PT.UPADANA SEMESTA BALI Jln. Tukad Badung XVIII C No. 3 Renon Denpasar - Bali
telp : +0361-4783299
[email protected]
www.upadanasemesta.com
PROJECT :
TAROO CAFE
OWNER :
IBU KRISNAWATI
LOKASI :
MAS UBUD, GIANYAR
PROJECT : TAROO CAFE UBUD CREATED DATED : 11 OKT 2022
OWNER : IBU KRISNAWATI WEEK : 8
LOCATION : MAS UBUD, GIANYAR SUBJECT : SUMMARY OF WORKS
NO URAIAN PEKERJAAN BOBOT LAST WEEK THIS WEEK UNTIL THIS
WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
I PRELIMINARY - TAHAP AWAL 4.99% 84.16% 4.20% 0.00% 0.00% 84.16% 4.20%
II PRELIMINARY - TAHAP 2 4.58% 82.21% 3.77% 2.18% 0.10% 84.39% 3.87%
III PEKERJAAN STRUKTUR TAHAP I
A MAIN BUILDING 27.88% 17.65% 4.92% 0.00% 0.00% 17.65% 4.92%
B AREA PARKIR 1.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C PAGAR PEMBATAS 4.25% 40.62% 1.72% 24.48% 1.04% 65.10% 2.76%
D POS SATPAM 0.85% 30.46% 0.26% 0.00% 0.00% 30.46% 0.26%
E PEKERJAAN LAIN - LAIN 2.81% 28.37% 0.80% 0.00% 0.00% 28.37% 0.80%
F OUTDOOR SEATING AREA 7.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
G TOILET AREA 3.96% 30.66% 1.21% 2.53% 0.10% 33.19% 1.31%
H PERGOLA 2.35% 2.35% 2.35% 2.35% 2.35% 2.35% 2.35%
I SWIMMING POOL 6.28% 82.86% 5.20% 5.79% 0.36% 88.64% 5.57%
J POOL DECK 0.79% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
K PUMP ROOM 0.95% 1.21% 0.01% 0.00% 0.00% 1.21% 0.01%
L BALANCING TANK CAP. 5 m3 0.55% 1.43% 0.01% 0.00% 0.00% 1.43% 0.01%
IV PEKERJAAN ARSITEKTUR TAHAP I
A MAIN BUILDING 11.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B AREA PARKIR 1.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C PAGAR PEMBATAS 5.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D POS SATPAM 0.64% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
E PEKERJAAN LAIN-LAIN 1.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V PEKERJAAN ARSITEKTUR TAHAP II
A OUTDOOR SEATING AREA 2.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B PERGOLA 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C TOILET AREA 4.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D SWIMMING POOL 3.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
E POOL DECK 0.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
F PUMP ROOM 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
% WEIGHT % WEIGHT % WEIGHT
(%)
G BALANCING TANK CAP. 5 m3 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 22.10% 1.60% 23.71%
PROJECT : TAROO CAFE UBUD CREATED DATED : 11 OKT 2022
OWNER : IBU KRISNAWATI WEEK : 8
LOCATION : MAS UBUD, GIANYAR SUBJECT : PRELIMINARY
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
I PRELIMINARY - TAHAP AWAL 4.99% 84.16% 4.20% 0.00% 0.00% 84.16% 4.20%
1 Pembersihan & Perataan 0.95% 100.00% 0.95% 0.00% 0.00% 100.00% 0.95%
2 Pembongkaran Bangunan Existing 0.31% 100.00% 0.31% 0.00% 0.00% 100.00% 0.31%
3 Uitzet 0.98% 100.00% 0.98% 0.00% 0.00% 100.00% 0.98%
4 Bowplank 0.37% 100.00% 0.37% 0.00% 0.00% 100.00% 0.37%
5 Mobilisasi - Demobilisasi Alat 0.12% 100.00% 0.12% 0.00% 0.00% 100.00% 0.12%
6 Urugan Tanah Levelling Lawn Area (Tanah
Urug ± 50cm) 1.47% 100.00% 1.47% 0.00% 0.00% 100.00% 1.47%
7 Urugan Tanah Levelling Lawn Area (Tanah
Subur ± 20cm) 0.79% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
II PRELIMINARY - TAHAP 2 4.58% 82.21% 3.77% 2.18% 0.10% 84.39% 3.87%
1 Pembersihan & Perataan 0.40% 100.00% 0.40% 0.00% 0.00% 100.00% 0.40%
2 Bangunan Sementara
Kantor Sementara 0.40% 100.00% 0.40% 0.00% 0.00% 100.00% 0.40%
Bedeng & Gudang 1.71% 100.00% 1.71% 0.00% 0.00% 100.00% 1.71%
Toilet Untuk Pekerja Proyek dan Septic Tank 0.10% 100.00% 0.10% 0.00% 0.00% 100.00% 0.10%
3 Listrik Sementara
Sambungan Listrik Sementara 0.11% 100.00% 0.11% 0.00% 0.00% 100.00% 0.11%
Pemakaian Listrik Kerja 0.20% 46.50% 0.10% 6.60% 0.01% 53.10% 0.11%
4 Air Kerja
Tandon Air 0.08% 100.00% 0.08% 0.00% 0.00% 100.00% 0.08%
Pemakaian Air Kerja 0.06% 46.50% 0.03% 6.60% 0.00% 53.10% 0.03%
5 Izin Tenaga Kerja (Kipem) 0.04% 100.00% 0.04% 0.00% 0.00% 100.00% 0.04%
6 Keselamatan Kerja (K3) 0.12% 100.00% 0.12% 0.00% 0.00% 100.00% 0.12%
7 Manajemen Project 0.67% 46.50% 0.31% 6.60% 0.04% 53.10% 0.36%
- Supervisor - Logistik 8 Administrasi
Shop Drawing 0.17% 50.00% 0.09% 10.00% 0.02% 60.00% 0.10%
As Built Drawing 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Laporan Mingguan 0.09% 46.50% 0.04% 6.60% 0.01% 53.10% 0.05%
9 Mobilisasi - Demobilisasi Alat 0.23% 46.50% 0.11% 6.60% 0.02% 53.10% 0.12%
10 Soil Test 0.12% 100.00% 0.12% 0.00% 0.00% 100.00% 0.12%
