MiinniissttrryyooffNNaattiioonnaallDDeevveellooppmmeennttPPllaannnniinngg// N
Foreword
In the process of planning external loans and grants, the Government has compiled
the Planned Priority List of External Loans and Grants (DRPPHLN), also known as
Green Book, for 2007. The requirements for compiling the Green Book are stipulated
in Government Regulation Number 2 of 2006 on Procedure for Procurement and
Forwarding of External Loans and Grants. It is also further stipulated in the
Regulation of the Minister of National Development Planning/Chairman of
Bappenas Number PER.005/M.PPN/06/2006 on Procedure for Planning and
Submitting of Proposal and for Evaluating Projects that are Financed by External
Loans/Grants.
The Green Book is one of planning documents in the process of planning projects
that will be financed by external loans/grants. This whole process encompasses the
Borrowing Strategy (RKPLN), the List of Project Proposal funded by External Loans
and/or Grants for Medium-Term (DRPHLN-JM), also known as Blue Book, Green
Book (DRPPHLN), and Planned Implementation of Projects Funded by External
Loans and/or Grants (RPK-PHLN).
The Green Book contains list of proposed projects that are eligible to be funded by
external loans and/or grants. Therefore, the list of proposed projects therein is the
proposed projects that are contained in the Blue Book that have met most of
readiness criteria, and already have indicated commitment from donors/lenders. The
Green Book is compiled as a guideline for preparing the Government Work Plan in
the following year. In that respect, it is expected that the process of undersigning the
loan and/or grant agreement can immediately be proceeded.
- ii -
With the publication of the 2007 Green Book, it is expected that the planning and
management of projects that are funded by external loans and/or grants, become
more effective and efficient, to optimal benefit to national development and to
increase the welfare of the people.
State Minister for National Development Planning/
Chairman of the National Development Planning Agency.
LIST OF PROJECT ASSISTANCE
DRPPHLN – 2007
National Civil Service Agency
1. National Civil Service Information System (NCSIS) ...3
National Coordinating Board for Disaster Management
2. Disaster Relief and Mitigation Management Project ...7
National Narcotic Board
3. One Stop Center for Therapy and Rehabilitation for Drug Abuser...11
National Agency of Drug and Food Control
4. Strengthening National Capacity on Drug and Food Control ...15
Agency for the Assessment and Application of Technology
5. Baron Renewable Energy Technopark ...21 6. National Infra Network Development ...23
Aceh and Nias Rehabilitation and Reconstruction Board
7. Rehabilitation Drainage System of Banda Aceh and Lhokseumawe ...27
Ministry of Religious Affairs
8. Development of Islamic State University of Sunan Gunung Djati ...31
Ministry of Home Affairs
9. Kecamatan Development Project ...35
Ministry of Marine Affairs and Fisheries
10. Development of Belawan and Sibolga Fishing Port ...39
Ministry of Health
List Priority of Project Assistance
- iv -
Ministry of Communication and Information Technology
13. Establishment of Information and Communication Technology Training Center ...49
14. Establishment of New RRI Transmission Systems ...51
15. Improvement on TVRI Transmitting Stations Project (Phase I) ...53
Ministry of Public Works
Director General of Water Resources 16. Construction of Jatigede Multipurpose Dam...57Directorate General of Highways 17. Bridge Construction Project for Regional Development in West Nusa Tenggara (Phase II) ....59
18. Main Bridges Urgent Reconstruction Project in Nias Island, North Sumatera Province...60
19. Manado by Pass (Phase II) ...61
Directorate General of Human Settlements 20. Construction of Western Denpasar and Kuta Sewerage Development Project ...62
21. Urban Community Empowerment Project (PNPM)...64
22. Urban Water Supply and Sanitation Project ...66
Directorate General of Water of Water Resources 23. Decentralized Irrigation System Improvement Management Project (Phase II)...68
24. Integrated Citarum Water Resources Management Project (Trance I)...70
25. Participatory Irrigation Rehabilitation Improvement Management Project...73
Ministry of National Education
26. Development and Upgrading of the State University of Jakarta ...7727. Development of a World Class University at University of Indonesia (UI) ...79
28. Indonesia Vocational Education Strengthening (Senior Secondary Education) ...81
29. The Quality Improvement of Padjadjaran University...83
Ministry of Transportations
Directorate General of Sea Transportation 30. Indonesia Ship Reporting System ...87List Priority of Project Assistance
Directorate General of Civil Aviation
32. Procurement and Installation of Airport Security Equipment for 27 Airports ...91 33. Procurement and Installation of Landing Facilities...93 34. Procurement of Airport Rescue and Fire Fighting Equipment ...95
Directorate General of Railway
35. Procurement of 1000 km Track Material and 200 Units Turn Out...97 36. Railway Double Tracking on the Java Southern Line (Stage II: Kroya-Kutoarjo and
Cirebon-Kroya) ...99
Ministry of Industry
37. Development of Leather Industries ...103
Ministry of Defense
38. Improvement of Aeromedical Hospital ...107 39. Procurement of Mobile Hospital and Hospital Equipment...109
Indonesian National Police
40. Procurement of Hospital Equipment and Mobile Hospital...115
Indonesian Institute of Science
41. Animal Husbandry Technology and Practice Improvement to Accelerate Meat and Milk
Production (Meat-Milk Pro)...119
National Resilience Institute
List Priority of Project Assistance
- vi -
Riau Province
43. Southern Pekanbaru Water Supply Development Project...129
South Sulawesi Province
44. The Project for Improvement of Health and Medical Facility in South Sulawesi Province ....133
PT. Merpati Nusantara Airlines
45. Procurement of Aircraft for National Air Bridge ...137
PT. Perusahaan Listrik Negara
LIST PRIORITY OF TECNICAL ASSISTANCE
DRPPHLN – 2007
Indonesian Maritime Security Coordinating Board
1. The Project on Indonesian Maritime Security Coordination Body Structural
Enhancement... 3
Investment Coordinating Board
2. Investment Promotion Policy Advisor ... 7National Agency of Drug and Food Control
3. Improvement of Pharmaceutical Management ... 11Agency for the Assessment and Application of Technology
4. Capacity Building of Biopesticide Production... 15Bank Indonesia
5. Financial System Stability in Indonesia (IFSN)... 216. Implementation of Basel II in Indonesian Banking Industry ... 23
7. Monetary Policy Formulation and Implementation ... 25
8. Strengthening of Small Financial Institution (ProFI) ... 27
Ministry of Energy and Mineral Resources
9. Development of Upgraded Brown Coal (UBC) Demonstration Plant... 3310. Electricity Power and Energy Policy Project ... 34
11. The Coal Mining Technology Enhancement Project (Follow up)... 36
