• Tidak ada hasil yang ditemukan

Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol67.Issue3.Oct2000:

N/A
N/A
Protected

Academic year: 2017

Membagikan "Directory UMM :Data Elmu:jurnal:I:International Journal of Production Economics:Vol67.Issue3.Oct2000:"

Copied!
15
0
0

Teks penuh

Loading

Gambar

Fig. 1. (a) Illustration of the setup cost reduction function} general case. (b) Illustration of the setup cost reduction } func-tion convex case.
Fig. 3. Illustration of the network representation of problem SP(i) (T"5).
Table 1
Table 2
+3

Referensi

Dokumen terkait

when each airline operates a distinct hub, this result shows that the airline which operates the higher demand network (associated with, e.g., larger city populations or higher

Then in order to enhance the solution of the Lagrangean heuristic, another procedure is developed to attain capacity feasibility in case of hierarchical relaxation before the

The robustness vector is a measure of how much the performance alters with respect to ITAE and noise bandwidth for all combinations of production lead time at 50%, 100%, and 150% of

The approach taken here is to use an asymptotic approximation for the & undershoot ' , the amount by which stock has fallen below the re-order level by the time an order is

The analysis clearly indicates that the impact of Inter-arrival time variation mainly regards the agil- ity performances (i.e. lead time, work in process, average bu!er size,

f autonomous agent architectures: 1 in the last years manufacturing research started to study possible applications of autonomous agent the- ory to production planning and

An important category of production control approaches for job shop production is based on workload control (WLC) principles. The WLC con- cepts bu ! er the shop # oor against

We hope these issues not only create knowledge, but also enhance individual creativity, so that the cognitive system } a " rm, a strategic business unit, a plant, a