USULAN PERBAIKAN LAYOUT PRODUKSI OBLONG PADA DIVISI GARMEN LOKAL DI PT MKF, LTD.

Fendi

Staf Produksi, Industri Manufaktur, PT ASTRA DAIHATSU MOTOR HEAD OFFICE, Jln. Gaya Motor III No. 5, Sunter II, Jakarta 14350

[email protected]

ABSTRACT

Irregular layout of machinery in the local garment division at PT Mulia Knitting Factory Ltd. Has resulted in delay of transfer of materials therefore indirectly affecting production capacity This study aims the design new layout based on product material flow-shirts using routing sheets, priority scales, from to chart the cost, from to chart inflow, activity relationship charts, activity relationship diagram, and allocation activity diagram. The proposed layout of material handling is expected to enable the division to be more organized, lowering costs and increasing production capacity. Results show that daily transfer material handling costs has decreased into only 7% of the costs before the implementation of the new layout and production capacity has increased 8%

compared to previous capacity.

Keywords: machinery layout, routing sheet, priority scales, activity relationship

ABSTRAK

Layout mesin yang tidak teratur pada divisi garmen lokal di PT Mulia Knitting Factory Ltd. telah menyebabkan terhambatnya perpindahan material sehingga secara tidak langsung mempengaruhi kapasitas produksi. Penelitian ini bertujuan untuk merancang layout baru berdasarkan aliran material produk oblong dengan menggunakan routing sheet, skala prioritas, from to chart the cost, from to chart inflow, activity relationship chart, activity relationship diagram, dan allocation activity diagram. Layout usulan ini diharapkan membuat material handling menjadi lebih teratur, menurunkan biaya dan meningkatkan kapasitas produksi. Hasil penelitian menunjukkan bahwa biaya perpindahan material handling telah berkurang menjadi hanya 7% dari biaya yang dikeluarkan sebelum penerapan layout baru, dan kapasitas produksi meningkat 8% dibandingkan dengan kapasitas sebelumnya.

Kata kunci: layout mesin, routing sheet, skala prioritas, activity relationship

(2)

PENDAHULUAN

Selama beberapa tahun terakhir ini, perlahan-lahan perekonomian dalam negeri mampu tumbuh lagi setelah sempat hancur lebur dihantam krisis ekonomi. Terutama dalam industri tekstil atau garmen, persaingan antara produk-produk lokal maupun impor semakin ketat. PT Mulia Knitting Factory Ltd. merupakan sebuah perusahaan industri tekstil dan salah satu pemasok pakaian dalam terbesar di Indonesia. Untuk dapat tetap bertahan dalam persaingan pada industri tekstil ini, perusahaan berusaha melakukan perbaikan dalam hal efesiensi dan efektivitas produksinya. Pengaturan tata letak pada lantai produksi merupakan salah satu cara untuk mempersingkat waktu produksi dan biaya sehingga target produksi yang ditetapkan oleh perusahaan dapat tercapai.

Berdasarkan pengamatan yang dilakukan selama penelitian di perusahaan, ditemukan bahwa tata letak mesin pada lantai produksi yang ada masih belum optimal dan efektif. Hal ini dapat dilihat dari mesin yang memiliki fungsi yang sama, tidak dikelompokkan dalam satu kelompok mesin. Letak mesin juga tidak sesuai dengan susunan proses produksi dari produk yang ada sehingga mengakibatkan perpindahan material menjadi lebih jauh dan waktu perpindahan menjadi lama, yang akan menyebabkan terhambatnya aliran perpindahan material oleh asisten operator dari mesin yang satu ke mesin yang lain.

Menurut Apple (1990: 3), perancangan tata letak fasilitas berperan penting sebagai (1) Suatu perencanaan aliran barang yang efisien merupakan prasyarat untuk mendapatkan produksi yang ekonomis; (2) Pola aliran barang yang merupakan dasar bagi perencanaan fasilitas fisik yang efektif; (3) Perpindahan barang merubah pola aliran statis menjadi suatu kenyataan yang dinamis, menunjukkan cara bagaimana suatu barang dipindahkan; (4) Susunan fasilitas yang efektif di sekitar pola aliran barang dapat menghasilkan pelaksanaan yang efisien dapat meminimumkan biaya produksi; (5) Biaya produksi minimum dapat memberikan keuntungan maksimum.

Sedangkan menurut Sritomo (1992: 110-117), terdapat 4 tipe dasar dari suatu tata letak pabrik yaitu (1) Tata letak fasilitas berdasarkan aliran produksi (production line product atau product layout); (2) Tata letak fasilitas berdasarkan lokasi material tetap (fix material location product layout atau fix position layout); (3) Tata letak fasilitas berdasarkan kelompok produk (product family product layout atau group technology layout); dan (4) Tata letak fasilitas berdasarkan fungsi atau macam proses (functional atau process layout).

PEMBAHASAN

Pengumpulan Data

Pertama, data jumlah produksi oblong saat ini. Jumlah produk oblong yang dihasilkan

tercatat pada periode bulan Januari hingga April 2007 (Tabel 1). Kedua, data layout permesinan

dan jumlah mesin saat ini (Tabel 2). Ketiga, data waktu pengerjaan. Data waktu pengerjaan setiap

tipe oblong (218, 222, 223, 226, dan 227).

