Perhitungan Struktur Balok Penulangan Balok As A

Dalam dokumen an Struktur Gedung Instalasi Rawat (Halaman 26-39)

a. Lantai 2 frame 531 B1 25x60

Tutorial Menghitung Beton Bertulang - Ir. Udiyanto

PENAMPANG PERSEGI TULANGAN DOUBLE - Menghitung Luas Penampang Tulangan

Metode trial and error (looping)

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 h [cm] = 60 Selimut beton [cv] = 3 cm dia. SK [mm] = 10

Cara Untuk mencari B1, jika f'c <= 300, maka B1 = 0.85 Jika f'c <= 300 kg/cm2, maka B1 = 0.85

Jika f'c > 300 kg/cm2, maka B1 = 0.85 - 0.0008 * (f'c - 300) Jika nilai B1 < 0.65, maka nilai B1 diambil 0.65

Sehingga untuk f'c = 186.75 kg/cm2, didapatkan B1 = 0.85 pmax = b1 * 4500 / (6000 + fy) * 0.85 * f'c / fy = 0.0157 pmin = 14 / fy = 0.0036

Tul As_terpasang = 3 D 19 ( 8.51 cm2 )

Jml_baris Tul As_terpasang = 1 Jarak antar baris tulangan = 2.5 cm Jarak antar tulangan dalam satu baris min. 2.5 cm

d = h - cv - dia.SK/10 - [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 55.05 cm Tul As'_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As'_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d' = cv + dia.SK/10 + [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 4.95 cm Ratio As'/As = 0.66 p = As_terpasang /(b*d) = 0.006

p' = As'_terpasang/(b*d) = 0.004

p > pmin, berarti penampang mencukupi, sehingga p - p'= 0.0019 B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy) = 0.0088

Jika (p - p')< (B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy)) dan p < pmax maka F = p * fy / (0.85 * f'c) = 0.147413179737178

K = F * (1 - F / 2) = 0.136547856957065

Mn = K * b * d^2 * 0.85 * f'c = 1642173 kg.cm Maka besarnya Mu = 0.8 * Mn = 1313738 kg.cm .-

Mu penampang > Mu hasil analisis struktur (=1300000 kg.cm) ... OK Menghitung tulangan geser tanpa gaya normal

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 d [cm] = 55.05 Vu [kg] = 7600 Mu [kg.cm] = 1300000 Vu * d / Mu = 0.321 Vu*d/Mu < 1 JmlKaki rencana = 2 dia.sk = 10 mm

Vc = 1* 0.17 * (f'c/10)^0.5 * b * d * 100 / 10 = 10117.3 kg.

VuMak = ((2 / 3 * (f'c/10)^0.5 * b * d * 100 + Vc) * 0.6) / 10 = 29875.9 kg. Vu < VuMak, maka penampang cukup 0.6*vc/2 = 3035.19 kg.

Vu > (0.6*Vc/2), maka penampang perlu tulangan geser, 0.6*Vc = 6070 kg Vu > 0.6*Vc, maka perlu tulangan geser,

Dicoba dengan jarak Sengkang (s) = 250 mm.

VuPenampang = (0.6 * (0.25 * 22 / 7 * (dia.sk)^ 2 * JmlKaki) * fy * d / s + Vc) = 14167 kg. VuPenampang > Vu .... OK

*** Sehingga digunakan sengkang 2 kaki D 10 - 200 *** b. Frame 532 B1 25x60

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 h [cm] = 60 Selimut beton [cv] = 3 cm dia. SK [mm] = 10

Cara Untuk mencari B1, jika f'c <= 300, maka B1 = 0.85 Jika f'c <= 300 kg/cm2, maka B1 = 0.85

Jika f'c > 300 kg/cm2, maka B1 = 0.85 - 0.0008 * (f'c - 300) Jika nilai B1 < 0.65, maka nilai B1 diambil 0.65

