Nomor Loan : IDB Financing Phase II [IND 147 - 151] and Phase III [169-171] Nama Konsultan : PT. CIRIAJASA ENGINEERING CONSULTANTS Joint Venture with
PT. PRISMAITA CIPTA KREASI
Paket Pekerjaan : Monitoring and Evaluation Consultant
Nomor & Tanggal Kontrak : HK.02.03/MEC/ICDD-IDB/SATKER-PKP/021/2013, Tanggal 18 April 2013 Periode Kontrak : 18 April 2013 s/d 31 Mei 2015
NO. AMANDEMENT NO. 4
REMUNERATION 1
EVALUATION TEAM
1.1 Professional Staff 7.755.000.000
1.1.1 PROFFESIONAL STAFF (EXPERTS) 3.568.500.000
1.1.2 Sub-PROFFESIONAL STAFF (EXPERTS) 4.186.500.000
1.2 Data Cleaning Specialist (2 Persons x 5 months) 1.701.000.000
1.2.1 PROFFESIONAL STAFF (EXPERTS) 1.413.000.000
1.2.2 Sub-PROFFESIONAL STAFF (EXPERTS) 288.000.000 Sub-Professional Staff
1.3 Supporting Staff 843.620.000
1.3.1 SUPPORTING STAFF 843.620.000
TOTAL I 10.299.620.000
2
DIRECT REIMBURSABLE COST
2.1 Duty Travel 2.528.144.800
2.2 Car and Motorcyle Rental 510.000.000
2.3 Office Rental and Furniture 349.435.000
2.4 Communication 90.067.780
2.5 Utilities Expenses 237.748.838
2.6 Office Equipment 313.450.000
2.7 Instrument 506.600.480
2.8 Recruitment for Enumerator &
Field Allowance 1.444.750.000
2.9 Focus Group Discussion (FGD) 3.673.250.000
2.10 Training, Workshop & Discussion 832.906.982
2.11 Reporting 15.000.000 TOTAL II 10.501.353.880 TOTAL I + II 20.800.973.880
PROGRAM PENANGGULANGAN KEMISKINAN DI PERKOTAAN
DITJEN CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM
Qty Rate Jumlah
1 REMUNERATION 10.299.620.000
1.1 EVALUATION TEAM 7.755.000.000
1.1.1 Professional Staff 3.568.500.000
Team Leader/ Evaluation Expert Ir. Sigit Indarto, Msi 26
Quantitative Evaluation Expert Wahid Sulaiman, S.Si, M.Si 26
Qualitative Evaluation Expert Drs. Asep Ahmad Satori 4
Dra. Christina Andys, MT 21
Infrastructure Expert Ir.Syamsoel Hidayat 12
Sampling Specialist/Statistician Ir. Budi Hari Priyanto 20
Econometric Specialist Nurkholis, SE, M.S.E 20
Computer Programmer (1 Persons x 12 months) Yoyok Riyanto, S. Kom 24
Data Cleaning Specialist (2 Persons x 5 months) 1. Danang Sektiawan 11
2. Surya Armi, S.Sos 11
1.1.2 Sub-Professional Staff 4.186.500.000 Field Supervisor (14 persons x 6 months) (14 persons) 84
Field Supervisor (14 persons x 2 months) (14 persons) 28
Field Supervisor (13 persons x 2 months) To Be Name 26
Junior Researchers/Editor (14 Persons x 6 months) (14 persons) 84
Junior Researchers/Editor (14 Persons x 2 months) (14 persons) 28
Junior Researchers/Editor (13 Persons x 2 months) To Be Name 26
Enumerator (45 Persons x 3,5 months) (45 persons) 158
Enumerator (45 Persons x 1 months) (45 persons) 45
Enumerator (41 Persons x 1 months) To Be Name 41
1.2 STUDY TEAM 1.701.000.000 1.2.1 Professional Staff 1.413.000.000 Co. Team Leader for Studies Bambang Iswantoro 12
Community Empowerment Expert / Sociology Anang Fahmi 12
Local Goverment Expert Hairin Nur 12
Institutional Expert Pramono Adisubroto 12