PROJECT : TAROO CAFE UBUD CREATED DATED : 11 OKT 2022
OWNER : IBU KRISNAWATI WEEK : 8
LOCATION : MAS UBUD, GIANYAR SUBJECT : PEKERJAAN STRUKTUR
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
III PEKERJAAN STRUKTUR TAHAP I 59.02% 23.95% 14.14% 2.55% 1.50% 26.50% 15.64%
A MAIN BUILDING 27.88% 17.65% 4.92% 0.00% 0.00% 17.65% 4.92%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.27% 87.40% 0.24% 0.00% 0.00% 87.40% 0.24%
- Pek. Urugan pasir bawah pondasi 50 mm 0.12% 87.40% 0.11% 0.00% 0.00% 87.40% 0.11%
- Pek. Pondasi Batu Kali 1.96% 87.40% 1.71% 0.00% 0.00% 87.40% 1.71%
- Anti termite 0.22% 100.00% 0.22% 0.00% 0.00% 100.00% 0.22%
2 Pedestal / Stump (15x15 cm)
- Pek. Bekisting Plywood Pedestal 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Pedestal 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Pedestal (4D13, Sengkang Ø8-
100) 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Tie Beam (20x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.44% 87.50% 0.38% 0.00% 0.00% 87.50% 0.38%
- Pek. Beton K-250 Tie Beam 0.28% 87.50% 0.24% 0.00% 0.00% 87.50% 0.24%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.65% 87.50% 0.57% 0.00% 0.00% 87.50% 0.57%
4 Plat Lantai, Tebal 10cm
- Urugan Tanah Peninggian Lantai T=1,05 m 1.28% 72.70% 0.93% 0.00% 0.00% 72.70% 0.93%
- Pek. Lantai kerja 50mm 0.39% 23.30% 0.09% 0.00% 0.00% 23.30% 0.09%
- Anti Termite 0.33% 100.00% 0.33% 0.00% 0.00% 100.00% 0.33%
- Pek. Bekisting Plywood Plat Lantai 0.04% 72.70% 0.03% 0.00% 0.00% 72.70% 0.03%
- Pek. Beton K-250 Plat Lantai 0.68% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M5 Single Layer 0.39% 16.60% 0.06% 0.00% 0.00% 16.60% 0.06%
5 Kolom
- Bekisting Plywood Kolom Praktis 15x15 0.32% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Beton K-250 Kolom Praktis 15x15 T= 3m 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pembesian Kolom Praktis 15x15 (4D13,
Sengkang Ø8-100/150) 0.37% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- 15x15 Kolom Kayu Ulin H = 3,7m (recycled
wood) 0.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- 15x15 Kolom Kayu Ulin H = 1m (recycled
wood) 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- 15x15 Kolom Kayu Ulin H = 2,7m (recycled
wood) 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Balok
- Bekisting Plywood Ring Balok Praktis 15x15 0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Beton K-250 Ring Balok Praktis 15x15 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pembesian Ring Balok Praktis 15x15 (4D13,
Sengkang Ø8-150) 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- 15x15 Balok Kayu Bengkirai 4.87% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- 6x12 Balok Kayu Bengkirai 0.76% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Struktur Atap
- Pek. Bekisting Plywood Plat Lantai 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton Plat Lantai 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M7 Single Layer 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite Struktur Atap Kayu 0.51% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Kuda-kuda Kayu Bengkirai 8/15 2.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Balok Nok Kayu Bengkirai 8/15 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Usuk Kayu Bengkirai 5/7 @60cm 3.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Penutup Atap Alang-alang 3.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Bubungan 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Ikut Celedu 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Kanopi Kayu Gelam 1.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Polycarbonate + Rangka 1.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B AREA PARKIR 1.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Perkerasan parkir
- Pek. Lantai Kerja 100 mm + Wiremesh M5 1
Layer 1.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C PAGAR PEMBATAS 4.25% 40.62% 1.72% 24.48% 1.04% 65.10% 2.76%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.26% 57.00% 0.15% 22.20% 0.06% 79.20% 0.21%
- Pek. Urugan pasir bawah pondasi 50 mm 0.17% 51.40% 0.09% 27.80% 0.05% 79.20% 0.14%
- Pek. Pondasi Batu Kali 2.23% 51.40% 1.15% 27.80% 0.62% 79.20% 1.77%
2 Tie Beam (15x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.60% 21.50% 0.13% 19.80% 0.12% 41.30% 0.25%
- Pek. Beton K-250 Tie Beam 0.29% 21.50% 0.06% 19.80% 0.06% 41.30% 0.12%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.69% 21.50% 0.15% 19.80% 0.14% 41.30% 0.28%