Sehingga untuk f'c = 186.75 kg/cm2, didapatkan B1 = 0.85 pmax = b1 * 4500 / (6000 + fy) * 0.85 * f'c / fy = 0.0157

pmin = 14 / fy = 0.0036 Tul As_terpasang = 3 D 19 ( 8.51 cm2 ) Jml_baris Tul As_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

Tul As'_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As'_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d' = cv + dia.SK/10 + [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 4.95 cm Ratio As'/As = 0.66 p = As_terpasang /(b*d) = 0.006

p' = As'_terpasang/(b*d) = 0.004

p > pmin, berarti penampang mencukupi, sehingga p - p'= 0.0019 B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy) = 0.0088

Jika (p - p')< (B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy)) dan p < pmax maka, F = p * fy / (0.85 * f'c) = 0.147413179737178

K = F * (1 - F / 2) = 0.136547856957065

Mn = K * b * d^2 * 0.85 * f'c = 1642173 kg.cm Maka besarnya Mu = 0.8 * Mn = 1313738 kg.cm .-

Mu penampang > Mu hasil analisis struktur (=1300000 kg.cm) ... OK Menghitung tulangan geser tanpa gaya normal

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 d [cm] = 55.05 Vu [kg] = 11000 Mu [kg.cm] = 1300000 Vu * d / Mu = 0.465 Vu*d/Mu < 1 JmlKaki rencana = 2 dia.sk = 10 mm

Vc = 1* 0.17 * (f'c/10)^0.5 * b * d * 100 / 10 = 10117.3 kg.

VuMak = ((2 / 3 * (f'c/10)^0.5 * b * d * 100 + Vc) * 0.6) / 10 = 29875.9 kg. Vu < VuMak, maka penampang cukup. 0.6*vc/2 = 3035.19 kg.

Vu > (0.6*Vc/2), maka penampang perlu tulangan geser, 0.6*Vc = 6070 kg Vu > 0.6*Vc, maka perlu tulangan geser,

Dicoba dengan jarak Sengkang (s) = 250 mm.

VuPenampang = (0.6 * (0.25 * 22 / 7 * (dia.sk)^ 2 * JmlKaki) * fy * d / s + Vc) = 14167 kg. VuPenampang > Vu .... OK

*** Sehingga digunakan sengkang 2 kaki D 10 - 200 *** c. Frame 385 B1 25x60

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 h [cm] = 60 Selimut beton [cv] = 3 cm dia. SK [mm] = 10

Cara Untuk mencari B1, jika f'c <= 300, maka B1 = 0.85 Jika f'c <= 300 kg/cm2, maka B1 = 0.85

Jika f'c > 300 kg/cm2, maka B1 = 0.85 - 0.0008 * (f'c - 300) Jika nilai B1 < 0.65, maka nilai B1 diambil 0.65

Sehingga untuk f'c = 186.75 kg/cm2, didapatkan B1 = 0.85 pmax = b1 * 4500 / (6000 + fy) * 0.85 * f'c / fy = 0.0157 pmin = 14 / fy = 0.0036

Tul As_terpasang = 4 D 19 ( 11.35 cm2 ) Jml_baris Tul As_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d = h - cv - dia.SK/10 - [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 55.05 cm Tul As'_terpasang = 3 D 19 ( 8.51 cm2 ) Jml_baris Tul As'_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d' = cv + dia.SK/10 + [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 4.95 cm Ratio As'/As = 0.75 p = As_terpasang /(b*d) = 0.008

p' = As'_terpasang/(b*d) = 0.006

p > pmin, berarti penampang mencukupi, sehingga p - p'= 0.002 B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy) = 0.0088

Jika (p - p')< (B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy))dan p < pmax F = p * fy / (0.85 * f'c) = 0.196550914326731

K = F * (1 - F / 2) = 0.177234783365394

Mn = K * b * d^2 * 0.85 * f'c = 2131489 kg.cm Maka besarnya Mu = 0.8 * Mn = 1705191 kg.cm .-