(3)

Tabel 1 Data Jumlah Produksi Oblong Saat Ini

218 222 223 226 227

Januari 3268 15651 39337 13276 11272

Februari 0 16035 78653 3480 4070

Maret 275 0 85874 4073 7606

April 2266 13385 61340 6053 7176

Rata‐rata 1453 11268 66301 6721 7531

Bulan Oblong Type  (piece )

Tabel 2 Data Layout Permesinan dan Jumlah Mesin Saat Ini

Panjang (m) Lebar (m)

1 Ms Jahit Pasang Merek 1.2 0.6 3

2 Ms Jahit Pasang Pundak - 1 1.2 0.6 3

3 Ms Jahit Pasang Pundak - 2 1.2 0.6 4

4 Ms Bis 1.2 0.6 8

5 Ms Obras Tangan  1.2 0.6 19

6 Ms Jahit Hazo 1.2 0.6 4

7 Ms Jahit Bartex 1.2 0.6 2

8 Ms Jahit Cubit 1.2 0.6 1

44 Nama Mesin 

No Jumlah

Total

Ukuran mesin

Pengolahan Data

Pertama, Uji Kecukupan Data

( ) ( )

( )

data 29 646 . 28

620 . 3

620 . 3 ) 445 . 0 ( 30 40 X

X X

N ' 40 N

2 2 2

i

2 i 2

i

=

=

⎟ ⎟

⎜ ⎜

⎛ −

=

⎟⎟

⎟ ⎟

⎜⎜

⎜ ⎜

⎛ −

= ∑ ∑ ∑

Karena N ' < N = 29 < 30, maka data yang dikumpulkan sudah cukup.

Kedua, Perhitungan Waktu Baku.

Waktu Normal

) P 1 ( rata Rata Siklus Waktu Normal

Waktu = − × +

= 0.121 x (1 + 0.06)

= 0.128 Menit.

Waktu Baku

% A

% 100

% Normal 100

Waktu Baku

Waktu

× −

=

menit 187 .

% 0 60 . 20

% 100

% menit 100

128 .

0 =

× −

=

(4)

Ketiga, perhitungan Routing Sheet. Routing Sheet dibuat untuk menentukan jumlah mesin yang dibutuhkan dan untuk menghitung jumlah part yang harus dipersiapkan, dalam usaha untuk memperoleh sejumlah produk jadi yang diinginkan (lampiran 1).

Keempat, perhitungan jumlah mesin (Tabel 3). Setelah melakukan perhitungan Routing Sheet, maka dilanjutkan dengan menghitung berapa jumlah mesin teoritis yang dibutuhkan untuk memenuhi kapasitas produksi yang direncanakan di awal.

Contoh perhitungan:

Nama Mesin = Mesin jahit pasang pundak - 2.

Jumlah total kebutuhan mesin teoritis = Penjumlahan jumlah mesin teoritis oblong 218, 222, 223, 226 dan 227 = 0.08 + 0.69 + 3.11 + 0.42 + 0.41 = 4.717 mesin.

Kebutuhan jumlah mesin = 4.717 ≈ 5 mesin.

Kelima, perhitungan luas lantai produksi. Setelah mengetahui berapa jumlah mesin teoritis yang dibutuhkan, maka selanjutnya dilakukan perhitungan luas lantai produksi. Dalam perhitungan luas lantai produksi ini, factor-faktor yang perlu diperhitungkan seperti ukuran mesin, jumlah mesin, operator, tempat input, dan tempat output (lampiran 2).

Tabel 3 Perhitungan Jumlah Mesin Total

1 Ms Jahit Pasang Merek 0.00 0.40 1.80 0.25 0.25 2.702 3 3

2 Ms Jahit Pasang Pundak - 1 0.07 0.62 2.76 0.37 0.36 4.184 5 3

3 Ms Jahit Pasang Pundak - 2 0.08 0.69 3.11 0.42 0.41 4.717 5 4

4 Ms Bis 0.13 1.07 4.81 1.60 1.55 9.163 10 8

5 Ms Obras Tangan 0.36 2.94 13.17 0.00 0.00 16.467 17 19

6 Ms Jahit Hazo 0.11 0.95 4.25 0.60 0.58 6.498 7 4

7 Ms Jahit Bartex 0.04 0.36 1.62 0.38 0.37 2.767 3 2

8 Ms Jahit Cubit 0.00 0.52 0.00 0.33 0.00 0.847 1 1

51 44

Jumlah  Mesin  Teoritis  Oblong 227

Jumlah Total  Kebutuhan 

Mesin  Teoritis

Jumlah  Mesin  Sebenarnya No

Total Nama Mesin 

Kebutuhan  Jumlah 

Mesin  Teoritis Jumlah 

Mesin  Teoritis  Oblong 218

Jumlah  Mesin  Teoritis  Oblong 222

Jumlah  Mesin  Teoritis  Oblong 223

Jumlah  Mesin  Teoritis  Oblong 226

Keenam, perhitungan Material Handling Planning Sheet (MHPS). MHPS adalah tabel yang digunakan untuk menghitung besarnya biaya dari tiap-tiap penanganan atau perpindahan bahan atau material berdasarkan peralatan material handling yang digunakan (lampiran 3).

Ketujuh, perhitungan From To Chart (FTC). From To Chart (FTC) Biaya dapat dilihat pada lampiran 4, From To Chart (FTC) Inflow dapat dilihat pada lampiran 4, dan From To Chart (FTC) Outflow dapat dilihat pada lampiran 4.

Kedelapan, perhitungan skala prioritas (Tabel 4).

(5)

Tabel 4 Perhitungan Skala Prioritas

A E I O U

1 Lokasi Buffer In1.0000.28 ‐ ‐ ‐

2 Ms Jahit Pasang Merek 3 0.530.14 ‐ ‐ ‐

3 Ms Jahit Pasang Pundak - 1 4 0.86 ‐ ‐ ‐ ‐

4 Ms Bis 5 1.000.19 ‐ ‐ ‐

5 Ms Jahit Pasang Pundak - 2 6 1.000.07 ‐ ‐ ‐

6 Ms Obras Tangan 7 0.93 ‐ ‐ ‐ ‐

7 Ms Jahit Bartex 8 1.00 ‐ ‐ ‐ ‐

8 Ms Jahit Hazo 9 1.00 10 0.84 ‐ ‐ ‐

9 Ms Jahit Cubit 10 0.16 ‐ ‐ ‐ ‐

10 Lokasi Buffer Out ‐ ‐ ‐ ‐ ‐

No Nama Area Hubungan

Kesembilan, Activity Relationship Chart (ARC). ARC dibuat berdasarkan pada perhitungan skala prioritas. Hasilnya dapat dilihat pada lampiran 5.