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
D POS SATPAM 0.85% 30.46% 0.26% 0.00% 0.00% 30.46% 0.26%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pek. Urugan pasir bawah pondasi 50 mm 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pek. Pondasi Batu Kali 0.05% 100.00% 0.05% 0.00% 0.00% 100.00% 0.05%
- Anti termite 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
2 Tie Beam (15x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
- Pek. Beton K-250 Tie Beam 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.03% 100.00% 0.03% 0.00% 0.00% 100.00% 0.03%
3 Plat Lantai, Tebal 10cm
- Urugan Tanah Peninggian Lantai T=0,4 m 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pek. Lantai kerja 50mm 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Anti Termite 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pek. Bekisting Plywood Plat Lantai 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pek. Beton K-250 Plat Lantai 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Wiremesh M5 Single Layer 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
4 Kolom
- Bekisting Plywood Kolom Praktis 15x15 0.03% 100.00% 0.03% 0.00% 0.00% 100.00% 0.03%
- Beton K-250 Kolom Praktis 15x15 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pembesian Kolom Praktis 15x15 (4D13,
Sengkang Ø8-100/150) 0.04% 100.00% 0.04% 0.00% 0.00% 100.00% 0.04%
6 Balok
- 15x15 Balok Kayu Bengkirai 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Struktur Atap
- Usuk Kayu Bengkirai 5/7 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Penutup Atap Alang-alang 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Listplank 2x25 cm 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
E PEKERJAAN LAIN - LAIN 2.81% 28.37% 0.80% 0.00% 0.00% 28.37% 0.80%
1 Pekerjaan Urugan Levelling
- Urugan Tanah Peninggian Lantai T=0,60 m 1.60% 50.00% 0.80% 0.00% 0.00% 50.00% 0.80%
- Urugan Levelling Lahan Outdoor (Tanah Subur
20cm) 0.26% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Pekerjaan Pondasi Batu Kali Entrance (20x30 cm)
- Pek. Galian Tanah 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan pasir bawah pondasi 50 mm 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pondasi Batu Kali 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti termite 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Pondasi Batu Kali Service Area (20x30 cm)
- Pek. Galian Tanah 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan pasir bawah pondasi 50 mm 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pondasi Batu Kali 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti termite 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Plat Lantai, Tebal 10cm Entrance
- Pek. Lantai kerja 50mm 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood Plat Lantai 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M5 Single Layer 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Plat Lantai, Tebal 10cm Service Area
- Pek. Lantai kerja 50mm 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood Plat Lantai 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M5 Single Layer 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
F OUTDOOR SEATING AREA 7.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan pasir bawah pondasi 50 mm 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pondasi Batu Kali 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti termite 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Tie Beam (15x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Tie Beam 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
3 Pedestal / Stump (15x15 cm)
- Pek. Bekisting Plywood Pedestal 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Pedestal 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Pedestal (4D13, Sengkang Ø8-
100) 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Plat Lantai, Tebal 10cm
- Urugan Tanah Peninggian Lantai T = 0,65 m 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Lantai kerja 50mm 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plat Lantai 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.30% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M5 Single Layer Plat Lantai 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Kolom
- 15x15 Kolom Kayu Bengkirai H = 3,15m 0.95% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- 15x15 Kolom Kayu Bengkirai H = 2,7m 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Balok
