NO JENIS PEKERJAAN SAT VOLUME I. PEKERJAAN PERSIAPAN/UMUM
1
PAPAN NAMA PROYEK LS 1,00
2
AIR DAN LISTRIK KERJA LS 1,00
3
PEMBERSIHAN LOKASI AWAL & AKHIR LS 1,00
4
PENGUKURAN & PEMASANGAN BOUWPLANK LS 1,00
5
ADMINISTRASI, DOKUMENTASI, PELAPORAN & AS BUILT DRAWING LS 1,00
6
MOBILISASI & DEMOBILISASI (BAHAN + ALAT) LS 1,00
II. PEMBANGUNAN PAGAR DEPAN 1 PEKERJAAN TANAH
1
GALIAN TANAH M3 16,40
2
URUGAN KEMBALI BEKAS GALIAN M3 5,47
2 PEKERJAAN PONDASI & BETON
1
PAS. PONDASI BATU BESAR/BATU GUNUNG Ad. 1 PC : 4 PSR M3 13,19
2
PONDASI BETON TELAPAK, K. 225 --› 114 KG/M3" M3 0,58
3
KOLOM PEDESTAL 20/20 M3 0,19
4
SLOOF BETON 15/20 CM, K. 225 --› 154 KG/M3" M3 1,32
5
KOLOM BETON 20/20 CM, K. 225 --› 126 KG/M3" M3 1,01
6
BALOK BETON 15/20 CM, ELEVASI 475 CM, K. 225 --› KG/M3" M3 1,32
3 PEKERJAAN DINDING & PLESTERAN
1
PAS. DINDING BATU TELA Ad. 1 PC : 4 PSR M2 65,28
2
PLESTERAN DINDING + BETON Ad. 1 PC : 4 PSR M2 205,53
3
ACIAN DINDING + BETON M2 205,53
4 PEKERJAAN PENGECATAN
1
CAT DINDING SETARA JOTUN EXTERIOR M2 205,53
III. PEMBANGUNAN PAGAR BELAKANG 1 PEKERJAAN TANAH
1
GALIAN TANAH M3 6,75
2
URUGAN KEMBALI BEKAS GALIAN M3 2,25
2 PEKERJAAN PONDASI & BETON
1
PAS. PONDASI BATU BESAR/BATU GUNUNG Ad. 1 PC : 4 PSR M3 5,45
2
KOLOM PEDESTAL 20/20 M3 0,22
3
SLOOF BETON 15/20 CM, K. 225 --› KG/M3" M3 0,54
4
KOLOM BETON 20/20 CM, K. 225 --› KG/M3" M3 0,43
5
BALOK BETON 15/20 CM, ELEVASI 475 CM, K. 225 --› KG/M3" M3 0,54
3 PEKERJAAN DINDING & PLESTERAN
1
PAS. DINDING BATU TELA Ad. 1 PC : 4 PSR M2 50,40
2
PLESTERAN DINDING + BETON Ad. 1 PC : 4 PSR M2 129,03
3
ACIAN DINDING + BETON M2 129,03
4 PEKERJAAN DINDING GRANIT & PENGECATAN
1
CAT DINDING METROLITE M2 129,03
IV. SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) KONSTRUKSI A. PENYIAPAN RENCANA KESELAMATAN DAN KESEHATAN KERJA KONTRAK (RK3)
1
KEBIJAKAN ORGANISASI, PERENCANAAN, PENGENDALIAN, PEMERIKSAAN,
EVALUASI DAN PENINJAUAN ULANG K3 LS 1,00
2
PEMBUATAN KARTU IDENTITAS PEKERJA LS 1,00
B. SOSIALISASI DAN PROMOSI K3 1
PENGARAHAN K3 (SAFETY BRIEFING) LS 1,00
D. ALAT PELINDUNG DIRI
1
HELM PELINDUNG (SAFETY HELMET) BH 7,00
2
PELINDUNG MATA (GOOGLES/SPECTACLES) BH 7,00
3
PELINDUNG PERNAPASAN DAN MULUT (GOOGLES MASKER) BH 7,00
4
SARUNG TANGAN (SAFETY GLOVES) PSG 7,00
5
SEPATU KESELAMATAN (SAFETY BOOTS) PSG 7,00
6
ROMPI KESELAMATAN (SAFETY VEST) BH 7,00
URAIAN PEKERJAAN
NO JENIS PEKERJAAN SAT VOLUME E. ASURANSI BPJS KETENAGAKERJAAN & KESEHATAN KERJA
1
JAMINAN KECELAAAN KERJA (JKK) LS 1,00
2
JAMINAN KEMATIAN (JKM) LS 1,00
F. PERSONIL K3 DAN FASILITAS/SARANA KESELAMATAN DAN KESEHATAN
1
PETUGAS P3K DAN/ATAU MEDIS BLN 3,00
2
PERALATAN P3K LS 1,00