QUARTERLY REPORT
For the Third Quarter of the Year 2015
PT. PERENTJANAOJAJA in subconsultancy
with
zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
4)
Yongma Engineering Co. Ltd and filPT. Epadascon
Pennata
Engineering Consultant
CTCOffice: 11.Ciniru VIINo. 25, Kebayoran Baru, Jakarta Selatan, 12180
Phone {Fax: (021) 7229823
Cc:
1. Direktur Jenderal Bina Marga
2.
InspektoratJenderal, Kementrian PU-PERA
3.
Direktur Transportasi - Bappenas
4.
Direktur Pengelolaan Kas Negara (PKN), KementrianKeuangan
5.
Direktur PengembanganJaringan Jalan, DitJen Bina Marga
6.
Direktur Jalan Bebas Hambatan, Perkotaan dan Fasilitasi Jalan Daerah, DitJen Bina Marga
7.
Direktur Pembangunan Jalan, DitJen Bina Marga
8.
Direktur Preservasi Jalan, Dit.Jen Bina Marga
9.
Biro Perencanaan
&
KLN, Kementrian PU-PERA
10. Kasubdit Kawasan Strategis dan Andalan, KementrianDalam Negeri
11. Kasubdit Pembiayaandan Kerjasarna
Luar
Negeri
12. KasubditWilayah I B, DirektoratBina Pelaksana Wilayah I, DJBM
13. KasubditWilayah I C, Direktorat Bina PelaksanaWilayah I, DJBM
14. KasubditWilayah I D, Direktorat Bina PelaksanaWilayah I, DJBM
15. Kepala Satker PembinaanAdministrasi dan Pelaksanaan PengendalianPHLN
16. Th~ World Bank Office, Jakarta
17. PT Perentjana Djaja
18. Yongma EngineeringCo, Ltd
19. PT Epadascon Permata EngineeringConsultant
20. File
This report is reproduced and submitted in twenty (20) copies for distribution to all concerned authorities.
In compliance with Item NO.3 (List of Documents To Be Delivered) of our Consultancy Contract, we submit
herewith the Quarterly Progress Report covering the 3rd Quarter of the Year 2015 (July, August and
September 2015).
: Quarterly
Progress Report for the 3rd Quarter of the Year 2015
Subject
: Ir. Agusta E. Sinulingga,
M.T
Officer in Charge PMU
WIN RIP
Attention
Directorate General of Highways, MPWH
JI. Patimura20 Kebayoran Baru
Jakarta Selatan
Indonesia
Jakarta, October 7,2015
: 03_10/C TAlO /Q -3.2015
Our Ref.No.
Perentjana Ojaja
MINISTRY
OF PUBLIC WORKS
&
HOUSING
DIRECTORATE
GENERAL
OF HIGHWAYS
DIRECTORATE OF PLANNING
Core Team Consultant for
Table Of Contents
1 Executive Summary ... 1
1.1 Current Implementation Situation... 1
1.1.1 Civil Works... 1
1.1.2 Consultancy Services ... 3
1.1.3 Goods ... 3
1.3
Current Problems and Action Required ... 5
2
General... 6
2.1
Reporting Requirements ... 6
2.2
Loan Status
... 7
2.3
Financial Management ... 7
2.4
Project Cost Monitoring ... 8
2.5
World Bank Implementation Review Mission and Site Visit... 8
2.6
Project Steering Committee Meeting... 10
3
Project Management and Implementation... 11
3.1
Procurement Status... 11
3.2
Implementation Status
Civil Works... 12
3.3
Variation Order Details ... 18
3.4
Consultancy Services ... 19
3.5
Implementation of the Anti-Corruption A c t i o n Plan ... 20
3.6
Implementation of the Environmental Management Plan and LARAP... 21
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
1
1 Executive Summary
1.1 Current Implementation Situation
1.1.1 Civil Works
Implementation of the WINRIP Project is scheduled to be implemented into three (3)
Annual Work Programs (AWP's). The implementation starts with the preparation of
tender documents (detailed design drawings including associated bidding documents),
tendering stage (procurement of works) and the actual civil works construction
implementation.
The original implementation schedules of the three (3) Annual Work Programs (AWPs)
are scheduled in three (3) phases, namely ; AWP-1 to start in mid-2011 and to be
completed on the last quarter of 2014, AWP-2 is expected to begin in mid 2012 with
target date of completion by mid-2016 and AWP-3 is expected to start during the
early part of 2013 and to be completed during the middle part of 2017.
However, due to some unavoidable circumstances the original implementation
schedules did not materialized.
[image:5.595.137.573.486.748.2]Based on the present status of the program implementation progress, a revised
implementation schedule, the Project Implementation Timeline (as shown on Page 2)
is to be implemented in order to accommodate the originally delayed schedule into
the remaining time frame of the WINRIP Program until the expiry date of the loan
agreement by the end of December 2017.
Table 1
shows the present status.
Table 1 - Implementation Status as of End of the 3
rd
Quarter on September 30, 2015
Note : Packages 9 and 18 are proposed to be deleted from the program.
Pack
Package Name
Contract
Under
Waiting
Proc
Review
No.