Microfinance Expert Sigit B Sudjalmo 12
Computer Programmer (1 Persons x 6 months) Budi Suesilo 8
Sampling Specialist (same person with evaluation) Ir. Budi Hari Priyanto 3
Econometric Specialist (same person with evaluation) Nurkholis, SE, M.S.E 3
Data Cleaning Specialist (2 Persons x 2 months) 1. Danang Sektiawan 2
(same person with evaluation) 2. Surya Armi, S.Sos 2
1.2.2 Sub-Professional Staff 288.000.000 Junior Researchers/Editor (5 Persons x 2 months) To Be Name 10
Junior Researchers/Editor (13 Persons x 2 months) 26
1.3 SUPPOTING STAFF 843.620.000 1.3.1 Supporting staff 843.620.000 Office Manager Hermas Herorathmono 26
Administrator/Secretary Dean Arif Maulana 26
Computer Operator (Evaluation Team) Ardi Hermawan 26
Computer Operator (Study Team) Faiza Rakhma 12
Data Entry and tabulation (Evaluation Team) 26.936 Data Entry and tabulation (Study Team) 3.501 Office Boy Nur Khafif 26
Security 2 persons Yatman 26
Umarul Arifin 26
Qty Rate Jumlah
2 DIRECT REIMBURSABLE COST 10.501.353.880
2.1 Duty Travel 2.528.144.800
2.1.1 Duty Travel For EVALUATION EXPERT 1.022.319.800
Transport (at cost) 2 Persons x 3 Times
1 Jakarta - Banda Aceh 8 4.000.000 29.787.000
2 Jakarta - Medan (Sumatera Utara) 10 3.800.000 34.786.000
3 Jakarta - Pekanbaru (Riau) 10 2.500.000 25.000.000
4 Jakarta - Tanjung Pinang (KEPRI) 10 2.500.000 24.715.800
5 Jakarta - Padang (Sumatera Barat) 10 3.000.000 27.916.400
6 Jakarta - Bengkulu (Bengkulu) 10 2.000.000 19.826.200
7 Jakarta - Jambi (Jambi) 10 2.000.000 19.634.400
8 Jakarta - Palembang (Sumatera Selatan) 10 2.000.000 19.154.000
NO. URAIAN AMANDEMENT No. 4
Qty Rate Jumlah
NO. URAIAN AMANDEMENT No. 4
9 Jakarta - Pangkal Pinang (Babel) 10 2.000.000 20.000.000
10 Jakarta - Bandar Lampung (Lampung) 10 1.500.000 15.000.000
11 Jakarta - Bandung (Jawa Barat) 10 500.000 5.000.000
12 Jakarta - Serang (Banten) 10 500.000 5.000.000
13 Jakarta - Pontianak (Kalimantan Barat) 10 2.000.000 20.000.000
Airport Tax Taxi Airport
Field Allowance / OSA 14 Loc 6 ptimes Total Invoice 7adays 377 400.000 150.800.000
Field Allowance / OSA 14 Loc 2 ptimes 5 days 140 400.000 56.000.000
Field Allowance / OSA 13 Loc 2 ptimes 5 days 130 400.000 52.000.000
Hotel Accommodation 13 Loc 6 ptimes 4 days 277 500.000 138.500.000
Hotel Accommodation 13 Loc 2 ptimes 4 days 104 500.000 52.000.000
Hotel Accommodation 12 Loc 2 ptimes 4 days 96 500.000 48.000.000
Tranport local 13 Loc 2 time 5 days 227 700.000 158.900.000
Tranport local 13 Loc 1 time 5 days 65 700.000 45.500.000
Tranport local 12 Loc 1 time 5 days 60 700.000 42.000.000
Pretest Instrument 2 Loc 16 person 1 days 32 400.000 12.800.000
2.1.2 Duty Travel For Field SUPERVISOR 757.975.000
Transport (at cost) 1 Persons x 3 Times
1 Jakarta - Banda Aceh 4 4.000.000 13.227.100
2 Jakarta - Medan (Sumatera Utara) 6 3.800.000 17.947.100
3 Jakarta - Pekanbaru (Riau) 5 2.500.000 12.403.600
4 Jakarta - Tanjung Pinang (KEPRI) 5 2.500.000 12.103.600
