Statistical indicators on service delivery as at the beginning of 2020/21 (to be completed only at the beginning of the municipal financial year)

Current status Number of sites currently serviced with electricity, water (house connection), sewerage remova

service and solid waste removal service 900782Sites

Number of households living in informal settlements 164718 Households

Number of hectares of land already acquired and suitable for human settlements development 500hectares

Number of households in formal areas with access to basic electricity 900782Households

Number of households living in informal areas with access to basic electricity 6000Households

Number of households in formal areas receiving water services 900782Households

Number of households living in informal areas receiving water services 191000Households

Number of households in formal areas receiving sewerage services 900782Households

Number of households living in informal areas receiving sewerage services 180865Households

Number of households in formal areas with kerb‐side refuse removal services (once a week) 718655

Households

Number of households living in informal areas with access to refuse removal  164669Households

QUARTERLY PERFORMANCE REPORTS ‐ 2020/21

Programme / Subprogramme / Performance Measures Backlog as at 

beginning of  2020/21

Target for  2020/21 as  per the SDBIP

1st Quarter Planned  output  as per SDBIP

1st Quarter  Actual output 

2nd Quarter  Planned  output  as per SDBIP

2nd Quarter  Actual output

3rd Quarter  Planned  output  as per SDBIP

3rd Quarter Actual output 

4th Quarter  Planned  output  as per SDBIP

4th Quarter  Actual output 

Summary of  Planned 

output  as per SDBIP

Summary of  Actual output  for 2020/21 

Actual output  for 2020/21

as per  Annual  Report

Variation Reason(s) for variation Remedial action

[3 + 5 + 7 + 9] [4+6+8+10] [13‐12]

1 2 3 4 5 6 7 8 9 10 11 12 13 14

QUARTERLY OUTPUTS

6 293

              120       ‐        ‐        60 146      30      ‐        30      ‐        120         146       ‐         (146)yield in terms of hectares  Not applicable

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ Not applicable Not applicable

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ Not applicable Not applicable

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐  3

              ‐        ‐        ‐         1        2       ‐        3        ‐         ‐        ‐  421 675

              3 000      600       821       600       221       800       262        1 000      ‐        3 000         1 304       ‐         (1 304)The projects which were earmarked for  It is advised that the target be adjusted  Number of informal settlements targeted for upgrading with upgrading plans        86      35      ‐        ‐        ‐        ‐        35      ‐        35        ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐  421 675

              3 000      600       821       600       221       800       262        1 000      ‐        3 000         1 304       ‐         (1 304)The projects which were earmarked for  It is advised that the target be adjusted 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

Number of sites serviced       381 657       2 209      ‐        ‐        ‐        ‐        ‐         2 209      ‐        2 209        ‐         ‐        ‐ 

73 000

               4 000      500       788       500       699       500       933       500       ‐        2 000         2 420       ‐         (2 420)beneficiaries to address the backlog Not Applicable 

‐ 

              16       1       ‐  0.89        4        4        6        8       ‐        14         10       ‐         (10)The reported over‐achievement relates to most  Not applicable

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

               2 210      690       140       610       344       312       311       ‐        1 923         484       ‐         (484)Performance in this indicator was negatively  and is likely to impact performance

‐ 

              30      ‐         8       11       6       16      ‐        30         11       ‐         (11)The reported over‐achievement relates to most  Not applicable

17.438       ‐        18      10      ‐        ‐        ‐        ‐        ‐        18         10       ‐         (10)

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

Water

‐ 

              600       ‐        349       200       484       200       50      200       ‐        600         883       ‐         (883)Indicator is demand driven on the basis of  Future targets to be informed by current trends 4 893

              100       ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

Sewerage

125, 598        1 000       200        1 629       200       100       200       81       200       ‐        800         1 810        ‐        (1 810)Most toilets were installed in the Last quarter Set targets according to performance trends 4 893

              ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

Solid Waste Management

‐ 

              ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

125, 598         718 655        718 655        718 655        718 655        718 655        723 890        723 890        723 890      ‐       2 885 090        2 161 200       ‐     (2 161 200)N:B The number of households is non‐

cumulative.  The 718 655  households  referes to the number of household that  routinely receive solid waste removal  services and it does not refer to new or  additional households receiving such 

services.  Not applicable 

Electricity

Number of additional households living in formal areas provided with electricity connections 115, 375        5 000      ‐        ‐         1 000       1 490       1 500       1 137       2 500      ‐        5 000         2 627       ‐         (2 627)732 households in Vumbuka Hostels A, B & C  and 758 households in Alra Park I S phases A, B 

& C were electrified

Contractors on site and work in progress.

Number of additional high mast lights installed        95      45      ‐        ‐        10      14      15       4       20      ‐        45         18       ‐         (18)

6 Solar high masts installed in Joe Slovo Informal  Settlement., 2 in Kwa Thema and 6 in Thokoza.

All contracts are in place and contractors on  site.

Number of additional households provided with access to Free Basic Electricity        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

Number of additional street lights installed       722       300       ‐        ‐        50      210       100       98      ‐        ‐        150         308       ‐         (308)15 street lights were installed in Thokoza and  195 in Daveyton.

All contracts are in place and contractors on  site.

Socio‐Economic Amenities

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

‐ 

              ‐         ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐          ‐         ‐  1

               1       ‐        ‐        ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ 

Local Economic Development and Job Creation:

‐ 

              14 000        3 000      835        3 500      773        3 000        4 500      ‐        14 000         1 608       ‐         (1 608)The underachievement is attributable to the  Following up with departments on a  Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and other 

  Number of parks / leisure facilities to be developed  / upgraded   Number of  clinics to be developed / upgraded

  Number of pre‐schools / early childhood development centres to be developed / upgraded developed    Number of community swimming pools to be developed  / upgraded

  Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded   Number of cemetries to be developed / upgraded

  Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded KMs of  roads resurfaced/rehabilitated/resealed

  Number of fire safety and emergency facilities to be developed / upgraded 12

  Number of sports fields and stadia to be developed / upgraded

Number of additional water service points to be installed for informal settlement dwellers within a 200m  Number of additional households to be provided with water connections

2

Number of additional sanitation service points (toilets) to be installed for informal settlement dweller Number of additional households to be provided with sewer connections

2

Number of new bus/taxi stops to be constructed 7

Number of waste minimisation projects initiated/ upgraded Number of households living in informal areas with solid waste removal service

2

  Number of community halls to be developed / upgraded Access to Services:

Number of additional households provided with access to weekly refuse removal  Number of households living in informal settlements targeted for upgrading

Number of informal settlements upgraded (services provided): In Situ

KMs of  storm water drainage installed in addition to current ones Transport:

KMs of  new pedestrian walkways to be constructed Number of new bus terminals or taxi ranks to be constructed Roads and storm water:13

KMs of new paved roads to be built KMs of new gravelled roads to be built

Number of informal settlements targeted for formalisation (services provided): Relocated Number of households living in informal backyard rental agreement

Number of Title deeds transferred to eligible beneficiaries Spatial Development and the Built Environment:

Number of hectares of land procured and suitable for Greenfields development Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare

Percentage density reduction in total informal settlements Number of informal settlements targeted for upgrading

(2)

JHB ‐ City Of Johannesburg

Statistical indicators on service delivery as at the beginning of 2020/21 (to be completed only at the beginning of the municipal financial year)

Current status Number of sites currently serviced with electricity, water (house connection), sewerage removal service

and solid waste removal service 1622424Sites

Number of households living in informal settlements Households

Number of hectares of land already acquired and suitable for human settlements development hectares

Number of households in formal areas with access to basic electricity Households

Number of households living in informal areas with access to basic electricity Households

Number of households in formal areas receiving water services 1465071Households

Number of households living in informal areas receiving water services 172500Households