Sign
Construct
COW
Process
DED
1
Krui - Biha
1
1
2
Padang Sawah - Sp.Empat
1
1
3
Manggopoh - Padang Sawah
1
1
4
Ipuh - Bantal
1
1
5
Sp. Rampa - Poriaha
1
1
6
Ps. Pedati - Kerkap
1
1
7
Indrapura - Tapan
1
8
Bts.Pariaman - Manggopoh
1
10
Sp. Empat - Sp. Air Balam
1
11
Bantal - Mukomuko
1
1
12
Kambang - Indrapura
1
13
Sp. Rukis - Tj.Kemuning
1
1
14
Painan - Kambang
1
15
Sibolga - Bts.Tap Sel
1
1
16
Seblat - Ipuh
1
17
Sp.Gn.Kemala - Pg.Tampak
1
1
19
Lais - Bintunan
1
1
20
Lubuk Alung - Sicincin
1
21
Lubuk Alung - Kuraijati
1
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
2
Length
C'tion
Km
Period
J
N
D
J
F
M
A M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A M
J
J
A
S
O
N
D
J
F
M
A M
J
J
A
S
O
N
D
J
F
M
A M
J
J
A
S
O
N
D
J
F
M
A M
J
J
A
S
O
N
D
1
Krui - Biha
25.00
21 mth
2
Padang Sawah - Sp.Empat
40.90
24 mth
3
Manggopoh - Padang Sawah
32.00
24 mth
4
Ipuh - Bantal
42.40
24 mth
5
SIMPANG RAMPA - PORIAHA
11.10
18 mth
11 BANTAL - MUKOMUKO
50.10
24 mth
13 SP RUKIS - TJ KEMUNING
56.30
24 mth
17 Sp.Gn.KEMALA - Pg. TAMPAK
36.80
24 mth
6
PS. PEDATI - KERKAP
25.00
15 mth
19 LAIS - BINTUNAN
11.60
10 mth
15 SIBOLGA - BATAS TAPSEL
36.00
27 mth
7
INDRAPURA - TAPAN
19.50
21 mth
8
BTS.Kt PARIAMAN-MANGGOPOH
46.80
24 mth
10 SIMPANG EMPAT - SP.AIR BALAM
61.70
24 mth
12 KAMBANG - INDRAPURA
55.20
24 mth
14 PAINAN KAMBANG
31.50
21 mth
16 SEBLAT IPUH
34.50
21 mth
20 LUBUK ALUNG SICINCIN
14.60
18 mth
21 LUBUK ALUNG KURAITAJI
16.80
18 mth
9
RANTAU TIJANG-KOTA AGUNG
42.00
The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
18 MUKOMUKO-BTS SUMBAR
25.80
The Road has been constructed by MPW within 2011-2013. Road condition is good. Proposed to be deleted from the list of WINRIP's work program
Original target :
715.60
km
ENVIRONMENT & SOCIAL SAFEGUARD
Revised target :
647.80 km
Prequalification
Detail Eng Design
LARAP Study
Road Safety
Appraisal & Public Consultation
Procurement & Sign Contr
LARAP Implementation
Commencement of Work
Standard Biding Document
Pack
#
PACKAGE NAME
2012
2013
2014
2015
2016
2017
2018
CONSTRUCTION
Review DED & RS
PQ
PROC
COW
CONSTRUCTION
CONSTRUCTION
Review DED & RS
PQ
PROC
COW
SC+COW
Review DED & RS
PQ
PROC
Review DED & RS
SBD & OE + BD
Review DED & RS
SBD & OE + BD
Review DED & RS
Review DED & RS
PQ
PROC
COW
OE & BD
DED
Rev-DED RS
OE & BD
OE & BD
DED
RSA & REVISED DED
OE & BD
DED
RSA & REVISED DED
OE & BD
PROC
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
PQ
RS
Proc
COW
SBD
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
DED
RSA & REVISED DED
OE & BD
DED
RSA & REVISED DED
OE & BD
DED
Rev-DED RS
OE & BD
DED
PROC
COW
PROC
COW
PROC
DED
SBD & OE + BD
COW
COW
COW
COW
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
PROC
PROC
PROC
PROC
Rev-DED RS
DED
Rev-DED RS
COW
COW
PROC
COW
CONSTRUCTION
PROC
PROC
COW
COW
CONSTRUCTION
CONSTRUCTION
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
3
For other activity status of the contract packages, a consolidated updated status
ending on the 3
rd
Quarter of the Year 2015 are presented in
Table 2
.
1.1.2 Consultancy Services
TA Consultant
Planned
Mobilization
Contract
Signed
Actual
Mobilization
CTC
Jul 2012
5 Nov 2012
12 Nov 2012
DSC
Jul 2012
11 Jun 2013
19 Jun 2013
Capacity Building for Disaster
Risks Reduction
Still to be
procured
Capacity Building for
Environmental Management
To be deleted
Capacity Building for
Road Safety
To be deleted
1.1.3 Goods
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
[image:8.595.66.564.97.734.2]Western I ndonesia National Roads I mprovement Project
4
Table 2
Brief Summary as of the 3rd Quarter of Year 2015
DED
T echnical
Design
Review
Road Safety
Audit
Status
Doc Requirem ent
Status
Doc Requirem ent
Status
Budget
Allocation
Status
Est'd.
Start
Duration
(Months)
1
Krui - Bha
Completed
Completed
Completed
SPPL & AMDAL
(No.1 & 17)
SPPL OK P2JN 2010 &
AMDAL Subdit TLKJ
OK 2012 . WB NOL
issues on 20 Nov 2013
1).LARAP
2). LARAP Mon
Report
1).NOL WB 4 Jan 13
2).NOL LARAP
Monitoring 18 April
2013, Rev 26 June
2013.
Satker PJN
Province
Lampung
98%.
Remaining issues: (1) Monitoring
report of compensation payment
f or the remaining 10 PAP is under
preparation by CTC. (2)
Certif ication process of the PAP
w ill be as soon as resolved by
Project
Completed
Jan-14
21.00
A
Padang Saw ah - Sp. Ampat
Including Air Gadang Bridge
3
Manggopoh - Padang Saw ah
Completed
Completed
Completed
SPPL
OK P2JN 2010.(No
need NOL WB f or
SPPL/UKL&UPL)
1).LARAP
2). LARAP Mon
Report
1).NOL WB 13 Dec
12
2). NOL WB_1: 26
Apr 2013, NOL
WB_2: 5 Mar 2014,
NOL WB_3: 23 Jun
2014, NOL WB_4: 12
Feb 2015, NOL
WB_5: 17 Mar 2015
APBD
Province West
Sumatera
99%.
Monitoring report of compensation
f or the remaining 1 PAPis ubder
preparation by CTC
Completed
Jan-14
24.00
A
4
Ipuh - Bantal
Completed
Completed
Completed
SPPL & UKL&UPL
SPPL OK P2JN 2010 &
UKL/UPL presentation
on Balai III on 27 Aug
14.
1).LARAP
2). LARAP Mon
Report
1).NOL WB 10 Dec
12 2).
NOL MR-1: 6 Jan
2014, MR-2: 5 Mar
2014, MR-3: 12 Feb
2015
Satker PJN
Province
Bengkulu
100%
Complete
Completed
Jan-14
24.00
A
5
Sp. Rampa - Poriaha
Completed
Completed
Completed
UKL/UPL
OK Balai 1 2011. (No
need NOL WB f or
SPPL/UKL&UPL)
1).SLARAP
2). LARAP Mon
Report
1).Nol WB 10 Dec 12
2). Mon Report:
-Satker PJN
Province
North
Sumatera
99%
Relocation 1 af f ected kiosk being
done by project
Completed
Mar-15
18.00
A
6
Ps. Pedati - Kerkap
Completed
Completed
Completed
UKL/UPL
OK TLKJ 2011. NOL
WB issued on 20 Nov
2013
1).LARAP
2). LARAP Mon
Report
1).NOL WB 20 Nov
2013
2). NOL WB_1: 23
Mar 2015.
