PHE WMO Contractor HSE Management System
& HSE Competency Test
2016
KEBIJAKAN
KESEHATAN, KESELAMATAN KERJA, LINDUNGAN LINGKUNGAN DAN PENGAMANAN
Mematuhi peraturan K3LL & Pengamanan
Menjadikan K3LL & Pengamanan sebagai ukuran kinerja
perusahaan
Mengelola kesehatan pekerja dan lingkungan kerja
Menerapkan CoW, CHSEMS dan PSM
Mencegah pencemaran lingkungan
Menerapkan Sistem Manajemen Pengamanan (SMP)
Memastikan kompetensi pekerja
Menyediakan sistem tanggap darurat
Melaksanakan sistem manajemen mutu
Melaksanakan tanggungjawab sosial dan lingkungan
“Kami berkomitmen untuk
melindungi pekerja, lingkungan, aset
perusahaan dan komunitas sekitar
serta mengutamakan kepuasan
pelanggan & stakeholder”
Sri Budiyani President/GM PHE WMO
Judul
HSSE PERFORMANCE JAN – JULI 2016
Safe Man
Hours
12.8 Millions
Since the last LTI 13 Nov
2015
TRIR
0.00
Vs tolerable 4 IP beyond First Aid
NOA
0
No Fatality, Fire/ property Damage < USD 1,000,000, Oil spill < 15 barrels
94%
CPAR Closure13%
Incident Invesigation Completeness88.2%
High risk – CHSEMS (vs 85%)100%
BLUE
PROPER
req’ments
17 CIP
Team
58.65%
SCE
Closed
Out
970 pax
HSSE
Training
81% HAZOP Recommend’ Closed13%
Incident Invesigation Completeness0
0
0
0
5
33
4.410
SAFETY PERFORMANCE (Ytd Juli)
Major
Incident
Fatality Incident
Fire that resulting loss ≥ USD 1,000,000, total operation shutdown, Oil spill ≥ 15 barrels
Property Damage that resulting loss ≥ USD 1,000,000
Recordable
Incident
Lost Time Incident (LTI)
Restricted Work Case (RWC)
Medical Treatment Case (MTC)
Other Incident
(5) First Aid Case ,(3) Fire < USD 1,000,000, Oil spill < 15 barrels, (2) Property Damage <
USD 1,000,000
Nearmiss
Number of Injured Person, Juli 2016 : 0 IP
Tolerable injured Person 2016 : 4 IP
• NLTA (SINCE THE LAST LTI November 14
th, 2013 at COSL Seeker Rig)
:
990
days
• TOTAL EMPLOYEE HOURS WORKED TO DATE SINCE THE LAST LTI
:
12.876.863
• 2016 TOTAL EMPLOYEE HOURS WORKED YTD
:
2.526.789
(213 days)
PHE WMO
No Incident Classification 2013 2014 2015 Total
1 Fatality 0 0 0 0
2 Lost Time Incident 4 0 0 4
3 Medical Treatment Case 5 3 0 8
4 Non-Recordable 7 3 4 14
26 TOTAL
Judul
•
Flash Fire Incident on ORF during Condensate Pipeline repair work between ORF and Semen Gresik Jetty (Field
Operation) – Feb 24
th2016 – 3 First Aids & Fire < USD 1 M
•
Root Causes:
a. No procedure and/or rule that regulate work duration limitation. b. Inadequate compliance to Confined Space Entry Procedure.
c. Inadequate competency requirements and HSE responsibilities on supervisor role profile.
d. Inadequate personnel data base on Control of Work key personnel so that PA & AA assignment did not match with the authorization.
e. Inadequate lead by example of stopping unsafe work from leadership (safety leadership). f. Inadequate compliance to Control of Work Cycle.
TOP 3 INCIDENT ROOT CAUSES
Judul
• Inadequate Equipment Integrity Program scope, especially to
include non critical parts.
• Non critical parts but vulnerable (e.g. flexible hose) fail to be
assessed for its potential failure.
EQUIPMENT INTEGRITY
• Inadequate equipment design specification on its lifetime
(usage period).
• Inadequate equipment design specification on its purpose of
usage (functionality).
EQUIPMENT DESIGN
•
Failed to meet with supervision requirements, which is
before the job commence, during the execution, and after its
completion.
•
Inadequate assurance on tools adequacy and/or conformity
with the working standards (SOP/WI).
