GENERALAUTHORITIES
セセorandum@ OF UNDERSTANDING BE.'TWEEN
THE GOVERNMENT OF THE REPUBLIC OF INDONESIA AND
THE GOVERNMENT OF AUSTRALIA
RELATING TO THE EXTENSION OF JOINT COOPERATION PROJECT ON RESEARCH DEVELOPMENT IN THE VETERINARY SCIENCES AT THE RESEARCH INSTITUTE FOR ANIMAL DISEASE, BOGOR
AGENCY FOR AGRICULTURAL RESEARCH & DEVELOPMENT DEPARTMENT OF AGRICULTURE
1 . THIS memoranduセ@ expresses the understanding of the Government of the Republic of Indonesia and the Government of Australia concerning the responsibili-ties and contributions respectively of the two Governments in regard to the extension of the joint cooperation proJect on research development in the veterinary sciences at Balitvet ( hereinafter refer-red to as Lhe Project ) located in Bogor, Indonesia. The Project is intended Lo continue in providing contributions to research and training in the vete -rinary sciences as further described and detailed in
the Annexes to this Memorandum .
2 . The Executing Authorities for this Project will be For the Indonesian Government : The Central Research Institute for Animal Science ( CRIAS ), Agency for Agricultural Research & Development ( AARD ) of the Department of Agriculture.
DURATION
PROJECT ORGANISATION
2
-3 . This Memorandum wil l take effect from the date of its signature and all undert akings given herein will cease on 22 J uly 1990 or such other date as may sub
-sequently be arranged between the two Governments .
4 . Responsibility for devel opment and direction of the Project will be vested in a Project Co- or dinating Board , whose chairman will be appointed by the
Indonesian Government . Membership of the Board will include the Australian Team Leader who is to be appointed by the Australian Government in consulta tion with the Indonesian Government . Membership of the Pr oject Co-ordinating Board will also include representat ives o f the Indonesian Government Depart -ment referred to in Clause 2 above, or nominated at
the discretion of the Indonesian Government, as well as a nominee designated by the Australian Embassy , Jakarta . The Board will meet not less than once each year . Responsibility for the development of co- opera-t i on beopera-tween BALITVET and DGLS will be vesopera-ted in opera-the National Reference Co-ordinating Committee (NRCC), whose chairman wil l be the Director of CRIAS . Membership of this Committee will be determined by senior Indonesian officials from both AARD and DGLS . 5 . Functions of the Project Co-ordinating Board will
include
(a) . co- ordinating policy for the Project;
(b) . reviewing and reporting on progress to the two Governments; and
(c) . recommending to the two Governments changes in
3
-FUNCTIONS OF THE 6 . Functions of the NRCC will be NATIONAL REFERENCE
CO-ORDINATING COMMITTEE .
RESPONSIBILITY
CONTRIBUTIONS
(a) . Supporting the development of research program-mes at Balitvet so that studies on diseases of r egional importance can be conducted ;
(b) . impr oving communications between Balitvet and the DGLS system so that advances in t echnology can be exchanged effectively ;
(c ) . co- ordinating training programmes between Balitvet and the DGLS system to make optimum use of expertise in both organisations ; (d) . studying methods for alleviating differences
between the terms and conditions of Balitvet and DIC scientific staff leading to improved cooperation between these organisations .
7 . overall responsibility for this Project will rest will the Government of Indonesia . The final authority for decisions on implementation of the agreed wor ks program will rest with the Director General of AARD
after considering consultations between the Director of CRIAS , the Indonesian Project Manager and t ne Australian Team Leader .
8 . The contributions of the Australian and Indonesian Gov er nments are detailed in Annexes 2 and 3 and a r e estimated to value $ . A. 12 . 86 million and
Rp . 10,108 million respectively . Disbursement of the Australian and Indonesian Governments contributions will be subject to the normal annual budget 。ーーイッーイゥセ@
REVIEW
PERSONNEL
4
-9. A Joint Review of project performance and prospects, at mid- term or earlier i f circumstances warrant , will be undertaken to provide guidance to both Governments on contributions and directions for the balance of
the Project . Other reviews may be made at times arranged 「・エキ・・ョセ。ョ、@ mutually convenient to, both Governments. Reviews will be undertaken by a joint review team appointed by the two Governments and
independent of staff involved in the Project.
10. For the purposes of this Project, the Indones ian Government will, in accordance with prevailing laws and regulations, facilitate the employment by the Australian Government or its agent of personnel as required for the Project and established between the
two Governments py :
(a) . bearing income or other taxes on project sala -ries and allowances; Australian Project person-nel will not bear these taxes;
(b) . granting exemption from import and other duties on personal and household effects;
(c) . granting exemption from taxes and duties on the purchase in Indonesia of a locally assembled motor vehicle per expert on condition that it either be sold to a person who has the same privileges, or to the Government authorised agents. The expert's assignment should be on a long term basis of at least twelve ( 12 consecutive months;
SUPPLIES
LIABILITY
5
-(e) . expediting the issue of all documentation required for the entry of, and performance of work by, project personnel, including work permits or certificates for eligible persons .
11 . (a) . The Indonesian Government will, in accordance with prevailing laws and regulations either exemp from import duties and other central, state and regional government taxes or pay/reimburse such duLies or taxes on all supplies purchased by Australia for the Project; (b) . The Indonesian Government will facilitate movement of
project equipment and supplies by providing appropriate customs and warfage facilities in the port of entry and will be responsible for the expeditious transport of such equipment and supplies to the site; and
(c) . Project equipment and supplies provided by Australia will be available for the unrestricted use of the Project and will not be withdrawn from such use without the consent of the Project Co-ordinating Board .
