ENHANCEMENT pertamina CONTRACTOR HSE MANAGEMENT SYSTEM July 2015

Bangkitkan Energi Negeri 1 CHSEMS Judul CHSEMS Judul CHSEMS Cycle Judul

Siklus CHSEMS Admin

Contracted Work Administration Phase: Select A Qualified Contractor Pre-Qualification Selection Risk Assessment

Contract Award Field

Data Bank

Field Implementation Phase: Ensure Field Safe Work Pre Job Activity

Work In Progress CHSEMS

Final Evaluation Judul

Tahap Risk Assessment Risk Assessment

Contracted Work Administration Phase: Select A Qualified Contractor Pre-Qualification Selection Risk Assessment

(3)

Contract Award

Data Bank Field Implementation Phase: Ensure Field Safe Work Pre Job ActivityWork In ProgressFinal Evaluation

TUJUAN

Judul Mengkaji seberapa besar dampak negatif pekerjaan yang dikontrakan terhadap aspek HSE yang meliputi keselamatan manusia, peralatan/asset, lingkungan hidup dan citra perusahaan. R I C A

SCM Dept. Manager

CHSEMS Champion in Each Dept Contractor/ Bidder

HSE Dept

1.Conduct Risk Assessment of the job/services required SCM

ACTIVITIES End User/SPA/Contract Holder Judul TUGAS DAN TANGGUNG JAWAB I

SEVERITY (KEPARAHAN) 0 1 2

RISIKO RENDAH

DAMPAK POTENSIAL Tanpa Cedera Tidak ada cidera

Cedera Ringan Tidak menyebabkan hari hilang

SEDANG Cedera Sedang Menyebabkan hari hilang, maksimum 7 (tujuh) hari 3

(4)

4

Cedera Fatal TINGGI 5

DEFINISI

Cedera Fatal Ganda

Menyebabkan hari hilang, lebih dari 7 (tujuh) hari Satu korban meninggal/cacat total

permanen/tidak mampu bekerja Korban meninggal/cacat total permanen/tidak mampu bekerja lebih dari 1 (satu) orang

Judul HASIL PENILAIAN RISIKO Judul

Tahap Pra-Kualifikasi (PQ) Administration

Contracted Work Qualification Phase: Select A Qualified Contractor Pre-Qualification Selection Risk Assessment

CHSEMS Contract Award

Data Bank Field Implementation Phase: Ensure Field Safe Work Pre Job ActivityWork In ProgressFinal Evaluation

TUJUAN

Judul • Menjaring Kontraktor yang memiliki kesadaran, kemampuan & kepedulian terhadap aspek HSE agar diperbolehkan mengikuti proses tender. • Semua Kontraktor yang di Pra Kualifikasi harus mampu mengidentifikasi risiko dari pekerjaan, mengatur, mengontrol dan mengendalikan semua aspek HSE dalam pekerjaannya.

1.Send PQ CHSEMS Questionnaire to Contractor/Bidder. 2.Return PQ CHSEMS Questionnaire with related evidence. 3.Send Invitation to Contractor/Bidder for PQ CHSEMS Clarification. 4. Attend PQ CHSEMS Clarification.

R R GM

(5)

CHSEMS Champion in Each Dept R Contractor/ Bidder I HSE Dept SCM ACTIVITIES

End User/SPA/Contract Holder Judul PRA-KUALIFIKASI - RACI I A I A I A I R I R R R R R A R C

(6)

C I A I 6.1 Create CA R C C R R I A 6.2 Site Visit R C R R R I A R I

5. Determine if Site visit required. 6. Create Conditional Acceptance if Required. 6.3 Register CA

A

(7)

Lulus > 56 Lulus > 60 Tidak Lulus < 56 Tidak Lulus < 60

Judul PROSES PRA KUALIFIKASI FLOW CHART

CHSEMS

-Tidak Boleh Mengikuti Tender High Risk. -Masih boleh mengikuti Tender untuk kategori Medium dan Low Risk. -Harus menunggu selama 6 bulan untuk dilakukan PQ ulang.

(Keputusan End User)

Judul EVALUASI PRA KUALIFIKASI CHSEMS

Judul CONDITIONAL ACCEPTANCE Conditional Acceptance: • Diberlakukan bila hanya ada satu atau dua, bahkan tidak ada kontraktor yang memenuhi kriteria HSE (tidak lulus PQ CHSEMS) dalam proses tender. • Kekurangan hasil dari PQ akan ditindaklanjuti oleh pihak kontraktor dan diberi tenggat waktu yang disepakati antara End User dan Kontraktor. • Conditional acceptance harus mendapat persetujuan dari Line Manager, Sr HSES Manager, Sr SCM Manager dan General Manager CA hanya boleh dilakukan sekali selama mengikuti semua Tender di PHE WMO.

