• Tidak ada hasil yang ditemukan

NERACA 2013

N/A
N/A
Protected

Academic year: 2017

Membagikan "NERACA 2013"

Copied!
2
0
0

Teks penuh

(1)

No. Catatan 2013 2012

I. 5.1.4.1

1 5.1.4.1.1 374.835.728.277,89 372.028.340.287,77

2 5.1.4.1.2 467.565.975,00 2.753.889.586,00

3 5.1.4.1.3 33.202.874,40 225.828.585,00

4 Kas di Rekening BLUD 5.1.4.1.4 6.724.947.649,61 4.459.711.178,79 5 Piutang Pendapatan Daerah 5.1.4.1.5 229.068.500,00 165.848.000,00 6 Piutang Lain-lain 5.1.4.1.6 11.151.031.995,17 3,00 7 Penyisihan Piutang 5.1.4.1.7 (964.289.446,68) (468.474.290,86) 8 Bagian Lancar Tuntutan Ganti Rugi 5.1.4.1.8 - 1.550.000,00 9 Biaya Dibayar Dimuka 5.1.4.1.9 357.175.886,38 28.100.000,00

10 Persediaan 5.1.4.1.10 112.732.880.966,38 124.259.217.922,38

11 Jumlah Aset Lancar (1 s/d 10) 505.567.312.678,15 505.975.693.897,27

II. 5.1.4.2

12

13 5.1.4.2.1 32.184.655.510,00 33.072.182.470,00

14 5.1.4.2.2 (1.481.523.393,00) (1.425.615.893,00)

15 Jumlah Investasi Non Permanen (13 + 14) 30.703.132.117,00 31.646.566.577,00

16

17 5.1.4.2.3 414.191.729.444,02 323.283.589.915,98

18 Jumlah Investasi Permanen (17) 414.191.729.444,02 323.283.589.915,98

19 Jumlah Investasi Jangka Panjang (15+18) 444.894.861.561,02 354.930.156.492,98

III. 5.1.4.3

20 5.1.4.3.1 1.826.576.704.949,00 1.758.127.072.490,00

21 5.1.4.3.2 407.525.835.707,00 348.549.187.368,00

22 5.1.4.3.3 1.215.255.759.030,00 1.128.228.185.025,00

23 5.1.4.3.4 1.644.445.187.113,00 1.474.306.759.697,00

24 5.1.4.3.5 32.912.528.143,19 28.037.353.579,00

25 5.1.4.3.6 132.287.108.738,00 95.164.550.169,00

26 Akumulasi Penyusutan Aset Tetap 5.1.4.3.7 -

-27 Jumlah Aset Tetap (20 s.d 26) 5.259.003.123.680,19 4.832.413.108.328,00

IV. 5.1.4.4

28 5.1.4.4.1 - 3.228.100.950,42

29 Jumlah Dana Cadangan (28) - 3.228.100.950,42

V. 5.1.4.5

30 5.1.4.5.1 5.532.000.000,00 5.987.000.000,00

31 5.1.4.5.2 -

-32 5.1.4.5.3 11.114.178.470,27 4.171.915.542,47

33 5.1.4.5.4 7.038.500.000,00 7.038.500.000,00

34 5.1.4.5.5 70.215.967.069,00 51.084.724.807,00

35 5.1.4.5.6 10.394.023.307,81 16.250.290.860,00

36 Jumlah Aset Lainnya (30 s.d 35) 104.294.668.847,08 84.532.431.209,47

6.313.759.966.766,44

5.781.079.490.878,14

PEMERINTAH DAERAH DAERAH ISTIMEWA YOGYAKARTA

NERACA

PER 31 DESEMBER 2013 DAN 2012

Uraian ASET

ASET LANCAR Kas di Kas Daerah

Kas di Bendahara Pengeluaran Kas di Bendahara Penerimaan

INVESTASI JANGKA PANJANG Investasi Non Permanen

Investasi Non permanen lainnya-Dana Bergulir Dana Bergulir Diragukan Tertagih

Investasi Permanen Penyertaan Modal

ASET TETAP T a n a h

Peralatan dan mesin Gedung dan Bangunan Jalan, Irigasi dan Jaringan Aset Tetap Lainnya Konstruksi Dalam Pengerjaan

DANA CADANGAN Dana Cadangan

ASET LAINNYA

Tagihan Bagi Hasil Kemitraan Tagihan Tuntutan Ganti Rugi Daerah Tagihan Sewa Jangka Panjang Kemitraan dengan Pihak ketiga Aset Tak Berwujud

