.80 0.25
Tempat Bahan Baku (Input) 17 0.30 0.50 Tempat Bahan Baku (Output) 17 0.30 0.50
7 Ms Jahit Hazo 7 1.20 0.60
Kursi Operator 7 0.80 0.25
Tempat Bahan Baku (Input) 7 0.30 0.50 Tempat Bahan Baku (Output) 7 0.30 0.50
8 Ms Jahit Bartex 3 1.20 0.60
Kursi Operator 3 0.80 0.25
Tempat Bahan Baku (Input) 3 0.30 0.50 Tempat Bahan Baku (Output) 3 0.30 0.50
9 Ms Jahit Cubit 1 1.20 0.60
Kursi Operator 1 0.80 0.25
Tempat Bahan Baku (Input) 1 0.30 0.50 Tempat Bahan Baku (Output) 1 0.30 0.50
10 Lokasi Buffer Out 1 1.20 0.60 1.20 0.60 0.72 4.26 4.98
173.54 9.00
34.55
7.20
3.60
1.20
Total Luas (m2) = No Nama Mesin / Lokasi Jumlah
Total
Ukuran Panjang Sub Kelompok
Mesin
Lebar Sub Kelompok Mesin
Total Luas Kelompok Mesin Tanpa Gang (m2)
4.49
1.20 9.00 9.03
Luas Kelompok Mesin + Gang
(m2)
1.50 1.20 5.40 8.10
Luas Allowance
Gang (m2)
2.70
1.50
1.50
1.50
1.50
18.03
1.50
1.50 27.00
13.49 1.50
1.80 1.20
1.20
1.20 12.60
5.40
65.15
19.80
3.00 9.00 1.20
1.20
1.20
9.00
18.00
30.60
LAMPIRAN 3
Asal Luas
Asal Tujuan Luas
Tujuan Equipment Unit
Prepared Unit Load
Frequency / Day
Buffer In 4.98 Ms Jahit Pasang Pundak - 1 18.03 3.239 Trolly 111.55 300 1 Rp 15.18 Rp 695.00 Rp 2,300.28 Ms Jahit Pasang Pundak - 1 18.03 Ms Bis (Tangan & Leher) 27.00 4.721 Manual 100.67 48 3 Rp 14.75 Rp ‐ Rp 208.94 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak ‐ 2 13.49 4.435 Manual 95.64 48 2 Rp 13.86 Rp ‐ Rp 122.92 Ms Jahit Pasang Pundak ‐ 2 13.49 Ms Obras Tangan 65.15 5.872 Manual 90.86 48 2 Rp 18.35 Rp ‐ Rp 215.54 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 5.536 Manual 86.32 48 2 Rp 17.30 Rp ‐ Rp 191.54 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 82.00 48 2 Rp 11.64 Rp ‐ Rp 86.72
Ms Jahit Hazo 19.80 Buffer Out 4.98 3.341 Trolly 82.00 300 1 Rp 15.66 Rp 695.00 Rp 2,374.31
Rp 5,500.24
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 2.539 Trolly 970.73 300 4 Rp 11.90 Rp 695.00 Rp 7,179.74 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 3.546 Manual 876.08 48 19 Rp 11.08 Rp ‐ Rp 746.54 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 4.721 Manual 832.28 48 18 Rp 14.75 Rp ‐ Rp 1,253.66 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 4.435 Manual 790.66 48 17 Rp 13.86 Rp ‐ Rp 1,044.78 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 5.872 Manual 751.13 48 16 Rp 18.35 Rp ‐ Rp 1,724.29 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 5.536 Manual 713.57 48 15 Rp 17.30 Rp ‐ Rp 1,436.52 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 677.89 48 15 Rp 11.64 Rp ‐ Rp 650.37 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 3.091 Manual 644.00 48 14 Rp 9.66 Rp ‐ Rp 417.97
Ms Jahit Cubit 3.00 Buffer Out 4.98 1.982 Trolly 644.00 300 3 Rp 9.29 Rp 695.00 Rp 4,188.05
18,641.93 Rp
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 2.539 Trolly 4817.16 300 17 Rp 11.90 Rp 695.00 Rp 30,513.91 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 3.546 Manual 4347.48 48 91 Rp 11.08 Rp ‐ Rp 3,575.55 Oblong 223
Tabel 4.13 Material Handling Planning Sheet (MHPS) PT MULIA KNITTING FACTORY LTD
Distance (m)
Move Material Handling
Biaya Perpindahan
Tiap Meter
Total Material Handling Cost /
Day
Total Biaya Perpindahan Oblong 218
Total Biaya Perpindahan Oblong 222 Oblong 222
Oblong 218
Biaya Depresiasi Peralatan
