• Tidak ada hasil yang ditemukan

JADWAL UJIAN AKHIR SEMESTER GENAP TAHUN AKADEMIK 2014/2015 PROGRAM STUDI S 1 MANAJEMEN

N/A
N/A
Protected

Academic year: 2021

Membagikan "JADWAL UJIAN AKHIR SEMESTER GENAP TAHUN AKADEMIK 2014/2015 PROGRAM STUDI S 1 MANAJEMEN"

Copied!
15
0
0

Teks penuh

(1)

HARI/TANGGAL : SENIN, 8 JUNI 2015

08.30-10.30 PENGANTAR BISNIS AX 17 B.0601

BX 28 B.0604

11.00-13.00 LAB PENGANTAR AKUNTANSI II AX 44 B.0605 B.0606

BX 53 B.0607

B.0606

CX 46 C.0601

C.0603

DX 54 C.0604

C.0603

EX 47 C.0605

C.0606

FX 54 C.0607

C.0606

GX 44 B.0601

B.0603

HX 53 C.0503

C.0504

IX 31 C.0501

JX 45 B.0604

B.0603

13.30-15.30 MANAJEMEN PEMASARAN AX 59 B.0601

B.0604

BX 56 C.0606

C.0607

CX 60 B.0501

B.0503

DX 56 C.0604

C.0603

EX 50 B.0607

B.0606

FX 48 C.0605

C.0606

GX 48 C.0601

C.0603

HX 58 B.0605

B.0606 JADWAL UJIAN AKHIR SEMESTER GENAP TAHUN AKADEMIK 2014/2015

PROGRAM STUDI S 1 MANAJEMEN

WAKTU MATA KULIAH KLS JML RUANG

(2)

13.30-15.30 MANAJEMEN USAHA ECERAN AX 32 B.0506

BX 28 B.0507

13.30-15.30 MANAJEMEN KEUANGAN INTERNASIONAL AX 42 B.0505 B.0504 13.30-15.30 MANAJEMEN PEMASARAN INTERNASIONAL AX 18 B.0504

16.00-18.00 PENGANTAR AKUNTANSI II AX 44 B.0605

B.0606

BX 53 B.0607

B.0606

CX 46 C.0601

C.0603

DX 54 C.0604

C.0603

EX 47 C.0605

C.0606

FX 54 C.0607

C.0606

GX 44 B.0601

B.0603

HX 53 C.0503

C.0504

IX 31 C.0501

JX 45 B.0604

B.0603

16.00-18.00 MANAJEMEN MUTU AX 52 B.0505

B.0506

BX 20 B.0501

CX 63 C.0506

C.0507

DX 48 B.0507

B.0506

EX 12 B.0501

HARI/TANGGAL : SELASA, 9 JUNI 2015

08.30-10.30 LAB. STATISTIK I AX 45 B.0601

B.0604

BX 41 B.0603

WAKTU MATA KULIAH KLS JML RUANG

(3)

B.0604

CX 17 B.0604

11.00-13.00 PENGANTAR MANAJEMEN AX 9 B.0603

BX 13 B.0603

11.00-13.00 MANAJEMEN PEMASARAN JASA AX 34 B.0501

11.00-13.00 TEORI EKONOMI I AX 52 B.0605

B.0606

BX 51 C.0605

C.0606

CX 18 B.0601

DX 43 C.0607

C.0606

EX 29 B.0604

FX 48 B.0607

B.0606

GX 56 C.0603

C.0604

HX 26 C.0601

IX 17 B.0601

13.30-15.30 STATISTIK I AX 45 B.0601

B.0604

BX 41 B.0603

B.0604

CX 17 B.0604

13.30-15.30 SISTEM INFORMASI MANAJEMEN AX 53 C.0601 C.0603

BX 42 C.0603

C.0604

CX 34 B.0606

DX 10 B.0607

EX 46 C.0605

C.0606

FX 47 C.0607

C.0606

GX 29 B.0605

HX 7 B.0605

IX 24 B.0607

(4)

16.00-18.00 SEMINAR KEWIRAUSAHAAN AX 41 B.0601 B.0604

BX 22 B.0604

16.00-18.00 SEMINAR MANAJEMEN SDM AX 27 B.0606

16.00-18.00 SEMINAR MANAJEMEN KEUANGAN AX 12 B.0605

BX 26 B.0605

16.00-18.00 SEMINAR MANAJEMEN PEMASARAN AX 18 B.0607

BX 5 B.0606

CX 18 B.0607

HARI/TANGGAL : RABU, 10 JUNI 2015

08.30-10.30 LAB. AKUNTANSI BIAYA AX 23 C.0601

BX 33 C.0603

CX 22 C.0606

DX 45 C.0605

C.0606

EX 27 C.0604

08.30-10.30 PENCIPTAAN USAHA BARU AX 48 C.0607

B.0607

BX 52 B.0607

B.0606

CX 49 B.0601

B.0604

DX 9 B.0604

EX 38 B.0605

11.00-13.00 STUDI KELAYAKAN BISNIS AX 57 B.0601

B.0604

BX 64 B.0606

B.0607

CX 42 C.0601

C.0603

DX 18 B.0605

WAKTU MATA KULIAH KLS JML RUANG

(5)