Kesepuluh, Activity Relationship Diagram (ARD). ARD menjadi dasar perencanaan keterkaitan antara pola aliran barang dan lokasi kegiatan pelayanan dihubungkan dengan kegiatan produksi. Berikut adalah gambar Activity Relationship Diagram (ARD) dapat dilihat pada lampiran 5.

PENUTUP

Berdasarkan hasil analisis dan pembahasan pada bagian sebelumnya, dapat ditarik beberapa kesimpulan sebagai berikut. Pertama, besarnya kapasitas produksi per hari saat ini adalah 4519 pieces atau 377 lusin. Sedangkan besarnya kapasitas produksi per hari, yang dibutuhkan untuk memenuhi target produksi yang sudah ditetapkan perusahaan, yaitu sebesar 4897 pieces atau 409 lusin. Hal ini mengakibatkan target produksi belum tercapai. Kedua, berdasarkan perhitungan, jumlah mesin yang dibutuhkan secara teoritis adalah 51 mesin sehingga perlu untuk dilakukan penambahan sekitar 7 mesin dari jumlah mesin yang ada saat ini. Ketiga, berdasarkan perhitungan, dapat diperkirakan biaya perencanaan material handling yang dikeluarkan untuk rancangan layout usulan adalah sebesar Rp 116,497.92. Sedangkan biaya material handling yang dikeluarkan untuk layout saat ini adalah sekitar Rp 1,588,792.30. Keempat, pada rancangan layout permesinan saat ini, mesin-mesin dengan fungsi yang sama masih belum tersusun dalam satu kelompok mesin dan mesin-mesin tidak disusun berdasarkan urutan proses produksi keseluruhan produk oblong. Kelima, pada rancangan layout permesinan usulan, mesin-mesin dengan fungsi yang sama sudah disusun dalam satu kelompok mesin dan mesin-mesin sudah disusun berdasarkan urutan proses produksi keseluruhan produk oblong.

Berikut adalah beberapa saran yang dapat menjadi bahan pertimbangan bagi perusahaan.

Pertama, untuk mencapai target produksi berdasarkan kapasitas produkai sebesar 409 lusin per

hari, sebaiknya perusahaan menggunakan rancangan layout usulan yang sudah dibuat. Kedua,

selain itu, berdasarkan perhitungan untuk mencapai target produksi berdasarkan kapasitas produkai

sebesar 409 lusin per hari, sebaiknya perusahaan juga perlu menambah mesin produksinya sesuai

jumlah perhitungan mesin teoritis.

(6)

DAFTAR PUSTAKA

Apple, J.M. (1990), Tataletak pabrik dan pemindahan bahan, Bandung: Penerbit Institut Teknologi Bandung.

Sutalaksana, I.Z., Anggawisastra, R., dan Tjakraatmadja, J.H. (1979). Teknik tata cara kerja, Bandung: Jurusan Teknik Industri, Institut Teknologi Bandung.

Tim Penyusun Modul Studio Perancangan Tata Letak Fasilitas. (2005). Modul studio perancangan tata letak fasilitas. Jakarta: Jurusan Teknik Industri, Universitas Bina Nusantara.

Wignjosoebroto, S. (1995). Ergonomi studi gerak dan waktu: Teknik analisis untuk peningkatan produktivitas kerja, Surabaya: Guna Widya.

Wignjosoebroto, S. (1996). Tata letak pabrik dan pemindahan bahan, edisi kedua, Surabaya: Guna

Widya.

(7)

LAMPIRAN 1

:

82 unit / hari

:

86.42%

Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin

( Detik ) Operasi Efisien ( % ) Teoritis

1 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 105.97 111.55 129.08 95% 0.07

2 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 100.67 105.97 122.63 95% 0.08

3 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 95.64 100.67 116.49 95% 0.08

4 Jahit Bis Tangan Ms. Bis 11.709 2433.99 5% 100.67 105.97 122.63 95% 0.05

5 Obras Tangan Ms. Obras 33.847 842.03 5% 90.86 95.64 110.67 95% 0.14

6 Pasang Tangan Ms. Obras 53.024 537.49 5% 90.86 95.64 110.67 95% 0.22

7 Bartex Ms. Bartex 11.213 2541.66 5% 86.32 90.86 105.14 95% 0.04

8 Hazo Ms Hazo 31.067 917.37 5% 82 86.32 99.88 95% 0.11

LAMPIRAN 21 Routing Sheet Oblong 218 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi

Efisiensi

2 Unit Produksi

Bagian A - 1 1 Unit Produksi 1 Unit Produksi Bagian Body

Nama Operasi

No. Nama Mesin

Bagian Tangan

:

644 unit / hari

:

86.31%

Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin

( Detik ) Operasi Efisien ( % ) Teoritis

1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 922.19 970.73 1124.70 95% 0.40

2 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 876.08 922.19 1068.46 95% 0.62

3 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 832.28 876.08 1015.04 95% 0.63

4 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 790.66 832.28 964.29 95% 0.69

5 Jahit Bis Tangan Ms. Bis 11.709 2433.99 5% 832.28 876.08 1015.04 95% 0.44

6 Obras Tangan Ms. Obras 33.847 842.03 5% 751.13 790.66 916.07 95% 1.15

7 Pasang Tangan Ms. Obras 53.024 537.49 5% 751.13 790.66 916.07 95% 1.79

8 Bartex Ms. Bartex 11.213 2541.66 5% 713.57 751.13 870.27 95% 0.36

9 Hazo Ms. Hazo 31.067 917.37 5% 677.89 713.57 826.76 95% 0.95

10 Cubit Ms. Cubit 17.8765 1594.27 5% 644.00 677.89 785.42 95% 0.52

LAMPIRAN 22 Routing Sheet Oblong 222 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi

Efisiensi

No. Nama Operasi Nama Mesin

Bagian Body 1 Unit Produksi

Bagian Tangan 2 Unit Produksi

Bagian A - 1 1 Unit Produksi

(8)

: 3364 unit / hari : 95.57%

Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis / har Tiap yang yang dengan Mesin Mesin ( Detik ) Operasi Diharapkan Disiapkan Efisiensi ( % ) Teoritis