The Australian Team Leader in consultation with the Indonesian Project Manager will exercise administrative control over such supplies for the duration of the Project.
12 . The Indonesian Government will be responsible for dealing with any claims which may be brought by third parties against Australia and its experts, agents and Australian personnel and will hold harmless Australia and its experts, agent and
Australian personnel in case of any claims of liabilities resulting from operations under this Memorandum.
SECURITY
SE'M'LEMENT OF
DIFFERENCES
AMENDMENTS
6
-13 . The Indonesian Government will arrange for any protection deemed necessary to ensure the safety of the person and property of Australian personnel and of their dependants and of Australian project equipment and supplies either at the project location, in transit in Indonesia or on any other official representational activity in Indonesia . The Australian Government will take reasonable precautions to ensure that Austral ian personnel have due regard for local t r aditions and customs .
14 .
Any disputes arising out of the interpretation or imple-mentation of the Memorandum shall be settled amicably by consultation or negotiation between the two Governments .15 .
Amendments to !.his Memorandum may be made at any time by an Exchange of Letters between the two Governments .ANNEXURES to this Memorandum form an integral part of it.
SIGNED at Jakarta in duplicate, this Second
day of _ _ _ ..;:;O..:;.ct"'o::.;;b:..::e:.:.r _ __ __ _ 1986
FOR TilE GOVERNMENT OF
THE REPUBLIC CF INDONESIA The Secretary General
Signed
Prof . Dr .Sjarifudin Baharsjah
L
FOR THE GOVERm.ffiNT OF
AUSTRALIA The Ambassador
Signed
Aim EX
PROJEC'l' GQ!\LS AND OBJECTIVES
The goal of the project 1s to support !n·lnnesian Government plans
..;n<.l proy!"arn;; lo incn!J::>c ャNエカッセlッエZォ@ pl."oou<:tion, in the jut:cn!!:Lt; o( !>U(;iul
\Nセョ、@ cconomi(; developnent, by strengthening the national capacity for ani
-mal disease control. cッョウゥウエセョエ[@ wiLh this go.:tl, Lhe objectives of the
pro-ject are to promote the application of existing advanced technology to the
solution of Vt:lterinary ーセZッ「ャ」ュイ[@ and to upgrade the level of イ」イ[」\セイ」ィ@ in
diagnostic ュ」ャィッ、セN@
I
The Project is designed to assist the Research ᄋiョウエセエオエ・@ for Ani
-mal Disease {OALITVET) to perform twh rolt:s . Tho.! first role is as a research
institute cali· ing out research on unirnal hccll.Lh problems of national
irn.-por.tance and assisting regional laboratories to investigate diseases of
local signific ance . The second role is to act as a central refctencc:
labo-ratory, offering highly skilled laboratory and consultative services t.v
other veterinary laboratoric:; in Indonesia .
Inputs to the Projccl are Australian Experts , traininCJ for slaff ,
ーイッカゥウゥッセ@ of equipment , supplies and vehicles, development of tacil• t ies, ッー・イ。エゥッセ。ャ@ funding and management . The activities of the project cover
the range of BAL!TVET activities in the fiell •' oc bacteriology, virology,
mycology, paras1tology , toxicology, veterinary {JJ.Lhology and epidemiology .
Outputs arc env1saged in term of improved physical infrastructure, research
staff development and str'engthening of research pt·ograms, national referenc:l!
services and administration and managenent .
The components of the project in terms of objecLives, activities,
ANNEX II
AUSTRALIAN CONTRIBUTION
Australia will make contributions totalling an estimate of $.A. 12,860,000 to the Project over five years. Australia will provide
1. Accommodation and remuneration for all Australian personnel assigned
to the Project , namely :
(a). resident scientists in the fields of bacteriology, virology, parasitology, toxicology, pathology and epidemiology;
(b) . short term advisers for each of the Departments of Bacteriology, Pathology, Parasitology, Toxicology and Virology; short term inputs will also be provided for Mycology, Communications and Epidemiology trainers;
(c) . resident technicians in support of each of the six resident scientists;
(d). a resident Team Leader assisted by a full time Project Officer (Administrative );
(e). a resident Techn1 cinn H|セッイォウィッーウI@ to assist in installing
maintenance and repair of modern,sophisticated equipment; and
(f). a full time English Teacher, to assist in promoting English
Language proficiency to Balitvet staff and CRIAS staff .
2. A comprehensive Training Program, namely:
(a). forty nine training fellowships to be undertaken in Australia, and if necessary, in another third country. Providing suitable candidates among the Balitvet personnel are available, training
will be provided towards 16 PhD's,30 セセ」Gウ@ and 3 Diplomas;
(b) . sixty four man months overseas short courses and short term
training, of which conference attendances and short familiarisation visits to Australia or to any other country by senior Balitvet staff will be allowed for.
3. Locally engaged staff to fulfill duties relating to management of the
Australian contribution or duties for which Balitvet staff u1·e beinB
2
4. Laboratory and scientific equipment to u value of approximately
$ .A. 640,000 to be recommended by the Project Co- ordinating Board;
and a. stand- by generation set , to be contingent on the recommendations
of ll :>hort tertn electr icity stud y.
5.