Number of households in formal areas receiving sewerage services 1292571Households

Number of households living in informal areas receiving sewerage services 78184Households

Number of households in formal areas with kerb‐side refuse removal services (once a week) 1454124Households

Number of households living in informal areas with access to refuse removal  168300Households

QUARTERLY PERFORMANCE REPORTS ‐ 2020/21

Programme / Subprogramme / Performance Measures Backlog as at 

beginning of  2020/21

Target for  2020/21 as  per the SDBIP

1st Quarter Planned  output  as per SDBIP

1st Quarter  Actual output 

2nd Quarter  Planned  output  as per SDBIP

2nd Quarter  Actual output

3rd Quarter  Planned  output  as per SDBIP

3rd Quarter Actual output 

4th Quarter  Planned  output  as per SDBIP

4th Quarter  Actual output 

Summary of  Planned  output  as per SDBIP

Summary of  Actual output  for 2020/21 

Actual output  for 2020/21 as per Annual  Report

Variation Reason(s) for variation Remedial action

[3 + 5 + 7 + 9] [4+6+8+10] [13‐12]

1 2 3 4 5 6 7 8 9 10 11 12 13 14

QUARTERLY OUTPUTS

215

                   ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐  Mayoral Committee approved report to acquire  land in Zandspruit.   The Department is 

‐ 

                   ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐  N/A

‐ 

                   ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐  N/A

‐ 

                   ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐  N/A

‐ 

                   ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ 

‐ 

                   30         ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ Delays to approve of the Surveyor General  Diagram will delay the implementation of Phase 2

UISP phase 2 activities/processes: Matholesville: 

‐Site has been cleared;  ‐Re‐blocking to 

‐ 

                     80 667         ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ The Upgrading Informal Settlement Programme  (UISP) requires the involvement of communities 

UISP phase 2 activities/processes: Matholesville: 

‐Site has been cleared;  ‐Re‐blocking to  Number of informal settlements targeted for upgrading with upgrading plans          ‐           ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ 

N/A

‐ 

                   ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐  N/A

‐ 

                   12         ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐  The Department identified 12 informal  settlements to be relocated to Temporary 

‐ 

                   ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ 

The City is not implementing this KPI. 

Number of sites serviced          ‐           800         ‐          ‐          200         ‐           350         ‐          250         ‐       800        ‐            ‐          ‐  Zandspruit Ext 84‐ (701):  ‐Water & Sanitation (stage3), 

Roads & Stormwater(stage4) Designs approved in April &   Zandspruit Ext 84‐ (701):   ‐Water & Sanitation  (stage3), Roads & Stormwater(stage4) Designs approved in 

‐ 

                  3 900         500         620         750        1 119        1 500        1 640        1 150         565       3 900         3 944          ‐         (3 944)Most of the beneficiaries died and the surviving  family members did not have the necessary 

Prior to level 3 and 4 the department was on the drive to  go directly to the beneficiaries to deliver the tittle deeds. 

414

                   21         5         65km 4.53km          8         2          ‐  Invalid Input   Invalid Input           ‐ Invalid Input N/A

‐ 

                   ‐           ‐           ‐           ‐          2         3       2         3          ‐         (3)The overall programme progressed faster than  anticipated and thus the YTD target was 

‐ 

                   112         ‐          3         ‐  35.07km          4         ‐          5         3       9   Invalid Input           ‐ Invalid Input

Tthis KPI is measured in percentage. 

‐ 

                   2         0         20.3km 0km          1         ‐          1         ‐  Invalid Input   Invalid Input           ‐ Invalid Input Due to the continuation of construction work  from 2019/20 financial year, the overall 

‐ 

                   ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ New pedestrian walkways are constructed as part  of the gravel roads built 2

                  ‐          ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ These two projects are currently being  implemented d(2) uring 2020/2021. 

‐ 

                   ‐          ‐           ‐           ‐           ‐          ‐          ‐       ‐          ‐            ‐          ‐ 

The City is not implemented this KPI.