- 6x12 Balok Kayu Bengkirai 0.78% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Penutup Atap
- Kanopi Kayu Gelam 1.46% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Solaf tuff 3mm + Rangka 1.59% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Stair
- Pek. Pasangan Batako 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
G TOILET AREA 3.96% 30.66% 1.21% 2.53% 0.10% 33.19% 1.31%
1 Pekerjaan Pondasi Batu Kali (30x60cm)
- Pek. Galian Tanah 0.09% 100.00% 0.09% 0.00% 0.00% 100.00% 0.09%
- Pek. Urugan pasir bawah pondasi 50 mm 0.04% 100.00% 0.04% 0.00% 0.00% 100.00% 0.04%
- Pek. Pondasi Batu Kali 0.47% 100.00% 0.47% 0.00% 0.00% 100.00% 0.47%
- Anti termite 0.07% 100.00% 0.07% 0.00% 0.00% 100.00% 0.07%
2 Tie Beam (15x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.14% 100.00% 0.14% 0.00% 0.00% 100.00% 0.14%
- Pek. Beton K-250 Tie Beam 0.07% 100.00% 0.07% 0.00% 0.00% 100.00% 0.07%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.16% 100.00% 0.16% 0.00% 0.00% 100.00% 0.16%
3 Pedestal / Stump (15x15 cm)
- Pek. Bekisting Plywood Pedestal 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Pedestal 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Pedestal (4D13, Sengkang Ø8-
100) 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Plat Lantai, Tebal 10cm
- Urugan Tanah Peninggian Lantai T=0,65 m 0.12% 0.00% 0.00% 80.00% 0.10% 80.00% 0.10%
- Pek. Lantai kerja 50mm 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite 0.05% 100.00% 0.05% 0.00% 0.00% 100.00% 0.05%
- Pek. Bekisting Plywood Plat Lantai 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M5 Single Layer 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Kolom
- Bekisting Kolom Praktis 15x15 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Beton K-250 Kolom Praktis 15x15 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pembesian Kolom Praktis 15x15 (4D13,
Sengkang Ø8-100/150) 0.23% 50.00% 0.11% 0.00% 0.00% 50.00% 0.11%
- 15x15 Kolom Kayu Bengkirai H = 2,35m 0.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Balok
- Bekisting Plywood Ring Balok Praktis 15x15 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Beton K-250 Ring Balok Praktis 15x15 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pembesian Ring Balok Praktis 15x15 (4D13,
Sengkang Ø8-150) 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- 6x12 Balok Kayu Bengkirai 0.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Struktur Atap
- Penutup Atap Kayu Gelam 0.53% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Solaf Tuff + Rangka 0.58% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
H PERGOLA 2.35% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan pasir bawah pondasi 50 mm 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pondasi Batu Kali 0.43% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti termite 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Tie Beam (15x30 cm)
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
- Pek. Bekisting Plywood Tie Beam 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Tie Beam 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pedestal / Stump (15x15 cm)
- Pek. Bekisting Plywood Pedestal 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Pedestal 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Pedestal (4D13, Sengkang Ø8-
100) 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Plat Lantai, Tebal 10cm
- Urugan Tanah Peninggian Lantai 0.19% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Lantai kerja 50mm 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood Plat Lantai 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M5 Single Layer 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Kolom
- 15x15 Kolom Kayu Bengkirai (H = 2,7m) 0.58% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Balok
- 6x12 Balok Kayu Bengkirai 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
7 Penutup Atap
- Penutup Atap Kayu Gelam 0.28% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Solar Tuff 3mm + Rangka 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
I SWIMMING POOL 6.28% 82.86% 5.20% 5.79% 0.36% 88.64% 5.57%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.13% 100.00% 0.13% 0.00% 0.00% 100.00% 0.13%
- Pek. Urugan pasir bawah pondasi 50 mm 0.07% 100.00% 0.07% 0.00% 0.00% 100.00% 0.07%
- Pek. Pondasi Batu Kali 0.55% 100.00% 0.55% 0.00% 0.00% 100.00% 0.55%