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 2.539 Trolly 587.86 300 2 Rp 11.90 Rp 695.00 Rp 3,589.87 Ms Jahit Pasang Merek 8.10 Ms Bis (Tangan) 27.00 4.021 Manual 530.55 48 12 Rp 12.57 Rp ‐ Rp 606.35 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 4.721 Manual 504.02 48 11 Rp 14.75 Rp ‐ Rp 766.13 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.721 Manual 478.82 48 10 Rp 14.75 Rp ‐ Rp 696.48 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 4.435 Manual 454.88 48 10 Rp 13.86 Rp ‐ Rp 614.58 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.337 Manual 432.13 48 10 Rp 10.43 Rp ‐ Rp 347.90 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 410.53 48 9 Rp 11.64 Rp ‐ Rp 390.22 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 3.091 Manual 390.00 48 9 Rp 9.66 Rp ‐ Rp 268.69
Ms Jahit Cubit 3.00 Buffer Out 4.98 1.982 Trolly 390.00 300 2 Rp 9.29 Rp 695.00 Rp 2,792.03
10,072.25 Rp
Buffer In 4.98 Ms Jahit Pasang Merek 18.70 3.278 Trolly 597.13 300 2 Rp 15.37 Rp 695.00 Rp 4,657.60 Ms Jahit Pasang Merek 18.70 Ms Bis (Tangan) 27.00 4.760 Manual 538.91 48 12 Rp 14.88 Rp ‐ Rp 849.75 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 4.721 Manual 511.97 48 11 Rp 14.75 Rp ‐ Rp 766.13 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.721 Manual 486.37 48 11 Rp 14.75 Rp ‐ Rp 766.13 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 4.435 Manual 462.05 48 10 Rp 13.86 Rp ‐ Rp 614.58 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.337 Manual 438.95 48 10 Rp 10.43 Rp ‐ Rp 347.90 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 417.00 48 9 Rp 11.64 Rp ‐ Rp 390.22
Ms Jahit Hazo 19.80 Buffer Out 4.98 3.341 Trolly 417.00 300 2 Rp 15.66 Rp 695.00 Rp 4,748.62
13,140.93 Rp
139,606.60 Rp Total Biaya Perpindahan
Oblong 227
Total Biaya Perpindahan Oblong 227 Oblong 226
Total Biaya Perpindahan oblong 226
LAMPIRAN 4
1 2 3 4 5 6 7 8 9 10
1 Lokasi Buffer in 45,941.12 2,300.28 48,241.40
2 Ms Jahit Pasang Merek 4,322.09 1,456.10 5,778.18
3 Ms Jahit Pasang Pundak-1 8,984.57 8,984.57
4 Ms Bis 1,532.25 7,436.36 8,968.61
5 Ms Jahit Pasang Pundak-2 10,345.76 695.81 11,041.57
6 Ms Obras Tangan 8,714.89 8,714.89
7 Ms Jahit Bartex 4,595.95 4,595.95
8 Ms Jahit Hazo 686.66 35,614.68 36,301.34
9 Ms Jahit Cubit 6,980.08 6,980.08
10 Lokasi Buffer Out 0.00
0 45,941.12 8,154.62 10,440.66 7,436.36 10,345.76 9,410.69 4,595.95 686.66 42,594.76 139,606.60 Total
Total
Ms jahit Bartex Ms jahit Hazo Ms Jahit Cubit lokasi Buffer Out
Nama Mesin No
Lokasi Buffer in Ms Jahit Pasang Merek Ms Jahit Pasang Pundak - 1 Ms Bis
Tabel 4. 14 From To Chart Biaya PT MULIA KNITTING FACTORY LTD
Ms Jahit Pasang Pundak - 2 Ms Obras Tangan
1 2 3 4 5 6 7 8 9 10
1 Lokasi Buffer in 1.00 0.28 1.28
2 Ms Jahit Pasang Merek 0.53 0.14 0.67
3 Ms Jahit Pasang Pundak-1 0.86 0.86
4 Ms Bis 0.19 1.00 1.19
5 Ms Jahit Pasang Pundak-2 1.00 0.07 1.07
6 Ms Obras Tangan 0.93 0.93
7 Ms Jahit Bartex 1.00 1.00
8 Ms Jahit Hazo 1.00 0.84 1.84
9 Ms Jahit Cubit 0.16 0.16
10 Lokasi Buffer Out 0.00
0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00
Ms Obras Tangan
Total
Ms jahit Bartex Ms jahit Hazo Ms Jahit Cubit lokasi Buffer Out
Tabel 4. 15 From To Chart Inflow PT MULIA KNITTING FACTORY LTD
Total
No Nama Mesin
Lokasi Buffer in Ms Jahit Pasang Merek Ms Jahit Pasang Pundak - 1 Ms Bis Ms Jahit Pasang Pundak - 2
1 2 3 4 5 6 7 8 9 10
1 Lokasi Buffer in 7.95 0.26 8.21
2 Ms Jahit Pasang Merek 0.48 0.16 0.64
3 Ms Jahit Pasang Pundak-1 1.00 1.00
4 Ms Bis 0.17 0.67 0.84