Vehicles to assist the Australian Project staff, in making fieldinvestigations into animal disease outbreaks , in executing survey:: and in implementing research programs . It is envisaged that the
vehicle pool will be made up of the following or equivalent
(a) .
5
(five) LW Chevrolet Troopers (diesel);(b) .
4
(four) Toyota Hiace Minibuses or equivalent;(c) . 1 (one) Chevrolet Luv Pi ck-Up (diesel);
(d) . 1 (one) Chevrolet Luv St ation Wagon (diesel) ;
(e) .
4
(four) Toyota Corona Sedans; and(f) . 1 (one) Toyota 3 ton lorry for transporting animals etc .
6.
Veterinary journal subscriptions, text books and English Languagetraining materi als .
7 . Assistance to the National Reference Coordinating Committee ( NRCC)
セ N@
B.
c.
D.
BALITVET PROJECT PHP.SE II
australiセn@
CONTRIBUTION ($A 000
86/86
86/87
87/88
Technical Assistance
l .
Long 'Ierm Advisers
a) Professional Fees
858
872
886
b) Allowances Individual
796
794
750
SUB
totセl@A.l
1,6511
1 ,666
1 ,636
2 .
lッョァMtセイュ@Advisers
111
111
111
(..:'ces)
totセl@
A.
1 ,765
1, 777
1,747
Overseas Training
1. Postgraduate
153
218
266
2. Short
セッオイウ・ウ@42
42
42
'l'OTAL
B.
195
260
308
Procurement Freight
1.
Equipment
518
191
32
2 . Vehicles
153
160
3. ConsumableS
and. FreighL100
80
6o
TOTAL
c.
771
1131
92
SuEEort and 0Eerations
1.
In Indoneoia :
a) Office Costn
26
26
26
b) Vehicle Running Costs
30
30
30
c) Travel
30
30
30
d ) Local staff
76
76
76
e> Advisers
セQQッキ。ョ」・ウ@27
27
27
SL'B TOTAL D.l
189
189
189
2 . In Australia
a) Office
18
18
18
b) Travel
26
12
12
c) Insurance
4
4
4
d ) Advisers (Communications) 1
1
1
e)
Advisers (Travel)
25
25
25
f)
Advisers (Passports)
1
l1
g)
Printi ng
1
1
1
SUB TOTAL D. 2 .
76
62
62
TOTAL D
265
251
251
TOTAL A- D
2,996
2,719
2,398
GRAND TOTAL OF AUSTRALIAN CONTRIBUTION
88/89
89/90
Total
894
902
4,412
758
750
3,848
1,652
1,652
8,260
111
111
ill1,763
1,763
8 ,815
250
324
1 , 211
42
42
210
292
366
1, 421
1
742
313
40
20
300
l11
20
1,355
26
26
130
30
30
150
30
30
150
76
76
380
27
27
135
189
189
945
18
18
90
12
12
74
I,
4
20
1
1
5
25
25
125
1
1
5
1
1
5
62
62
324
251
251
1,269
2,347
2,400
12,860
ANNEX III
INDONESIAN CONTRIBUTION
The Government of Indonesia will provide contributions estimated
to value Rp. 101108 million over the next five years. This input will be
、セ「オイウ・、@ into :
(i) . Salaries for permanent staff and イ・」イオセエュ・ョエ L@ and other
allowances .
(ii). Capital for additional buildings, other construction of
extensions and rehabilitat\on5 , to be funded under the AARD
Projects over the four years of the ProjecL.
(iii). Cost of upgrading uti+ity services and facilities. Specific Allowances will be made for improvement to electrical wiring and system, extension of communication system (telephone), .
rehabilitation of water supply and improvement of garbage and effluen1 disposal .
(iv) Handling cost for arriving equipment and running cost ror vehicles .
(v). Other operating cost such as local surveillance for Indonesia
indoセesian@
CONTRIBUTION,LIST OF nEQUIREMENTS
OF DUIIDINGS,SERVICES AND OTHER FACILITIES
UP
TO
1990Facility
Central administralion (two storeys) ·
Parasitology Laboratory (two storeys)
Animal housing: Small/Lab .animals
Nediwn ・セN@ Animals 1
Large exp. Animals l large exp. Animals
Autopsy Room + ゥョ」ゥョ・イ。エ・セL@
clinical lab. 1
\-lorJI.shop/service station
Animal Food Storage 1
Guest house 1
Access roads : 1
Width 5m, length 1.790 m Width 4m, length 110 m
\H.lth ;:m, leng th 380m
l?ac-K.lng fencing 1
Drainage :
、ゥ。ュ\ZNGエセイ@
6um
diameter 40m
、ゥ。イョセセ・イ@ 20m
nousing : 1
stat'f T '{0 x iO
staff '1' 36 x 20
1. in Cimanglid vゥャャ。セ・@
3727a
Area Unit Cost
per m2/m
sq. !1/tn (Rp.OOO)
1,929 160
11,192 200
442 80
350 80
368 90
320 90
173 135
452 110
108 110
27 llO
8,950 15
440 15
'j60 15
600 15
4,200 10
3, 5110m 2'5
)20rn 15
76lhn lU
700
8u
·r20
.... ...
t\0Total Cost
( Rp. 000)
308,160 238 ,400 35,360 28,000 33,120 28,750 23 , 355
49! 720 11,880 2,970
134,250 6,600
l l14uo
C),QOO
126,000
89,500
1, 8v0 7,600
56,oou 5'f, 6uo
ACTiviTIES l35/i36
1. Operational costs 280,305
(including salaries,
イ・ウ・。イ」ィL。」エゥカゥセゥ・ウL@
etc).