Mu penampang > Mu hasil analisis struktur (=1350000 kg.cm) ... OK Menghitung tulangan geser tanpa gaya normal

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 d [cm] = 55.05 Vu [kg] = 8300 Mu [kg.cm] = 1350000 Vu * d / Mu = 0.338 Vu*d/Mu < 1 JmlKaki rencana = 2 dia.sk = 10 mm

VuMak = ((2 / 3 * (f'c/10)^0.5 * b * d * 100 + Vc) * 0.6) / 10 = 29875.9 kg. Vu < VuMak, maka penampang cukup. 0.6*vc/2 = 3035.19 kg.

Vu > (0.6*Vc/2), maka penampang perlu tulangan geser, 0.6*Vc = 6070 kgVu > 0.6*Vc, maka perlu tulangan geser,

Dicoba dengan jarak Sengkang (s) = 250 mm.

VuPenampang = (0.6 * (0.25 * 22 / 7 * (dia.sk)^ 2 * JmlKaki) * fy * d / s + Vc) = 14167 kg. VuPenampang > Vu .... OK

d. *** Sehingga digunakan sengkang 2 kaki D 10 - 250 *** Frame 386 B1 25x60

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 h [cm] = 60 Selimut beton [cv] = 3 c dia. SK [mm] = 10

Cara Untuk mencari B1, jika f'c <= 300, maka B1 = 0.85 Jika f'c <= 300 kg/cm2, maka B1 = 0.85

Jika f'c > 300 kg/cm2, maka B1 = 0.85 - 0.0008 * (f'c - 300) Jika nilai B1 < 0.65, maka nilai B1 diambil 0.65

Sehingga untuk f'c = 186.75 kg/cm2, didapatkan B1 = 0.85 pmax = b1 * 4500 / (6000 + fy) * 0.85 * f'c / fy = 0.0157 pmin = 14 / fy = 0.0036

Tul As_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d = h - cv - dia.SK/10 - [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 55.05 cm Tul As'_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As'_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d' = cv + dia.SK/10 + [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 4.95 cm Ratio As'/As = 1 p = As_terpasang /(b*d) = 0.004

p' = As'_terpasang/(b*d) = 0.004

p > pmin, berarti penampang mencukupi, sehingga p - p'= 0 B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy) = 0.0088

Jika (p - p')< (B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy))dan p < pmax F = p * fy / (0.85 * f'c) = 9.82754571633655E-02

K = F * (1 - F / 2) = 9.34464244230312E-02 Mn = K * b * d^2 * 0.85 * f'c = 1123820 kg.cm Maka besarnya Mu = 0.8 * Mn = 899056 kg.cm .-

Mu penampang > Mu hasil analisis struktur (=360000 kg.cm) ... OK Menghitung tulangan geser tanpa gaya normal

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 d [cm] = 55.05 Vu [kg] = 5040 Mu [kg.cm] = 360000 Vu * d / Mu = 0.77

Vu*d/Mu < 1 JmlKaki rencana = 2 dia.sk = 10 mm Vc = 1* 0.17 * (f'c/10)^0.5 * b * d * 100 / 10 = 10117.3 kg.

VuMak = ((2 / 3 * (f'c/10)^0.5 * b * d * 100 + Vc) * 0.6) / 10 = 29875.9 kg. Vu < VuMak, maka penampang cukup. 0.6*vc/2 = 3035.19 kg.