1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 4576.30 4817.16 5040.45 95% 1.80

2 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 4347.48 4576.30 4788.43 95% 2.76

3 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 4130.11 4347.48 4549.00 95% 2.85

4 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 3923.60 4130.11 4321.55 95% 3.11

5 Jahit Bis Tangan Ms. Bis 11.709 2433.99 5% 4130.11 4347.48 4549.00 95% 1.97

6 Obras Tangan Ms. Obras 33.847 842.03 5% 3727.42 3923.60 4105.48 95% 5.13

7 Pasang Tangan Ms. Obras 53.024 537.49 5% 3727.42 3923.60 4105.48 95% 8.04

8 Bartex Ms. Bartex 11.213 2541.66 5% 3541.05 3727.42 3900.20 95% 1.62

9 Hazo Ms Hazo 31.067 917.37 5% 3364.00 3541.05 3705.19 95% 4.25

LAMPIRAN 23 Routing Sheet Oblong 223 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi

Efisiensi

No. Nama Operasi Nama Mesin

Bagian Body 1 Unit Produksi

Bagian Tangan 2 Unit Produksi

Bagian A - 1 1 Unit Produksi

: 390 unit / hari

: 82.52%

Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin

( Detik ) Operasi Efisien ( % ) Teoritis

1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 558.47 587.86 712.39 95% 0.25

2 Jahit Bis Tangan Ms. Bis 48.679 585.46 5% 530.55 558.47 676.77 95% 1.22

3 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 504.02 530.55 642.93 95% 0.37

4 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 478.82 504.02 610.78 95% 0.38

5 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 454.88 478.82 580.24 95% 0.42

6 Bartex Ms. Bartex 18.669 1526.62 5% 432.13 454.88 551.23 95% 0.38

7 Hazo Ms Hazo 31.067 917.37 5% 410.53 432.13 523.67 95% 0.60

8 Cubit Ms. Cubit 17.8765 1594.27 5% 390.00 410.53 497.49 95% 0.33

LAMPIRAN 24 Routing Sheet Oblong 226 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi

Efisiensi

No. Nama Operasi Nama Mesin

Bagian 226 1 Unit Produksi

(9)

: 417 unit / hari

: 86.54%

Waktu Kapasitas % Scrap Jumlah Jumlah Produksi Reliabilitas Jumlah Baku Alat Teoritis/jam Tiap Diharapkan Disiapkan dengan Mesin Mesin

( Detik ) Operasi Efisien ( % ) Teoritis

1 Pasang Merek Ms. Jahit 9.666 2948.48 5% 567.28 597.13 690.01 95% 0.25 2 Jahit Bis Tangan Ms. Bis 48.679 585.46 5% 538.91 567.28 655.51 95% 1.18 3 Jahit Pundak - 1 Ms. Jahit 15.620 1824.55 5% 511.97 538.91 622.73 95% 0.36 4 Jahit Bis Leher Ms. Bis 16.934 1682.98 5% 486.37 511.97 591.60 95% 0.37 5 Jahit Pundak - 2 Ms. Jahit 19.514 1460.50 5% 462.05 486.37 562.02 95% 0.41 6 Bartex Ms. Bartex 18.669 1526.62 5% 438.95 462.05 533.91 95% 0.37

7 Hazo Ms Hazo 31.067 917.37 5% 417.00 438.95 507.22 95% 0.58

LAMPIRAN 25 Routing Sheet Oblong 227 PT MULIA KNITTING FACTORY LTD Kapasitas Produksi

Efisiensi

No. Nama Operasi Nama Mesin

Bagian 227

1 Unit Produksi

(10)

LAMPIRAN 2

Panjang  (m)

Lebar  (m)

1 Lokasi Buffer In 1 1.20 0.60 1.20 0.60 0.72 4.26 4.98

2 Ms Jahit Pasang Merek 3 1.20 0.60

Kursi Operator 3 0.80 0.25

Tempat Bahan Baku (Input) 3 0.30 0.50 Tempat Bahan Baku (Output) 3 0.30 0.50 3 Ms Jahit Pasang Pundak ‐ 1 5 1.20 0.60

Kursi Operator 5 0.80 0.25

Tempat Bahan Baku (Input) 5 0.30 0.50 Tempat Bahan Baku (Output) 5 0.30 0.50 4 Ms Jahit Pasang Pundak ‐ 2 5 1.20 0.60

Kursi Operator 5 0.80 0.25

Tempat Bahan Baku (Input) 5 0.30 0.50 Tempat Bahan Baku (Output) 5 0.30 0.50

5 Ms Jahit Bis 10 1.20 0.60

Kursi Operator 10 0.80 0.25

Tempat Bahan Baku (Input) 10 0.30 0.50 Tempat Bahan Baku (Output) 10 0.30 0.50

6 Ms Obras Tangan 17 1.20 0.60

Kursi Operator 17 0.80 0.25

Tempat Bahan Baku (Input) 17 0.30 0.50 Tempat Bahan Baku (Output) 17 0.30 0.50

7 Ms Jahit Hazo 7 1.20 0.60

Kursi Operator 7 0.80 0.25

Tempat Bahan Baku (Input) 7 0.30 0.50 Tempat Bahan Baku (Output) 7 0.30 0.50

8 Ms Jahit Bartex 3 1.20 0.60

Kursi Operator 3 0.80 0.25

Tempat Bahan Baku (Input) 3 0.30 0.50 Tempat Bahan Baku (Output) 3 0.30 0.50

9 Ms Jahit Cubit 1 1.20 0.60

Kursi Operator 1 0.80 0.25

Tempat Bahan Baku (Input) 1 0.30 0.50 Tempat Bahan Baku (Output) 1 0.30 0.50

10 Lokasi Buffer Out 1 1.20 0.60 1.20 0.60 0.72 4.26 4.98

173.54 9.00

34.55

7.20

3.60

1.20

Total Luas (m2) = No Nama Mesin / Lokasi Jumlah 

Total

Ukuran  Panjang Sub  Kelompok 

Mesin

Lebar Sub  Kelompok  Mesin

Total Luas  Kelompok Mesin  Tanpa Gang (m2)