2. Land ladmin .
expenses)
3. Local purchase
9?, 7::>0 of mat.erials (incl.
expendable office supplies)
4. r..quipment and 9,o5o
machinery lincl. local purchase of minor items, main1.enance.,repair and handling costs)
5. Travelling
30,900
expenses (local surveillance etc)·
6. Construction 3,195
(. Other
'l'u'I'AL 4.!0,uOO
l. Operational
costs 10,000
2. Land
::s.
Local purchaseof materials 46,000
4. i:!:quiprnent and
machinery 35,000
BALITVET l'ROJEC•r PHASE II INDONESIAN BUDCE'r ES'l'IMATES (Rp.OOO)
Dr..VELOPfviEN'l· BUDGET
86/8'( 87/88 tl8/89 89/90
275,000 280,000 c20,ooo 280,000
no.
,ouo
30,000 20,000 8; ,oooll, )00 cO,UOO 17,000 90,000
il, 500 20,000 20,000 60,000
セNッッッ@ l'( ,000 1),000 2o,OOO
413,000 367,000 292,000 541,000
COUN'I'ERPAR'.C BUl.>GET
21,900 SPセPPP@ 30,000 30,000
83,000 110,000 190,000 140,,000
40,950 135,000 110,000 8o,oou
90/91
TOTAL
1,335,305
340,750
14tj,350
QTセ@
,4uo
66,1.95
626,000 826,000
826,000 2,859,000
121,900
::>69,000
COUNTERPART BUDGET
ACT 1 V I'l'IES 85/86 ti6/tl7 8'( /88 tl8/b9 89/90 90/91 'roTAL
5. Travelling 20,000 43,500 50,000 66 ,000 57,000 セSVLUPu@
expenses etc.
6. Construct lon/ 4,000 4,650 7,000 50' QQ(J 20,000 85,6?0
Building etc .
'T.
Other 21.4) 000 セQ Q[N@ 000'ruTAL 11),000 194,000 セXRLPPP@ 446 ,000 327,000 214 ,000 1,?78,001
RUUTINE BUDGET
1. Operati-onal 223,434 287,500 332,700 380,000 400,000
-
1,623,634costs
セ N@ Land
j. LQca1. Purchase 164,241 161,7)0 ltl4 , ooo 210 ,000 250,0UO セVYLYYQ@
4. i!.quipment of materials <:?2' '(50 セRLGWUP@ 26,000 jO,OOO )0,000 15i,5CJO
and Machinery
5 . Travelling 1, 575 c ,OOO 2,300 3,000 lO,UOO 18,875
expenses
6. l:onstruction/ 3,uoo lO,uOO 13,000
Buildings
7. uther 826,000 828,000
'l'OTAL 412,000 474,000 545,000 626,000 720,000 828,000 3,605,000
) . YEAR SUB TOTAL 9117,000 l,OfH,OOO 1,194,0001,364,0001,588,000 1,86tl,OOO XLPTセLPPP@
BUILDING
&
SERVICES (as per 。エセオ」「・、I@ OVERH!!.ADS 1.l.iRAtiD 'Nl'AL OF INDONESIAN CONTRIDU'l'ION
QLセVULPPP@
601,000
10,108,000
1. Allowance for heud office administration costs of the Central Government which
NARRATIVE SUMMARY
GOAL
To 」ッョエイゥ「オ セ ・@ to a reduction in the ・」ッイNッセゥ」@ loss from livestock 。セ、@ fish diseases in Indonesia through the development of a better オョ、・イウエ。ョ、ゥセァ@ of the occurrence , aistribution , and control of such diseases .
PURPOSES
1. To impro·.re the capabili;:y of セNエNlitvet@ to act a5 a central reference laboratory キィセ」ィ@ ofrers to other veterinary diagnostic laboratocies in Indonesia :
(a) Skilled Laboratory se-.>"Vice
(b) Cons·.lltant services .
Source : BPR:R , vol 2 , Appendix X
LOGICAL FRAHEWORK MATRIX
verifiセセle@ INDICATORS
Smallholder livestock Incidence of specific diseases . Extent of disease control programs .
Outside professional views of BALITVET as a national referance institute. nu:nber of unsol1cited
referrals and consultations.
meaZ^セs@ OF VERIFICATION
Socio-economic survey eーゥ、・ュゥッャッァセ」。ャ@
moni-toring Department records and discussion
Survey of rrofessional staff in laboratcries and field service .
。セitvet@ records.
ASStw.PTIONS
CONCERNING long Mteセセ@ VALUE
OF PROJECT
That the existing ァッカ・イイセ・ョエ@
ーイゥッイゥセケ@ for livestock
developmenc キセャャ@ be maintained. That current and future
livestock diseases cause significant economic loss . That livestock owners accept and co-operate in control programs .
That sufficient complementary inputs to livestock development are provided .
AFFECTING PURPOSE - TO - GOAL LrnK
NARRATIVE SUM.'1ARY
2 . To improve the research capability of BALITVET
in :
(a) Developing and testing diagnostic methods
(b) Investigating and solving animal health problems of ョ。エセッョ。ャ@ importance (c) Helping regional
authorities in the investigation of diseases of local significance. (d) uウセョァ@ an economic
framework for assessing research priorities .
