• Tidak ada hasil yang ditemukan

Usulan Perbaikan Line Production PT. Tiga Mitra Sentosa dengan Metode Rank Position Weight (RPW) dan Methods-Time Measurement (MTM)

N/A
N/A
Protected

Academic year: 2017

Membagikan "Usulan Perbaikan Line Production PT. Tiga Mitra Sentosa dengan Metode Rank Position Weight (RPW) dan Methods-Time Measurement (MTM)"

Copied!
2
0
0

Teks penuh

(1)

DAFTAR PUSTAKA

Buffa, Elwood S. 1987. Modern Production/Operational Managment. Edisi 8.

New York City : John Wiley and Sons (WIE)

Departemen Teknik Industri USU. 2013. Buku Pedoman Tugas Sarjana

Departemen Teknik

Dettmer, William H. 1997. Goldratt’s Teory of Constraint : A Systems Approach

to Continious Improvement. Milwaukee : The Quality Press.

Elsayed. 1994. Analysis and Control of Production Systems. Prentice Hall : Indian

Sector.

Freivalds, A. 2009. Niebel's Methods, Standards, and Work Design. Twelfth

Edition. New York: McGraw-Hill.

Geng, H. 2004. Manufacturing Engineering Handbook. California: McGraw-Hill.

Groover, Mikell P. 2001. Automation, Production System, and

Computer-Integrated Manufacturing. Edisi 2. New Jersey : Prentice Hall

Iftikar Z. Sutalaksana. 2006. Teknik Perancangan Sistem Kerja. Bandung: ITB.

Sinulingga, Sukaria. 2009. Perencanaan Dan Pengendalian Produksi. Cetakan I.

Yogyakarta: Graha Ilmu.

Sinulingga, Sukaria. 2013. Metode Penelitian. Edisi 3. Medan: Usu Press.

(2)

Tjan, Diana. 2013. Usulan Perbaikan Lini Berdasarkan Metode Keseimbangan

Lini dan Predetermined Time Systems pada Perakitan Upper Ncvs1.06 Di

Pt.Asia Dwimitra Industri. Jakarta : Binus University

Umble, Micheal L. 1996. Synchronous Manufacturing Principles for World Class

Execellence. New York : Spectrum Publishing.

Wignjoesoebroto, Sritomo. 2008. Ergonomi, Studi Gerak Dan Waktu. Surabaya :

Guna Widya.

Referensi

Dokumen terkait