4.49

1.20 9.00 9.03

Luas Kelompok  Mesin + Gang 

(m2)

1.50 1.20 5.40 8.10

Luas  Allowance 

Gang (m2)

2.70

1.50

1.50

1.50

1.50

18.03

1.50

1.50 27.00

13.49 1.50

1.80 1.20

1.20

1.20 12.60

5.40

65.15

19.80

3.00 9.00 1.20

1.20

1.20

9.00

18.00

30.60

LAMPIRAN 3

Asal Luas 

Asal Tujuan Luas 

Tujuan Equipment Unit 

Prepared Unit  Load

Frequency /  Day

Buffer In 4.98 Ms Jahit Pasang Pundak - 1 18.03 3.239 Trolly 111.55 300 1 Rp        15.18 Rp      695.00 Rp      2,300.28 Ms Jahit Pasang Pundak - 1 18.03 Ms Bis (Tangan & Leher) 27.00 4.721 Manual 100.67 48 3 Rp        14.75 Rp       Rp         208.94 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak ‐ 2 13.49 4.435 Manual 95.64 48 2 Rp        13.86 Rp       Rp         122.92 Ms Jahit Pasang Pundak ‐ 2 13.49 Ms Obras Tangan 65.15 5.872 Manual 90.86 48 2 Rp        18.35 Rp       Rp         215.54 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 5.536 Manual 86.32 48 2 Rp        17.30 Rp       Rp         191.54 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 82.00 48 2 Rp        11.64 Rp       Rp       86.72

Ms Jahit Hazo 19.80 Buffer Out 4.98 3.341 Trolly 82.00 300 1 Rp        15.66 Rp      695.00 Rp      2,374.31

 Rp       5,500.24 

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 2.539 Trolly 970.73 300 4 Rp        11.90 Rp      695.00 Rp       7,179.74 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 3.546 Manual 876.08 48 19 Rp        11.08 Rp       Rp         746.54 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 4.721 Manual 832.28 48 18 Rp        14.75 Rp       Rp      1,253.66 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 4.435 Manual 790.66 48 17 Rp        13.86 Rp       Rp      1,044.78 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 5.872 Manual 751.13 48 16 Rp        18.35 Rp       Rp      1,724.29 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 5.536 Manual 713.57 48 15 Rp        17.30 Rp       Rp      1,436.52 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 677.89 48 15 Rp        11.64 Rp       Rp         650.37 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 3.091 Manual 644.00 48 14 Rp      9.66 Rp       Rp         417.97

Ms Jahit Cubit 3.00 Buffer Out 4.98 1.982 Trolly 644.00 300 3 Rp      9.29 Rp      695.00 Rp      4,188.05

18,641.93 Rp    

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 2.539 Trolly  4817.16 300 17 Rp        11.90 Rp      695.00 Rp    30,513.91 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 3.546 Manual 4347.48 48 91 Rp        11.08 Rp       Rp      3,575.55 Oblong 223

Tabel 4.13 Material Handling Planning Sheet (MHPS) PT MULIA KNITTING FACTORY LTD

Distance  (m)

Move Material Handling

Biaya  Perpindahan 

Tiap Meter

Total Material  Handling Cost / 

Day

Total Biaya Perpindahan Oblong 218

Total Biaya Perpindahan Oblong 222 Oblong 222

Oblong 218

Biaya  Depresiasi  Peralatan 

(11)

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 2.539 Trolly 587.86 300 2 Rp        11.90 Rp     695.00 Rp      3,589.87 Ms Jahit Pasang Merek 8.10 Ms Bis (Tangan) 27.00 4.021 Manual 530.55 48 12 Rp        12.57 Rp        Rp         606.35 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 4.721 Manual 504.02 48 11 Rp        14.75 Rp       Rp      766.13 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.721 Manual 478.82 48 10 Rp        14.75 Rp        Rp         696.48 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 4.435 Manual 454.88 48 10 Rp        13.86 Rp        Rp         614.58 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.337 Manual 432.13 48 10 Rp        10.43 Rp        Rp         347.90 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 410.53 48 9 Rp        11.64 Rp        Rp         390.22 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 3.091 Manual 390.00 48 9 Rp      9.66 Rp        Rp         268.69

Ms Jahit Cubit 3.00 Buffer Out 4.98 1.982 Trolly  390.00 300 2 Rp      9.29 Rp     695.00 Rp      2,792.03

10,072.25 Rp    

Buffer In 4.98 Ms Jahit Pasang Merek 18.70 3.278 Trolly  597.13 300 2 Rp        15.37 Rp     695.00 Rp      4,657.60 Ms Jahit Pasang Merek 18.70 Ms Bis (Tangan) 27.00 4.760 Manual 538.91 48 12 Rp        14.88 Rp        Rp         849.75 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 4.721 Manual 511.97 48 11 Rp        14.75 Rp       Rp      766.13 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.721 Manual 486.37 48 11 Rp        14.75 Rp        Rp         766.13 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 4.435 Manual 462.05 48 10 Rp        13.86 Rp        Rp         614.58 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.337 Manual 438.95 48 10 Rp        10.43 Rp        Rp         347.90 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 3.725 Manual 417.00 48 9 Rp        11.64 Rp        Rp         390.22

Ms Jahit Hazo 19.80 Buffer Out 4.98 3.341 Trolly  417.00 300 2 Rp        15.66 Rp     695.00 Rp      4,748.62

13,140.93 Rp    

139,606.60 Rp  Total Biaya Perpindahan

Oblong 227

Total Biaya Perpindahan Oblong 227 Oblong 226

Total Biaya Perpindahan oblong 226

LAMPIRAN 4

1 2 3 4 5 6 7 8 9 10

1 Lokasi Buffer in 45,941.12 2,300.28 48,241.40

2 Ms Jahit Pasang Merek 4,322.09 1,456.10 5,778.18

3 Ms Jahit Pasang Pundak-1 8,984.57 8,984.57

4 Ms Bis 1,532.25 7,436.36 8,968.61

5 Ms Jahit Pasang Pundak-2 10,345.76 695.81 11,041.57

6 Ms Obras Tangan 8,714.89 8,714.89

7 Ms Jahit Bartex 4,595.95 4,595.95

8 Ms Jahit Hazo 686.66 35,614.68 36,301.34

9 Ms Jahit Cubit 6,980.08 6,980.08

10 Lokasi Buffer Out 0.00

0 45,941.12 8,154.62 10,440.66 7,436.36 10,345.76 9,410.69 4,595.95 686.66 42,594.76 139,606.60 Total