12. The Training Project on Coal Mining Technology ... 38
Ministry of Culture and Tourism
13. Project for Tourism Product Development ... 43Ministry of Forestry
14. Advisor for Facilitating National Strategy on Forestry ... 4915. Ecosystem Management and Biodiversity Conservation... 51
List Priority of Technical Assistance
- viii -
Ministry of Marine Affairs and Fisheries
18. Assistance for SMEs in Fish and Shrimp Industry ... 59
19. Strengthening Capacity Building of Fish Quarantine in Indonesia ... 61
20. Sustainable Indonesia Fisheries Product Competitiveness... 63
Ministry of Health
21. Health Policy Advisor... 6722. Policy Analysis and Formulation in the Health Sector... 68
23. Preparedness and Disaster Response Management... 70
24. Strengthening Surveillance and Response to Avian and Pandemic Influenza... 72
Ministry of Finance
25. Capital Market Development Policy... 7726. Development on Training and Learning Program... 79
27. Public Financial Management Multi-Donor Trust Fund (PFM-MDTF) to Support Indonesia’s Government Financial Management and Revenue Administration Project (GFMRAP) ... 82
28. Training and Technical Assistance on Internal Audit ... 84
29. Training on Public Relation, Fiscal Management, and International Cooperation... 86
Ministry of Communication and Information Technology
30. Development of e-Local Government... 9131. Improvement for Management of the Public Broadcaster in Indonesia... 93
32. IT Expert Advisory Mission ... 95
33. National’s Disaster for Early Warning System ... 96
Ministry of Public Works
Agency for Research and Development 34. Capacity Development for River Basin Organizations (RBOs) in Practical Water Resources Management and Technology... 101Directorate General for Highways 35. Capacity Building for Public-Private Partnership (PPP) Operation ... 106
36. Road Policy Advisor... 107
List Priority of Technical Assistance
Directorate General for Water Resources
38. Integrated Water Resources Management in Jabodetabek and Its Surrounding Area... 109
39. Water Resources Policy Advisor ... 111
Ministry of National Education
40. Higher Education Training on Developing Education Content for Mobile Learning... 115Ministry of Trade
41. C/P Training for Strengthening Export Promotion Organization... 11942. Increasing the Capability of Mastering Chinese Language for SME’s and Government Officials ... 120
Ministry of Transportation
Directorate General for Land Transportation 43. Program for Improvement of Transport System in Medium Cities... 123Directorate General for Sea Transportation 44. Long Term Expert on Strengthening Maritime Safety and Security Especially for Anti Piracy and Anti Maritime Terrorism... 124
Directorate General for Air Transportation 45. Training Program for Aircraft Accident Investigators ... 126
Directorate General for Railways 46. Bandung Urban Railway Transport Development, Electrification Padalarang - Cicalengka Line... 128
47. Capacity Building of the Jabotabek Railway... 130
48. Construction of Aceh Railway Line Phase I - Engineering Services ... 132
49. Improvement of Railway Safety Management (Phase II)... 134
50. Improvement of Railway System in the East Jakarta Industrial Region ... 136
Ministry of Agriculture
51. Development of Jatropha Curcas Oil as Bioenergy for Rural Areas in Nusa Tenggara and Central Sulawesi ... 14152. Enhancing Livestock Development Policy... 143
List Priority of Technical Assistance
- x -
55. Improvement on Animal Health Laboratory for Avian Influenza (AI) and Other
Strategic Animal Diseases ... 148
56. Indonesia Avian Influenza Surveillance and Control Project... 150
57. Standardization and Quality Control for Horticulture Product of Indonesia ... 152
Ministry of Social Affairs
58. The Disaster Relief for Mobile Water Treatment... 157Ministry of Manpower and Transmigration
59. Advisor on Manpower Policy ... 16160. Capacity Building for Employment Service... 162
61. Capacity Building for Labors Inspector... 163
62. Seminar for the Ministry of Man Power and Transmigration ... 164
Indonesian National Police
63. Project for Support Program for Reform of Indonesian National Police... 167Indonesian Institute of Science
64. Project for Determine Sustainable Energy Research Priority in Indonesia ... 171Ministry of Environment
65. Environmental Support Programme II ... 175Ministry of National Development Planning/ National Development Planning
Agency (BAPPENAS)
66. Electronic Government Procurement Infrastructure Development... 179
67. Local and Regional Economic Development ... 181
68. Rice Fortification for the Poor ... 183
69. Strengthening Capacity to Improve Aid Effectiveness... 185
State Secretariat
70. Strengthening the Capacity of Bureau for International Technical Cooperation of the State Secretariat as the Secretariat of Coordinating Committee for International Technical Cooperation ... 189GB ID : P-06-08800-0700-062001
1. Project Title : National Civil Service Information System (NCSIS)
2. Project Type : Project Assistance
3. Executing Agency : National Civil Service Agency
4. Implementing Agency : National Civil Service Agency
5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
To develop National Civil Service Information System (NCSIS)
8. Scope of Projects
a. to provide hardware, software and computer network devices b. to provide training activities
c. to provide technical support and application development
9. Activities
Activities Implementation Locations
Project Implementation Units
a. Procurement hardware, software and computer network devices
b. Developing national civil service information system
c. Training activities
National Civil Service Agency (BKN – Jakarta)
Civil Service Information and Data Processing unit
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding
(US $ 000) Remarks
National Civil Service Agency 17,000 2,567 19,567 Spain
Total 17,000 2,567 19,567
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
P-4
GB ID : P-06-08800-0700-062001
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services
Construct-ions Goods Trainings Others
a. Goods 6,434
b. Freight & Insurance 390
c. Application Development 4,624
d. Training Activities 2,177
e. Socialization Activities 848
f. Project Management 1,298
g. Consultancy Services 306
h. Implementation Service 1,877
i. Maintenance and Technical
Support 1,613
Total 8,105 6,434 2,177 2,851
13. Project References :
GB ID : P-03-11200-0700-068006
1. Project Title : Disaster Relief and Mitigation Management Project
2. Project Type : Project Assistance
3. Executing Agency : National Coordinating Board for Disaster Management
4. Implementing Agency : Secretariat of National Coordinating Board for Disaster Management,
National Coordinating Board for Disaster Management
5. Duration : 24 months
6. Location : DKI Jakarta
7. Objectives
a. In disaster event, area information up to individual house precision along with estimated or observed damage will be displayed in 3D view to make counter disaster activity quick and effective.