Satker PJN
Province
Bengkulu
90,7%
The project is completing payment
of compensation to the remaining
56 PAP
Completed
Mar-15
15.00
A
7
Indrapura - Tapan
Completed
Completed
Completed
AMDAL
OK TLKJ , 20 Feb
2014. NOL WB issued
on 8 Aug 2014
1).SLARAP
2). LARAP Mon
Report
1).NOL WB 10 Oct
2014
2). Target of a Mon
Report on April - Jun
2015
Satker PJN II
Province West
Sumatera
Appraisal of the af f ected asset is
under process
On-Going
Jan-16
21.00
G
8
Bts. Kota Pariaman - Manggopoh
Completed
Completed
Completed
AMDAL
OK TLKJ 2013 . NOL
WB issued on 14 April
2014
1).LARAP
2). LARAP Mon
Report
1).NOL WB 12 Aug
2014
2). Target of a Mon
Report on May 2015
APBD Provinsi
2015
The compensation payment data
f or 839 f rom 948 PAP in Kab Agam
has not been received PMU f rom
Satker yet. Completion the
inventory of the af f ected asset in
Kab. Pdg Pariaman is being done
(now just ready 630 PAP)
On-Going
Jan-16
24.00
G
9
Rantau Tijang - Kota Agung be
changed w ith Bengkunat - Biha
UKL/UPL
OK TLKJ 2011. NOL
WB issued on 20 Nov
2013
Social and Env
saf eguards
screening
Being prepared by
Consultant (Balai 3)
Satker PJN
Provinsi
-
-
21.00
L
10
Sp. Empat - Sp. Air Balam
Completed
Completed
Completed
AMDAL
OK TLKJ 2013 . NOL
WB issued on 14 April
2014
1).LARAP
2). LARAP Mon
Report
1).NOL WB 12 Aug
2014
2). Target of a Mon
Report on Apr - Jun
2015
APBD Provinsi
2015
Completion the inventory of the
af f ected asset is being done (now
just ready 1,092 PAP f or 42 f rom
the total 61,7 km)
On-Going
Jan-16
24.00
G
11
Bantal - Mukomuko
Completed
Completed
Completed
AMDAL
OK TLKJ 2014. NOL
WB issued on 8 Aug
2014
1).LARAP
2). LARAP Mon
Report
1).Nol WB: 20 Nov
2013
2). NOL WB-1: 2 Dec
2014, NOL WB-2: 12
Feb 2015
Satker PJN
Province
Bengkulu
73%.
The compensation payment data
f or 15 f rom the remaining 123 PAP
has not been received PMU f rom
Satker yet. Compensation payment
f or the remaining PAP is being
done by Satker.
Completed
Feb 15
24.00
A
12
Kambang - Indrapura
Completed
Completed
Completed
AMDAL
OK TLKJ 2014 .NOL
WB issued on 8 Aug
2014
1).LARAP
2). LARAP Mon
Report
1).NOL WB 10 Oct
2014
2). Target of a MR on
Apr - Jun 2015
Satker PJN II
Province West
Sumatera
Appraisal of the af f ected asset is
under process
On-Going
Jan-16
24.00
G
13
Sp. Rukis - Tj.Kemuning
Completed
Completed
Completed
UKL/UPL
OK P2JN 2011. (No
need NOL WB f or
SPPL/UKL&UPL)
1).LARAP
2). LARAP Mon
Report
1).NOL WB:20 Nov
2013
2). Target a MR in Jun
2015
Satker PJN
Province
Bengkulu
Mon Report f or the remaining 40
f rom 190 in Kab Bengkulu Selatan
is under submission to WB. the
total 190 PAP already be paid by
project, and f or 3.106 PAP in Kaur
is under payment process
Comnpleted
Jul-15
24.00
A
14
Painan - Kambang
Completed
Completed
Completed
AMDAL
OK TLKJ 2014 .NOL
WB issued on 8 Aug
2014
1).LARAP
2). LARAP Mon
Report
1).NOL WB 19 Des
2014
2). Target of a MR on
Jun 2015
Satker PJN II
Province West
Sumatera
Appraisal of the af f ected asset is
under process
Not Yet Started
May -16
21.00
B
15
Sibolga - Bts.Tap Sel
Completed
Completed
Completed
UKL/UPL
OK Balai 1 2011. (No
need NOL WB f or
SPPL/UKL&UPL)
1).LARAP
2). LARAP Mon
Report
1).NOL WB: 5Feb
2014
2).Target a MR Apr
-Jun 2015
Satker PJN
Province
North
Sumatera
0%.
Compensation payment f or 43 f rom
total 1.448 PAP is complete (PMU
not yet receive the payment data
f rom Satker), and the remaining
PAP is under negotiation process
Contract
Aw arded
Oct-15
30.00
J
Seblat - Ipuh including
Air Lalang & Air Guntung Bridge
18
Mukomuko - Bts.Sumbar be changed
w ith Sibolga - Sorkam
UKL/UPL
OK TLKJ 2011. (No
need NOL WB f or
SPPL/UKL&UPL)
Social and Env
saf eguards
screening
Being prepared by
Consultant (Balai 1)
Satker PJN II
Provinsi
-
May -15
18.00
L
19
Lais - Bintunan
Completed
Completed
Completed
UKL/UPL
OK TLKJ 2011.(No
need NOL WB f or
SPPL/UKL&UPL)
1).LARAP
2). LARAP Mon
Report
1).NOL WB 20 Nov
2013
2). NOL WB_1: 23
Mar 2015.
Satker PJN
Province
Bengkulu
53%.
The project is completing payment
of compensation to the remaining
260 PAP.
Completed
Mar-15
10.00
A
20
Lubuk Alung - Sicincin
Completed
Completed
Completed
UKL/UPL
OK TLKJ 2011.(No
need NOL WB f or
SPPL/UKL&UPL)
1).LARAP
2). LARAP Mon
Report
1).NOL WB 19 Des
2014
2). Target of a MR on
Jun 2015
APBD Provinsi
2015/APBN
Socialization process
Not Yet Started
May -16
18.00
B
21
Lubuk Alung - Kurajati
Completed
Completed
Completed
UKL/UPL
OK TLKJ 2011. (No
need NOL WB f or
SPPL/UKL&UPL)
1).LARAP
2). LARAP Mon
Report
1).NOL WB 19 Des
2014
2). Target of a MR on
Jun 2015
APBD Provinsi
2015/APBN
Socialization process
Not Yet Started
May -16
18.00
B
Remarks :
A
On going Construction
=
3 Packages in 1 study AMDAL (West Sumatera Prov ince)
B
Bidding documents and DED draw ings completed
C
Technical Design Rev iew by CTC
=
2 Packages in 1 study AMDAL (Bengkulu Prov ince)
D
Under Rev iew by Directorate of Technical Affairs
E
Final Detailed Engineering Design by DSC
F
Under Rev iew by BALAI
G
Bid Ev alaution Reports (BER) completed by POKJA
H
World Bank rev iew for issuance of NOL
I
DED rev ision and OE completed
J
Form 384 issued by WB
K
Bid Ev aluation Report (BER) finalized by POKJA
L
Propose to be deleted
M
Contract aw arded. NTP still to be issued.