Disarankan untuk dipilih Bidder yang hasil PQ nya mendekati angka 60. Tindak lanjut penyelesaian rekomendasi CA akan menentukan hasil FE.

Judul

Tahap Seleksi Pemenang Administration

Contracted Work Qualification Phase: Select A Qualified Contractor Pre-Qualification Selection Risk Assessment

CHSEMS Contract Award

Data Bank Field Implementation Phase: Ensure Field Safe Work Pre Job ActivityWork In ProgressFinal Evaluation

Judul SELECTION

Kontraktor menyiapkan penawaran HSE Program selama kontrak (dokumen HSE Plan). Perusahaan mengevaluasi penawaran dan melakukan klarifikasi. Bidder harus lulus dari semua persyaratan HSE yang ditetapkan

(8)

Bobot penilaian ditentukan, untuk lulus harus memenuhi skor minimal penilaian 2.Determine if Site Visit required 3.Site Visit 4.Bidder Selection 5.Award

R C I I A R C C I A I R C C R R C I I A R R C I

(9)

I A I R R I A Contractor/ Bidder SCM Dept. Manager R

CHSEMS Champion in Each Dept HSE Dept

1.Bid opening and evaluation SCM

ACTIVITIES

End User/SPA/Contract Holder Judul SELECTION-RACI

6.Send unsuccessful letter to unsuccessful bidder

Judul KRITERIA UMUM PENILAIAN HSE PLAN EVALUATION CRITERIA ON HSE PLAN PROCEDURE PER SECTION/SUBSECTION/POINT A Not Meet the Minimum Expectation No evidence as per request by minimum expectation in the section/subsection/point Item 1 2

B Below Minimum Expectation

Provide evidence, however only in general, no detail evidence as required by minimum expectation in the section/subsection/point

Description Technical Aspect HSE Plan as exhibit H required and Site Visit (if required) Total C Meet the Minimum Expectation

(10)

D Exceed Minimum Expectation

Provide evidence in detail for the project as required by the minimum expectation in the section/subsection/point

Provide a comprehensive evidence for the project beyond the minimum expectation in the section/subsection/point

Min Score (of max 100) 70 Weight Factor 90%

70

10% 100%

Pre Job Activity Pre Job Activity Contracted Work

Administration Phase: Select A Qualified Contractor CHSEMS

Pre-Qualification Risk Assessment Selection

Contract Award Field Implementation Phase: Ensure Field Safe Work Pre Job Activity Work In Progress Final Evaluation

Data Bank TUJUAN

Judul • Membuka komunikasi pertama diantara PHE WMO dan Kontraktor untuk tingkat pekerjaan lapangan.

• Memastikan aspek-aspek HSE telah dikomunikasikan, dipahami dan siap dilaksanakan oleh semua pihak sebelum pelaksanaan pekerjaan. • Meyakinkan bahwa Kontraktor sudah memahami risiko, mempersiapkan rencana mitigasi dan program HSE yang akan dilakukan terhadap pekerjaan yang akan dilaksanakan. • Memastikan kesiapan Kontraktor dalam melaksanakan HSE Plan yang telah disepakati.

SCM Dept. Manager

CHSEMS Champion in Each Dept HSE Dept

(11)

Contractor SCM

ACTIVITIES

End User/SPA/Contract Holder Judul PRE JOB ACTIVITY-RACI

1. Assign CONTRACTOR HSE Representative I I C R A I

2. Initiate Kick off Meeting – PJA Meeting 3. Develop CONTRACTOR’s HSE Plan 4. Review and Approve CONTRACTOR’s HSE Plan 5. Conduct Safety Orientation and Induction 6. Conduct Pre-Job Audits R I R R R I C C C C R R R I A A A I I R R I I I I Pre-Mobilization Phase: I

(12)

Mobilization Phase: 1. Conduct Pre-Job Safety Meeting 2. Mobilization of personnel and equipment 3. Mobilization audit

A A R I

FORM PJA AUDIT Judul

Approval Line Manager Jumlah WIP

• Rekomendasi Faill/Pass FORM PJA AUDIT

Judul HSE Plan yang disetujui

Sertifikat dan kelayakan peralatan yang dipakai • Kualifikasi HSE Rep • Lulus HSE Comp Test HSE Induction

FORM PJA AUDIT Judul

Kontrol dari bahaya-bahaya yang diidentifikasi pada Risk Assessment FORM PJA AUDIT

Judul •

Emergency Response Plan dan Prosedur • Sosialisasi ERP • Emergency Contact List PJA Meeting

FORM PJA AUDIT

Judul • Training dari Personil Kontraktor • Training Plan Tandatangan Komitmen HSE

Judul

(13)