- Pek. Urugan Tanah Kembali 0.04% 100.00% 0.04% 0.00% 0.00% 100.00% 0.04%
- Pek. Buangan Tanah Sisa Galian 0.05% 100.00% 0.05% 0.00% 0.00% 100.00% 0.05%
- Anti termite 0.12% 100.00% 0.12% 0.00% 0.00% 100.00% 0.12%
2 Tie Beam (20x40 cm)
- Pek. Bekisting Plywood Tie Beam 0.31% 100.00% 0.31% 0.00% 0.00% 100.00% 0.31%
- Pek. Beton K-250 Tie Beam 0.20% 100.00% 0.20% 0.00% 0.00% 100.00% 0.20%
- Pek. Pembesian Tie Beam (6D13, Sengkang Ø8-
150) 0.38% 100.00% 0.38% 0.00% 0.00% 100.00% 0.38%
3 Plat Lantai Swimming Pool, Tebal 20cm
- Pek. Galian Tanah 0.24% 100.00% 0.24% 0.00% 0.00% 100.00% 0.24%
- Pek. Urugan pasir bawah plat 50 mm 0.09% 100.00% 0.09% 0.00% 0.00% 100.00% 0.09%
- Pek. Lantai kerja 50mm 0.12% 100.00% 0.12% 0.00% 0.00% 100.00% 0.12%
- Anti Termite 0.10% 100.00% 0.10% 0.00% 0.00% 100.00% 0.10%
- Pek. Bekisting Plywood Plat Lantai 0.00% 100.00% 0.00% 0.00% 0.00% 100.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.43% 100.00% 0.43% 0.00% 0.00% 100.00% 0.43%
- Pek. Pembesian (D10-150 2 layer) 0.59% 100.00% 0.59% 0.00% 0.00% 100.00% 0.59%
4 Plat Dinding Swimming Pool, Tebal 20cm
- Pek. Bekisting Batako 0.07% 100.00% 0.07% 0.00% 0.00% 100.00% 0.07%
- Pek. Bekisting Plywood 0.33% 100.00% 0.33% 0.00% 0.00% 100.00% 0.33%
- Pek. Beton K-250 Plat Dinding 0.24% 20.00% 0.05% 80.00% 0.19% 100.00% 0.24%
- Pek. Pembesian (D10-150 2 layer) 0.38% 100.00% 0.38% 0.00% 0.00% 100.00% 0.38%
5 Plat Lantai Gutter, Tebal 20cm
- Pek. Galian Tanah 0.05% 100.00% 0.05% 0.00% 0.00% 100.00% 0.05%
- Pek. Urugan pasir bawah pondasi 50 mm 0.01% 100.00% 0.01% 0.00% 0.00% 100.00% 0.01%
- Pek. Lantai kerja 50mm 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
- Anti Termite 0.02% 100.00% 0.02% 0.00% 0.00% 100.00% 0.02%
- Pek. Bekisting Plywood Plat Lantai 0.00% 100.00% 0.00% 0.00% 0.00% 100.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.07% 100.00% 0.07% 0.00% 0.00% 100.00% 0.07%
- Pek. Pembesian (D10-150 2 layer) 0.16% 100.00% 0.16% 0.00% 0.00% 100.00% 0.16%
6 Plat Dinding Gutter, Tebal 20cm
- Pek. Bekisting Batako 0.09% 100.00% 0.09% 0.00% 0.00% 100.00% 0.09%
- Pek. Bekisting Plywood 0.29% 100.00% 0.29% 0.00% 0.00% 100.00% 0.29%
- Pek. Beton K-250 Plat Dinding 0.23% 25.00% 0.06% 75.00% 0.17% 100.00% 0.23%
- Pek. Pembesian (D10-150 2 layer) 0.19% 100.00% 0.19% 0.00% 0.00% 100.00% 0.19%
7 Waterproofing
- Waterproofing Lantai ex. Sika + screed 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Waterproofing Dinding ex. Sika + screed 0.42% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
J POOL DECK 0.79% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
- Pek. Galian Tanah 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan pasir bawah pondasi 50 mm 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pondasi Batu Kali 0.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti termite 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Tie Beam (15x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Tie Beam 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Plat Lantai, Tebal 10cm
- Urugan Tanah Peninggian Lantai 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Lantai kerja 50mm 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood Plat Lantai 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M5 Single Layer 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Stair
- Pek. Pasangan Batako 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
K PUMP ROOM 0.95% 1.21% 0.01% 0.00% 0.00% 1.21% 0.01%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.02% 60.00% 0.01% 0.00% 0.00% 60.00% 0.01%
- Pek. Urugan pasir bawah pondasi 50 mm 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pondasi Batu Kali 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan Tanah Kembali 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Buangan Tanah Sisa Galian 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti termite 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Tie Beam (20x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Tie Beam (4D13, Sengkang
Ø8-150) 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Tie Beam 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Plat Lantai Pump Room, Tebal 20cm
- Pek. Galian Tanah 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan pasir bawah plat 50 mm 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Lantai kerja 50mm 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti Termite 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood Plat Lantai 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M8 Double Layer 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Plat Dinding Pump Room, Tebal 15cm