5 Jakarta - Padang (Sumatera Barat) 5 3.000.000 13.973.600
6 Jakarta - Bengkulu (Bengkulu) 5 2.000.000 9.555.600
7 Jakarta - Jambi (Jambi) 5 2.000.000 9.716.600
8 Jakarta - Palembang (Sumatera Selatan) 8 2.000.000 16.000.000
9 Jakarta - Pangkal Pinang (Babel) 5 2.000.000 9.897.800
10 Jakarta - Bandar Lampung (Lampung) 9 1.500.000 13.500.000
11 Jakarta - Bandung (Jawa Barat) 7 500.000 3.500.000
12 Jakarta - Serang (Banten) 5 500.000 2.500.000
13 Jakarta - Pontianak (Kalimantan Barat) 5 2.000.000 10.000.000
Field Allowance Survey 1 14 prs 1 times 20 days 245 275.000 67.375.000
Field Allowance Survey 2 14 prs 1 times 25 days 350 275.000 96.250.000
Field Allowance Survey 3 14 prs 1 times 38 days 449 275.000 123.475.000
Field Allowance Survey 1 14 prs 1 times 36 days 504 275.000 138.600.000
Field Allowance Survey 1 13 prs 1 times 36 days 468 275.000 128.700.000
LAND TRANSPORTATION (PROVINCE TO DISTRICTS) By SUPERVISOR A. From Banda Aceh to:
1 Kab Aceh Besar 4 200.000 800.000
2 Kota Lhokseumawe (from Medan) 3 500.000 1.500.000
3 Kota Banda Aceh 3 250.000 750.000
B. From Medan to:
1 Labuhan Batu 3 300.000 900.000
2 Deli Serdang 5 100.000 500.000
3 Tanjung Balai 3 400.000 1.200.000
4 Medan 4 100.000 400.000
C. From Padang to:
1 Kota Padang 5 200.000 1.000.000
2 Kota Pariaman 4 200.000 800.000
3 Kota Sawahlunto 3 400.000 1.200.000
4 Kota Payakumbuh 3 500.000 1.500.000
5 Kab Sijunjung 3 500.000 1.500.000
6 Kab Padang Pariaman 5 350.000 1.750.000
7 Kab Agam 3 600.000 1.800.000
D. From Tanjung Pinang to:
1 Batam 5 500.000 2.500.000
2 Bintan 4 500.000 2.000.000
3 Tanjung Pinang 3 300.000 900.000
E. From Pekanbaru to:
1 Bengkalis 5 500.000 2.500.000
2 Pekanbaru 5 150.000 750.000
3 Kab. Siak 4 150.000 600.000
F. From Bengkulu to:
1 Kota Bengkulu 5 150.000 750.000
2 Kab Rejang Lebong 5 300.000 1.500.000
4 Kab Kapahiang 4 300.000 1.200.000
G. From Jambi to:
1 Jambi 5 150.000 750.000
2 Sungai Penuh 5 400.000 2.000.000
3 Kab Muarojambi 4 400.000 1.600.000
4 Kab Merangin 4 400.000 1.600.000
H. From Palembang to:
1 Kota Palembang 5 150.000 750.000
2 Kab Lubuk Linggau 5 300.000 1.500.000
3 Kab Muara Enim 3 300.000 900.000
4 Kab Ogan Ilir 4 300.000 1.200.000
5 Kota Pagar Alam 3 300.000 900.000
6 Musi Rawas 4 300.000 1.200.000
I. From Pangkalpinang to:
1 Pangkalpinang 5 150.000 750.000
2 Belitung Timur 1 700.000 700.000
3 Bangka 4 200.000 800.000
J. From Bandar Lampung to:
1 Bandar Lampung 5 150.000 750.000
2 Pringsewu 5 200.000 1.000.000
K. From Serang to:
1 Kota Serang - 150.000
-2 Kota Cilegon 3 150.000 450.000
3 Kota Tangerang Selatan (from Jakarta) 5 150.000 750.000
4 Kota Tangerang (from Jakarta) 2 150.000 300.000
5 Kab Tangerang (from Jakarta) 5 150.000 750.000
L. From Jakarta to:
1 Jakarta Selatan 5 150.000 750.000
2 Jakarta Timur 3 150.000 450.000
3 Jakarta Barat 3 150.000 450.000
4 Kabupaten Bogor 4 300.000 1.200.000
M. From Pontianak to:
1 Bangkayang 3 300.000 900.000