Contracted Work

Administration Phase: Select A Qualified Contractor Pre-Qualification Risk Assessment

Selection

Contract Award Field Implementation Phase: Ensure Field Safe Work Pre Job Activity Work In Progress Final Evaluation

CHSEMS Data Bank TUJUAN

Judul • Melakukan penilaian terhadap kinerja HSE Kontraktor selama pelaksanaan pekerjaan dan memberikan feedback. • Memastikan tidak ada potensi bahaya yang terlewatkan dan melakukan intervensi bila ditemukan. • Melakukan kontrol terhadap konsistensi implementasi HSE selama pelaksanaan pekerjaan dan memastikan bahwa pelaksanaan pekerjaan telah sesuai dengan

kesepakatan HSE Plan sebelumnya • Salah satu cara untuk memperkecil “Gap” implementasi HSE yang merupakan bagian dari pelaksanaaan HSE Plan.

1. Determine WIP Schedule R

C I A

2. Initiate Opening Meeting R

C R A

3. Conduct HSE Inspection Audit R

(14)

R A

4. Conduct HSE Program Audit R

C R A

5. Determine Interim Evaluation Score R

C I A

6. Close Out Meeting R

C R A

SCM Dept. Manager

CHSEMS Champion in Each Dept Contractor

HSES Dept SCM

ACTIVITIES

End User/SPA/Contract Holder Judul WORK IN PROGRESS-RACI PROSES WIP

(15)

Judul

Inspeksi HSE Program

Evaluasi Kinerja HSE Sementara Inspeksi HSE Work Practice

CHSEMS Procedure Lama • Pelaksanaan WIP minimal sekali selama kontrak

CHSEMS Guidelines Baru • Pelaksanaan WIP minimal 1 tahun sekali/sekali untuk kontrak < 1 tahun FORM WIP Data Interim KPI Kontraktor: • Leading dan Lagging Indicator.

Judul NC FORM Judul

Untuk memonitor penyelesaian rekomendasi pada WIP, rekomendasi agar dituliskan dalam NC Form Waktu penyelesaian rekomendasi disepakati pada saat closing meeting WIP

Judul Guidance Penilaian WIP Judul

Final Evaluation Final Evaluation Contracted Work

Administration Phase: Select A Qualified Contractor Pre-Qualification Risk Assessment

Selection

Contract Award Field Implementation Phase: Ensure Field Safe Work Pre Job Activity Work In Progress Final Evaluation

CHSEMS Data Bank

1.Determine FE Schedule R

(16)

I A

2.Initiate Opening Meeting 3.Determine Final Evaluation Score 4.Close Out Meeting 5.Determine Final HSE Performance 6.Reward & Punishment

R R R R C C C A R I R I A A A I R I R I SCM Dept. Manager

CHSEMS Champion in Each Dept Contractor/

HSES Dept SCM

ACTIVITIES

End User/SPA/Contract Holder Judul FINAL EVALUATION-RACI I I

Judul PENILAIAN FINAL EVALUATION Judul FORM FINAL EVALUATION

Judul FORM FINAL EVALUATION Data KPI Kontraktor selama Project: • Leading dan Lagging Indicator.

Judul (KPI Kontraktor) FORM FINAL EVALUATION

(17)
(18)

Referensi

Dokumen terkait

Untuk mengatasi kendala atau masalah tersebut, disarankan: (1) tutor diberikan pembekalan intensif dan berkelanjutan terkait dengan teknis dan substansi tuton,

&#34;Wajar kalau Anda terkejut, Anda tak tahu ada pintu lain dari kamar tidur saya yang menuju.

Hubungan antara status vitamin D dan kejadian tuberkulosis telah banyak diteliti Banyak penelitian di berbagai belahan dunia tentang kadar vitamin D dalam darah yang

Based on Lumped Mass Model the velocity of landslide matter at initial condition is 12 m/s in horizontal direction (x-axis) and 30 m/s in vertical direction (y-axis). There

Gambaran Konsep Diri Anak Usia Dini pada Kegiatan Menggambar di TK Aisyiyah 1 Serang ... Gambaran Kegiatan Menggambar Membentuk Konsep Diri Anak Usia Dini di TK Aisyiyah

Dan dari 28 (dua puluh delapan) perusahaan yang mendaftar tersebut terdapat 21 (dua puluh satu) perusahaan yang mengupload tabel kualifikasi, yaitu sebagai berikut

Penyelesaian yang ditempuh guna menghilangkan sikap ketidakpatuhan aparatur negara dapat dilakukan upaya mengefektifkan eksekusi putusan PTUN terhadap Pejabat TUN,

Selanjutnya pelanggaran yang penting-penting dalam pasal ini ialah bahwa kekuasaan untuk menunjuk pegawai pencatat nikah, menetapkan tempat kedudukan dan wilayah