Analisa Perbandingan Kebutuhan Tulangan dan Kabel Balok Prategang Pada Jembatan Menggunakan Balok PCI dan Box

N/A
N/A
Protected

Academic year: 2017

Membagikan "Analisa Perbandingan Kebutuhan Tulangan dan Kabel Balok Prategang Pada Jembatan Menggunakan Balok PCI dan Box"

Copied!
2
0
0

Teks penuh

(1)

ii

ABSTRAK

Seperti dilansir dalam berita online di website www.tribunnews.com

tertanggal 14 ζovember β014 dengan judul “Insinyur Harus Bisa εanfaatkan

MEA untuk bangun Infrastruktur”. Dalam berita tersebut dijelaskan ada 59 topik yang dibahas dalam konferensi antara perhimpunan Organisasi Insinyur se- ASEAN ke 32. Namun dari 59 topik yang dibahas ada 3 hal pokok yang didapat dari pemaparan para insinyur se ASEAN tersebut. Ketiga hal tersebut yaitu solusi untuk ketersediaan energi, transportasi dan Infrastruktur yang terintegrasi.

Sejalan dengan hal tersebut diatas, pihak Insinyur Sipil sangat diharapkan maampu memenuhi kebutuhan Infrastruktur yang terintegrasi di kawasan Asia Tenggara. Untuk itu perlu kematangan ataupun keahlian seorang Insinyur dalam merencanakan infrastruktur yang akan dibangun. Salah satu perencanaan infrastruktur yang sudah kita kenal yaitu pembangunan suatu jembatan.

Adapun topik bahasan dalam tugas akhir ini adalah untuk mengetahui perbandigan jumlah tulangan dan kabel pada balok PCI dan Balok Box, disamping itu juga penulis ingin mengetahui berapa dimensi yang digunakan untuk kedua jenis balok tersebut serta dibandingkan terhadap ke ekonomisan balok di tinjau dari pekerjaan pembesiaan nya yaitu pekerjaan penulangan dan kabel prategang nya.

Teknik pengumpulan dan pengolahan data dibuat dengan mengasumsikan panjang bentang jembatan dan pengumpulan literature-literatur yang mendukung, dari situ diolah hingga mendapatkan desain yang diperlukan. Dari pengolahan data tersebut, ternyata balok Box memberikan nilai ke ekonomisan yang diharapkan. Perbandingan harga yang dihitung sebesar 2 PCI : 1 Box. Namun perbandingan itu hanya dibandingkan terhadap pekerjaan pembesiaan saja.

Disarankan agar perhitungan pekerjaan lain yang mendukung pembangunan jembatan tersebut dihitung lagi agar didapat estimasi biaya yang real, atau detail dari pembangunan jembatan tersebut.

Kata kunci: Beton prategang, PCI girder, Box Girder, losses, strand

(2)

iii ABSTRACT

As reported in the online news website www.tribunnews.com dated November 14, 2014, with the title "Engineer Must Could Make the MEA to wake Infrastructure". In the news explained there are 59 topics covered in the conference between union organizations as ASEAN Engineers to 32. But from 59 topics that discussed there are 3 main things that come from exposure to the engineers of the ASEAN . The third thing that is the solution for energy supply, transportation and integrated infrastructure.

In line with the above, the Civil Engineer is expected can meet the needs of an integrated infrastructure in Southeast Asia. For that we need the maturity or skills an engineer in the planning of infrastructure to be built. One of the infrastructure planning that we already know, namely the construction of a bridge. As for the topic of discussion in this thesis is to find out comparative amount of reinforcement and cables on the beam PCI and Beams Box, as it also writer wanted to know how many dimensions are used for both types of beams and compared against to the overall economy beams in the review of the inforcement’s work, it is reinforcement work and its prestressed cables.

Data collection and processing techniques created by assuming long-span bridges and the collection of literature-literature that supports, from which processed to obtain the necessary design. Processing of the data, it turns Box beams give the expected value to the overall economy. Comparative price calculated at 2 PCI: 1 Box. But the comparison can only be compared to the inforcement’s work only. It is recommended that the calculation of other work that supports the construction of the bridge is calculated again in order to obtain estimates of the cost of real, or details of the construction of the bridge.

Keywords: prestressed concrete, Box Girder, losses, PCI girder, strand

Referensi

Dokumen terkait

LAN pada PT.TELKOM DIVRE II Jakarta Timur difungsikan sebagai alat komunikasi antar karyawan yang digunakan untuk informasi dan pemasukan data Network yang terpasang dikaitkan

bahwa berdasarkan hasil evaluasi dan dalam upaya meningkatkan efisiensi dan efektifitas kelembagaan pemerintah daerah secara proposional dan sesuai dengan kebutuhan

Honeypot adalah suatu sistem yang didesain untuk diserang / disusupi oleh cracker, dan bukan untuk menyediakan suatu suatu layanan produksi. Seharusnya hanya sedikit atau bahkan

[r]

Oleh karena itu pengetahuan ibu yang baik tentang stimulasi perkembangan bahasa anak akan membentuk perilaku ibu dalam berinteraksi dengan anak, dengan pemahaman yang baik ibu

Didesa Dlingo partisipasi masyarakat yang peduli dengan pertanian organik diwujudkan oleh petaninya yang banyak tergabung dalam kelompok tani, jadi pertemuan

Perencanaan proses Pembelajaran IPS Melalui Project Based Learning untuk Menumbuhkan Perilaku Peduli Lingkungan pada Kelas VIII A di MTS Al- Musyawaroh Lembang

Verbenaceae banyak ditemukan pada daerah dengan jenis tanah yang bersifatG. subur dan tidak terlalu keras sperti tanah humus dan