2 Singkawang 3 400.000 1.200.000
3 Pontianak 4 200.000 800.000
4 Kab Kubu Raya 4 400.000 1.600.000
N. From Bandung to:
1 Kab Cirebon 4 200.000 800.000
2 Kota Cirebon 1 200.000 200.000
3 Kab Bogor (from Jakarta) 4 150.000 600.000
4 Kota Bandung 4 100.000 400.000
5 Kab Kuningan 3 200.000 600.000
6 Kab Majalengka 3 200.000 600.000
7 Kab Garut 1 150.000 150.000
8 Kab Bandung Barat 4 100.000 400.000
2.1.3 Duty Travel For STUDY EXPERT 384.600.000
DOMESTIC AIR / LAND TRAVEL Transport (at cost) 2 Persons x 1 Times
1 Jakarta - Tanjung Pinang (Including Airport Tax and Taxi Airport) 4 2.500.000 10.000.000
2 Jakarta - Padang (Including Airport Tax and Taxi Airport) 4 3.000.000 12.000.000
3 Jakarta - Bengkulu (Including Airport Tax and Taxi Airport) 4 2.000.000 8.000.000
4 Jakarta - Bandung 6 500.000 3.000.000
5 Jakarta - Pontianak (Including Airport Tax and Taxi Airport) 4 2.000.000 8.000.000
6 Jakarta - Pangkal Pinang (Including Airport Tax and Taxi Airport) 4 2.000.000 8.000.000
7 Jakarta - Palembang (Including Airport Tax and Taxi Airport) 4 2.000.000 8.000.000
8 Jakarta - Bandar Lampung (Including Airport Tax and Taxi Airport) 4 1.500.000 6.000.000
9 Jakarta - Jambi (Including Airport Tax and Taxi Airport) 4 2.000.000 8.000.000
10 Jakarta - Pekanbaru (Including Airport Tax and Taxi Airport) 2 2.500.000 5.000.000
11 Jakarta - Medan (Including Airport Tax and Taxi Airport) 2 3.800.000 7.600.000
12 Jakarta - Banten - 500.000
-13 Jakarta - -
-DAILY ALLOWANCE
Field Allowance / OSA 5 Loc 4 ptimes 5 days 100 400.000 40.000.000
Field Allowance / OSA 13 Loc 2 ptimes 5 days 130 400.000 52.000.000
Hotel Accommodation 5 Loc 4 ptimes 4 days 80 500.000 40.000.000
Qty Rate Jumlah
NO. URAIAN AMANDEMENT No. 4
Tranport local 5 Loc 2 time 5 days 50 700.000 35.000.000
Tranport local 12 Loc 1 time 5 days 60 700.000 42.000.000
Pretest Instrument (Study Team) 100 400.000 40.000.000
2.1.4 Duty Travel For STUDY EXPERT (Jr.Research) 363.250.000
DOMESTIC AIR / LAND TRAVEL Transport (at cost) 2 Persons x 1 Times
1 Jakarta - Tanjung Pinang (Including Airport Tax and Taxi Airport) 2 2.500.000 5.000.000
2 Jakarta - Padang (Including Airport Tax and Taxi Airport) 2 3.000.000 6.000.000
3 Jakarta - Bengkulu (Including Airport Tax and Taxi Airport) 2 2.000.000 4.000.000
4 Jakarta - Bandung 3 500.000 1.500.000
5 Jakarta - Pontianak (Including Airport Tax and Taxi Airport) 2 2.000.000 4.000.000
6 Jakarta - Pangkal Pinang (Including Airport Tax and Taxi Airport) 1 2.000.000 2.000.000
7 Jakarta - Palembang (Including Airport Tax and Taxi Airport) 1 2.000.000 2.000.000
8 Jakarta - Bandar Lampung (Including Airport Tax and Taxi Airport) 1 1.500.000 1.500.000
9 Jakarta - Jambi (Including Airport Tax and Taxi Airport) 1 2.000.000 2.000.000
10 Jakarta - Pekanbaru (Including Airport Tax and Taxi Airport) 1 2.500.000 2.500.000
11 Jakarta - Medan (Including Airport Tax and Taxi Airport) 1 3.800.000 3.800.000