LOGICAL frNャャMセQᆪ|ᄋャork@ MATRIX
VERIFIABLE INDICATORS
Number of effective diagnostic methods developed .
Number of solutions to national disease problems.
i1E!;Ns OF VERIFICATION
Research reports . Sur;ey of professional responses to research findings.
NARRATIVE SUMMARY
OUTPUTS
1. Physical Infrastructure A national veterinary diagnostic and research
institute with adequate :acilities in the fields of :
(a) Bacteriology.
(ol Parasitology. (c) Pathology. (d) Toxicology. (e) Virology.
(f) Epidemiology.
2. セ・ウ・。イ」ィ@ Staff Development Improved staff
capability in the areas.: of :
(a) Scientific research . (b) Diagnostic tests
and interprecation. (c) \vritcen and oral
communications. (d) Scientific
professionalism.
LOGICAL fraNGQeエセork@ •"lATRIX
VERIFIABLE INDICATORS
Extent of buildings . equipment and facilities which are operational . Degree of utilisation of ヲ。」ゥャゥセゥ・ウ@ セョ@ each field .
Performance of individual staff in each area. Views of individual staff of their own capability.
HEANS OF VERIFICATION
On-site inspection . Discussion with staff .
Assessmenc by Coordinators and Advisers.
Staff surveys and inter -views.
ASSU:1PTIONS
AFFECTING OUTPUT TO
-lltJRPOSE LINK
The planned facilities are necessary and of sufficient quality.
NAitRATIVE SUM:-lARll
(OUTPUTS)
3 . セ・ウ・。イ」ィ@ Programs (a) A functio nal and
effective research program.
(b) A frame work established for assessing research priorities
4 . セ。エゥッ ョ 。ャ@ aefer ence セ@ system of liaison and collaboration with セエィセイ@ veterinary ciag nostic laboratories aimed 。セ@ :
(a) Effective transfer of ウーセ」 Nゥュ・ ョウ@ and results .
(b) Flow of imformation from research and
t ec hnical depelopments . (c) Co- operation in
regional disease investigation .
LOGICAL FRAJ.'1EWORK MATRIX
VERIFIART.F. INDICATOa S
Number of resea r ch projects . Relevance of research
topics .
Number and quali ty of researc h repor ts .
セオュ「・イ@ of specimens, time taken 。セ、@ condition . Turn around time for referral results .
View of other laboratories on value of referral service.
Amou nt of imformation flow . Number of co- operative investigations .
:1EANS OF VERIFICATIOt"'
SACC r ecords .
Assess.nent of research reperts .
DRU records .
cッュュセセゥ」。エゥッョ@ Unit records . Surveys of staff of other laboratories .
SACC records .
ASSUi<lPTI ONS
AFFEC'!: !NG OUTPUT -
•ro
-PUR?OSE LINK
That the イ・ウ・。イ」セ@ pr ogram i s applied to ーイゥッイセエケ@ problem areas .
That olセ・イ@ laboratories accept the role o: BALITVET
NARRATIVE SU;-!.'1ARY
5. Administration and Management Improved Balitvet administra-tion and management relating to :
(a) Budgetting and stores
(b) Secretarial services (c) Norkshop and vehicle
operations.
inpセts@
Incor.esian and Australian ex.;::ert staff.
On-the-job training . Overseas training fellow-ships .
laboratory equipment and supplies .
Vehicles .
cッョセ。」エウ@ for buildings and services .
fセイN、ウ@ for project ope::ation .
Project ュ。ョ。ァ。セ・ョエ@ structure.
LOGICAL E'RAMEI<JORK MATRIX
VERIFIABLE INDICATORS
Admin workload of Director ; level of financial and stores control ; speed and quality of report typing; condition of buildings and equipment .
Staff numbers . Number of training activities completed . Amount of equipment and supplies .
Number and types of contract.
Amounts of funds expended . Lines of responsibility established and understood .
MEANS OF VERIFICATION
Surveys of institute operation .
Staff interviews; admin; inspections of facilities .
Project records . oョMウセセ・@ discussions and inspection .
ASSU1PTIONS
That administr a t ive and management resources are fUt to appropriate use in proving
capacity and capability of Bali tvet .
AFFECTING INPUT TO OUT -PUT LINK
That suitably qualified staff are provided on a timely basis .
That training programs are necessary and will be effective.
That trained staff will continue to work on the project .
That equipment and supplies
will be appropriate and
timely .
(l'.HYSICAL INFRAS'rRUCTURE)
THE COHPONEN'l'S OF TH.E PROJECT
For the purposes of project design and management, the project has been divided into five components , which will be described individually below. These components are
I. Physical Infrastructure Component II. Research Staff Development Component III. Research Programmes Component
IV .
National r・ヲ・セ・ョ」・@ ComponentV. Administration and Management Component I . Physical Infrastructure Component
(a) Objective
•ro further ucvclop a nation<ll vet0rinary diagnostic and research institute with adequate facilities in the fields of
- Bac ter iol!ogy - Parasitology - Pathology - Toxicology - Virology - Epidemiology
This objective includes the provision of facilities in service areas ( workshop and animal accommodation l and creation of faci-l ities for new departmens (Epidemiofaci-logy and Communications) .