b. In recovery stage of a disaster, recovery plan view will be displayed visually in 3D view or necessary format to make any level of managers make it easy to understand the plan.
c. In preparedness stage, stimulated or statistical data of an expected disaster will be displayed in various scales to make managers easy to understand the urgency of a disaster. Also, providing hazard map and land use information as well
8. Scope of Projects
The Study composed of three components, namely: a. Formulation of Natural Disaster Management Plan, b. Capacity Development of the organization concerned, and
c. Preparation of general guideline for formulation of regional disaster of Regional Disaster Management Plan.
9. Activities
Activities Implementation Locations
Project Implementation Units
a. Consultation of the system design
b. Supply equipment and necessary data (satellite image)
c. Dispatch expert in system construction and operator
National Level (DKI Jakarta)
Secretariat Bakornas PB
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding
(US $ 000) Remarks Secretariat of National
Coordinating Board for Disaster Management
8,600 1,290 9,890 Japan (JICA)
P-8
GB ID : P-03-11200-0700-068006
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
4,520 5,370 9,890
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Consultation of the
system design 1,500
Supply equipment and necessary data (satellite image)
7,500
Dispatch expert in system
construction and operator 890
Total 1,500 7,500 890
13. Project References :
GB ID : P-05-06600-0700-062013
1. Project Title : One Stop Center for Therapy and Rehabilitation for Drug Abuser
2. Project Type : Project Assistance
3. Executing Agency : National Narcotic Board
4. Implementing Agency : National Narcotic Board
5. Duration : 24 months
6. Location : National Wide
7. Objectives
a. To provide therapy and rehabilitation laboratory equipment based on provision b. Implementation of therapy and rehabilitation based on provision services c. Increasing the human resources capability
d. Decreasing of bad impact caused by injection e. Therapy and rehabilitation based community
8. Scope of Projects
Procurement of medical equipment
9. Activities
Activities Implementation Locations
Project Implementation Units One Stop Center development
a. Facilities development : procurement of 33 packages of medical equipment and medicine b. Provision of medical complication diagnosis:
procurement of 33 packages which consist of blood test, screening/test kit, GC-MS, toxilab, headspace and elisa.
Whole 33 provinces
Outreach Center development
a. Facilities improvement : procurement of 370 packages of medical equipment and medicine b. Development of simple laboratory : procurement
of 370 packages which consist of blood test and screening/test kit
370 selected districts
National Narcotic Board
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks National Narcotic
Board
P-12
GB ID : P-05-06600-0700-062013
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
1,500 15,150 16,650
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Medical, security, and operation
System
10,347
b. Project management 2,386
c. Installation and training 1,653 d. Operation and maintenance
supervision
1,539
e. Consultant 442
f. Contingency and Miscellaneous 283
Total 2,828 13,539 283
13. Project References :
GB ID : P-05-06300-0700-061018
1. Project Title : Strengthening National Capacity on Drug and Food Control
2. Project Type : Project Assistance
3. Executing Agency : National Agency of Drug and Food Control (NADFC)
4. Implementing Agency : National Agency of Drug and Food Control (NADFC)
5. Duration : 60 months
6. Location : DKI Jakarta and 30 provinces
7. Objectives
To improve the safety and quality of food and pharmaceuticals by strengthening the food and pharmaceutical quality assurance management system, with particular emphasis on capacity building of laboratory testing.
8. Scope of Projects
The project will achieve quality assurance management system through:
a. Strengthening the food and pharmaceuticals control system based on the risk analysis approach to safety and quality control
b. Strengthening the laboratory capacity of food and drug control system c. Fostering institutional development of the NADFC
9. Activities
Activities Implementation Locations
Project Implementation
Units Component I:
a. Risk Assessment b. Risk Management c. Risk Communication
DKI Jakarta NADFC
Component II:
a. Develop laboratory center of excellences DKI Jakarta and several provinces b. Enhancing laboratory capacity for testing,
assessment, and research at the center level and regional labs
DKI Jakarta and 26 provinces
c. Develop specific laboratories for toxicity and other specific tests
d. Establishing supporting laboratory facilities
DKI Jakarta
e. Establishing 4 new regional laboratories Banten, Gorontalo, Kep.