Group
Pack.
No.
Procurement
Status
AWP-1
1).LARAP
2). LARAP Mon
Report
1).NOL WB 13 Dec
12
2). NOL WB 19 Juli
2013, NOL_2 WB 12
Feb 2015
APBD Provinsi
West
Sumatera
90%.
Pending issues: Compensation f or
the remaining 3 PAP and 24 new
PAP being resolved by Local
Government
Completed
Jan-14
AWP-2
Remarks
Contract
Implementation Plan
Loan Package Name
2
Completed
Completed
Completed
SPPL&UKL/ UPL
Bridge
OK P2JN 2010 (No
need NOL WB f or
SPPL/UKL&UPL)
Environmental
Social
Land Acquisition
24.00
A
A
B
AWP-3
6,7%.
Monitoring Report of the payment
154 f rom total 2.269 PAP is under
submission to WB. Now ,
compensation payment to the
Completed
Sep-15
24.00
OK TLKJ 2011. NOL
WB issued on 20 Nov
2013
1).LARAP
2). LARAP Mon
Report
1).NOL WB: 16 Sep
2014
2). Target a MR in Jun
2015
16
Completed
Completed
17
Sp.Gunung Kemala - Pg.Tampak
Completed
Completed
21.00
May -16
Not Yet Started
The project is completing payment
of compensation to the remaining
184 PAP
Satker PJN
Province
Bengkulu
Satker PJN II
Province
Bengkulu
OK TLKJ 2014 . NOL
WB issued on 8 Aug
2014
Completed
AMDAL
Completed
AMDAL (No.1
&17)
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
5
1.2
Current Status of Loan
At the end of this quarter (September 2015) some USD 31.21 million of the USD 109.63
million forcasted expenditures representing 12.49% of the available loan had been
disbursed. Disbursement is considerably behind schedule by 30.86% of the forecast
expenditures, while 62.35% of the time has already elapsed with the main reason for
the delay being the long period waiting for the implementation of the remaining civil
works contracts and slow progress of the ten (10) on-going construction packages.
Total disbursements during this Quarter amounted to USD 7.524 million covering
the payments for "Statement of Work Accomplished' (MC) to civil works
Contractors of the on-going construction packages and replenishments of the
Special Account. Details of the Disbursements and Expenditures Status are
presented in
Appendix 1
.
A more detailed and updated status of the loan are fully described and presented in
the eleventh (11
th
) Quarterly Financial Report covering the 3
rd
Quarter (July, August,
September) of the Year 2015 which will be submitted separately.
1.3
Current Problems and Action Required
Program
Activity
Responsibility
AWP-1
4 Nos. Under construction stage.
Progress of works for three (3) of the four (4) packages
are way behind schedule with negative slippage ranging
from -24% to -43% with only limited contract time are left
to finish the huge percentage of remaining works.
Field Engineering for 3 packages are still to finalized.
Construction of Air Gadang Bridge have started.
Contractor
DSC and Civil Works Project
Manager
AWP-2 & AWP-3
6 Nos. Recently commenced. Field Engineering shall be started
immediately prior to starting works on the major items.
1 No. Contract Agreement already signed.
Notice To Proceed to commence the works still to
be issued to the Contractor.
4 Nos. Under procurement. BER completed by POKJA
4 Nos. Detailed Engineering Design drawings, Engineer s
Estimate and associated bidding documents are finalized.
2 Nos. To be deleted from the program.
Contractor and
DSC PPK and DSC
POKJA
Civil work Project Manager,
DSC, POKJA and CTC
PMU and MPW
Capacity Building for
Disaster Risks Reduction
Still to be procured
Sub-Directorate of
Environment & Road Safety
DTA- DGH
Capacity Building for
Environmental
Management
To be deleted
Capacity Building for
-2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
6
2
General
2.1
Reporting Requirements
Quarterly Progress Reports
:
This is the Seventh (7
th
) Quarterly Progress Report as
required and stipulated in CTC's consultancy contract and the Loan Agreement. Prior
to the production of this report, Monthly Progress Reports have been prepared and
have dealt with all aspects of the works. This report attempts to bring the situation up
to date by covering overall progress up to the end of third (3
rd
) Quarter of the Year
2015.
Financial Monitoring Reports
:
These have been prepared for each quarter since the
beginning of 2013 with the first Report, issued in May 2013, covering the period
January
March 2013. Since that date quarterly reports have been prepared and
submitted regularly.
Report
Period Covered
Date Issued
Financial Monitoring Report No. 1
January 2013
March 2013
15 May 2013
Financial Monitoring Report No. 2
April 2013
June 2013
15 August 2013
Financial Monitoring Report No. 3
July 2013
September 2013
15 November 2013
Financial Monitoring Report No. 4
October 2013
December 2013
15 February 2014
Financial Monitoring Report No. 5
January 2014
March 2014
15 May 2014
Financial Monitoring Report No. 6
April 2014
June 2014
15 August 2014
Financial Monitoring Report No. 7
July 2014
September 2014
15 November 2014
Financial Monitoring Report No. 8
October 2014
December 2014
7 April 2015
Financial Monitoring Report No. 9
January 2015
March 2015
31 August 2015
Financial Monitoring Report No. 10
April 2015
June 2015
2 October 2015
Financial Monitoring Report No. 11
July 2015
September 2015
Under Preparation
CTC Monthly Progress Reports
:
These report have been prepared covering each full
month since January 2013. Subsequent reports have been submitted on a regular
monthly basis.
Environmental Studies and Activity Reports
:
These report have been continuously
updated and submitted to PMU for submission to World Bank for Bank's issuance of No
Objection Letter (NOL).
Appendix S-1
shows the summary of submitted of Reports
covering each contract package since inception of the Project.
Social Impact Studies and Activity Reports
:
These report which mainly dealt with the
implementation of "Land Acquisition Resettlement Action Plan" (LARAP) have been
continuously submitted to PMU for submission to World Bank for Bank's issuance of
No Objection Letter (NOL). As presented in
Appendix S-2
indicates the updated
summary of all submitted Reports.
Anti-Corruption Action Plan (ACAP) : Community Development Activity Reports
:
These Reports have been prepared and continuously submitted to the Client.
Appendix S-3
shows the summary of submitted Reports from the very first (1
st
)
submittal up to latest report before the Quarter ended.
Community Representative Observers (CRO) Reports
:
These Reports were
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
7
2.2
Loan Status
[image:11.595.106.560.436.669.2]The agreed allocation of loan funds from the original loan agreement together with the %
disbursed to the end of the quarter date (September 30, 2015) is presented in
Table 3
Table 3
Category
Description
Loan Restructuring
Amount US$
Total Disbursement
for the 3
rd
Quarter of
2015
Previous
Disbursement
Total Disbursed by
WB to End
September 30, 2015
in US$
% Disbursed
Part 1
Betterment and Capacity
Expansion of National Roads.