(b) Activities
Activities under this component reli.lte to the provision of bu i l -dings, services and utilities , security , furniture and equipment required to iJnprove Balitvet facilities,. Some inputs will be new while others relate to the upgrading of existing buildings or services . Improvement in facilities is required for :
- Administrative - Laboratories - Animal facilities - Workshop
(PHYSICAL INFRASTRUCTURE)
'l'he main activities in improving these facilities are as follows : - Construction of new buildings (Administration, Parasitology, on
site large animal facilities and Cimanglit Village) Preparing plans
Awarding contracts
Demolishing existing large animal facilities Construction of new buildings and animal. housing Installing services
Relocating equipment Testing and commissioning
- Upgrading existing buildings (Workshops, Library and English Language Department)
Preparing plans
Relocating existing users Conducting renovations
Installing services and equipment - Improvement of utilities
セ・ャ・」エゥョァ@ electrical engineer Conducting electricity study Deciding on corrective action
Implementing electricity improverpents
Planning improvement to waste disposal, water and gas supply Implementing improvements to waste disposal , water and gas -supply
- Provision of CtJ.Uipment and vehicles Finalising equipment lists
Calling and awarding of tenders Purchasing and shipping
Clearance and delivery Location and installation - Improvement of security
Planning improvements
(PHYSICAL INFRASTRUCTURE)
(C) Expected Results
This componenL should result in an institute that has sufficient space for the staff in each of its deparl.ments and ildequate utili ties and equipment to enable staff training and Lhe conduct of disease investiqations at a high level of performance . In particu lar, increased space will be available for Admj,nistration,
Parasi-tology, Bacteriology, Epidemiology, Communications, Toxicology . workshops and English I.ang1,1age> Training . FaciliLie>s for 30 - 50
large animals will be constructed at Balitvet .
Extended wood and metal workshops |セゥャャ@ be- available and an electr i'-'
cal and equipment イ・ヲセゥイ@ shop will be established . In addition the ELD will have an addiLional classroom and office and the library -will hilvc oln nirc.:o11ditioned stor41<JC .1rea Eor valuable do<.:urncnts . Some staff housing and infrasLructure will also have been developed at the outstaLion of Cimanglit.
Electricity, gas and water ウオーーャセ・ウ@ will be adequate and reliable and will incorporate ・ュ・イァ」ョ」セ@ electricity supplies for de>partment with a critical need. In addition, there will be adequate |セ。ウエ・@
disposal facilities. Additional equipment wlll incr .. ase the sophi sticaLion of research and diagnosis Lo a point where it is adequate for Indonesia's needs but not beyond the capacity oC local staff in the absence of expatriate advice . Security at Balitvet will be impro vcd by lィセ@ closure of the public Lhrough\vay.
(d) Inputs
Australian inputs comprh;e adviser:; ( most oC tlw time of Lhc Servi-ces Technician and part of the time of five Resident ScienLists and Technicians plus other min.or inputs ) , additional equipmenL
($A 740,000) ,.15 vehicles for the usc of the longtcrm Australian advisers and a lorry for general Balitvet use . Indonesian inputs in-clude constuctd.On coasts of all new buildings, stz::uctural improvements
(RESEARCH STAFF DEVEWP1·1ENT)
I n addition, a trainin<J procJr<.unme in 1\dm ird str.l L i.o n holS conrmcnt:cd in
secretarial services and in accountin<) o:;yqtl"rn.
II. Research Staff Development Component
( a ) Objective
To further improve staff capability in the areas of
i) scientific research
ii) diagnostic tests and interpretation
iii) written and oral 」ッセョオョゥ」。エゥッョウ@
iv) scienti fic pro(eRsionalism
The aim is to achieve around 20 PhD's and 35 ;·!Sc • s by 1990 (either
-completed ot· in trainin<J) anc.l to ゥューイッカセ@ technician cat..abi lit· y in illl
areas so that balanced development of the institute accurs .
(b) 1\clivitles
Activities under this component :celate to the development of. the 」。ーセ@
bil.:.ty and competence of scientific and technical staff at Bal itvet,
so that staff are self-motivated and fulfill their designated role
(as specified in the Development Plant) in the running of the institute .
Th ese acliviLics can be divided into direct, ie aimed ウー・」ゥヲセ」。ャャケ@ at
the person , and indirect , ie aimed at helping people to attain their
goals . Direct activities include training, which involves English Language,
informill anc.l form.:tl sectors.
The main activities in Staff Development arc as follows
- l>ircct uctiv itjc!;
Periodic revision of the Staffing Plan.considering positions
and people required in ・セエ」ィ@ department/ unit. Tables should
be consulted in Appendix E concerning the base plan .
Annual monitoring so that development can be measured
Appointment of Coordinator of nesearch
Continued training of scientific and technicians based on the follov1ing criteria
- Recruitment
- Identification in Staffing Plan
- Assesment oC 」。セ「ゥャゥエケ@
- セZョァャゥウャャ@ lLャャャャNjャャNZャ|jセ@ Train i IHJ - Informal tr.:li.ning at Balitvct
- Formal training (1\ustra lia/lndonesia/e 1 ウセキィ・イ・I@
(RESEARCII STAFP DEVELOPt1ENT)
Incorporation of scientist s and technicians from the existing Mycology oセjZj。イエュセョエ@ lnto Lhc Uuclcriology and Pathology/ Toxicology De par bnen t:s
Appointment and training of scientific ancl technical staff
li1 the new departments of Epidemiology , Statistics and Economics , and Communications .