EX 17 B.0605

FX 41 C.0605

C.0606

GX 57 C.0607

C.0606

HX 30 C.0501

IX 53 C.0604

C.0603

13.30-15.30 AKUNTANSI BIAYA AX 23 C.0601

BX 33 C.0603

CX 22 C.0606

DX 45 C.0605

C.0606

EX 27 C.0604

16.00-18.00 KOMUNIKASI BISNIS AX 50 C.0601

C.0603

BX 51 C.0605

C.0606

CX 41 C.0607

C.0606

DX 8 C.0601

16.00-18.00 PENGANTAR APLIKASI KOMPUTER AX 14 C.0604

16.00-18.00 MANAJEMEN SDM INTERNASIONAL AX 28 B.0605

BX 10 C.0604

HARI/TANGGAL : KAMIS, 11 JUNI 2015

08.30-10.30 LAB. MANAJEMEN KEU. LANJUTAN AX 41 B.0606 B.0607

BX 21 B.0607

08.30-10.30 MANAJEMEN KOMPENSASI AX 52 B.0601

B.0604

08.30-10.30 EKONOMI MANAJERIAL AX 23 B.0603

BX 56 C.0607

WAKTU MATA KULIAH KLS JML RUANG

(6)

C.0606

CX 52 C.0603

C.0604

DX 48 C.0605

C.0606

EX 49 C.0601

C.0603

FX 36 B.0605

GX 10 B.0603

11.00-13.00 LAB. MANAJEMEN KEUANGAN AX 55 C.0601

C.0603

BX 56 C.0605

C.0606

CX 50 C.0607

C.0606

DX 53 C.0501

C.0503

EX 54 C.0504

C.0503

FX 51 C.0604

C.0603

GX 49 B.0605

B.0606

HX 62 B.0607

B.0606

13.30-15.30 MANAJEMEN KEUANGAN LANJUTAN AX 41 B.0606 B.0607

BX 21 B.0607

13.30-15.30 PENGANTAR EKONOMI MAKRO AX 56 B.0601

B.0604

BX 45 C.0601

C.0603

CX 51 C.0604

C.0603

DX 55 C.0605

C.0606

EX 50 C.0501

C.0503

FX 52 C.0504

C.0503

GX 38 B.0605

HX 37 C.0607

(7)

C.0606

IX 54 C.0505

C.0506

JX 37 C.0507

C.0506

16.00-18.00 MANAJEMEN KEUANGAN AX 55 C.0601

C.0603

BX 56 C.0605

C.0606

CX 50 C.0607

C.0606

DX 53 C.0501

C.0503

EX 54 C.0504

C.0503

FX 51 C.0604

C.0603

GX 49 B.0605

B.0606

HX 62 B.0607

B.0606

16.00-18.00 MANAJEMEN DISTRIBUSI AX 50 C.0505

B.0603

BX 20 B.0603

HARI/TANGGAL : JUM'AT, 12 JUNI 2015

08.30-10.30 LAB. PENGANTAR AKUNTANSI I AX 33 B.0605

BX 7 B.0605

08.30-10.30 ANALISIS JABATAN DAN PEKERJAAN AX 24 B.0604

08.30-10.30 EKONOMI KOPERASI AX 48 C.0601

C.0603

BX 51 C.0605

C.0606

CX 51 C.0607

C.0606

DX 19 C.0603

WAKTU MATA KULIAH KLS JML RUANG

(8)

13.30-15.30 BISNIS INTERNASIONAL AX 51 B.0606 B.0607

BX 53 B.0601

B.0604

CX 18 B.0607

13.30-15.30 SOSIOLOGI DAN POLITIK AX 58 C.0601

C.0603

BX 50 C.0605

C.0606

CX 48 C.0607

C.0606

EX 28 C.0604

13.30-15.30 PENGANTAR AKUNTANSI I AX 33 B.0605

BX 7 B.0605

16.00-18.00 MANAJEMEN SUMBER DAYA MANUSIA AX 45 C.0601 C.0603

BX 51 C.0605

C.0606

CX 29 B.0605

DX 39 C.0607

C.0606

EX 52 C.0603

C.0604

FX 25 B.0601

GX 50 B.0606

B.0607

HARI/TANGGAL : SENIN, 15 JUNI 2015

08.30-10.30 MANAJEMEN PRODUK DAN HARGA AX 50 B.0606 B.0607

08.30-10.30 MANAJEMEN PENGADAAN SDM AX 41 B,0601

B.0604

BX 38 B.0603

B.0604

WAKTU MATA KULIAH KLS JML RUANG

(9)