Total

Ms jahit Bartex Ms jahit Hazo Ms Jahit Cubit lokasi Buffer Out

Nama Mesin No

Lokasi Buffer in Ms Jahit Pasang Merek Ms Jahit Pasang Pundak - 1 Ms Bis

Tabel 4. 14 From To Chart Biaya PT MULIA KNITTING FACTORY LTD

Ms Jahit Pasang Pundak - 2 Ms Obras Tangan

1 2 3 4 5 6 7 8 9 10

1 Lokasi Buffer in 1.00 0.28 1.28

2 Ms Jahit Pasang Merek 0.53 0.14 0.67

3 Ms Jahit Pasang Pundak-1 0.86 0.86

4 Ms Bis 0.19 1.00 1.19

5 Ms Jahit Pasang Pundak-2 1.00 0.07 1.07

6 Ms Obras Tangan 0.93 0.93

7 Ms Jahit Bartex 1.00 1.00

8 Ms Jahit Hazo 1.00 0.84 1.84

9 Ms Jahit Cubit 0.16 0.16

10 Lokasi Buffer Out 0.00

0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 9.00

Ms Obras Tangan

Total

Ms jahit Bartex Ms jahit Hazo Ms Jahit Cubit lokasi Buffer Out

Tabel 4. 15 From To Chart Inflow PT MULIA KNITTING FACTORY LTD

Total

No Nama Mesin

Lokasi Buffer in Ms Jahit Pasang Merek Ms Jahit Pasang Pundak - 1 Ms Bis Ms Jahit Pasang Pundak - 2

(12)

1 2 3 4 5 6 7 8 9 10

1 Lokasi Buffer in 7.95 0.26 8.21

2 Ms Jahit Pasang Merek 0.48 0.16 0.64

3 Ms Jahit Pasang Pundak-1 1.00 1.00

4 Ms Bis 0.17 0.67 0.84

5 Ms Jahit Pasang Pundak-2 1.19 0.15 1.34

6 Ms Obras Tangan 1.90 1.90

7 Ms Jahit Bartex 0.13 0.13

8 Ms Jahit Hazo 0.10 0.00 0.10

9 Ms Jahit Cubit 0.00 0.00

10 Lokasi Buffer Out 0.00

0.00 7.95 0.91 1.16 0.67 1.19 2.05 0.13 0.10 0.00 14.16

Total

Ms jahit Bartex

Total

Ms jahit Hazo Ms Jahit Cubit lokasi Buffer Out

No Nama Mesin

Lokasi Buffer in Ms Jahit Pasang Merek Ms Jahit Pasang Pundak - 1 Ms Bis

Tabel 4. 16 From To Chart Outflow PT MULIA KNITTING FACTORY LTD

Ms Jahit Pasang Pundak - 2 Ms Obras Tangan

LAMPIRAN 5

(13)

LAMPIRAN 6

MHPS Saat ini

Asal Luas 

Asal Tujuan Luas 

Tujuan Equipment Unit 

Prepared Unit  Load

Frequency /  Day

Buffer In 4.98 Ms Jahit Pasang Pundak - 1 18.03 11.928 Trolly 111.55 300 1 Rp       55.91 Rp   695.00 Rp         8,956.64 Ms Jahit Pasang Pundak - 1 18.03 Ms Bis (Tangan & Leher) 27.00 19.450 Manual 100.67 48 3 Rp       60.78 Rp          Rp         3,546.59 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak ‐ 2 13.49 14.410 Manual 95.64 48 2 Rp       45.03 Rp          Rp         1,297.80 Ms Jahit Pasang Pundak ‐ 2 13.49 Ms Obras Tangan 65.15 1.200 Manual 90.86 48 2 Rp         3.75 Rp          Rp       9.00 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 10.460 Manual 86.32 48 2 Rp       32.69 Rp          Rp       683.82 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.025 Manual 82.00 48 2 Rp       71.95 Rp          Rp         3,313.44

Ms Jahit Hazo 19.80 Buffer Out 4.98 29.300 Trolly 82.00 300 1 Rp    137.34 Rp   695.00 Rp       24,387.67

 Rp        42,194.96 

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 7.665 Trolly 970.73 300 4 Rp       35.93 Rp   695.00 Rp       22,411.53 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 24.477 Manual 876.08 48 19 Rp       76.49 Rp          Rp       35,573.25 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 19.450 Manual 832.28 48 18 Rp       60.78 Rp          Rp       21,279.52 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual 790.66 48 17 Rp       45.03 Rp          Rp       11,031.31 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 1.200 Manual 751.13 48 16 Rp         3.75 Rp          Rp       72.00 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 10.460 Manual 713.57 48 15 Rp       32.69 Rp          Rp         5,128.67 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual 677.89 48 15 Rp       71.94 Rp          Rp       24,840.02

Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 46.810 Manual 644.00 48 14 Rp    146.28 Rp          Rp       95,863.95

Ms Jahit Cubit 3.00 Buffer Out 4.98 6.800 Trolly 644.00 300 3 Rp       31.88 Rp   695.00 Rp       14,828.25

231,028.49 Rp     

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 7.665 Trolly  4817.16 300 17 Rp       35.93 Rp   695.00 Rp       95,249.01 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 24.477 Manual 4347.48 48 91 Rp       76.49 Rp          Rp     170,377.15 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 19.450 Manual 4130.11 48 87 Rp       60.78 Rp          Rp     102,850.99 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual 3923.60 48 82 Rp       45.03 Rp          Rp       53,209.83 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 1.200 Manual 3727.42 48 78 Rp         3.75 Rp          Rp       351.00 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 10.460 Manual 3541.05 48 74 Rp       32.69 Rp          Rp       25,301.43 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual 3364.00 48 71 Rp       71.94 Rp          Rp     117,576.09