- Supporting Staff Development Activities
Appointment of foreman and designated staff in each of the workshop (see Table E.lS Appendix E) and their development Increase library staff and complete training of all personnel
(see Table E. l2 , Appendix E)
Appoint LES.staf£ to English Language Dcpart.ment as specified in •Table
B. io.
Appendix E.Prep .. u.d tion of lubor.a tory opcraL ions manuals in a.ll de pur tmcnts Organisation of suitable on the job training.
(C) Expected Results
This component should result in a large number of scientists having an increased dept and breadth of knowledge and work experience . This will :include a sound knO\vledge of English and a significant number of postgracuate degrees (around 35 MSc ' s and 20 PhD ' s). Logically, this
shoul d lead to the effective operation of the five present departments and the new department of Epidemiology. Mycology staff will become an integral part of Bacteriology and Toxicology.
All the service units, such as the Library , Communications , Laboratory Animal, l'iorkshops and Secretarial Services, should be fully staffed and offering an effective service to scientist!> .
Technician training should be well advanced and personnel capable of
undertaking equipment handling and maintenance, and operation of laboratory techniques, enabling all Departments to fulfill their required role in the institute .
{RJ::SEARC!I 5'1'1\J:'F DEVELOPMENT) {d) Inputs
l\ustrillian inf.'U ts inc J Ullc •1dv iscrs , both lon<J term (mo!; t of the t.: imc of Resieent Scientists, Resident Technicians and the English Language Adviser) and short term (part of 115 man months) ; overseas fellowships
(16 PhD 1 s , 30 MSc 1 s 3 diplomas); overseas short training courses
(59 man months); locally - engaged staff (ELT); and part of library support .
Indonesian inputs to 1990 comprise 82 scientists and 142 technicians , operating costs and the gradual purchase of all consumables and librar y requirements currently funded by Australia.
I II. Research Pr ogrammes Component {a) Objective
To develop further effective research programmes which produce information suitable for the planning and implementation of specific control progranunes .
(b ) Activities
Activities under this component refer to the continued devel opment of research under the management of the Sl\CC .
The consolidation rather than expansion of research commitments is envisaged . Some new specialist research areas may be developed , for example , viral diseases of fish .
&nphasis will be placed on improved <1 isease f:)roblem identification , experimental design and implementation .
The main activities will include :
- Improved management procedures within SACC
Better methods of classifying research eq ., by commodity encouragement of multidisciplinary research
stricter assessment of research proposals to improve quality
(RESEARCH PROGRAN1'1ES)
- Encouragement of better methods for identifying, writing and planning research projects
the Epidemioloyy, Statistics & Economics Department
should play a key role in developing a framework for the planning of projects , relating both to
identification of economically important diseases and to experimental design
English Language and Communications Departments to play a role in improving presentation of research proposals - Stricter monitoring systems for research development
bi- annual reporting to SACC evaluation of progress by SACC
application of monitoring systems (see Appendix H) use of field pilot projefts encouraged
- Stricter standards for acceptance of papers for publication compulsory use of the peer review system for publications bad papers must be rewritten or rejected
(c) Expected Results
This component should result in the development of more effective research programmes. These programmes should meet the animal health need of Indonesia, and be carefully, planned, professionally managed and result in improved methodologies for disease control .
The Department of Epidemiology, Statistics and Economics should become fully operational and pl<ly an integral LJitrL in rcsoarch planning , management and data analy.sis .
The 51\CC will continue to ーャNZZセケ@ i1 clomin,1nt I"OI<• in rt) S(!:orc:il llh111.o<J<'""'nL,
strictly applying the monitoring system to assess good and poor projects . The standard of published work (manuals, technical reports and journal publications) should improve, leading to research having a much greater impact . Penyakit Hewan should become a recognised international journal. By 1990 , it is expected that Balitvet should have the capacity for problem identification, project design, project implementation, and modern
(RESEAHCH PROCRAHMES)
(d) Inputs
Australian inputs comprise long-term advisers (part of the time the of five
Resident ScienL ists , the Epidemjologist and CounLcrparL Project Manager, as
well as a l 11sser inpuL from the five Resident:. 'l'echnicians and the i':nylish
Language .\dyis_er); short- term advisers (part of 115 man months); part of Li:_
brary support cost ilntl the co!; ts. of labor a tory consumaules (the
last two on a reducing basis). The main Indonesian input is the increasing
take-over of library and laboraLory consumable costs.
IV . National Reference Component
(a) Objectives
'l'o create a sysLem of li.:1ison ami collaboration Qセゥエィ@ oLher veterinary 、ゥエセァᆳ
nostic laboratories (Class A, 8 and C) aimed at
i) effective transfer of specimens and results
ii) exch.:lnge of information from rcscurch and エ・」ィョゥ」\セNA@ dcvelot-tnents
iii) cooper a t.ion in reg 1onal disease i nvcstiga tion
(b) Activities
Some activities under this compone nt relate to development of the functions
within 13alitvet that relate specifically to its required role as a national
veterinary reference laboratory . Other act.i.viLies will concentrate on
im];Jro-ved collaboration be.Lween Balitvet and DGLS in .areas of problem idenLificati
on, research and training , and improved methods.
These concern the communication of research .J.nd diagnostic results to the
DGLS system and farmers .