Vu > (0.6*Vc/2), maka penampang perlu tulangan geser, 0.6*Vc = 6070 kg Vu < 0.6*Vc, maka perlu tulangan geser minimum,3035 kg

av = (d / 2 * b) / (3 * fy) = 5.88 mm2

dia.sengkang = ((aV / 2) / (0.25 * 22 / 7))^0.5 = 1.93 mm. *** Sehingga digunakan sengkang 2 kaki D 10 - 200 *** e. Frame 387 B1 25x60

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 h [cm] = 60 Selimut beton [cv] = 3 cm dia. SK [mm] = 10

Cara Untuk mencari B1, jika f'c <= 300, maka B1 = 0.85 Jika f'c <= 300 kg/cm2, maka B1 = 0.85

Jika f'c > 300 kg/cm2, maka B1 = 0.85 - 0.0008 * (f'c - 300) Jika nilai B1 < 0.65, maka nilai B1 diambil 0.65

Sehingga untuk f'c = 186.75 kg/cm2, didapatkan B1 = 0.85 pmax = b1 * 4500 / (6000 + fy) * 0.85 * f'c / fy = 0.0157 pmin = 14 / fy = 0.0036

Tul As_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d = h - cv - dia.SK/10 - [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 55.05 cm Tul As'_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As'_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d' = cv + dia.SK/10 + [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 4.95 cm Ratio As'/As = 1 p = As_terpasang /(b*d) = 0.004

p' = As'_terpasang/(b*d) = 0.004

p > pmin, berarti penampang mencukupi, sehingga p - p'= 0 B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy) = 0.0088

Jika (p - p')< (B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy))dan p < pmax F = p * fy / (0.85 * f'c) = 9.82754571633655E-02

K = F * (1 - F / 2) = 9.34464244230312E-02 Mn = K * b * d^2 * 0.85 * f'c = 1123820 kg.cm Maka besarnya Mu = 0.8 * Mn = 899056 kg.cm .-

Mu penampang > Mu hasil analisis struktur (=560000 kg.cm) ... OK Menghitung tulangan geser tanpa gaya normal

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25d [cm] = 55.05 Vu [kg] = 3800 Mu [kg.cm] = 560000 Vu * d / Mu = 0.373

Vu*d/Mu < 1 JmlKaki rencana = 2 dia.sk = 10 mm Vc = 1* 0.17 * (f'c/10)^0.5 * b * d * 100 / 10 = 10117.3 kg.

VuMak = ((2 / 3 * (f'c/10)^0.5 * b * d * 100 + Vc) * 0.6) / 10 = 29875.9 kg. Vu < VuMak, maka penampang cukup. 0.6*vc/2 = 3035.19 kg.

Vu > (0.6*Vc/2), maka penampang perlu tulangan geser, 0.6*Vc = 6070 kg Vu < 0.6*Vc, maka perlu tulangan geser minimum,3035 kg

av = (d / 2 * b) / (3 * fy) = 5.88 mm2

dia.sengkang = ((aV / 2) / (0.25 * 22 / 7))^0.5 = 1.93 mm. *** Sehingga digunakan sengkang 2 kaki D 10 - 200 *** f. Frame 388 B1 25x60

h [cm] = 60 Selimut beton [cv] = 3 cm dia. SK [mm] = 10 Cara Untuk mencari B1, jika f'c <= 300, maka B1 = 0.85

Jika f'c <= 300 kg/cm2, maka B1 = 0.85

Jika f'c > 300 kg/cm2, maka B1 = 0.85 - 0.0008 * (f'c - 300) Jika nilai B1 < 0.65, maka nilai B1 diambil 0.65

Sehingga untuk f'c = 186.75 kg/cm2, didapatkan B1 = 0.85 pmax = b1 * 4500 / (6000 + fy) * 0.85 * f'c / fy = 0.0157 pmin = 14 / fy = 0.0036

Tul As_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d = h - cv - dia.SK/10 - [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 55.05 cm Tul As'_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As'_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d' = cv + dia.SK/10 + [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 4.95 cm Ratio As'/As = 1 p = As_terpasang /(b*d) = 0.004

p' = As'_terpasang/(b*d) = 0.004

p > pmin, berarti penampang mencukupi, sehingga p - p'= 0 B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy) = 0.0088 Jika (p - p')< (B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy)) dan p < pmax maka,