Ms Jahit Hazo 19.80 Buffer Out 4.98 29.300 Trolly  3364.00 300 12 Rp    137.34 Rp   695.00 Rp     292,652.06

857,567.55 Rp      Oblong 223

Tabel 4.18 Material Handling Evaluation (MHES )Sheet Saat Ini PT MULIA KNITTING FACTORY LTD

Total Biaya Perpindahan Oblong 223 Distance 

(m)

Move Material Handling

Biaya  Perpindahan 

Tiap Meter

Total Material  Handling Cost / 

Day

Total Biaya Perpindahan Oblong 218

Total Biaya Perpindahan Oblong 222 Oblong 222

Oblong 218

Biaya  Depresiasi  Peralatan 

(14)

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 7.665 Trolly

587.86

300 2 Rp        35.93 Rp    695.00 Rp        11,205.77 Ms Jahit Pasang Merek 8.10 Ms Bis (Tangan) 27.00 45.036 Manual

530.55

48 12 Rp     140.74 Rp       ‐ Rp        76,059.72 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 37.105 Manual

504.02

48 11 Rp     115.95 Rp       ‐ Rp        47,326.85 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 19.450 Manual

478.82

48 10 Rp        60.78 Rp       ‐ Rp        11,821.95 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual

454.88

48 10 Rp        45.03 Rp       ‐ Rp          6,489.00 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.830 Manual

432.13

48 10 Rp        11.97 Rp       ‐ Rp        458.40 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual

410.53

48 9 Rp        71.94 Rp       ‐ Rp        14,904.01 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 46.810 Manual

390.00

48 9 Rp     146.28 Rp       ‐ Rp        61,626.83 Ms Jahit Cubit 3.00 Buffer Out 4.98 6.800 Trolly 

390.00

300 2 Rp        31.88 Rp    695.00 Rp          9,885.50 239,778.04 Rp     

Buffer In 4.98 Ms Jahit Pasang Merek 18.70 7.665 Trolly 

597.13

300 2 Rp        35.93 Rp    695.00 Rp        11,205.77 Ms Jahit Pasang Merek 18.70 Ms Bis (Tangan) 27.00 45.036 Manual

538.91

48 12 Rp     140.74 Rp       ‐ Rp        76,059.72 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 37.105 Manual

511.97

48 11 Rp     115.95 Rp       ‐ Rp        47,326.85 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 19.450 Manual

486.37

48 11 Rp        60.78 Rp       ‐ Rp        13,004.15 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 14.410 Manual

462.05

48 10 Rp        45.03 Rp       ‐ Rp          6,489.00 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.830 Manual

438.95

48 10 Rp        11.97 Rp       ‐ Rp        458.40 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 23.020 Manual

417.00

48 9 Rp        71.94 Rp       ‐ Rp        14,904.01 Ms Jahit Hazo 19.80 Buffer Out 4.98 29.300 Trolly 

417.00

300 2 Rp     137.34 Rp    695.00 Rp        48,775.34 218,223.25 Rp     

1,588,792.30 Rp   Total Biaya Perpindahan

Oblong 227

Total Biaya Perpindahan Oblong 227 Oblong 226

Total Biaya Perpindahan oblong 226

MHPS Usulan

Asal Luas 

Asal Tujuan Luas 

Tujuan Equipment Unit 

Prepared Unit  Load

Frequency /  Day

Buffer In 4.98 Ms Jahit Pasang Pundak - 1 18.03 4.316 Trolly 111.55 300 1 Rp        20.23 Rp   695.00 Rp      3,086.94 Ms Jahit Pasang Pundak - 1 18.03 Ms Bis (Tangan & Leher) 27.00 4.150 Manual 100.67 48 3 Rp        12.97 Rp       Rp      161.46 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak ‐ 2 13.49 5.300 Manual 95.64 48 2 Rp        16.56 Rp          Rp         175.56 Ms Jahit Pasang Pundak ‐ 2 13.49 Ms Obras Tangan 65.15 3.530 Manual 90.86 48 2 Rp        11.03 Rp          Rp       77.88 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 3.300 Manual 86.32 48 2 Rp        10.31 Rp          Rp       68.06

Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 82.00 48 2 Rp      9.00 Rp          Rp       51.84

Ms Jahit Hazo 19.80 Buffer Out 4.98 3.080 Trolly 82.00 300 1 Rp        14.44 Rp   695.00 Rp      2,185.07

 Rp       5,806.81 

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 1.480 Trolly 970.73 300 4 Rp      6.94 Rp   695.00 Rp      4,155.47 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 7.557 Manual 876.08 48 19 Rp        23.61 Rp       Rp       3,390.53 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 4.150 Manual 832.28 48 18 Rp        12.97 Rp          Rp         968.77 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 790.66 48 17 Rp        16.56 Rp          Rp      1,492.28 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 3.530 Manual 751.13 48 16 Rp        11.03 Rp          Rp         623.05 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 3.300 Manual 713.57 48 15 Rp        10.31 Rp          Rp         510.47 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 677.89 48 15 Rp      9.00 Rp          Rp         388.80 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 1.530 Manual 644.00 48 14 Rp      4.78 Rp          Rp         102.41

Ms Jahit Cubit 3.00 Buffer Out 4.98 1.130 Trolly 644.00 300 3 Rp      5.30 Rp   695.00 Rp      2,374.01