Bangka-Belitung, Kep. Riau f. Developing National Laboratory for preparation of
Reference Substances
DKI Jakarta
P-16
GB ID : P-05-06300-0700-061018
Activities Implementation Locations
Project Implementation Units Component III:
a. Enhancing National Laboratory Organizational Structure
DKI Jakarta
b. Improving Information Management c. Strengthening Human Resource Capacity
DKI Jakarta and 30 provinces
NADFC
Component IV:
a. Project Management Unit DKI Jakarta b. Monitoring & Evaluation DKI Jakarta and 30
provinces
NADFC
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks 39,936 (loan)
National Agency of Drug and Food
Control (NADFC) 3,767 (grant)
1,809 45,512 World Bank
Total 43,703 1,809 45,512
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
7,221 15,190 17,638 3,708 1,755 45,512
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct
-ions Goods Trainings Others Component I:
a. Risk Assessment b. Risk Management c. Risk Communication
1,375 94 1,360
Component II:
a. Develop laboratory center of excellences
1,087
b. Enhancing laboratory capacity for testing, assessment, and research at the center level and regional labs
GB ID : P-05-06300-0700-061018
Categories (US $ 000) Detail of Activities
Services Construct
-ions Goods Trainings Others c. Develop specific laboratories for
toxicity and other specific tests
230
d. Establishing supporting laboratory facilities
145 3,054
e. Establishing 4 new regional laboratories
2,515
f. Developing National Laboratory for preparation of Reference Substances
409
Component III:
a. Enhancing National Laboratory Organizational Structure
430 645 27
b. Improving Information Management
2,050 2,460 315
c. Strengthening Human Resource Capacity
75 1,004
Component IV:
a. Project Management Unit
93 77 715
b. Monitoring & Evaluation 1,110 6
Total 5,185 37,827 419 2,081
13. Project References :
GB ID : P-05-08100-0700-064023
1. Project Title : Baron Renewable Energy Technopark
2. Project Type : Project Assistance
3. Executing Agency : Agency for the Assessment and Application of Technology
4. Implementing Agency : Agency for the Assessment and Application of Technology
5. Duration : 30 months
6. Location : Baron, Gunung Kidul, DIY
7. Objectives
a. To develop an area as utilization center for the electricity generation technology using renewable energy.
b. To encourage the utilization of renewable energy to reduce fossil fuel dependency for electricity generation.
c. To optimize the utilization of local energy resources to supply local (especially the Baron Renewable Energy Project area) electricity needs.
d. To enhanced human resources capability in engineering of hybrid electricity generation technology in remote area.
e. To make Baron as a tourism and renewable energy development area
8. Scope of Projects
a. Completion of the Baron Techno-park Master Plan. b. Site preparation.
c. Civil works ( access road, landscaping, building, electricity distribution system, etc ) d. Preliminary design for electricity generation using renewable energy
e. Design and Installation Electric Power Generation Plant based on hybrid system technology. f. Commissioning test and training
9. Activities
Activities Implementation Locations Project Implementation Units a. Programme Development Jakarta, and site location Baron
b. Infrastructure construction Baron, Gunung Kidul, DIY
BPPT
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding
(US $ 000) Remarks
BPPT 1,000 150 1,150 Norway
Total 1,000 150 1,150
11. Disbursement Plan
Disbursement Plan (US $ 000)
P-22
GB ID : P-05-08100-0700-064023
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
a. Programme Development 350
b. System equipment/hybrid power system
500
c. Construction civil works 250
d. Capacity Building 50
Total 350 250 500 50
13. Project References :
GB ID : P-03-08100-0700-064021
1. Project Title : National Infra Network Development
2. Project Type : Project Assistance
3. Executing Agency : Agency for the Assessment and Application of Technology
4. Implementing Agency : Agency for the Assessment and Application of Technology
5. Duration : 36 months
6. Location : DKI Jakarta
7. Objectives
The purpose of this project is to develop the ICT infrastructure that will facilitate the implementation of national e-Gov, which will allow maximum automation of inter-government coordination and other online government services to citizen (G2C), government to businesses (G2B), and most importantly among government institutions G2G), by using appropriate ICT technology
8. Scope of Projects
This project will be carried out to develop the main targets which are aimed to achieve the nationwide government network development objectives:
a. To provide the extensive government network infrastructure for the sake of government
productiveness and security
b. To encourage the growth of national economy by the development of the government
network infrastructure.
The infrastructure will provide a seamless, secured and strategic data and information communication connections between government ministries and agencies through the use of Virtual Private Network technology (VPN) and centralized data repository in order strengthen the overall coordination roles of government. This infrastructure consists of:
a. Government Secured Intranet (GSI)
b. Government Data Management Centre (GDMC)
c. Government Data Recovery Centre (GDRC)
d. Government Internet Exchange (GIX)
9. Activities
Activities Implementation Locations Project Implementation
Units
Phase I : 400 Nodes Jakarta and Java Island
Phase II : 3300 Nodes Others
IPTEKnet
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000)
Local Funding (US $ 000)
Total of Funding
(US $ 000) Remarks
Agency for the Assessment
and Application of Technology 50,000 1,500 51,500
P-24
GB ID : P-03-08100-0700-064021
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
25,500 15,500 10,500 51,500
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
a. GSI 21,500
b. GDMC 8,000
c. GIX 2,400
d. GDRC 5,100
e. Local Implementation
& Training
10,000
f. Consulting 2,500
g. Project Management 1,500
h. Contingency 500
Total 4,000 37,000 10,000 500
13. Project References :
Aceh and Nias
GB-ID : P-03-09400-0701-067031
1. Project Title : Rehabilitation Drainage System of Banda Aceh and Lhokseumawe
2. Project Type : Project Assistance
3. Executing Agency : Aceh and Nias Rehabilitation and Reconstruction Board (until 2009) and
Continued by Ministry of Public Works
4. Implementing Agency : Housing and Settlements Department of NAD Province
5. Duration : 18 months
6. Location : Banda Aceh City, NAD Province
7. Objectives
The objective of the project is to reduce flooding problem in the city of Banda Aceh, especially in zones 4,5,6,7 and Darussalam. Partly due big earthquake most of land level in Banda Aceh is lowered than before. Run off water in many areas especially close to coast-line can’t flow to the sea by gravity. This project is aimed to construct some structure for alleviating and controlling flooding in the city. The components of the project include cleaning of existing drainage system, increasing the capacity of drain, constructing retarding basin to store the water during high water, and building pumping stations.