F = p * fy / (0.85 * f'c) = 9.82754571633655E-02 K = F * (1 - F / 2) = 9.34464244230312E-02 Mn = K * b * d^2 * 0.85 * f'c = 1123820 kg.cm Maka besarnya Mu = 0.8 * Mn = 899056 kg.cm .-

Mu penampang > Mu hasil analisis struktur (=800000 kg.cm) ... OK Menghitung tulangan geser tanpa gaya normal

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 d [cm] = 55.05 Vu [kg] = 7600 Mu [kg.cm] = 800000 Vu * d / Mu = 0.522

Vu*d/Mu < 1 JmlKaki rencana = 2 dia.sk = 10 mm Vc = 1* 0.17 * (f'c/10)^0.5 * b * d * 100 / 10 = 10117.3 kg.

VuMak = ((2 / 3 * (f'c/10)^0.5 * b * d * 100 + Vc) * 0.6) / 10 = 29875.9 kg. Vu < VuMak, maka penampang cukup 0.6*vc/2 = 3035.19 kg.

Vu > (0.6*Vc/2), maka penampang perlu tulangan geser, 0.6*Vc = 6070 kg Vu > 0.6*Vc, maka perlu tulangan geser,

Dicoba dengan jarak Sengkang (s) = 250 mm.

VuPenampang = (0.6 * (0.25 * 22 / 7 * (dia.sk)^ 2 * JmlKaki) * fy * d / s + Vc) = 14167 kg. VuPenampang > Vu .... OK

*** Sehingga digunakan sengkang 2 kaki D 10 - 200 *** g. Frame 389 B1 25x60

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25

h [cm] = 60 Selimut beton [cv] = 3 cm dia. SK [mm] = 10 Cara Untuk mencari B1, jika f'c <= 300, maka B1 = 0.85

Jika f'c <= 300 kg/cm2, maka B1 = 0.85

Jika f'c > 300 kg/cm2, maka B1 = 0.85 - 0.0008 * (f'c - 300) Jika nilai B1 < 0.65, maka nilai B1 diambil 0.65

Sehingga untuk f'c = 186.75 kg/cm2, didapatkan B1 = 0.85 pmax = b1 * 4500 / (6000 + fy) * 0.85 * f'c / fy = 0.0157 pmin = 14 / fy = 0.0036

Tul As_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d = h - cv - dia.SK/10 - [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 55.05 cm Tul As'_terpasang = 2 D 19 ( 5.67 cm2 ) Jml_baris Tul As'_terpasang = 1 Jarak antar baris tulangan = 2.5 cm

Jarak antar tulangan dalam satu baris min. 2.5 cm

d' = cv + dia.SK/10 + [dia.tul/10*jml_baris + 2.5*(jml_baris - 1)]/2 4.95 cm Ratio As'/As = 1 p = As_terpasang /(b*d) = 0.004

p > pmin, berarti penampang mencukupi, sehingga p - p'= 0 B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy) = 0.0088

Jika (p - p')< (B1 * 0.85 * f'c / fy * d1 / d * 6000 / (6000 - fy))dan p < pmax F = p * fy / (0.85 * f'c) = 9.82754571633655E-02

K = F * (1 - F / 2) = 9.34464244230312E-02 Mn = K * b * d^2 * 0.85 * f'c = 1123820 kg.cm Maka besarnya Mu = 0.8 * Mn = 899056 kg.cm .-

Mu penampang > Mu hasil analisis struktur (=690000 kg.cm) ... OK Menghitung tulangan geser tanpa gaya normal

Input f'c [kg/cm2] = 186.75 fy [kg/cm2] = 3900 b [cm] = 25 d [cm] = 55.05 Vu [kg] = 5600 Mu [kg.cm] = 690000 Vu * d / Mu = 0.446

Vu*d/Mu < 1 JmlKaki rencana = 2 dia.sk = 10 mm Vc = 1* 0.17 * (f'c/10)^0.5 * b * d * 100 / 10 = 10117.3 kg.