12 Jakarta - Banten 1 500.000 500.000
13 Jakarta 1 -
-LAND TRANSPORTATION (PROVINCE TO DISTRICTS) By Jr. Reseach
From Padang to District: 2 time 5 loc - 750.000
-From Padang to District: 2 time 2 loc 4 750.000 3.000.000
From Tanjung Pinang to District: 2 time 5 loc - 750.000
-From Tanjung Pinang to District: 2 time 2 loc 4 750.000 3.000.000
From Bengkulu to District: 2 time 5 loc - 750.000
-From Bengkulu to District: 2 time 2 loc 4 750.000 3.000.000
From Bandung to District: 2 time 5 loc - 750.000
-From Bandung to District: 3 time 2 loc 6 750.000 4.500.000
From Pontianak to District: 2 time 5 loc - 750.000
-From Pontianak to District: 2 time 2 loc 4 750.000 3.000.000
From Pangkali Pinang to District 2 time 2 loc 4 750.000 3.000.000
From Palembang to District 2 time 2 loc 4 750.000 3.000.000
From Bandar Lampung to District 2 time 2 loc 4 750.000 3.000.000
From Jambi to District 1 time 3 loc 3 750.000 2.250.000
From Pekanbaru to District 1 time 2 loc 2 750.000 1.500.000
From Medan to District 1 time 2 loc 2 750.000 1.500.000
From Banten to District 1 time 2 loc 2 750.000 1.500.000
From Jakarta to District 1 time 2 loc 2 750.000 1.500.000
Junior Researcher (5 Persons) of Study Team
Field Allowance / OSA 5 loc 2 ptimes 30 days - 100.000
-Field Allowance / OSA 10 loc 1 ptimes 30 days 300 100.000 30.000.000
Field Allowance / OSA 13 loc 1 ptimes 60 days 780 100.000 78.000.000
Hotel Accommodation 5 loc 2 ptimes 29 days - 100.000
-Hotel Accommodation 10 loc 1 ptimes 29 days 290 100.000 29.000.000
Hotel Accommodation 13 loc 1 ptimes 59 Night 767 100.000 76.700.000
Tranport local 5 Loc 2 time 30 days - 75.000
-Tranport local 10 Loc 1 time 30 days 300 75.000 22.500.000
Tranport local 13 Loc 1 time 60 780 75.000 58.500.000
2.2 Car and Motorcyle Rental 510.000.000
Head Office/Jakarta (2 cars) 51 10.000.000 510.000.000
2.3 Office Rental and Furniture 349.435.000
Office Rental ( 1tahun = 1.200 m2) untuk 6 bulan = 1.200 x 0.5 = 600 m2 2.550 120.000 306.000.000
Rental Furniture + Ac (Biaya 1 Tahun = 20.440.000, jadi biaya 6 bulan = 20.440.000,- x 0,5) 2 20.440.000 43.435.000
2.4 Communication 90.067.780 Telephone (1 line) 26 3.000.000 44.812.014 Faximile 26 1.000.000 13.930.066 Internet 26 1.500.000 31.325.700 2.5 Utilities Expenses 237.748.838 Office Supply 25 2.500.000 62.352.500 Office Consumable 25 3.000.000 75.841.038 Computer Supply 25 3.000.000 74.335.800
Photo Copy Supply 25 1.000.000 25.219.500
2.6 Office Equipment 313.450.000
Computer Notebook (rental) for Expert Evaluation Team (5 Unit x 6 bulan) 128 500.000 63.750.000
Computer Notebook (rental) for Expert Study Team (4 Laptop x 6 bulan) 48 500.000 24.000.000
Computer Desktop (rental) for Evaluation Team (6 Unit x 6 bulan) 153 400.000 61.200.000
Computer Desktop (rental) for Study Team (2 Unit x 6 bulan) 24 400.000 9.600.000
Printer Laser Jet 2 units (rental) for Evaluation Team x 6 bulan 51 300.000 15.300.000