5 Ms Jahit Pasang Pundak-2 1.19 0.15 1.34
6 Ms Obras Tangan 1.90 1.90
7 Ms Jahit Bartex 0.13 0.13
8 Ms Jahit Hazo 0.10 0.00 0.10
9 Ms Jahit Cubit 0.00 0.00
10 Lokasi Buffer Out 0.00
0.00 7.95 0.91 1.16 0.67 1.19 2.05 0.13 0.10 0.00 14.16
Total
Ms jahit Bartex
Total
Ms jahit Hazo Ms Jahit Cubit lokasi Buffer Out
No Nama Mesin
Lokasi Buffer in Ms Jahit Pasang Merek Ms Jahit Pasang Pundak - 1 Ms Bis
Tabel 4. 16 From To Chart Outflow PT MULIA KNITTING FACTORY LTD
Ms Jahit Pasang Pundak - 2 Ms Obras Tangan
LAMPIRAN 5
LAMPIRAN 6
MHPS Saat ini
Asal Luas
Asal Tujuan Luas
Tujuan Equipment Unit
Prepared Unit Load
Frequency / Day
Buffer In 4.98 Ms Jahit Pasang Pundak - 1 18.03 11.928 Trolly 111.55 300 1 Rp 55.91 Rp 695.00 Rp 8,956.64 Ms Jahit Pasang Pundak - 1 18.03 Ms Bis (Tangan & Leher) 27.00 19.450 Manual 100.67 48 3 Rp 60.78 Rp ‐ Rp 3,546.59 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak ‐ 2 13.49 14.410 Manual 95.64 48 2 Rp 45.03 Rp ‐ Rp 1,297.80 Ms Jahit Pasang Pundak ‐ 2 13.49 Ms Obras Tangan 65.15 1.200 Manual 90.86 48 2 Rp 3.75 Rp ‐ Rp 9.00 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 10.460 Manual 86.32 48 2 Rp 32.69 Rp ‐ Rp 683.82 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.025 Manual 82.00 48 2 Rp 71.95 Rp ‐ Rp 3,313.44
Ms Jahit Hazo 19.80 Buffer Out 4.98 29.300 Trolly 82.00 300 1 Rp 137.34 Rp 695.00 Rp 24,387.67
Rp 42,194.96
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 7.665 Trolly 970.73 300 4 Rp 35.93 Rp 695.00 Rp 22,411.53 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 24.477 Manual 876.08 48 19 Rp 76.49 Rp ‐ Rp 35,573.25 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 19.450 Manual 832.28 48 18 Rp 60.78 Rp ‐ Rp 21,279.52 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual 790.66 48 17 Rp 45.03 Rp ‐ Rp 11,031.31 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 1.200 Manual 751.13 48 16 Rp 3.75 Rp ‐ Rp 72.00 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 10.460 Manual 713.57 48 15 Rp 32.69 Rp ‐ Rp 5,128.67 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual 677.89 48 15 Rp 71.94 Rp ‐ Rp 24,840.02
Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 46.810 Manual 644.00 48 14 Rp 146.28 Rp ‐ Rp 95,863.95
Ms Jahit Cubit 3.00 Buffer Out 4.98 6.800 Trolly 644.00 300 3 Rp 31.88 Rp 695.00 Rp 14,828.25
231,028.49 Rp
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 7.665 Trolly 4817.16 300 17 Rp 35.93 Rp 695.00 Rp 95,249.01 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 24.477 Manual 4347.48 48 91 Rp 76.49 Rp ‐ Rp 170,377.15 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 19.450 Manual 4130.11 48 87 Rp 60.78 Rp ‐ Rp 102,850.99 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual 3923.60 48 82 Rp 45.03 Rp ‐ Rp 53,209.83 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 1.200 Manual 3727.42 48 78 Rp 3.75 Rp ‐ Rp 351.00 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 10.460 Manual 3541.05 48 74 Rp 32.69 Rp ‐ Rp 25,301.43 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual 3364.00 48 71 Rp 71.94 Rp ‐ Rp 117,576.09
Ms Jahit Hazo 19.80 Buffer Out 4.98 29.300 Trolly 3364.00 300 12 Rp 137.34 Rp 695.00 Rp 292,652.06
857,567.55 Rp Oblong 223
Tabel 4.18 Material Handling Evaluation (MHES )Sheet Saat Ini PT MULIA KNITTING FACTORY LTD
Total Biaya Perpindahan Oblong 223 Distance
(m)
Move Material Handling
Biaya Perpindahan
Tiap Meter
Total Material Handling Cost /