Aset Lain-lain

(2)

No. Uraian Catatan 2013 2012

VI. 5.1.5.1

37 5.1.5.1.1 3.231.281,00

-Utang Bunga - -Utang Pajak -

-38 5.1.5.1.2 4.889.000,00

39 5.1.5.1.3 - -40 Pendapatan Diterima dimuka 5.1.5.1.4 1.479.337.509,86 1.280.528.961,51

38 5.1.5.1.5 1.263.134.638,00 5.010.884.399,00

41 Jumlah Kewajiban Jangka Pendek (37 s.d 40) 2.750.592.428,86 6.291.413.360,51

VII. 5.1.5.2

42 5.1.5.2.1 - -43 Jumlah Kewajiban Jangka Panjang (42) -

-44 JUMLAH KEWAJIBAN (41+43) 2.750.592.428,86 6.291.413.360,51

VIII. 5.1.6.1

45 5.1.6.1.1 375.295.149.247,89 374.782.229.873,77

46 5.1.6.1.2 6.724.947.649,61 4.459.711.178,79

47 5.1.6.1.3 33.227.598,40 225.828.585,00

48 5.1.6.1.4 10.772.986.934,87 2.248.706.337,33

49 5.1.6.1.5 112.732.880.966,38 124.259.217.922,38

50 5.1.6.1.6 (2.742.472.147,86) (6.291.413.360,51)

51 Jumlah Ekuitas Dana Lancar (45 s.d 50) 502.816.720.249,29 499.684.280.536,76

IX. 5.1.6.2

52 5.1.6.2.1 444.894.861.561,02 354.930.156.492,98

53 5.1.6.2.2 5.259.003.123.680,19 4.832.413.108.328,00

54 5.1.6.2.3 104.294.668.847,08 84.532.431.209,47

55 5.1.6.2.4 -

-56 Jumlah Ekuitas Dana Investasi (52 s.d 55) 5.808.192.654.088,29 5.271.875.696.030,45

X. 5.1.6.3

57 5.1.6.3.1 - 3.228.100.950,42

58 Jumlah Ekuitas Dana Cadangan (57) - 3.228.100.950,42

59 JUMLAH EKUITAS (51+56+58) 6.311.009.374.337,58 5.774.788.077.517,63

6.313.759.966.766,44

5.781.079.490.878,14

KEWAJIBAN

KEWAJIBAN JANGKA PENDEK Utang Perhitungan Pihak Ketiga (PFK)

Utang kepada Pihak Ketiga

Bagian Lancar Kewajiban Jangka Panjang

Utang Jangka Pendek Lainnya

KEWAJIBAN JANGKA PANJANG Utang Jangka Panjang

EKUITAS

EKUITAS DANA LANCAR

Sisa Lebih Perhitungan Anggaran (SILPA) SILPA di BLUD

Pendapatan yang ditangguhkan Cadangan Piutang

JUMLAH KEWAJIBAN DAN EKUITAS DANA (44+59) Cadangan Persediaan

Dana yang harus disediakan untuk pembayaran hutang jangka pendek

EKUITAS DANA INVESTASI

Diinvestasikan dalam Investasi Jangka Panjang Diinvestasikan dalam Aset Tetap

Yogyakarta, 31 Desember 2013 GUBERNUR

DAERAH ISTIMEWA YOGYAKARTA

HAMENGKU BUWONO X TTD

Diinvestasikan dalam Aset Lainnya

Dana yang harus disediakan untuk pembayaran hutang jangka panjang

Referensi

Dokumen terkait

[r]

Kurs pada tanggal 31 Desember 2012, 1 US $ : Rp 9.670 yang ditetapkan, yaitu dana yang dibutuhkan untuk mengantisipasi risiko kerugian yang Jakarta, 30 April 2014. mungkin

[r]

C.3.4 Penyisihan Piutang Tak Tertagih - Tagihan Tuntutan Perbendaharaan/ Tuntutan Ganti Rugi (TP/TGR). Saldo Penyisihan Piutang tak Tertagih Tagihan Tuntutan

3/30/DPNP tanggal 14 Desember 2001 perihal "Laporan Keuangan Publikasi Triwulanan dan Bulanan Bank Umum serta Laporan tertentu yang disampaikan kepada Bank

Laporan keuangan pada tanggal 31 Desember 2012, diambil dari Laporan Keuangan yang telah diaudit oleh Kantor Akuntan Publik Hadori, Sugiarto, Adi, dan dalam laporannya tertanggal

[r]

[r]