- Pek. Bekisting Batako 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood 0.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Dinding 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M8 Double Layer 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Plat Tutup Pump Room, Tebal 20cm
- Pek. Bekisting Plywood Plat Lantai 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M8 Double Layer 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Waterproofing
- Waterproofing Lantai ex. Sika + screed 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Waterproofing Dinding ex. Sika + screed 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
L BALANCING TANK CAP. 5 m3 0.55% 1.43% 0.01% 0.00% 0.00% 1.43% 0.01%
1 Pekerjaan Pondasi Batu Kali (30x60 cm)
- Pek. Galian Tanah 0.01% 60.00% 0.01% 0.00% 0.00% 60.00% 0.01%
- Pek. Urugan pasir bawah pondasi 50 mm 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pondasi Batu Kali 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan Tanah Kembali 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Buangan Tanah Sisa Galian 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anti termite 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Tie Beam (20x30 cm)
- Pek. Bekisting Plywood Tie Beam 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Tie Beam 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pembesian Tie Beam (4D13, Sengkang Ø8-
150) 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Plat Lantai Balancing Tank, Tebal 20cm
- Pek. Galian Tanah 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Urugan pasir bawah pondasi 50 mm 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Lantai kerja 50mm 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
- Anti Termite 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood Plat Lantai 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M8 Double Layer 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Plat Dinding Balancing Tank, Tebal 15cm
- Pek. Bekisting Batako 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Bekisting Plywood 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Dinding 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M8 Double Layer 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
5 Plat Tutup Balancing Tank, Tebal 15cm
- Pek. Bekisting Plywood Plat Lantai 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Beton K-250 Plat Lantai 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wiremesh M8 Double Layer 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
6 Waterproofing
- Waterproofing Lantai ex. Sika + screed 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Waterproofing Dinding ex. Sika + screed 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
IV PEKERJAAN ARSITEKTUR TAHAP I 20.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
A MAIN BUILDING 11.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Dinding
- Pasangan Bata Ringan T = 100 mm dengan
perekat mortar 0.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Dinding Dan Lantai Waterproofing Dasar Semen
ex. Sika 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Plesteran Dinding 0.81% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Semen Polish fin. Beige 2.39% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pasangan Keramik 60x60 Putih ex. Dura Floor 0.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Anyaman Bambu (Bedek) 0.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Ornamen Kayu Gelam 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Keramik 10x10 (Bar area) 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Finishing Lantai
- Concrete Rough Finish fin. Beige 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wayang Stone 1.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wooden Deck ex. Kayu Bengkirai 1.37% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pasangan Keramik 60x60 Putih ex. Dura Floor 0.38% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Langit - Langit
- Plafond Gypsum 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Bubungan Alang - Alang 0.31% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Pekerjaan Pintu Dan Jendela
- Pintu D1 (1200x2200 mm), Kusen Kayu