Day
Total Biaya Perpindahan Oblong 218
Total Biaya Perpindahan Oblong 222 Oblong 222
Oblong 218
Biaya Depresiasi Peralatan
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 7.665 Trolly
587.86300 2 Rp 35.93 Rp 695.00 Rp 11,205.77 Ms Jahit Pasang Merek 8.10 Ms Bis (Tangan) 27.00 45.036 Manual
530.5548 12 Rp 140.74 Rp ‐ Rp 76,059.72 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 37.105 Manual
504.0248 11 Rp 115.95 Rp ‐ Rp 47,326.85 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 19.450 Manual
478.8248 10 Rp 60.78 Rp ‐ Rp 11,821.95 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual
454.8848 10 Rp 45.03 Rp ‐ Rp 6,489.00 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.830 Manual
432.1348 10 Rp 11.97 Rp ‐ Rp 458.40 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual
410.5348 9 Rp 71.94 Rp ‐ Rp 14,904.01 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 46.810 Manual
390.0048 9 Rp 146.28 Rp ‐ Rp 61,626.83 Ms Jahit Cubit 3.00 Buffer Out 4.98 6.800 Trolly
390.00300 2 Rp 31.88 Rp 695.00 Rp 9,885.50 239,778.04 Rp
Buffer In 4.98 Ms Jahit Pasang Merek 18.70 7.665 Trolly
597.13300 2 Rp 35.93 Rp 695.00 Rp 11,205.77 Ms Jahit Pasang Merek 18.70 Ms Bis (Tangan) 27.00 45.036 Manual
538.9148 12 Rp 140.74 Rp ‐ Rp 76,059.72 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 37.105 Manual
511.9748 11 Rp 115.95 Rp ‐ Rp 47,326.85 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 19.450 Manual
486.3748 11 Rp 60.78 Rp ‐ Rp 13,004.15 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual
462.0548 10 Rp 45.03 Rp ‐ Rp 6,489.00 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.830 Manual
438.9548 10 Rp 11.97 Rp ‐ Rp 458.40 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual
417.0048 9 Rp 71.94 Rp ‐ Rp 14,904.01 Ms Jahit Hazo 19.80 Buffer Out 4.98 29.300 Trolly
417.00300 2 Rp 137.34 Rp 695.00 Rp 48,775.34 218,223.25 Rp
1,588,792.30 Rp Total Biaya Perpindahan
Oblong 227
Total Biaya Perpindahan Oblong 227 Oblong 226
Total Biaya Perpindahan oblong 226
MHPS Usulan
Asal Luas
Asal Tujuan Luas
Tujuan Equipment Unit
Prepared Unit Load
Frequency / Day
Buffer In 4.98 Ms Jahit Pasang Pundak - 1 18.03 4.316 Trolly 111.55 300 1 Rp 20.23 Rp 695.00 Rp 3,086.94 Ms Jahit Pasang Pundak - 1 18.03 Ms Bis (Tangan & Leher) 27.00 4.150 Manual 100.67 48 3 Rp 12.97 Rp ‐ Rp 161.46 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak ‐ 2 13.49 5.300 Manual 95.64 48 2 Rp 16.56 Rp ‐ Rp 175.56 Ms Jahit Pasang Pundak ‐ 2 13.49 Ms Obras Tangan 65.15 3.530 Manual 90.86 48 2 Rp 11.03 Rp ‐ Rp 77.88 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 3.300 Manual 86.32 48 2 Rp 10.31 Rp ‐ Rp 68.06
Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 82.00 48 2 Rp 9.00 Rp ‐ Rp 51.84
Ms Jahit Hazo 19.80 Buffer Out 4.98 3.080 Trolly 82.00 300 1 Rp 14.44 Rp 695.00 Rp 2,185.07
Rp 5,806.81
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 1.480 Trolly 970.73 300 4 Rp 6.94 Rp 695.00 Rp 4,155.47 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 7.557 Manual 876.08 48 19 Rp 23.61 Rp ‐ Rp 3,390.53 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 4.150 Manual 832.28 48 18 Rp 12.97 Rp ‐ Rp 968.77 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 790.66 48 17 Rp 16.56 Rp ‐ Rp 1,492.28 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 3.530 Manual 751.13 48 16 Rp 11.03 Rp ‐ Rp 623.05 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 3.300 Manual 713.57 48 15 Rp 10.31 Rp ‐ Rp 510.47 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 677.89 48 15 Rp 9.00 Rp ‐ Rp 388.80 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 1.530 Manual 644.00 48 14 Rp 4.78 Rp ‐ Rp 102.41