08.30-10.30 MJN PELATIHAN DAN PENGEMBANGAN AX 33 C.0601

08.30-10.30 LAB MANAJEMEN INVESTASI AX 40 B.0605

BX 23 B.0604

11.00-13.00 TEORI EKONOMI II AX 22 B.0604

BX 56 B.0605

B.0606

CX 51 B.0606

B.0607

11.00-13.00 PEREKONOMIAN INDONESIA AX 51 C.0607

C.0606

BX 53 C.0606

C.0605

13.30-15.30 MANAJEMEN INVESTASI AX 40 B.0505

BX 23 B.0506

13.30-15.30 AKUNTANSI MANAJEMEN AX 53 B.0605

B.0606

BX 44 B.0601

B.0604

CX 45 B.0607

B.0606

DX 56 C.0601

C.0603

EX 48 C.0605

C.0606

FX 48 C.0607

C.0606

GX 28 B.0504

HX 38 C.0604

C.0603

IX 19 B.0604

16.00-18.00 PERPAJAKAN AX 33 B.0601

BX 38 B.0605

CX 21 B.0604

DX 27 B.0606

16.00-18.00 PENGETAHUAN PASAR MODAL AX 11 C.0606

BX 6 C.0606

(10)

CX 6 C.0606

DX 7 C.0607

EX 22 C.0607

HARI/TANGGAL : SELASA, 16 JUNI 2015

08.30-10.30 BAHASA INGGRIS AX 14 B.0605

BX 25 B.0605

08.30-10.30 PERILAKU KONSUMEN AX 38 B.0601

B.0604

BX 40 B.0603

B.0604

CX 25 B.0604

11.00-13.00 MATEMATIKA EKONOMI II AX 52 B.0605

B.0606

BX 52 B.0607

B.0606

CX 55 C.0601

C.0603

DX 56 B.0601

B.0604

EX 42 C.0604

C.0603

FX 51 C.0605

C.0606

GX 37 C.0505

C.0506

HX 52 C.0607

C.0606

IX 30 B.0603

JX 55 C.0507

C.0506

11.00-13.00 MANAJEMEN STRATEGIK BX 53 C.0501

C.0503

CX 50 C.0504

C.0503

13.30-15.30 HUKUM BISNIS AX 11 B.0604

WAKTU MATA KULIAH KLS JML RUANG

(11)

BX 13 B.0606

CX 5 B.0604

13.30-15.30 ANALISIS FUNDAMENTAL DAN TEKNICAL AX 39 B.0605

16.00-18.00 RISET OPERASI AX 52 B.0605

B.0606

BX 53 B.0607

B.0606

CX 52 C.0601

C.0603

DX 53 C.0604

C.0603

EX 43 C.0501

C.0503

FX 55 C.0605

C.0606

GX 51 C.0504

C.0503

HX 46 C.0505

C.0506

IX 38 C.0607

C.0606

JX 53 C.0507

C.0506

HARI/TANGGAL : RABU, 17 JUNI 2015

08.30-10.30 LAB MANAJEMEN OPERASI AX 48 B.0605

B.0606

BX 54 B.0607

B.0606

11.00-13.00 HUBUNGAN INDUSTRIAL AX 17 B.0604

11.00-13.00 MJN USAHA KECIL DAN MENENGAH AX 52 C.0605 C.0606

BX 39 B.0605

CX 50 C.0607

C.0606 11.00-13.00 LAB PENGANGGARAN PERUSAHAAN AX 22 C.0601

BX 44 C.0603

WAKTU MATA KULIAH KLS JML RUANG

(12)

C.0604

CX 9 C.0604

DX 8 C.0601

13.30-15.30 MANAJEMEN OPERASI AX 48 C.0601

C.0603

BX 54 C.0603

C.0604

13.30-15.30 PERILAKU KEORGANISASIAN AX 52 C.0605

C.0606

BX 46 C.0606

C.0607

CX 46 B.0607

B.0606

16.00-18.00 WARALABA AX 26 C.0505

16.00-18.00 PENGANGGARAN PERUSAHAAN AX 22 C.0601

BX 44 C.0603

C.0604

CX 9 C.0604

DX 8 C.0601

16.00-18.00 METODOLOGI PENELITIAN AX 47 B.0601

B.0603

BX 20 B.0603

CX 18 C.0503

DX 49 C.0501

C.0503

EX 42 C.0605

C.0606

FX 60 C.0607

C.0606

GX 57 B.0605

B.0606

HX 49 B.0607

B.0606

HARI/TANGGAL : KAMIS, 18 JUNI 2015

WAKTU MATA KULIAH KLS JML RUANG

(13)