The main activities will include :
- Development of functions relating to national reference
incorporation of the PRU into the Epidcmioloyy Department
applie<.l research on opLimal system for transport of di<H.JnosLic Sp!:_
cimens under Indonesian conditions
ーイセー。イ。エゥッョ@ of laboraLory manuals
preparc1tion of reference antiy«ml> ullcl antisera for SUJ:Jply to other
laboratories
(NnTIONAL REFERENCE)
d evelopment of standard laborutory procedures for application in all
laboratories in Indonesia
- Culldi.JO.t"cl Lion between Bal itvet and OGLZ
forntation of a spccLll. vomm.i.Ltce the nッNセエゥッョ。ャ@ Reference Coor<li.nating
Committee (NRCC), to initiate, coordinate and monitor activities at
Balitvct in relation to the National Reference role. The proposed
operation of Lhe NHCC is outlined in 1\ppendix G.
Balitvet field trips must be planned セョ@ collaboration with the local
DIC laboratory or Dinus Pcternaltan office . These trips should be
re-lated to specipic research projects which have themselves been discu
ssed by the NRCC with local OGLS officials .
seminars on jmportant disease topics be held involving nalitvet and
OGLS staff
technical discussions to be held between Bal itvet and DIC laboratories
on regional d.i.sl!ase ーイッ「ャ・ュセ@ ッNセイャ」ャ@ melltot.ls ol vollul>orution
- Imprcved communication
Communications Deparlrnont to l>c formed to cッNセ」ゥャゥエ。エ・@ two-wi.ly flow oC
information between Balitvet and DGLS
Balitvet library services to be improved
methods to improve information flow (CS quarterly newsletter) to be
implemented.
(c) Expected Results
This component should result in Balitvct realising i t ' s proper role ns the
national veterinary rcfcrance laboratory. The institute should be playing
a-leading role in tho transferral of appropri.:tte techm)logy to Lhc UGI.S systctn
and offering a sophisticated diagnostic service.
The veterinary manpower of both n.1litvf't ;Jnd nca.s should bt' rnorC) P.f(pt·tivr:ly
used and should assist each other to plan and implement economic disr!usr,- con
trol prograrunes.
(d) Inputs
Australia inputs comprise long-term advisers (part o( the time of the CPM and
Epidemiologist and a lesser in!Jut from car:h of the RPsiucnt Scientists); short
term advisers (part of 115 man months); and part of the cost of holding
seminars and NRCC meetings. Indonesian inputs , ... ill be manageme>nt time by sP.nior
-staff, part of the cost of seminars and meetings and additional travel and
(NATIONAL REFERENCE) V. Administration and t4anagement Component
This component will be devided into two sub- components, namely Balitvet Adminis-tration ar.d aオウエイ。ャゥセQpイッェ・」エ@ Administration .
Objective
To further improve the afficiency and effectiveness of the Balitvet administrati on and management at a departmental and institute level in relation to improved :
i) systems of budget and stores control ii) workshop and vehicle pool operations ii i ) secretarial services
a) Balitvet Administration Sub- component (i) Activities
The activities of this .sub-component relat.e to manpower and training required to· improve the lllilll<l<JCJncnt; of Lllc .Lnsl.lLuLc, ilnu Lo • .n;!;isL Lll<.! オ、ュゥョャウャZイ\Nセlゥッョ N@ 'l'hc!:ie activit i es can be divided into problem identification, informal training and suit able short-term formal truining.
Activities will include :
- Appointment of Coordinator of 7\dmi nistration
- Identification of personnel as indicated in 'l'able E . , Appendix E
- Introducing techniques for stores and stock control, and computer methods for financial control
(ADMIN AND MANAGEMENT)
(ii) Expected Result
This sub- component should result in a more efficiently managed institute, parti-culary in the areas of secretarial services, equipment purchase and inventory control, and finence control .
The present adminisrtative \vorkload of the director should be largely removed and オョ、・イセ。ォ・ョ@ by the Coordinating of Administration .
Each department should have a fully エイエNゥセ・、@ secretary capable of word processing and .experienced in typing report. Accurate budgeting and forward planning will re sult in adequate stocks of equipment on site and available funds for equipment maintenance contracts . Good workshop management should result in the maintenance of buildings, capital equipment and vehicles to a high standart .
(iii) Inputs
Australian inputs comprise long-term advisers (Administrative Officer, CPM and Foreman technician part time ) , some locally employed staff, and items of equip-ment ( $ セU L PPP@ ) . Indonesian Inputs will be recruitment of new manpower and operating costs of all administrative services.
(b) Australian Administration Sub-component (i) Activities
The activities of this sub- component concern manpower required to maintain and administer a team of 15 resident Australians (long-term) and 115 man months of short- term Australian specialists from July 1985 to July 1990 .
Activities will include
- Appointment of CPM and Australian Administrative Adviser at Balitvet - Appointment of adequate LES staff to assist the CPM and Administrative
off iee-e . These should include 3 secretaries .(one for CPM, Admin officer and ELA) , one clerk and 3 typi;;ts (two for Admin and one for ELD).
- 41anagement of an Administration office capable of servicing all Australian adviser ' s requirements in housing, allowances , finance and equipment orde ring.
(AO:UN 1\.1'110 i·IANAGE:1ENT}
- Management of office for CPH aapable of ovcr-SC'C'ing . .,hole projC'ct - Development of computer system for financial control. monitoring
DP and storage of reports
(ii) Expected Result
The expected result of this sub-component is an effective administrdtion capable of meeting the needs of all Australians working at Balitvet . This administration will keep pace with developments in computer technology and off icc management system so that appropriate technology is available to the Indonesian system.
(iii) Inputs