Ms Jahit Cubit 3.00 Buffer Out 4.98 1.130 Trolly 644.00 300 3 Rp 5.30 Rp 695.00 Rp 2,374.01
14,005.78 Rp
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 1.480 Trolly 4817.16 300 17 Rp 6.94 Rp 695.00 Rp 17,660.75 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 7.557 Manual 4347.48 48 91 Rp 23.61 Rp ‐ Rp 16,238.87 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 4.150 Manual 4130.11 48 87 Rp 12.97 Rp ‐ Rp 4,682.37 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 3923.60 48 82 Rp 16.56 Rp ‐ Rp 7,198.06 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 3.530 Manual 3727.42 48 78 Rp 11.03 Rp ‐ Rp 3,037.34 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 3.300 Manual 3541.05 48 74 Rp 10.31 Rp ‐ Rp 2,518.31 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 3364.00 48 71 Rp 9.00 Rp ‐ Rp 1,840.32
Ms Jahit Hazo 19.80 Buffer Out 4.98 3.080 Trolly 3364.00 300 12 Rp 14.44 Rp 695.00 Rp 26,220.81
79,396.83 Rp Oblong 223
Tabel 4.19 Material Handling Evaluation Sheet (MHES )Usulan PT MULIA KNITTING FACTORY LTD
Total Biaya Perpindahan Oblong 223 Distance
(m)
Move Material Handling
Biaya Perpindahan
Tiap Meter
Total Material Handling Cost /
Day
Total Biaya Perpindahan Oblong 218
Total Biaya Perpindahan Oblong 222 Oblong 222
Oblong 218
Biaya Depresiasi Peralatan
Buffer In 4.98 Ms Jahit Pasang Merek 8.10 1.480 Trolly 587.86 300 2 Rp 6.94 Rp 695.00 Rp 2,077.74 Ms Jahit Pasang Merek 8.10 Ms Bis (Tangan) 27.00 1.890 Manual 530.55 48 12 Rp 5.91 Rp ‐ Rp 133.95 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 6.530 Manual 504.02 48 11 Rp 20.41 Rp ‐ Rp 1,465.78 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.150 Manual 478.82 48 10 Rp 12.97 Rp ‐ Rp 538.20 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 454.88 48 10 Rp 16.56 Rp ‐ Rp 877.81 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.000 Manual 432.13 48 10 Rp 9.38 Rp ‐ Rp 281.25 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 410.53 48 9 Rp 9.00 Rp ‐ Rp 233.28 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 1.530 Manual 390.00 48 9 Rp 4.78 Rp ‐ Rp 65.84
Ms Jahit Cubit 3.00 Buffer Out 4.98 1.130 Trolly 390.00 300 2 Rp 5.30 Rp 695.00 Rp 1,582.67
7,256.52 Rp
Buffer In 4.98 Ms Jahit Pasang Merek 18.70 1.480 Trolly 597.13 300 2 Rp 6.94 Rp 695.00 Rp 2,077.74 Ms Jahit Pasang Merek 18.70 Ms Bis (Tangan) 27.00 1.890 Manual 538.91 48 12 Rp 5.91 Rp ‐ Rp 133.95 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 6.530 Manual 511.97 48 11 Rp 20.41 Rp ‐ Rp 1,465.78 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.150 Manual 486.37 48 11 Rp 12.97 Rp ‐ Rp 592.02 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 462.05 48 10 Rp 16.56 Rp ‐ Rp 877.81 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.000 Manual 438.95 48 10 Rp 9.38 Rp ‐ Rp 281.25 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 417.00 48 9 Rp 9.00 Rp ‐ Rp 233.28
Ms Jahit Hazo 19.80 Buffer Out 4.98 3.080 Trolly 417.00 300 2 Rp 14.44 Rp 695.00 Rp 4,370.14
10,031.97 Rp
116,497.92 Rp Total Biaya Perpindahan
Oblong 227
Total Biaya Perpindahan Oblong 227 Oblong 226
Total Biaya Perpindahan oblong 226