8. Scope of Projects
a. Cleaning of Existing system and implementation of an Operational and Maintenance system. b. Increasing the Capacity of Drainage System by diverting the flow, adding new canal and
rehabilitation/widen the existing system.
c. Constructing retarding basin to temporally store the water (delay the out flow to the macro system). During low water levels in the macro system water will be discharged by gravity. During high water levels in the macro system the gates will be closed and water will be stored and pumped.
d. Installing pumping system to pump the water to the main river/sea during high water and heavy rain.
9. Activities
Activities Implementation
Locations Project Implementation Units a. Cleaning of Existing System
b. Increasing The Capacity of Drainage System
Zone 4,5,6,7 and Darussalam
c. Constructing Retarding Basin
d. Building Pumping Station
Zone 4,5,6, and 7
P-28
GB-ID : P-03-09400-0701-067031
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding
(US $ 000) Remarks Aceh and Nias
Rehabilitation and Reconstruction Board
50,000 10,000 60,000 France
Total 50,000 10,000 60,000
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
23,172 36,828 60,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Construct
-ions Goods Trainings Others a. Civil Works: Primary and secondary
drainage works 2,452 55,714
b. Equipments: support to operational
capacities 1,446
c. Implementation management 388
Total 2,452 55,714 1,446 388
13. Project References :
GB-ID : P-05-02500-0700-061055
1. Project Title : Development of Islamic State University of Sunan Gunung Djati
2. Project Type : ProjectAssistance
3. Executing Agency : Ministry of Religious Affairs
4. Implementing Agency : Islamic State University of Sunan Gunung Djati
5. Duration : 36 months
6. Location : Bandung, West Java
7. Objectives
The main objectives of the project are:
a. To strengthen Islamic State University of Sunan Gunung Djati as an integrated Islamic higher education institution with the provision of laboratory, research center, community service center, library and on line information system;
b. To accelerate the development of study programs conducted through wider mandate fields
into faculties;
a. To improve postgraduate program as model for Islamic community and research
development;
b. To develop academic program as center of excellence of S&T, culture and compliance, and
provide ethics and moral base for S&T utilization.
c. To develop curriculum by adopting new subjects that are added into the old fields so that
Islamic State University of Sunan Gunung Djati will serve students with new academic program.
d. To develop information technology system utilization in line with constructing academic
information network between higher education institution and research institute.
e. To reconstruct scientific epistemology in Islam in an epistemology form which integrates
Islamic sciences and general sciences, so there is no dichotomy between religious and general sciences, but integrated into one chain of scientific system in Islam.
f. To prepare education participants becoming community members who possess academic
capabilities and/or professionals capable of applying, boosting, create S&T and/or culture in the field of Islamic and social sciences.
8. Scope of Projects
Buildings and Civil Works
a. Faculty Buildings
1) Faculty of Economic
2) Faculty of Law
3) Faculty of Psychology
4) Faculty of Social Politic
5) Faculty of Communication
6) Faculty of Science and Technology
b. Supporting Institution Buildings
1) Multipurpose
2) Library Building
3) Research Center
4) Integrated Laboratory and Computer
Center
P-32
GB-ID : P-05-02500-0700-061055
9. Activities
Activities Implementation
Locations
Project Implementation Units
a. Building Construction
b. Equipment
c. Furniture & Fixture
d. Project Management Unit (PMU)
e. Academic (Curriculum) Development Program
f. Fellowship Training
g. Auditing
h. Start Up Workshop
Bandung, West Java
Islamic State University of Sunan Gunung Djati
10. Funding Source
Implementing Agency Foreign Funding
(US $ 000)
Counterpart Funding (US $ 000)
Total of Funding
(US $ 000) Remarks
Islamic State University of Sunan Gunung Djati
22,000 5,700 27,700 IDB
Total 22,000 5,700 27,700
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
4,432 13,573 9,695 27,700
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
a. Building Construction 14,667
b. Equipment 5,343
c. Furniture & Fixture 2,200
d. Project Implementation Unit
(PIU) 120
e. Academic (Curriculum)
Development Program 1,000
f. Consultant Service & Training
Implementation 1,800
g. Auditing 40
h. Start Up Workshop 15
i. Contingency 2,515
Total 1,000 14,667 7,543 1,800 2,690
13. Project References :
GB-ID : P-01-01000-0700-063063
1. Project Title : Kecamatan Development Project
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Home Affairs
4. Implementing Agency : Directorate General of Village Community Empowerment (Ditjen PMD)
5. Duration : 12 months
6. Location : 33 Province, 349 Regency
7. Objectives
KDP has overall development objectives of reducing poverty and improving local-level governance in rural Indonesia.
Specific development objectives for KDP include:
a. Institutionalizing participatory processes in local government;
b. The cost effective provision of basic social and economic infrastructure;
c. Strengthening the capacity of the micro-finance institutions developed under KDP-1 and KDP-2 to manage and monitor funds sustainable.