Water

‐ 

                   100         25         18         15         ‐           37         ‐          30         19      107        37          ‐         (37)The target was not met due to  the delay in 13 177

                     12 920        1 000        1 782        2 650         650        4 171        4 623        1 101        2 242       8 922         9 297          ‐         (9 297)A shortfall of 2 000 households at Princess 

Sewerage

‐ 

                  ‐        ‐        ‐        ‐        ‐        ‐       ‐          ‐         ‐        ‐ All  processes have now been finalized , 103 533

                    2 895         500         ‐          990         ‐          1 200         768        1 159         ‐        3 849        768          ‐         (768)Target was not met, due to the delay in award A new tender was advertised  and closed in   Solid Waste Management

‐ 

               1 454 124     1 454 124     1 454 124     1 454 124     1 454 124         ‐           ‐      1 446 490     1 446 490       4 354 738         4 354 738          ‐     (4 354 738)

‐ 

                   0         0         0         ‐           ‐           ‐           ‐          ‐          ‐        0         0          ‐         (0)

‐ 

                  168 300        168 300        168 300        168 300        168 300        168 300        168 300        168 300        168 300      673 200        673 200          ‐        (673 200)

Electricity

Number of additional households living in formal areas provided with electricity connections          ‐           ‐           ‐           300         82        1 225        2 039       1 525         2 121          ‐         (2 121)

Number of additional high mast lights installed N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputKPI not measured in the first quarter of this 

financial year Number of additional households provided with access to Free Basic Electricity          ‐           100         100         100         ‐           ‐           100         100         100         100      300        300          ‐         (300) Number of additional street lights installed          ‐          1 225         50         ‐          220         398         180         345         600         142       1 050        885          ‐         (885)

Socio‐Economic Amenities

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid Input

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputNo budget was allocated for this financial year 

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid Input

No budget was allocated for this financial year 

‐ 

                   5         ‐          3

‐                     ‐ 

‐ 

                   ‐          2         ‐        2         3          ‐         (3)There are 2 project which the Health  Department is executing with USDG, namely: 

Bophelong Clinic Project is 95% completed.

Practical Completion expected in Q3.

Naledi Clinic  Detailed designs completed.

Critical design elements being reviewed (Ideal  Clinic Requirements) Construction to start in Q3.

Bophelong

Outstanding SDP's and building plan issue has  been escalated to the executive level to resolve. 

Naledi Clinic 

The project is being closely monitored to ensure  the practical completion is achieved as per the  baseline programme.

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputThis project is at an advanced stage of

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputNo budget was allocated for this financial year 

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputNo budget was allocated for this financial year 

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputNo budget was allocated for this financial year 

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputNo budget was allocated for this financial year 

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputNo budget was allocated for this financial year 

‐ 

                  ‐           ‐          ‐ N/A N/A       ‐        ‐        ‐        ‐  Invalid Input   Invalid Input        ‐ Invalid Input No budget was allocated for this financial year 

‐ 

                   ‐           ‐          ‐ N/A N/A          ‐           ‐          ‐          ‐  Invalid Input   Invalid Input           ‐ Invalid InputNo budget was allocated for this financial year 

Local Economic Development and Job Creation:

‐ 

                     11 060        2 500         800           28 000        1 683        8 100        4 258        2 960        4 314       41 560         11 055          ‐          (11 055) Access to Services:

Number of additional households to be provided with water connections

Number of additional households to be provided with sewer connections

Number of households living in informal areas with solid waste removal service 2

  Number of fire safety and emergency facilities to be developed / upgraded   Number of parks / leisure facilities to be developed  / upgraded

  Number of abbattoirs to be developed / upgraded    Number of markets to be developed / upgraded   Number of sports fields and stadia to be developed / upgraded

12

  Number of  clinics to be developed / upgraded

  Number of pre‐schools / early childhood development centres to be developed / upgraded developed 