Bengkirai & Daun Pintu Multiplex 0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pintu D2 (800x2200 mm), Kusen Kayu
Bengkirai & Daun Pintu Multiplex 1.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Jendela J1 (1800x1200 mm) Kayu Bengkirai 0.18% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Jendela J2 (3000x1200 mm) Kayu Bengkirai 0.29% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Kaca Mati 8 mm Area Chef Office 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B AREA PARKIR 1.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Lantai
- Pek. Pasangan Paving 200x200x80 mm 1.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
C PAGAR PEMBATAS 5.65% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Dinding
- Pasangan Batako Pagar Tebal 15cm 1.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Kolom Praktis 15x15 0.44% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Ring Praktis 15x15 0.67% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Plesteran 0.73% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek Cat exterior ex. Dulux Weathershield 0.71% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Paint Texture incld. Plesteran (Area
Entrance) 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Cement Comprout incld. Plesteran (Service
Area) 0.43% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Dinding Kayu Gelam 0.97% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Finishing Sloof Dinding Kayu Gelam
- Pek. Plesteran 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Acian 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D POS SATPAM 0.64% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Dinding
- Pasangan Bata Ringan T = 100 mm dengan
perekat mortar 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Ring Praktis 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Paint Texture fin. Beige incld. Plesteran 0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Finishing Lantai
- Concrete Rough Finish fin. Beige 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Langit - Langit
- Plafond Gypsum 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Pekerjaan Pintu Dan Jendela
- Pintu D2 (800x2200 mm), Kusen Kayu
Bengkirai & Daun Pintu Multiplex 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Jendela J3 Fix Glass 8 mm (800x1200 mm) 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Jendela J4 Fix Glass 8mm (800x1200 mm) 0.08% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
E PEKERJAAN LAIN-LAIN 1.24% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Area Entrance
- Wooden Deck ex. Kayu Bengkirai 0.89% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Area Service
- Concrete Rough Finish fin. Beige 0.21% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pintu P3 ex. Kayu bengkirai 0.14% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
V PEKERJAAN ARSITEKTUR TAHAP II 11.11% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
A OUTDOOR SEATING AREA 2.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Lantai
- Concrete Rough Finish fin. Beige 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wooden Deck ex. Kayu Bengkirai 1.60% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wayang Stone 0.52% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
B PERGOLA 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Lantai
- Wayang Stone 0.34% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
C TOILET AREA 4.06% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Dinding
- Pasangan Bata Ringan T = 100 mm dengan
perekat mortar 0.56% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Dinding Dan Lantai Waterproofing Dasar Semen
ex. Sika 0.16% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Paint Texture fin. Beige incld. Plesteran 1.65% 0.00% ` 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Keramik 10x10 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Wayang Stone 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Finishing Lantai
- Concrete Rough Finish fin. Beige 0.25% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wayang Stone 0.20% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Langit - Langit
- Balok Decoratif 300x225 mm 0.12% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
4 Pekerjaan Pintu Dan Jendela
- Pintu D2 (800x2200 mm), Kusen Kayu
Bengkirai & Daun Pintu Multiplex 0.99% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Cermin 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