SUPERVISION
75%
Judul
provides the motivating force and resources for
organizing and controlling activities within an
organization in HEALTH, SAFETY, ENVIRONMENT &
Contractor HSE Management System
PHE WMO define the risk of the activities
Contractor submit Pre-Qualification
Questionnaire & its evidence and attend the PQ Assessment that held by Company Contractor submit proposed HSE Plan and Company evaluated the proposed HSE Plan
PHE WMO and Contractor initial
meeting prior commencing the Job (set HSE Performance etc.) and conduct audit
relating HSE Aspect of Mobilization phase
Audit during Job commencement
Final Assessment after Job
completed/Contra ct End
CHSEMS - Pra Kualifikasi (PQ)
Tahun PQ Baru Refreshment Total Lulus PQ Tidak Lulus PQ Total % tidak lulus % lulus
2011 108 3 111 29 140 26,13% 73,87% 2012 53 26 79 23 102 29,11% 70,89% 2013 67 38 105 56 161 53,33% 46,67% 2014 42 44 86 48 134 55,81% 44,19% 2015 92 73 165 66 231 40,00% 60,00% 0 20 40 60 80 100 120 2011 2012 2013 2014 2015
PQ Trend
Tidak Lulus PQ Refreshment PQ BaruCHSEMS - Pre Job Activities (PJA)
HSE Competency Test
(Si HEBAT Program)
• Our procedure and requirements to ensure all activity supervised by competence
personnel.
• We are committed to develop competencies HSE personnel contractor and increase
the ability in HSE aspect
Business Process –
Contractor HSE Competency Test
Pengumuman LoA (Letter of Award)
Kontraktor mengajukan surat permohonan kepada
PHE WMO untuk tes kompetensi bagi personil HSE yang akan dikirim ke
lapangan
Surat permohonan dikirim melalui user departemen
ke HSSE Department dilengkapi dengan CV personil yang ikut
HSSE Department akan membuat jadwal tes yang
kirimkan via email ke perwakilan kontraktor
dan user department Personil HSE Kontraktor
mengikuti tes di tempat yang di tunjuk oleh PHE WMO (PHE TOWER/ ORF
Gresik) Pengumuman lulus atau
tidak lulus akan dikirimkan melalui email ke perwakilan kontraktor
dan user department
Bagi yang lulus akan di berikan HSE Id Badge
Competency (berlaku 2 thn)
Bila tidak lulus diberikan
kesempatan re-test 1 kali lagi setelah mendapatkan pembinaan
Proses Tes Kompetensi Kontraktor dilakukan dengan
Online Sistem Melalui Intranet PHE WMO dengan materi
pertanyaan mengenai pengetahuan HSE di Industri
Minyak dan Gas.
Nilai Kelulusan Minimal adalah 60, apabila lulus
diberikan kartu yang berlaku selama 2 tahun.
Si HEBAT-Result 2015
12
12
2
0
0 2 4 6 8 10 12 14Lulus
Jumlah Peserta
Tidak Lulus
CHSEMS – Work in Progress (WIP)
Inspeksi HSE
Work
Practice
Inspeksi
HSE
Program
Evaluasi
Kinerja HSE
Sementara
CHSEMS Procedure Lama
• Pelaksanaan WIP minimal sekali selama kontrak
CHSEMS Guidelines Baru
• Pelaksanaan WIP minimal 1 tahun sekali/sekali
untuk kontrak < 1 tahun
Penunjukkan Champion CHSEMS
•
Pedoman CHSEMS
•
Monitoring pelaksanaan siklus CHSEMS melalui CHSEMS online
•
External Audit CHSEMS dari Direktorat Hulu
Review Prosedur CHSEMS, HSE Plan dan Exhibit HSE
•
Internal Audit CHSEMS
•
Coaching Clinic CHSEMS untuk Local Vendor
PHE WMO-CHSEMS Program
No Kegiatan Sub Kegiatan Tahun Pelaksanaan Jumlah Peserta/Perusahaan Hasil
1 Coaching Clinic untuk Local Vendor: Coaching Clinic Local Vendor Jakarta 2015 Batch 1 13 April 2015 22 Orang dari 11 Perusahaan Batch 2 18 Mei 2015 44 Orang dari 44 Perusahaan Batch 3 27 Juli 2015 24 Orang dari 24 Perusahaan Batch 4 20 Ags 2015 25 Orang dari 25 Perusahaan Batch 5 28 Sept 2015 13 Orang dari 13 Perusahaan
Coaching Clinic Local Vendor Gresik 2014 Apr 2014 s/d Jan 2015 5 Perusahaan/Kontraktor 4 Perusahaan mendapatkan sertifikat CHSEMS 2015 Mei 2015 s/d Des 2015 17 Perusahaan/Kontraktor
Training dan Sosialisasi CHSEMS ke Champion CHSEMS
•
Vendor Day
PHE WMO-CHSEMS Program
No Kegiatan Sub Kegiatan Tahun Pelaksanaan Jumlah Peserta/Perusahaan
2 Sosialisasi Prosedur Sosialisasi ke Champion Champion CHSEMS 2014 Batch 1 14-16 April 2014 21 Orang Batch 2 21-23 Mei 2014 21 Orang Batch 3 27-29 Ags 2014 19 Orang Batch 4 19-21 Nov 2014 22 Orang Sosialisasi ke Champion CHSEMS 2015 Batch 1 23-24 April 2015 23 Orang