8. Scope of Projects
a. Providing Kecamatan Grants (BLM) on 33 Province, 349 Kabupaten/Kota 1285 Kecamatan b. Providing Revolving Funds and Credit for Economic Activities;
c. Providing basic productive infrastructure and social infrastructure; d. Strengthening capacity of community and local government;
e. Strengthening local institution and women participation on decision making;
9. Activities
Activities Implementation Locations Project Implementation Units a. Facilitating, Training
and Consulting
National DG PMD
b. Block Grant 33 Province, 349 Kabupaten, 2389 Kecamatan
Kecamatans and Villages
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding
(US $ 000) Remarks Directorate General of
Village Community Empowerment
231,194 229,465 460,659 World Bank
Total 231,194 229,465 460,659
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
P-36
GB-ID : P-01-01000-0700-063063
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
a. Kecamatan Grant 393,438
b. Kecamatan Planning Grants 7,139 c. Kecamatan CCT Grants
d. Training and Facilitators 20,585 e. Consultant Services 38,377
f. M&E, Studies and Incremental
1,120
Total 39,497 20,585 400,577
13. Project References :
GB ID : P-04-03200-0700-065105
1. Project Title : Development of Belawan and Sibolga Fishing Port
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Marine Affairs and Fisheries
4. Implementing Agency : Directorate General of Capture Fisheries, Ministry of Marine Affairs and
Fisheries
5. Duration : 48 months
6. Location : Belawan Ocean Fishing Port and Sibolga National Fishing Port
7. Objectives
To provide improved port infrastructure, build to international standard in ocean a class by 2011 on Belawan Ocean Fishing Port and national B class by 2011 on Sibolga National Fishing Port by: a. to increase the number of fishing vessels using the government fishing port facilities; b. to improve facilities to all fishermen for the handling and marketing of fish;
c. to improve working conditions for fishers and port operators; d. to improve vessel berthing facilities so as to improve productivity
8. Scope of Projects
a. Consultancy and supervisory services
b. Construction of port facilities in Belawan and Sibolga c. Study for institutional reforms
d. Project management Unit Support e. Financial Audit
9. Activities
Activities Implementation Locations
Project Implementation Units
a. Revetment –1.510 m’ b. Retaining wall-160 m
c. Earth works (land reclamation-170.000 m3, dredging-284.000 m3, rip-rap dressing-8.100 m3) d. Jetties- 28.560 m2
e. Roads and drainage networks-11.400m’ f. Wastewater treatment and power supply-2 unit g. Light house-1pkt
h. Auction hall and fish market-2 unit i. Wall fence- 1 pkt
j. Coast guard posts 2 pkt.
Belawan, North Sumatera
Sibolga, NorthSumatera
Belawan Ocean Fishing Port 2.P-40
GB ID : P-04-03200-0700-065105
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Local Funding (US $ 000)
Total of Funding
(US $ 000) Remarks Directorate for Capture
fisheries
32,150 3,180 35,330 IDB
Total 32,150 3,180 35,330
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
3,180 12,719 10,952 8,479 35,330
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Construction of Port
Facilities
13. Project References :
GB-ID : P-05-02400-0700-061124
1. Project Title : Improvement of H. Adam Malik Hospital Medan
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Health
4. Implementing Agency : RSUP H. Adam Malik Medan
5. Duration : 36 months
6. Location : RSUP. H. Adam Malik Medan
7. Objectives
Improvement and development of service capacities RSUP H. Adam Malik in providing service of certifiable health, totally, and reached for all society
8. Scope of Projects
a. Building construction
b. Procurement of hospital equipment
9. Activities
Activities Implementation Locations Project Implementation Units a. Construction
b. Procurement of hospital equipment
RSUP H. Adam Malik Medan RSUP H. Adam Malik Medan
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks RSUP H. Adam
Malik Medan
30,000 2,000 32,000 Korea
Total 30,000 2,000 32,000
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
3,200 19,200 9,600 32,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Development of IGD building 6,000
b. Equipment procurement 26,000
Total 6,000 26,000
P-44
GB-ID : P-05-02400-0700-061124
1. Project Title : Strengthening of Teaching Hospitals in Indonesia
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Health
4. Implementing Agency : Directorate General for Medical Care (DGMC), Ministry of Health
5. Duration : 36 months
6. Location :
a. Dr.Zainoel Abidin Hospital, Aceh, b. H. Adam Malik Hospital, Medan, c. Dr. Mohammad Hoesin Hospital,
Palembang,
d. RSAB Harapan Kita, Jakarta,
e. Jantung Harapan Kita Hospital, Jakarta, f. Persahabatan Hospital, Jakarta,
g. Dr. Ciptomangunkusumo Hospital, Jakarta,
h. Dr. Soeradji Tirtonegoro Hospital, Klaten, i. Sanglah Hospital, Denpasar,
j. Prof. Dr. R.D. Kandou Hospital, Manado, k. Andi Makkasau Hospital, Pare-Pare
7. Objectives
To strengthen the operating theater and intensive care in 11 teaching hospitals to become units that provides quality care in the region.
8. Scope of Projects
The scope of the project is to provide adequate medical equipment and train doctors for improving targeted hospitals in Indonesia. The scope consists of the following:
a. procurement of equipment and materials, installation of the equipment and materials, testing and commissioning
b. training;
c. operation and maintenance;
9. Activities
Activities Implementation Locations
Project Implementation Units a. Procurement of medical equipment ,installation of
the equipment and materials, testing and commissioning
b. Training
c. Operation and maintenance;
11 Teaching Hospitals
Directorate General for Medical Care
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks
DGMC 14,000 3,500 17,500 Finland
GB-ID : P-05-02400-0700-061124
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
10,000 4,000 3,500 17,500
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Procurements of
Medical Equipment
12,600
b. Renovation of Hospital Facilities
3,500
c. Trainings program 560
d. Maintenances 840
Total 840 3,500 12,600 560
13. Project References :
GB-ID : P-03-05900-0701-066187
1. Project Title : Establishment of Information and Communication Technology Training
Center
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Communication and Information Technology
4. Implementing Agency : Human Resources and ICT Research Agency, Ministry of
Communication and Information Technology
5. Duration : 36 months
6. Location : DKI Jakarta and Bekasi
7. Objectives
To provide a model for center of excellence ICT training program to improve public’s quality (skill and competence)
8. Scope of Projects
a. Construction of facilities: head office building, laboratory, library, lecture rooms, workshop, and dormitory.