  Number of cemetries to be developed / upgraded

Number of additional jobs to be created using the Expanded Public Works  Programme guidelines and other  Number of new bus terminals or taxi ranks to be constructed

  Number of community swimming pools to be developed  / upgraded   Number of libraries to be developed / upgradeddeveloped    Number of museums / theatres and art galleries to be developed / upgraded 7

Number of informal settlements upgraded (services provided): In Situ Number of informal settlements targeted for formalisation (services provided): Relocated

KMs of new gravelled roads to be built Number of Title deeds transferred to eligible beneficiaries 13

Roads and storm water:

Number of additional water service points to be installed for informal settlement dwellers within a 200m radius

Number of additional sanitation service points (toilets) to be installed for informal settlement dwellers

2 2

Number of waste minimisation projects initiated/ upgraded

  Number of community halls to be developed / upgraded Spatial Development and the Built Environment:

Number of hectares of land procured and suitable for Brownfield development Number of hectares of land proclaimed (township establishment completed) Number of dwelling units developed per hectare Percentage density reduction in total informal settlements Number of hectares of land procured and suitable for Greenfields development

KMs of  roads resurfaced/rehabilitated/resealed

Number of additional households provided with access to weekly refuse removal  Number of households living in informal settlements targeted for upgrading

Number of households living in informal backyard rental agreement Number of informal settlements targeted for upgrading

KMs of new paved roads to be built

KMs of  storm water drainage installed in addition to current ones

Transport:

Number of new bus/taxi stops to be constructed KMs of  new pedestrian walkways to be constructed

(3)

TSH ‐ City Of Tshwane

Statistical indicators on service delivery as at the beginning of 2020/21 (to be completed only at the beginning of the municipal financial year) Current

status Number of sites currently serviced with electricity, water (house connection), sewerage remova

service and solid waste removal service Sites

Number of households living in informal settlements Households

Number of hectares of land already acquired and suitable for human settlements development hectares

Number of households in formal areas with access to basic electricity Households

Number of households living in informal areas with access to basic electricity Households

Number of households in formal areas receiving water services Households

Number of households living in informal areas receiving water services Households

Number of households in formal areas receiving sewerage services Households

Number of households living in informal areas receiving sewerage services Households

Number of households in formal areas with kerb‐side refuse removal services (once a week) Households

Number of households living in informal areas with access to refuse removal  Households

QUARTERLY PERFORMANCE REPORTS ‐ 2020/21

Programme / Subprogramme / Performance Measures Backlog as at  beginning of  2020/21

Target for  2020/21 as  per the SDBIP

1st Quarter Planned 

output  as per SDBIP

1st Quarter  Actual output 

2nd Quarter  Planned 

output  as per SDBIP

2nd Quarter  Actual output

3rd Quarter  Planned 

output  as per SDBIP

3rd Quarter Actual output 

4th Quarter  Planned  output  as per SDBIP

4th Quarter  Actual output 

Summary of  Planned  output  as per SDBIP

Summary of  Actual output  for 2020/21 

Actual output  for 2020/21 as per Annual 

Report

Variation Reason(s) for variation Remedial action

[3 + 5 + 7 + 9] [4+6+8+10] [13‐12]

1 2 3 4 5 6 7 8 9 10 11 12 13 14

QUARTERLY OUTPUTS

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  3 000

              17 245       17 245       ‐         17 245       17 245       17 245       ‐         17 245         178 825      68 980         196 070        ‐         (196 070)

Number of informal settlements targeted for upgrading with upgrading plans        ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         17 425      ‐       17 425        ‐        (17 425) N/A

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  2

      8       ‐         ‐         ‐         ‐         ‐         ‐        8       ‐        8       ‐          ‐         ‐ external City stakeholders continously engaged to secure their expeditious 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  Number of sites serviced       3 802       1 380       ‐         ‐         500       ‐         880       ‐         ‐         ‐       1 380        ‐          ‐         ‐ 

2 000

              680       250       33       250       147       250       ‐         250       ‐       1 000        180        ‐         (180)