220,400,000.00
6,142,681.53
20,786,692.52
26,929,374.05
12.22
2
Part 2
Implementation Support
16,000,000.00
1,380,000.00
2,904,880.83
4,284,880.83
26.78
3
Part 3
Road Sector Institutional
Development
1,000,000.00
0,00
0
0
0
Part 4
Contingency for Disaster Risk
Response
0
0
0
0
Unallocated
12,600,000.00
0,00
0
0
0
Original Loan
Amount
250,000,000.00
7,522,681.53
23,691,573.35
31,214,254.88
12.49
2.3
Financial Management
S-Curve for Financial Progress
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
8
2.4
Project Cost Monitoring
A detailed summary of the project cost monitoring in tabular format is presented as
Appendix 3
at the end of this report.
2.5
World Bank Implementation Review Mission and Site Visit
During the period (3
rd
Quarter 2015), there was no mid-term review mission and site visit.
However, the regular monthly meetings were held in each month to review
implementation progress and monitoring the key activities on the Agreed Key Action
Plan .
An "Agreed Key Action Plans" for progress compliance monitoring of the status of the
works on weekly, bi-monthly and monthly intervals is shown in
Table 4
.
Table 4 Agreed Key Action and Plans
Status as of end of 3
rd
Quarter (September 2015)
No.
Action
By Whom
Updated Status
Current Target Dates
1.
Carry out workshop on HIV-
AIDS for packages 1, 2, 3 and
4
PMU/CTC
/DSC
•
End of July, 2015
1 month after NOL to DSC contract
amendment since it envisages a new
environmental specialist
2.
Submit to the Bank the LARAP
monitoring reports for:
•
Package 2
•
Package 3
•
package 11
•
package 16
•
package 5
•
Package 17
•
Package 13
PMU
•
End of July 2015
•
Need decision on slope design
(decision by end of Sep 2015)
•
End of Sep 2015
•
End of Sep 2015
•
End of Sep 2015
•
End of Oct 2015
•
Sep 14, 2015
•
End of Sep 2015
3.
Submit to the Bank progress
report in terms of LARAP
implementation for packages
6, 7, 8, 10, 11, 12, 14, 15, 16,
19, 20, 21
PMU
•
Every second
Monday
•
Ongoing, Every second Monday
4.
Special meeting to monitor
the LARAP implementation
progress
PMU and
WB
•
Third week of Sep 2015
5.
Bidding process on disaster
management
•
Send to Bank the revised
ToR
•
Re-announce the RFP
PMU and
CTC
•
End of July 2015
•
Second week of
August 2015
[image:12.595.66.567.315.781.2]2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
9
No.
Action
By Whom
Updated Status
Current Target Dates
6.
Send copy of signed contract
of package 15 to the Bank
PMU
•
End of July 2015
•
Done
7.
Send BER for packages 7, 8,
10 and 12 to the Bank for
prior review (all ICB and NCB
over US$10 million)
PMU
•
End of August 2015
•
End of Sep 2015
8.
Procurement training for
Pokja/s of package 7,8,10,12
Bank and
PMU
•
July 13, 2015
•
Done
9.
•
Send the engineering
designs for packages 16,
20 and 21 to the Bank
•
Send informally the
engineering designs for
packages 16, 20 and 21
to the Bank
PMU
•
End of July 2015
(#16, #20, #21)
•
End of July 2015
(#14)
•
Done
10.
•
Send bidding document
Packages 20, 21
•
Send bidding document
Packages 14, 16
PMU
•
14 Sep 2015
•
End of Sep 2015
11.
Package 1 (all permits have
now been received): Respond
to the letter of the Bank
regarding contract
modification 1 with respect to
the stone masonry
calculations and the capacity
of the reduced U Ditches
PMU
•
Mid of July 2015
•
14 Sep 2015
12.
Package 2: Accelerate the
processing of the necessary
contact modification, which
needs to cover all accesses to
property and any time
extension and send it to the
Bank if it is above 15%
PMU
•
Mid of July 2015
•
Need decision on slope design to
finalize the contract modification
request (decision by end of Sep 2015)
13.
Package 3: Send draft
amendment for package 3
(19%) for prior Bank
no-objection, which needs to
cover all accesses to property
and DSC needs to push
contractor to submit soft
drawing of cross section to
propose variation order
PMU
•
End of July 2015
•
Need decision on slope design to
finalize the contract modification
request (decision by end of Sep 2015)
14.
Report back to the Bank on
how DGH has implemented
the recommendations of the
auditors in the auditing report
of the 2012 and 2013
financial statements (partial
response at least while
waiting for feedback from the
Balai)
PMU
•
Mid of July 2015
•
Sending partial report by 11 Sep 2015
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
10
No.
Action
By Whom
Updated Status
Current Target Dates
15.
Report back to the Bank on
how DGH has implemented
the recommendations of the
auditors in the auditing report
of the 2014 financial
statements (partial response
at least while waiting for
feedback from the Balai)
PMU
•
Sending partial report (P1, P2, P3) by
11 Sep 2015
•
Sending full report by end of Oct 2015
16.
Send to the Bank a request
for modification of the
contract with CTC
PMU
•
End of July 2015
•
Mid of Sep 2015 (revised version of
request)
•
By Sep 8, 2015 clarify with the DSC PPK
and send to the Bank a response to the
questions raised in July
17.
Regularly submit the
quarterly progress reports to
the Bank (INCLUDE DETAILED
INFORMATION ON THE
IMPLEMENTATION OF THE
RKPPLs)
PMU
•
July 2015
•
Done, send next one in October 2015
18.
Send restructuring request to
the Bank
Ministry
of Finance
•
End of September
2015
•
End of Nov 2015
•
PMU will send the draft request to
Bank by the end of Sep 2015
19.
Send the response to the
Bank on the TFAC reports for
packages 2 and 3 and the
supervision mission reports
for package 1 and 4
(Response in format similar to
EINRIP project)
PMU
•
Mid of July 2015
•
Sep 21, 2015
20.
Send to Bank monthly
supervision reports for
packages with problematic
issues
PMU
•
End of July 2015
•
Request PPK to send DSC monthly
supervision reports to PMU (including
a section with issues on the ground,
which require attention) by mid of Sep
2015 and subsequently sent to Bank
21.
Report to the Bank on the
decisions of the meeting on
the steps to take for
packages 1, 2, 3, 4 and 19
PMU
•
Sep 21, 2015
22.