08.30-10.30 MANAJEMEN BISNIS KELUARGA AX 56 B.0605 B.0606

BX 61 B.0601

B.0604

CX 47 B.0607

B.0606

08.30-10.30 MANAJEMEN RESIKO AX 38 C.0601

C.0603

11.00-13.00 MATEMATIKA EKONOMI I AX 25 C.0503

BX 33 C.0504

11.00-13.00 LAB STATISTIK II AX 1 B.0607

BX 43 C.0601

C.0603

CX 52 C.0604

C.0603

DX 44 C.0605

C.0606

EX 61 B.0601

B.0604

FX 52 C.0607

C.0606

GX 36 B.0605

HX 30 B.0606

IX 22 B.0607

13.30-15.30 KOMUNIKASI PEMASARAN AX 54 B.0605

B.0606

BX 50 B.0607

B.0606

CX 57 B.0601

B.0604

13.30-15.30 MANAJEMEN PERBANKAN AX 46 C.0601

C.0603

BX 20 B.0505

CX 46 C.0605

C.0606

DX 49 C.0607

C.0606

EX 24 B.0504

FX 56 C.0604

C.0603

GX 25 B.0506

HX 27 B.0507

(14)

IX 18 B.0505

16.00-18.00 PENELITIAN PEMASARAN AX 15 C.0504

BX 42 C.0503

C.0504

CX 20 C.0501

16.00-18.00 STATISTIK II AX 1 B.0607

BX 43 C.0601

C.0603

CX 52 C.0604

C.0603

DX 44 C.0605

C.0606

EX 61 B.0601

B.0604

FX 52 C.0607

C.0606

GX 36 B.0605

HX 30 B.0606

IX 22 B.0607

HARI/TANGGAL : JUM'AT, 19 JUNI 2015

08.30-10.30 ETIKA BISNIS DAN PROFESI AX 45 B.0605

B.0606

BX 54 B.0607

B.0606

CX 46 B.0601

B.0604

DX 11 B.0604

08.30-10.30 MANAJEMEN KREDIT AX 24 C.0601

13.30-15.30 PENGANTAR EKONOMI MIKRO AX 8 C.0601

BX 36 C.0603

13.30-15.30 KEPEMIMPINAN AX 53 C.0601

C.0604

WAKTU MATA KULIAH KLS JML RUANG

(15)

BX 49 C.0605 C.0606

CX 19 C.0606

16.00-18.00 PENG. EKONOMI PEMBANGUNAN AX 57 B.0605

B.0604

BX 38 B.0606

B.0607

CX 13 B.0604

DX 24 B.0607

EX 31 B.0601

FX 45 C.0601

C.0603

GX 46 C.0603

C.0604

HX 32 C.0605

16.00-18.00 MANAJEMEN RANTAI PASOKAN AX 50 B.0505

B.0506

BX 54 B.0507

B.0506

CX 6 B.0506

16.00-18.00 PENGANTAR PSIKOLOGI AX 37 C.0505

C.0506

BX 45 C.0501

C.0503

CX 30 C.0506

DX 45 C.0504

C.0503

Referensi

Dokumen terkait

PANITIA JADWAL SEMESTER GENAP TAHUN AKADEMIK 2014/2015 .S Sekretariat : Jl. Pawiyatan Luhur IV/17

Dalam suatu kolektor surya plat tipe pipa sejajar sebagian besar energi matahari ditranmisikan oleh kaca penutup ke plat penyerap yang dicat hitam, plat ini

Kondisi batas ini digunakan untuk memodelkan aliran kompresibel, besaran yang harus dimasukkan nilainya adalah tekanan gauge, bilangan March, temperatur aliran,

Mengetahui peran apa saja yang dilakukan Pemerintah Kabupaten Mesuji terhadap upaya penegakan HAM dalam Konflik Agraria PT.BSMI dan masyarakat Desa Sritanjung, Kagungan

sama elemen yang terdapat dalam film ini termasuk didalamnya kode sosial (realitas) dan kode representasional yang ditransmisikan melalui kode konvensional

 Stop Out / Automatic Cut-Loss (likuidasi otomatis terhadap Posisi Terbuka) terjadi pada saat Equity/Dana Nasabah mencapai atau ≤50% Margin Requirement (kebutuhan Margin atas Posisi

Selanjutnya untuk memberikan arah dan sasaran yang jelas serta sebagai pedoman dan tolok ukur kinerja Pengadilan Agama Pangkajene diselaraskan denga arah

Jadwal Ujian Akhir Semester Genap Kelas F Tahun Akademik 2020 /2021 Program Studi Manajemen STIE Rahmaniyah Sekayu.. (Lampiran 1. SK Ketua STIER No..