Printer Laser Jet 2 units (rental) for Study Team x 6 bulan 24 300.000 7.200.000
Photo Copy Machine (rental) for Evaluation Team (1 Unit x 6 bulan) 26 500.000 12.750.000
Computer Notebook (rental) for Editor Evaluation Team (13 Unit x 2 Bulan) 138 500.000 69.000.000
Computer Notebook (rental) for Editor Study Team (13 Unit x 2 Bulan) 36 500.000 18.000.000
Program STATA SE 13 (2 Quantity) 1 25.000.000 25.000.000
2.7 Instrument (Reproduction) 506.600.480
Instrument Production for Evaluation Team - 200
Survey 1 (3290 Sample RTM) ---> menjadi 2296 RTM 73.283 200 14.656.600
Survey 2 (3290 Sample RTM) 230.300 200 46.060.000
Survey 3 (5615 Sample RTM) 429.165 200 85.833.000
Survey Evaluation Team (3290 Sample RTM) 628.654 200 125.730.880
Delivery Instrument (13 Prov x 3 Times) - 2.500.000
-64
2.000.000 128.000.000 Instrument (Reproduction) for Study Team
Survey 1 : Beneficeries of Livelihood 45.000 200 9.000.000
Survey 2 : Capacity Building of KSM 45.000 200 9.000.000
Survey 3 : Satisfaction of Beneficiaries 221.600 200 44.320.000
Delivery Instrument 22 2.000.000 44.000.000
2.8 Recruitment,Transport & Field Allowance (1 Times) for Jr. Reseach and Enumerator 1.444.750.000
Recruitment for Local Enumerator 110% - 300.000
-Transport
Transport Junior Researcher Province to Kabupaten (3 times) 42 750.000 31.500.000
Transport Team Evauation for Junior Researcher Province to Kabupaten (14 Person 1 times) 14 750.000 10.500.000
Transport Team Evauation for Junior Researcher Province to Kabupaten (13 Person 1 times) 13 750.000 9.750.000
TransportJunior Researcher in Kabupaten 42 500.000 21.000.000
(14 Person 1 times) 14 500.000 7.000.000
(13 Person 1 times) 13 500.000 6.500.000
Transport Enumerator Province to Kabupaten (3 times) 135 750.000 101.250.000
Transport Evaluation Team for Enumerator Province to Kabupaten (45 Person 1 times) 45 750.000 33.750.000
Transport Evaluation Team for Enumerator Province to Kabupaten (41 Person 1 times) 41 750.000 30.750.000
Transport Enumerator in Kabupaten 135 500.000 67.500.000
Transport Evaluation Team for Enumerator in Kabupaten (45 Person 1 times) 45 500.000 22.500.000
Transport Evaluation Team for Enumerator in Kabupaten (41 Person 1 times) 41 500.000 20.500.000
Field Allowance
-Field Allowance Jr Research 14 prs 3 times 30 days - 150.000
-Field Allowance Jr Research 14 prs 1 times 15 days 210 150.000 31.500.000
Field Allowance Jr Research 14 prs 1 times 25 days 294 150.000 44.100.000
Field Allowance Jr Research 14 prs 1 times 34 days 396 150.000 59.400.000
14 prs 1 times 30 days 420 150.000 63.000.000
13 prs 1 times 30 days 390 150.000 58.500.000
Field Allowance Enumerator 45 prs 1 times 15 days 675 150.000 101.250.000
Field Allowance Enumerator 45 prs 1 times 25 days 945 150.000 141.750.000
Field Allowance Enumerator 45 prs 1 times 30 days 1.305 150.000 195.750.000
45 prs 1 times 30 days 1.350 150.000 202.500.000