D SWIMMING POOL 3.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Dinding
- Batu Hijau Sukabumi 1.23% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
NO URAIAN PEKERJAAN BOBOT
LAST WEEK THIS WEEK UNTIL THIS WEEK
% WEIGHT % WEIGHT % WEIGHT
(%)
- Batu Andesit tebal 200x400x20mm 0.15% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Finishing Lantai
- Batu Hijau Sukabumi 1.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Batu Andesit tebal 200x400x50mm 0.22% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Lain-lain
- Batu Boulder 0.43% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
E POOL DECK 0.88% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Lantai
- Wooden Deck ex. Kayu Bengkirai 0.73% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Wayang Stone 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Concrete Rough Finish fin. Beige 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
F PUMP ROOM 0.40% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Dinding
- Pek. Plesteran 0.05% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Keramik 30x30 ex. Asia Tile 0.13% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Finishing Lantai
- Pek. Plesteran 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Keramik 30x30 ex. Asia Tile 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Langit - Langit
- Pek. Plesteran 0.04% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Acian 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Manhole 100x100 cm, Hollow 40 x 40 mm + Plat
Strip 2 mm fin. Matte Black 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
G BALANCING TANK CAP. 5 m3 0.17% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
1 Finishing Dinding
- Pek. Plesteran Dinding 0.03% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Keramik 30x30 ex. Asia Tile 0.09% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
2 Finishing Lantai
- Pek. Plesteran 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Pasangan Keramik 30x30 ex. Asia Tile 0.02% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
3 Pekerjaan Langit - Langit
- Pek. Plesteran 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
- Pek. Acian 0.01% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
100.00% 22.10% 1.60% 23.71%
Web. www.upadanasemesta.com
TIME SCHEDULE
PROJECT : TAROO CAFE UBUD CREATED DATED : 11 OKT 2022
OWNER : IBU KRISNAWATI WEEK : 8
LOCATION : MAS, UBUD
NO URAIAN PEKERJAAN BOBOT AGUSTUS 2022 SEPTEMBER 2022 OKTOBER 2022 NOVEMBER 2022
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
(%) 22-24 25-31 01-07 08-14 15-21 22-28 29-05 06-12 13-19 20-26 27-02 03-09 10-16 17-23 24-30
I PRELIMINARY - TAHAP AWAL 4.99% 0.53% 1.60% 2.86%
II PRELIMINARY - TAHAP 2 4.58% 2.21% 0.99% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.19%
III PEKERJAAN STRUKTUR TAHAP I
A MAIN BUILDING 27.88% 0.62% 2.00% 2.68% 3.17% 4.60% 4.37% 4.74% 4.59% 1.11% 0.00% 0.00% 0.00%
B AREA PARKIR 1.26% 0.63% 0.63%
C PAGAR PEMBATAS 4.25% 0.26% 0.80% 0.80% 1.59% 0.79%
D POS SATPAM 0.85% 0.14% 0.12% 0.59%
E PEKERJAAN LAIN - LAIN 2.81% 0.80% 1.14% 0.26% 0.62%
F OUTDOOR SEATING AREA 7.10% 0.26% 0.57% 0.14% 0.38% 0.82% 1.87% 1.53% 1.53%
G TOILET AREA 3.96% 0.42% 0.47% 0.46% 1.03% 0.47% 0.56% 0.56%
H PERGOLA 2.35% 0.62% 0.39% 0.58% 0.18% 0.29% 0.29%
I SWIMMING POOL 6.28% 1.03% 1.45% 2.36% 0.72% 0.71%
J POOL DECK 0.79% 0.03% 0.56% 0.20%
K PUMP ROOM 0.95% 0.23% 0.34% 0.24% 0.14%
L BALANCING TANK CAP. 5 m3 0.55% 0.16% 0.19% 0.12% 0.08%
IV PEKERJAAN ARSITEKTUR TAHAP I
A MAIN BUILDING 11.12% 0.48% 0.98% 1.65% 1.09% 1.04% 2.70% 2.51% 0.68%
B AREA PARKIR 1.65% 1.65%
C PAGAR PEMBATAS 5.65% 0.80% 0.80% 2.66% 1.26% 0.14%
D POS SATPAM 0.64% 0.11% 0.05% 0.23% 0.25%
E PEKERJAAN LAIN-LAIN 1.24% 1.24%
V PEKERJAAN ARSITEKTUR TAHAP II
A OUTDOOR SEATING AREA 2.25% 0.53% 0.86% 0.86%
B PERGOLA 0.34% 0.17% 0.17%
C TOILET AREA 4.06% 0.28% 0.68% 0.55% 0.57% 0.58% 0.34% 0.97% 0.09%
D SWIMMING POOL 3.02% 1.38% 1.21% 0.43%
E POOL DECK 0.88% 0.44% 0.44%
F PUMP ROOM 0.40% 0.18% 0.13% 0.09%
G BALANCING TANK CAP. 5 m3 0.17% 0.12% 0.02% 0.02%
DAILY PROGRESS 100.00% 0.53% 1.60% 2.86% 3.51% 5.28% 6.33% 9.96% 9.99% 11.37% 10.84% 12.20% 9.49% 7.64% 6.47% 1.93%
ACCUMULATIVE PROGRESS 0.00% 0.53% 2.13% 4.99% 8.50% 13.78% 20.11% 30.07% 40.05% 51.43% 62.27% 74.47% 83.96% 91.60% 98.07% 100.00%
ACTUAL 16.03% 6.00% 1.60%
ACTUAL ACCUMULATIVE 16.03% 22.10% 23.71%
DEVIASI