Organize formal supervision
mission for the project with
Bappenas/MoF
Bank/
PMU
•
Mid-October 2015
2.6
Project Steering Committee Meeting
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
11
3
Project Management and Implementation
3.1
Procurement Status
(A) Civil Works
Civil Works are now being implemented in Annual Work Programs (AWP) which have
been numbered AWP-1, AWP-2, and AWP-3.
All Contract Agreements for the four (4) AWP-1 contract packages were signed by the
end of 2013 with actual work commencement on January 2014.
[image:15.595.137.536.392.785.2]Under the two (2) implementation programs, AWP-2 and AWP-3, seven (7) packages
were already procured with six (6) packages already on-going construction, four (4)
packages on tendering stage with Bid Evaluation Reports (BER) completed and four (4)
sub-projests with completed Detailed Engineering Design (DED) drawings and associated
bid documents.
Table 5
Shows the actual pre-construction and procurement status under the
implementation schedules AWP-2 and AWP-3
Table 5
Package
No.
Package Name
Status
AWP-2
5
Sp. Rampa - Poriaha
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on June 18, 2015
6
Ps. Pedati - Kerkap
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on March 11, 2015
7
Indrapura
Tapan
Under tendering period. Bids opened on August
13, 2015.
8
Bts. Pariaman
Manggopoh
Under tendering period. Bids opened on August
13, 2015.
10
Sp. Empat
Sp. Air Balam
Under tendering period. Bids opened on August
13, 2015.
11
Bantal - Mukomuko
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on February 23,
2015
12
Kambang
Indrapura
Under tendering period. Bids opened on August
13, 2015.
13
Sp. Rukis
Tj. Kemuning
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
12
Package
No.
Package Name
Status
AWP-3
14
Painan
Kambang
DED drawings and associated bid documents are
completed and finalized. Owner s Estimates
under final review by Bina Marga.
15
Sibolga
Bts. Tapsel
Contract signed on July 13, 2015. World Bank
issued on September 2, 2015 from 384 for
disbursement purpose.
16
Seblat - Ipuh
DED drawings and associated bid documents are
completed and finalized. Owner s Estimates
under final review by Bina Marga.
17
Sp.Gn.Kemala
Pg. Tampak
Procured Under construction since the issuance
of Notice To proceed on September 4, 2015.
19
Lais
Bintunan
Procured. Under construction since the issuance
of Notice To Proceed (NTP) on March 11, 2015
20
Lubuk Alung
Sicincin
DED drawings and associated bid documents are
completed and finalized. Owner s Estimates
under final review by Bina Marga.
21
Lubuk Alung - Kuraitaji
DED drawings and associated bid documents are
completed and finalized. Owner s Estimates
under final review by Bina Marga.
Note : Packages No.9 and No.18 are proposed to be deleted from the program.
Presented in
Appendix 4
is the current status of procurement management.
(B) Services
The Core Team (CTC), Design & Supervision Consultant (DSC), and the others Capacity
Building Consultancy status are discussed in Section 3.4.
3.2
Implementation Status
Civil Works
AWP-1 Packages
All four (4) contract packages scheduled under AWP-1 are currently under construction by
different Contractors. Commencement of Works for all the four (4) packages commenced
on the 2
nd
week January 2014.
At the end of this reporting quarter of September 2015, all the four (4) contract packages
being implemented under the AWP-1 were still lagging farther behind schedule. The
situation remains the same as in the previous months with no sign in sight to attain
substantial progresses to catch-up with the target dates of contract completion.
As time is fast approaching toward the contract completion dates, it is doubtful that three
(3) of the four (4) contract packages can be completed on the target dates of completion
due to huge percentage of unfinished works.
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
13
construction of Air Gadang Bridge which contributed greatly to the work delays in the
previous months is now on-going construction since June 2015.
AWP-2 Packages
Four (4) contract packages are now under construction and one (1) package still to be
issued Notice To Proceed.
Aside from the on-going mobilization, Contractors started Earthworks and Routine
Maintenance of the existing roads. Although, all 4 packages are behind schedule, the
slippages are still on tolerable limits with respect to progress recovery in the coming
months.
AWP-3 Packages
Two
(2) sub-project under this implementation program
are now on-going
implementation.
[image:17.595.49.584.373.771.2]The Contractor of the newly started package is in the process of mobilization, while the
other sub-project is far behind schedule with limited time left prior to target date of
completion.
Table 6
Presents the current work implementation and status of packages with
signed contracts and progress of the on-going construction packages.
Table 6
Program
Contract
Package
#
Contractor
Name of
Road
Target
Progress
Schedule
Ending
Septemb
er 2015
Actual
Progress
Accomplish
ed
Slippage
Contract
Time (Cal.
Days)
Commence
ment of
Works
Target Date of
completion
Time
Elapsed
(Cal. Days)
Remaining
Time
AWP-1
1
PT. Jaya
Konstruksi
Biha - Krui
94.42%
65.00%
-23.43%
640
Jan, 8, 2014
Oct, 9, 2015
625
14 CD
2
PT. Jaya
Konstruksi
Padang
Sawah
Sp.Empat
incl.Air
Gadang
Brd
87.07%
77.80%
-9.27%
730
Jan, 6, 2014
Jan, 5, 2016
627
102 CD
3
PT. Jaya
Konstruksi
Manggop
o h
Padang
Sawah
89.96%
65.63%
-24.33%
730
Jan, 6, 2014
Jan, 5, 2016
627
102 CD
4
PT. Waskita
Karya and
PT. Mulya
Turangga
(JO)
Ipuh Bantal
91.86%
48.52%
-43.34%
730
Jan, 10,
2014
Jan, 9, 2016
623
109 CD
AWP-2
5
PT. Nusa
Konstruksi
Enjiniring
Tbk.
Sp. Rampa
- Poriaha
8.90%
1.69%
-7.20%
540
Jun 18,
2015
Dec 8, 2016
99
440 CD
6
PT. Waskita
Karya
Ps. Pedati
-Kerkap
14.27%
10.03%
-4.24%
450
Mar 11,
2015
June 2, 2016
198
251 CD
11
PT. Hutama
Karya / PT.
Daya Mulya
(JO)
Bantal
-Mukomuko
18.72%
15.09%
-3.64%
720
Feb 23,
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
14
Program
Contract
Package
#
Contractor
Name of
Road
Target
Progress
Schedule
Ending
Septemb
er 2015
Actual
Progress
Accomplish
ed
Slippage
Contract
Time (Cal.
Days)
Commence
ment of
Works
Target Date of
completion
Time
Elapsed
(Cal. Days)
Remaining
Time
13
PT. Waskita
Karya
Sp. Rukis
Tj.
Kemuning
1.60%
0.88%
-0.72%
720
July 22,
2015
July 10, 2017
65
653 CD
AWP-3
15
PT.