41 prs 1 times 30 days 1.230 150.000 184.500.000
2.9 Focus Group Discussion (FGD) 3.673.250.000
FGD in Village for Evaluation Team
FGD Survey 1 = 150 Kelurahan (1 FGD = 20 orang) 3.000 125.000 375.000.000
FGD Survey 2 = 252 Kelurahan (1 FGD = 8 orang) 3.432 125.000 429.000.000
FGD Survey 3 = 429 Kelurahan (1 FGD = 8 orang) 3.432 125.000 429.000.000
FGD Survey 3 = 150 Kelurahan (1 FGD = 20 orang) 3.000 125.000 375.000.000
FGD Survey Evaluation Team (impact) = 429 Kelurahan (1 FGD = 8 orang) 3.432 125.000 429.000.000
FGD Survey Evaluation Team (impact) = 150 Kelurahan (1 FGD = 20 orang) 3.000 125.000 375.000.000
FGD Survey Evaluation Team (Mid Term ICDD 3) = 389 Kelurahan (1 FGD = 10 orang) 3.890 125.000 486.250.000
FGD Survey Evaluation Team (Mid Term KSM) = 389 Kelurahan (1 FGD = 10 orang) 3.890 125.000 486.250.000
FGD in Village for Study Team -
-FGD Survey 1 (benefeciaries of livelihood) = 5 Kabupaten @ 5 Kelurahan (1 -FGD = 15 Orang) 375 125.000 46.875.000
FGD Survey 2 (CB for KSM/SHG's) = 5 Kabupaten @ 5 Kelurahan (1 FGD = 15 Orang) 375 125.000 46.875.000
FGD Survey 3 (Satisfaction of Benefeciaies) = 13 Prop x 2 Kabupaten @ 4 Kelurahan (1 FGD = 15 Orang) 1.560 125.000 195.000.000
2.10 Training, Workshop & Discussion 832.906.982
For Evaluation Team
Training and Refresher for Supervisor 5 days 5 25.000.000 125.000.000
Training and Refresher for Local Enumerator 4 days 4 20.250.000 81.000.000
41 Training and Refresher for Local Enumerator 4 days (41 person x Rp. 450.000,-) 1 18.450.000 18.450.000
Field Allowance Team Evaluation for Jr Research
Field Allowance Team Evaluation for Enumerator
Field Allowance Team Evaluation for Enumerator
Transport Team Evaluation for Junior Researcher in Kabupaten
Transport Team Evaluation for Junior Researcher in Kabupaten
Field Allowance Team Evaluation for Jr Research
Qty Rate Jumlah
NO. URAIAN AMANDEMENT No. 4
Training for Junior Researcher 4 Days (14 Person x 450.000) 4 6.300.000 25.200.000
Training for Junior Researcher 4 Days (13 Person x 450.000) 1 5.850.000 5.850.000
Discusi and konsinyasi 8 15.000.000 120.000.000
Workshop Baseline Survey
1
37.006.982 37.006.982 1
38.000.000 38.000.000
Workshop Impact Survey of ICDD II 1 40.000.000 40.000.000
Workhop Survey MidTerm ICDD III 1 40.000.000 40.000.000
Workshop Preliminary Results (Final) 1 38.000.000 38.000.000
Pembahasan Final Report 1 13.000.000 13.000.000
For Study Team Team
Training for Junior Researcher 4 Days (5 Person x 450.000) 40 450.000 18.000.000
Training for Junior Researcher 4 Days (13 Person x 450.000) 52 450.000 23.400.000
Discusi and konsinyasi 6 15.000.000 90.000.000
Workshop beneficiries of livelihood and CB of KSM 2 40.000.000 80.000.000
Workshop Satisfaction of Benefeciaries 1 40.000.000 40.000.000
2.11 Reporting 15.000.000 Inception Report 30 100.000 3.000.000 Interim Report 30 150.000 4.500.000 Final Report + CD 30 250.000 7.500.000 20.800.973.880 TOTAL :