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         20      6      20         6        ‐        (6)required standards.) None, The annual target of  None

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  144

               94       ‐         ‐         20       ‐         50       ‐         24       ‐       94        ‐          ‐         ‐ of surfaced municipal road lanes which have been  21.52        15      1      5      4      2       ‐        1       10      9      15        17        ‐        (17)drainage network constructed) The cell does not 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  50

               149       15       ‐         30       44       45       ‐         60       ‐       150        44        ‐        (44)

Water

‐ 

               2 004       ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  7 174

              5 000       1 200       1 202       1 800       3 732       1 000       703       1 000       1 768      5 000        7 405        ‐        (7 405)Not provided Not provided

Sewerage

7 032

              1 913       ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  400

               350       ‐         108       ‐         ‐         100        250       120      350        228        ‐         (228)Projects moved in slow pace. To be fast tracked in the next financial  Solid Waste Management

‐ 

               2 338       2 338       2 338       2 338       2 338       2 338       2 338       2 338       2 338      9 352        9 352        ‐        (9 352)The City has a similar indicator named 

"Percentage of formal areas provided with  weekly waste collection services" with  100% Target and 100% Actual results, and  not "Number of additional households  provided with access to weekly refuse  removal"

Traget achived. Remedial action is not  applicable 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

              1      1      1      1      1      1      1      1      1       4      4        ‐        (4)The City has a similar indicator named 

"Percentage of known informal  settlements receiving integrated waste  handling" with 100% Trget and 100% 

Actual results, and not "Number of  households living in informal areas with  solid waste removal services"

100% target met. Target achived. 

Remedial action is not applicable  Electricity

Number of additional households living in formal areas provided with electricity connections       4 237       1 200       300       227       400       312       200       385       300       488      1 200        1 412        ‐        (1 412)

The KPI is demand driven. The City  responds to applications received. Traget  setting is alwys dependent on the trends  and focusting based on the observed  trends in the last cycle of planning and  reporting.  Therefore, the may be a lesser  demand than the projected demand which  may have informed target setting. The  variance is attributed to this. 

The City will forver strive to provide electri

Number of additional high mast lights installed        22       12       ‐         ‐         ‐         ‐        7       ‐        5       ‐       12        ‐          ‐         ‐  Number of additional households provided with access to Free Basic Electricity        ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  Number of additional street lights installed        509       1 200       ‐         ‐         ‐         ‐         700       ‐         500       ‐       1 200        ‐          ‐         ‐  Socio‐Economic Amenities

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

              1       ‐         ‐        1      0      1       ‐        1       ‐        3      0        ‐        (0)

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐ 

‐ 

               ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐         ‐       ‐       ‐          ‐         ‐  Local Economic Development and Job Creation:

18 312

               29 000   �

Referensi

Dokumen terkait

In general, as shown in Figure 1, a circuit design of single stage RF amplifier is constructed of microstrip lines at the input and output ports as matching impedance circuits and

At the end of this project, a working line following robot is developed successfully using FPGA as its brain and has the capability of controlling the input sensors

This project is about the design of an advanced controller that is Model Predictive Controller (MPC) for commercial use to control temperature in the Heat Exchanger Pilot Plant..

Modulation has been defined as the process of combining an input signal m ( t ) and a carrier at frequency to produce a signal s ( t ) whose bandwidth is (usually) cen- tered on

Background: The prevalence of tumors/cancer in Indonesia is increasing. Many cases of cancer at an advanced stage experience severe symptoms and cause suffering that has not

Attempting to cure bacterial infections at an advanced stage results in considerable waste of time, effort and expenditure.. Thus, the prevention of such illnesses is

One aspect of the project is looking at the conversion of bagasse into products called microbial oils, which can then be used as a feedstock to create advanced biofuels.. Dr Jan Zhang

An analysis of the company's strengths, weaknesses, opportunities, and threats SWOT was conducted to help with the project development and as well as for the company to understand that