Pembangunan
Perumahan
Sibolga
Bts. Tapsel
No Data
No Data
No Data
810
Still to be
issued
Still to be
determined
-
-17
PT. Jaya
Konstruksi
Sp. Gunung
Kemala
Pugung
Tampak
No Data
No Data
No Data
720
Sep. 4.
2015
Aug. 23. 2017
23
693 CD
19
PT.
Rodatekindo
Purajaya
Lais
-Bintunan
76.91%
28.90%
-48.02%
300
Feb 27,
2015
Jan 4, 2016
198
101 CD
At the end of this reporting quarter ending
September 2015
, all the four (4) contract
packages being implemented under the AWP-1 were still lagging farther behind schedule.
The situation remains the same as in the previous months with no sign in sight to attain
substantial progresses to catch-up with the target dates of contract completion.
As time is fast approaching toward the contract completion dates, it is doubtful that three
(3) of the four (4) contract packages can be completed on the target dates of completion
due to huge percentage of unfinished works.
It is only Contract PackageNo.2 that all the works can still be completed on time as the
construction of Air Gadang Bridge which contributed greatly to the work delays in the
previous months is now on-going construction since June 2015.
For the five (5) newly started contracts being implemented under AWP-2 and AWP-3 the
Contractors are still concentrated on their mobilization. Roadwork items such as
earthworks, drainage and structures have been started. While one (1) sub-project (Package
19) under AWP-3, the work progress is lagging far behind with only limited time left before
the completion date.
Package No. 1 : Biha
Krui
As expected due to the remaining huge percentage of works left unfinished during the last
few months, the Contractor will surely fail to meet the target date of completion on
October 9, 2015.
At the end of this quarter (September 2015) based on the proposed revised S-Curve
Schedule , the overall actual physical work progress is only 65.00% against the scheduled
progress of 94.42% and as the contract time is about to be exhausted in a week time, 35%
of the works remain to be completed.
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
15
In anticipation that the completion date could not be met, the Contractor formally
submitted on August 20, 2015 a Claim for Time Extension for an additional contract time
of 180 working days.
However, based on the quantification and evaluation by the Engineer Design Supervision
Consultant (DSC), the justified time extension that could be granted is 123 calendar days,
but still subject for approval by DGH.
Pending approval by the authorities of the extended time, the new tentative date of
completion will be on January 30, 2016 reckoned from the original target date of
completion on October 9, 2015.
A more detailed status of this Package is presented in
ANNEX P-I Executive Summary
Report.
Package No. 2 : Padang Sawah
Sp. Empat (Including Air Gadang Bridge)
As of end of this quarter the total overall work progress is
77.80%
against the revised
scheduled progress of
87.07%
and based on the revised schedule, there are still 22%
remaining works which are to be completed within the remaining three (3) months of the
contract time.
The remaining works are still manageable within the remaining contract time and at the
rate the Contractor executes the works and barring no major problem will arise during the
remaining contract time, most likely the Project could be completed within the contract
period on January 5, 2015.
With regard to the construction of Air Gadang Bridge, 69% of the total pile length has been
driven and all the 20 pre-cast girders required has been casted and ready to be transported
from Medan casting yard to the bridge site.
ANNEX P-2 Executive Summary Report
present a more detailed status of the Contract
Package.
Package No. 3 : Manggopoh
Padang Sawah
Based on the revised work schedule, the current overall work progress of only
65.63%
against scheduled progress of
89.96%
since the works commenced 21 months ago is of
much concern due to the very limited remaining contract time of only 3 months,
As of end of this period, the remaining contract time is only 102 calendar days with still
34% of the works to be completed.
For the Contractor to deliver the completion of the contract package on the target date of
completion on January 5, 2016, a per month progress of minimum 11.30% shall be
attained until the end of the contract time.
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
16
A more detailed status of the project progress are shown in
ANNEX P-3 Executive
Summary Report
.
Package No. 4 : Ipuh
Bantal
The current status of this contract package still remain in critical situation with respect to
completion date on January 9, 2016.
During this period ending on the month of September 2015, only 2.24% progress has been
attained and actual overall progress as of month s end is 48.52%.
As the contract time of only 3 months with still 51.50% remaining works to be done, it
seems the target date of completion on January 9, 2016 cannot be met.
In order for the contractor to complete the project on time at the target date of
completion, an average of at least 17% progress per month for the last 3 remaining
months have to be attained.
Based on the Contractor s performance during the last 21 months of the current contract,
attaining only an average of less than 3% per month, the possibility of completing the
remaining works in 3 month is next to impossible.
Shown in
ANNEX P-4 Executive Summary Report
showing the details and status of the
project.
Package No. 5 : Sp. Rampa
Poriaha
To date, since the commencement of works started three (3) and half months ago, the
actual physical work progress is 1,69% against scheduled work progress of 8.90%. The
delayed works further slid down from -2.80% last month to -7.20% at the end of this
month.
The problem that hampered the slow progress of the works is the unexpected ROW
problems that were overlooked during the pre-construction stage, wherein some
improvements such as trees and other obstructions exist along the alignment.
ANNEX P-5 Executive Summary Report
shows the Contractor s Progress Schedule.
Package No. 6 : Kerkap
Ps. Pedati
Actual overall physical work accomplished as of this reporting period is 10.03% out of
14.27% schedule or -4.24% negative slippage. Works during the quarter were mainly on
the Earthworks, Structures, Granular Pavement and Routine Maintenance Work items.
During the period, the Contractor was able to picked up some last grounds from slow
progress the previous months as 7.76% progress was attained leading to reducing the
slippage from -5.90% last month to -4.24% this month.
ANNEX P-6 Executive Summary Report
shows the complete details of the contract
package.
Package No. 11 : Bantal - Mukomuko
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
17
against 18.72% schedule.
In contrast to previous months wherein the progress was still on-schedule, this end of the
quarter the actual work progress is still -3.64% behind schedule.
For more details of the Contract Package, refer to
ANNEX P-11
Executive Summary
Report .
Package No. 13 : Sp. Rukis
Tj. Kemuning
This sub-project is still in the early stage of construction. Actual work progress is only
0.88% and slightly behind schedule by -0.72%..
The works done during the quarter were mobilization, earthwork and granular pavement.
Details of the work progress are shown in
ANNEX P-13 Executive Summary Reports.
Package No. 17 : Sp. Gunung Kemal
Pg. Tampak
Notice To Proceed (NTP) just recently issued on September 4, 2015. During the
preparation of this Report, there was no information or progress schedule data submitted
by Design Supervision Consultant (DSC). Pre-construction meeting was held on September
17, 2015 in BALAI 3, Palembang and followed by 2nd meeting on September 28, 2015 in
Lampung.
