Kompresi Waktu Pelaksanaan Proyek dengan Analisis Metode RPM (Repetitive Project Modeling) pada Proyek RS

Tipe-36 Perumahan Griya Mitra Karya Bandung

by Shodik Mujahid

thesis paper for presented to Magister Management Program Gadjah Mada University, 2002

Many project, such as construction of roadways, pipilines, housing unit, and high rise buildings, involve considerable repetitive construction activities that performed at all stage of the project. Many researcher recognized the disadvantages of using traditional network technique for planning, schedulling, and monitoring such projects. Alternate approaches based on graphical, or on analytical techniques have been proposed to model repetitives project.

This paper present a new approach called the repetitives project model (RPM) that models repetitive construction project. Its model incorporates a network, a graphical, and a analytical technique in a unified approach to model repetitive project.