b. Provision of IT equipment. c. Development of soft programs.
d. Training program in Korea for lectures/trainers and key staff in training center.
e. Dispatch of Korean experts: project manager, program development and management, operation of IT Training center.
f. Dispatch of Korean survey teams: project development, Implementation
9. Activities
Activities Implementation Locations
Project Implementation Units
a. Land Provision b. Construction Building c. Equipment
Bekasi
d. Operational Preparation DKI Jakarta e. Operational Overhead
f. Development of Training
Bekasi
Human Resources and ICT Research Agency
10. Funding Source
Implementing Agency Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding
(US $ 000) Remarks Human Resources and
ICT Research Agency
7,000 1,500 8,500 Korea
(KOICA
P-50
GB-ID : P-03-05900-0701-066187
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
2,170 3,165 3,165 8,500
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others
a. Land Provision 800
b. Construction Building 2,961
c. Equipment 1,549
d. Operational Preparation 850
e. Operational Overhead 740
f. Develop Training 1,600
Total 850 3,761 1,549 1,600 740
13. Project References :
GB-ID : P-03-05900-0701-066187
1. Project Title : Establishment of New RRI Transmission Systems
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Communication and Information Technology
4. Implementing Agency : a. Directorate General Communication and Media Information
Dissemination, Ministry of Communication and Information Technology
b. Public Broadcaster Radio of Republic Indonesia (LPP RRI)
5. Duration : 36 months
6. Location : DKI Jakarta (Central), Toli-Toli (Central Sulawesi), Tarakan (East
Kalimantan)
7. Objectives
Disseminate public information and other important information to remote areas by establishing new RRI transmission systems
8. Scope of Projects
Procurement and Installation of equipment for MW radio broadcasting system in Toli-Toli and Tarakan broadcasting stations including the operating and maintenance guidance.
9. Activities
Activities Implementation Locations Project Implementation Units a. Equipment Installation
b. Antenna Establishment c. Training (Guidance)
Toli-Toli, Tarakan LPP RRI
10. Funding Source
Implementing Agencies Foreign Funding (US $ 000)
Counterpart Funding (US $ 000)
Total of Funding
(US $ 000) Remarks
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
P-52
GB-ID : P-03-05900-0701-066187
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. Preparation (land
acquisition, tower, diesel, operator house)
1,561
b. Procurement installation and trainings
2,900
Total 1,561 2,900
13. Project References :
GB-ID : P-03-05900-0700-066170
1. Project Title : Improvement on TVRI Transmitting Stations Project (Phase I)
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Communication and Information Technology
4. Implementing Agency : Public Broadcaster Television of Republic Indonesia (LPP TVRI)
5. Duration : 36 months
6. Location : Nationwide
7. Objectives
Short Term
a. To improve the quality of signal reception b. To increase TVRI coverage area
c. To improve the role of community in national development d. To improve TVRI broadcasting system
Long Term
a. To promote the social life, economy and culture
b. To educate people by dissemination of education information c. To achieve social, culture, economic and politic stability in Indonesia d. To encourage community involvement on development
e. To bring prosperity of the whole Indonesia people
8. Scope of Projects
Supply, delivery, installation and commissioning of TV transmitters for the following locations: Kalabahi, Bengkayang, Sanggauledo, Kefamenanu, Betun, Atambua, Wanci, Lirung, Saumlaki, Tanah merah, Selat Panjang, Balai Karangan, Nanga Marakai, Semitau, Nunukan, Sebatik, Malinau, Balikpapan, Manado, Ternate, Polimak Jayapura, Bengkulu, Bukit Bakung, Sambas, Gn. Lampu/Samarinda, Penyandakan, Gombel, Yogyakarta, Makassar, Palembang, Gn. Gebug, Oro Oro Ombo, Banjarmasin, Surabaya, Banda Aceh.
9. Activities
Activities Implementation Locations
Project Implementation
Units a. Supply, Installation,
Commissioning & training of TV Transmitter
Bengkayang, Sanggauledo, Kefamenanu, Betun, Atambua, Wanci, Lirung, Saumlaki, Tanah merah, Selat panjang, Balai Karangan, Nanga Marakai, Semitau, Nunukan, Sebatik, Malinau, Balikpapan, Manado, Ternate, Bengkulu, Bukit Bakung, Sambas, Gn. Lampu/Samarinda, Penyandakan, Makassar b. Supply, Installation,
Commissioning & training of TV Transmitter & FPU
Manado, Polimak Jayapura, Gombel, Palembang, Banda Aceh
P-54
GB-ID : P-03-05900-0700-066170
Activities Implementation Locations
Project Implementation Units a. Supply, Installation, Commissioning &
training of TV Transmitter & STL
Yogyakarta, Surabaya
b. Supply, Installation, Commissioning & training of TV Transmitter, FPU & STL
Oro Oro Ombo
c. Common supply & common service Jakarta sites
LPP TVRI
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks LPP TVRI 21,400 1,300 22,700 Spain
Total 21,400 1,300 22,700
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
5,631 5,706 11,363 22,700
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others a. TV Transmitters:
Supply, Installation
16,720
b. Commissioning and training of TV Transmitter
4,730 1,250
Total 4,730 16,720 1,250
13. Project References :
Director General of Water Resources
GB-ID : P-03-03300-0700-066262
1. Project Title : Construction of Jatigede Multipurpose Dam
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Cimanuk Cisanggarung River Basin Agency (Balai Besar Wilayah
Sungai Cimanuk Cisanggarung), Directorate General of Water Resources, Ministry of Public Works
5. Duration : 65 months
6. Location : Sumedang Regency, West Java Province
7. Objectives
a. Domestic, Municipal and Industry (DMI) & Irrigation water supply b. Flood control
c. First Stage Headrace Tunnel
8. Scope of Projects
Dam and appurtenant structure
9. Activities
Activities Implementation Locations d. Grouting Gallery – 1,771 m length e. Access Gallery – 217 m length f. Cofferdam – 2 unit
g. Main dam 1,715 m length h. Spillway – 4 unit radial gates i. Irrigation Outlet – 400 m length j. Road Work – 16 km length k. First Stage Headrace Tunnel l. Hydro mechanical Works
Jatigede District, Sumedang Regency, West Java Province
PPK – 10
Pembangunan Waduk Jatigede
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks Cimanuk
Cisanggarung River Basin Agency
239.570 26.353 265,276 China
P-58
GB-ID : P-03-03300-0700-066262
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th 6th Total
26,528 39,791 45,097 66,320 74,277 13,263 265,276
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Jatigede Dam Project 265.276
Total 265.276
13. Project References :
Directorate General of Highways
GB-ID : P-03-03300-0700-066205
1. Project Title : Bridge Construction Project for Regional Development in West Nusa
Tenggara (Phase II)
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Directorate General of Highways
5. Duration : 48 months
6. Location : West Nusa Tenggara
7. Objectives
a. To replace and upgrade the bridges in West Nusa Tenggara to support the development of area and social economic activity.
