Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol67.Issue3.Oct2000:
Teks penuh
Gambar
Dokumen terkait
when each airline operates a distinct hub, this result shows that the airline which operates the higher demand network (associated with, e.g., larger city populations or higher
Then in order to enhance the solution of the Lagrangean heuristic, another procedure is developed to attain capacity feasibility in case of hierarchical relaxation before the
The robustness vector is a measure of how much the performance alters with respect to ITAE and noise bandwidth for all combinations of production lead time at 50%, 100%, and 150% of
The approach taken here is to use an asymptotic approximation for the & undershoot ' , the amount by which stock has fallen below the re-order level by the time an order is
The analysis clearly indicates that the impact of Inter-arrival time variation mainly regards the agil- ity performances (i.e. lead time, work in process, average bu!er size,
f autonomous agent architectures: 1 in the last years manufacturing research started to study possible applications of autonomous agent the- ory to production planning and
An important category of production control approaches for job shop production is based on workload control (WLC) principles. The WLC con- cepts bu ! er the shop # oor against
We hope these issues not only create knowledge, but also enhance individual creativity, so that the cognitive system } a " rm, a strategic business unit, a plant, a