14,005.78 Rp    

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 1.480 Trolly  4817.16 300 17 Rp      6.94 Rp   695.00 Rp    17,660.75 Ms Jahit Pasang Merek 8.10 Ms Jahit Pasang Pundak‐1 18.03 7.557 Manual 4347.48 48 91 Rp        23.61 Rp       Rp     16,238.87 Ms Jahit Pasang Pundak‐1 18.03 Ms Bis (Tangan & Leher) 27.00 4.150 Manual 4130.11 48 87 Rp        12.97 Rp          Rp      4,682.37 Ms Bis (Tangan & Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 3923.60 48 82 Rp        16.56 Rp          Rp      7,198.06 Ms Jahit Pasang Pundak‐2 13.49 Ms Obras Tangan 65.15 3.530 Manual 3727.42 48 78 Rp        11.03 Rp          Rp      3,037.34 Ms Obras Tangan 65.15 Ms Jahit Bartex 9.00 3.300 Manual 3541.05 48 74 Rp        10.31 Rp          Rp      2,518.31 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 3364.00 48 71 Rp      9.00 Rp       Rp       1,840.32

Ms Jahit Hazo 19.80 Buffer Out 4.98 3.080 Trolly  3364.00 300 12 Rp        14.44 Rp   695.00 Rp    26,220.81

79,396.83 Rp     Oblong 223

Tabel 4.19 Material Handling Evaluation Sheet (MHES )Usulan PT MULIA KNITTING FACTORY LTD

Total Biaya Perpindahan Oblong 223 Distance 

(m)

Move Material Handling

Biaya  Perpindahan 

Tiap Meter

Total Material  Handling Cost / 

Day

Total Biaya Perpindahan Oblong 218

Total Biaya Perpindahan Oblong 222 Oblong 222

Oblong 218

Biaya  Depresiasi  Peralatan 

(15)

Buffer In 4.98 Ms Jahit Pasang Merek 8.10 1.480 Trolly 587.86 300 2 Rp      6.94 Rp  695.00 Rp      2,077.74 Ms Jahit Pasang Merek 8.10 Ms Bis (Tangan) 27.00 1.890 Manual 530.55 48 12 Rp      5.91 Rp          Rp         133.95 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 6.530 Manual 504.02 48 11 Rp        20.41 Rp          Rp      1,465.78 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.150 Manual 478.82 48 10 Rp        12.97 Rp          Rp         538.20 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 454.88 48 10 Rp        16.56 Rp          Rp         877.81 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.000 Manual 432.13 48 10 Rp      9.38 Rp          Rp         281.25 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 410.53 48 9 Rp      9.00 Rp          Rp         233.28 Ms Jahit Hazo 19.80 Ms Jahit Cubit 3.00 1.530 Manual 390.00 48 9 Rp      4.78 Rp          Rp       65.84

Ms Jahit Cubit 3.00 Buffer Out 4.98 1.130 Trolly  390.00 300 2 Rp      5.30 Rp  695.00 Rp      1,582.67

7,256.52 Rp      

Buffer In 4.98 Ms Jahit Pasang Merek 18.70 1.480 Trolly  597.13 300 2 Rp      6.94 Rp  695.00 Rp      2,077.74 Ms Jahit Pasang Merek 18.70 Ms Bis (Tangan) 27.00 1.890 Manual 538.91 48 12 Rp      5.91 Rp          Rp         133.95 Ms Bis (Tangan) 27.00 Ms Jahit Pasang Pundak ‐1 18.03 6.530 Manual 511.97 48 11 Rp        20.41 Rp          Rp      1,465.78 Ms Jahit Pasang Pundak ‐1 18.03 MS Bis (Leher) 27.00 4.150 Manual 486.37 48 11 Rp        12.97 Rp          Rp         592.02 MS Bis (Leher) 27.00 Ms Jahit Pasang Pundak‐2 13.49 5.300 Manual 462.05 48 10 Rp        16.56 Rp          Rp         877.81 Ms Jahit Pasang Pundak‐2 13.49 Ms Jahit Bartex 9.00 3.000 Manual 438.95 48 10 Rp      9.38 Rp          Rp         281.25 Ms Jahit Bartex 9.00 Ms Jahit Hazo 19.80 2.880 Manual 417.00 48 9 Rp      9.00 Rp          Rp         233.28

Ms Jahit Hazo 19.80 Buffer Out 4.98 3.080 Trolly  417.00 300 2 Rp        14.44 Rp  695.00 Rp      4,370.14

10,031.97 Rp    

116,497.92 Rp  Total Biaya Perpindahan

Oblong 227

Total Biaya Perpindahan Oblong 227 Oblong 226

Total Biaya Perpindahan oblong 226

Referensi

Dokumen terkait

Program komputer dirancang untuk membuat sistem informasi dalam bentuk pilihan menu menyelesaikan persoalan logika untuk pencarian pustaka data nuklida secara terstruktur

1999 menunjukkan buah manggis yang dipanen dengan warna kulit buah hijau dengan setitik noda ungu (104 HSBM), warna kulit buahnya berubah dengan cepat menjadi 10 - 25% ungu

Sebagian besar responden memiliki aktivitas fisik ringan, dan aktivitas fisik ringan lebih banyak pada responden obesitas baik pada hari kuliah maupun hari

dengan judul “ ANALISIS PENGARUH KESADARAN MEREK, PERSEPSI KUALITAS, ASOSIASI MEREK, DAN LOYALITAS MEREK TERHADAP KEPUTUSAN PEMBELIAN MOBIL SUZUKI (Studi Kasus

Terdapat perbedaan hasil belajar dasar desain grafis dengan menerapkan model pembelajaran CBL berbantuan animasi dibandingkan dengan model pembelajaran CBL berbantuan

Masyarakat Mesir Kuno juga memelihara lebah madu karena untuk mengawetkan mumi dibutuhkan jumlah madu yang sangat banyak. Hanya masyarakat di sekitar

Berdasarkan Tabel 1 dapat diinformasikan bahwa terjadi interaksi pada parameter tinggi tanaman jagung manis dengan perlakuan pemberian Plant Growth Promoting

TERHADAP YAYASAN SEBAGAI BADAN HUKUM(SUBJEK HUKUM) KARENA ADANYA 3 UNSUR ESSENSIALIA TELAH DIPENUHI OLEH YAYASAN SEBAGAI BADAN HUKUM, YAITU ADANYA: KEKAYAAN YANG DIPISAHKAN, UPAYA