b. To provide basic transport facilities to support regional development.
8. Scope of Projects
These projects consist of construction of 6.000 m bridges in West Nusa Tenggara.
9. Activities
Activities Implementation Locations Project Implementation Units FS, Field Survey & DED West Nusa Tenggara Directorate of Road and Bridge
Eastern Region
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks Directorate General
of Highways 19,660 2,949 22,609 Japan (JICA)
Total 19,660 2,949 22,609
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
4,524 6,782 6,782 4,521 22,609
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others FS, Field Survey & DED 22,609
Total 22,609
13. Project References :
P-60
GB-ID : P-03-03300-0700-066207
1. Project Title : Main Bridges Urgent Reconstruction Project in Nias Island, North
Sumatera Province
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Directorate General of Highways
5. Duration : 24 months
6. Location : North Sumatra
7. Objectives
a. To maintain the minimum life-level, basic human needs, and to release from isolation. b. To make the commodities transfer to the villages and to get availability of transportation. c. To make the children study and attend the school and provide the education opportunities. d. To make the infants, children and the old care their health and mental care.
e. To increase the opportunities of participation of social activities.
8. Scope of Projects
Design, reconstruction, and supervision of the reconstruction of the bridges, including river revetments adjacent to the abutment.
9. Activities
Activities Implementation Locations Project Implementation Units Bridge Construction Nias Island, North Sumatra Directorate of Road and Bridge West Region
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks Directorate General
of Highways 15,380 2,307 17,687 Japan (JICA)
Total 15,380 2,307 17,687
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
8,136 9,551 17,687
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others Bridge Construction 17,687
Total 17,687
13. Project References :
GB-ID : P-03-03300-0700-066200
1. Project Title : Manado by Pass (Phase II)
2. Project Type : Project Assistance
3. Executing Agency : Ministry of Public Works
4. Implementing Agency : Directorate General of Highways
5. Duration : 36 months
6. Location : Manado, North Sulawesi
7. Objectives
a. To promote the balanced regional development based on Manado development plans. b. To relieve the chronic traffic congestion in the downtown of Manado City.
c. To enhance the transportation capacity to Bitung City, a main port of Manado area.
8. Scope of Projects
a. Review and revision of the feasibility study b. Field survey
c. Detailed engineering design
9. Activities
Activities Implementation Locations Project Implementation Units FS, Field Survey & DED Manado Directorate of Road and Bridge
Eastern Region
10. Funding Source
Implementing
Total of Funding
(US $ 000) Remarks Directorate General
of Highways 16,000 4,000 20,000
Korea (ODCF)
Total 16,000 4,000 20,000
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
6,000 6,000 8,000 20,000
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others FS, Field Survey & DED 20,000
Total 20,000
P-62
Directorate General of Human Settlements
GB-ID: P-03-03300-0700-066221
1. Project Title : Construction of Western Denpasar and Kuta Sewerage Development
Project
2. Project Type : Project Assistance
3. Executing Agency : Directorate General of Human Settlements, Ministry of Public Works
4. Implementing Agency : a. Government of Bali Province
b. Government of Denpasar City c. Government of Badung Regency
5. Duration : 36 months
6. Location : Western Denpasar, Sanur and Kuta
7. Objectives
The objectives of the project are:
a. To conserve the beautiful tropical nature of Bali island as tourism resources b. To mitigate the contamination of river water and sea water quality
c. To improve the environmental conditions along the river and the urban area in Denpasar, Kuta and Sanur
d. To upgrade the living conditions of the inhabitant in the project area e. To make a BLUPAL to be a sustainable institution
8. Scope of Projects
Construction of Western Denpasar and Kuta Sewerage
9. Activities
Activities Implementation Locations Project Implementation Units a. Construction in
Denpasar Area
Denpasar City
Government of Bali Province,
Government of Denpasar City b. Construction in Sanurand Kuta Area
Badung Regency
Government of Bali Province,
Government of Badung Regency10. Funding Source
Implementing Agencies c. Government of Badung Regency 16,339 4,175 20,514
Japan (JBIC)
GB-ID : P-03-03300-0700-066221
11. Disbursement Plan
Disbursement Plan (US $ 000)
1st 2nd 3rd 4th 5th Total
22,627 22,627 22,627 67,881
12. Funding Allocations
Categories (US $ 000) Detail of Activities
Services Constructions Goods Trainings Others c. Construction in Denpasar Area 2,575 25,752 3,394 d. Construction in Sanur Area 971 9,718 1,282 e. Construction in Kuta Area 1,963 19,638 1,044 1,544
Total 5,509 55,108 1,044 6,220