Package No. 19 : Lais
Bintunan
To date , based on revised schedule and corrections of progress figures in previous
months, the cumulative work accomplished is 28.90%, out of the 76.91% scheduled at
end of the quarter.
Failure of the Contractor to work on other major works, the progress schedule incurred
significant delay as the slippage further slid down to an alarming situation at -48.02%
behind schedule at end of this period.
The current slow progress of works has reached an alarming level considering the short
implementation period of only 300 calendar days wherein only 101 calendar days
remaining of the Contract time with 52% of the works are still to be done.
Unless the Contractor commits seriously to implement the remaining works within a
realistic action plan and catch-up schedule, the target date of completion by January 4,
2016 will not be realized.
A high level management meeting with the Contractor and other related government
agencies who are directly involve in the implementation is highly recommended in order
to resolve all the problems and issue that are hampering the work progress.
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
18
3.3
Variation Order Details
Variation Order No.1 (Amendment 1) is the amendment to the Contract Agreements (Part
A
Contract Data) while Variation Order No.2 covers the results of the Field
Engineering , specially quantity overruns/underuns and minor design revisions.
"Field Engineering" results of the three (3) other on-going construction contract packages
(Packages 2,3 and 4) under AWP-1 are about to be approved soon and it is anticipated
that there will be cost increase or additive cost variations.
In anticipation of future claims for varied works by the Contractors, a revised costs of
additional 5% to the Estimated Cost for each contract package was prepared and
submitted to PMU to cover any Variation Orders that may arise during the
implementation of the Works.
[image:22.595.43.576.336.631.2]Presented in
Table 7
are details of Variation Orders for the four (4) sub-projects under
AWP-1.
Table 7
Details of Variation Orders
Package
No.
Variation
Order
No.
Original
Contract
Amount (Rp)
Contract Amount Variation
Revised
Contract
Amount (Rp)
Variance
Approved
Time
Extension
(Cal.
Days)
Reason
For
Variation
Additive (+)
(Rp)
Deductive
(-) (Rp)
1
1
134,909,211,000
-
-
134,909,211,000
0
A
2
19,163,804,000
-
154,073,015,000
+14.20%
0
B
3
-
-
154,073,015,000
123
C
2
1
197,936,699,000
-
-
197,936,699,009
0
A
2
27,710,501,000
*
-226,713,217,000
*
+14.00%
0
B
3
1
143,688,963,000
-
-
143,688,963,000
0
A
2
21,468,809,000
*
165,157,772,000
*
+14.94%
0
B
4
1
186,936,750,000
-
-
186,936,750,000
0
A
2
9,501,334,000
*
196,438,084,000
+5.08%
0
B
Reason For Variation :
A
Amendment to Contract Agreement (Part A
Contract Data), change of Engineer s name from V. Thiagarajah to Johnson V.
Villar as replacement Team Leader of the Construction Supervision Consultant.
B
Contract Amendment with respect to revised contract amount due to Field Engineering results, quantity overruns/underuns
and variations in design relative to the actual site conditions.
C
Time extension subject for approval by DGH.
Note :
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
19
3.4
Consultancy Services
Technical Assistance for Core Team Consultant (CTC) to Support the Project
Management Unit.
Lead Consultant: PT. Perentjana Djaja
CTC Contract No. 06-20/CTC/TA/LN/8043/1112 was signed on 5 Nov 2012 between
the Ministry of Public Works , Directorate of Planning, DGH and
PT. Perentjana
Djaja, Yongma Engineering Co. Ltd, PT. Epadascon Permata Engineering Consultant, JV
and the work commenced on 12 November 2012.
Amendment No.1 to this contract dated 25 October 2013 was signed to accommodate
the increase in staffing requirements with the following increase in cost.
[image:23.595.135.551.381.584.2]Amendment No. 2 is officially approved. Proposed amendment to the Original Contract
and Amendment No. 1 are additional man-months for professional and technical staff
for international and local, replacement of foreign and local consultants and
modification to various reimbursables to match with the actual requirements.
Presented in
Table 8
is the current status of CTC contract.
Table 8
Description
USD
IDR
Original Contract including 10% VAT
1,404,370
23,556,940,000
Amendment No.1 including 10% VAT
1,447,517
24,668,792,500
Variance Against Original Contract
+3,07%
+4,72%
Combine Variance Against Original Contract
+4.12%
Amendment No. 2 including 10% VAT
1,509,117
24,704,544,150
Variance Against Original Contract
+7,46%
+4,87%
Combine Variance Against Original Contract
+5.81%
Amendment No.3 including 10% VAT
*1,509,117
*29,072,948,058
Variance Against Original Contract
*+7.46%
*+23.41%
Combine Variance Against Original Contract
*+17.62%
Note :
1)
Draft Final Amendment No.3 is still subject to approval by DGH with World Bank
concurrence and issuance of No Objection Letter (NOL)
2)
Figures with asterisk (*) are tentative pending approval of Amendment No.3
3)
Combine variance (USD+IDR) is based on 1 USD = Rp. 9,558 exchange rate used during
the time of signing the original Contract Agreement.
Technical Assistance for Design & Supervision Consultant (DSC)
Lead Consultant: Renardet S.A
2015 Quarterly Progress Report
3
rd
Quarter : July-August-September
Western I ndonesia National Roads I mprovement Project
20
[image:24.595.134.552.123.197.2]Seecons and PT. Yodya Karya (Persero) Joint Venture and mobilized on 19 June 2013.
Table 9
shows the current status of DSC contract.
Table 9
Description
USD
IDR
Original Contract plus 10% VAT
902.660
57,000,575,500
Addendum No.1 plus 10% VAT
868.340
62,436,542,901
Variance Against Original Contract
*-3.80%
*+9.54%
Note :
1) Draft Addendum No.1 is still subject to approval by DGH with World Bank concurrence and
issuance of No Objection Letter (NOL).
2) Figures with asterisk (*) are tentative pending approval of Addendum No.1
Technical Assistance for Capacity Building for Disaster Risks Reduction
Lead Consultant
: Under procurement.
Still under discussion whether to push thru with the procurement or to reallocate the
budget to other categories of the loan agreement.
Technical Assistance for Capacity Building for Environmental Management
Lead Consultant
:
To be deleted.
Technical Assistance for Capacity Building for Road Safety
Lead Consultant
:
To be deleted.
Procurement Plan for consulting services is presented in
Appendix 5.
3.5
Implementation of the Anti-Corruption Ac t ion Plan
Community Representative Officers (CRO)
During the 3
rd
quarter of the year 2015 (July
August
September), there was no
schedule for CRO selection.
To date or as of end of this 3
rd
Quarter of the Year 2015, the total number of appointed
CRO's remain at thirty (30) individuals. All these thirty (30) CRO's discharged their duties
as independent observers for fifteen (15) Contract Packages during the procurement
activities.