VuMak = ((2 / 3 * (f'c/10)^0.5 * b * d * 100 + Vc) * 0.6) / 10 = 29875.9 kg. Vu < VuMak, maka penampang cukup. 0.6*vc/2 = 3035.19 kg.

Vu > (0.6*Vc/2), maka penampang perlu tulangan geser, 0.6*Vc = 6070 kg Vu < 0.6*Vc, maka perlu tulangan geser minimum,3035 kg

av = (d / 2 * b) / (3 * fy) = 5.88

dia.sengkang = ((aV / 2) / (0.25 * 22 / 7))^0.5 = 1.93 mm. *** Sehingga digunakan sengkang 2 kaki D 10 - 200 *** 5. Perhitungan Struktur Kolom

Data-data kolom

- Mutu baja (fy) : 390 MPa - Mutu beton (fc) : 18.6 Mpa

Kolom dihitung dengan program PCA-COL dengan memasukan data-data diatas. Kolom aman bila tanda + berada didalam grafik. Gambar penulangan kolom didapat langsung dari SANSPRO. Yang terlampir berikut ini adalah lembar pengecekan kekuatan tulangan kolom lantai 1 pada as I dengan ukuran kolom K 25X40 dan K 60x60.

6. Pembebanan Pada Frame Tiap Lantai a. Beban Lantai 6

1) Beban Mati

Berat Plat ME = 100 kg/cm2 = 150 kg/cm2 Berat Plat t-10 = 100 kg/cm2 = 150 kg/cm2 Berat Plat Gondola = 150 kg/cm2 = 150 kg/cm2

Dinding = 250 kg/cm2 * 4 = 1000 kg/cm2 Atap = 6150 kg/cm2 = 6150 kg/cm2 Tangga = 20000 kg/cm2 = 20000 kg/cm2 2) Beban Hidup Tangga = 36000 kg/cm2 = 36000 kg/c Berat Plat ME = 500 kg/cm2 = 500 kg/cm2 Berat Plat t-10 = 150 kg/cm2 = 150 kg/cm2 Berat Plat Gondola = 500 kg/cm2 = 500 kg/cm2 b. Beban Lantai 5 1) Beban Mati Berat Plat = 150 kg/cm2 = 150 kg/cm2 Dinding = 250 kg/cm2 * 4 = 1000 kg/cm2 Atap = 7500 kg/cm2 = 7500 kg/cm2 Partisi = 4800 kg/cm2 = 4800 kg/cm2 Tangga = 20000 kg/cm2 = 20000 kg/cm2 2) Beban Hidup Tangga = 36000 kg/cm2 = 36000 kg/cm Berat Plat = 250 kg/cm2 = 250 kg/cm2 c. Beban Lantai 4 1) Beban Mati Berat Plat = 150 kg/cm2 = 150 kg/cm2 Dinding = 250 kg/cm2 * 4 = 1000 kg/cm2 Atap = 7500 kg/cm2 = 7500 kg/cm2

Partisi = 4800 kg/cm2 = 4800 kg/cm2 Tangga = 20000 kg/cm2 = 20000 kg/cm2 2) Beban Hidup Tangga = 36000 kg/cm2 = 36000 kg/cm2 Berat Plat = 250 kg/cm2 = 250 kg/cm2 d. Beban Lantai 3 1) Beban Mati Berat Plat = 150 kg/cm2 = 150 kg/cm2 Dinding = 250 kg/cm2 * 4 = 1000 kg/cm Atap = 7500 kg/cm2 = 7500 kg/cm Partisi = 4800 kg/cm2 = 4800 kg/cm Tangga = 20000 kg/cm2 = 20000 kg/cm2 2) Beban Hidup Tangga = 36000 kg/cm2 = 36000 kg/cm2 Berat Plat = 250 kg/cm2 = 250 kg/cm2 e. Beban Lantai 2 1) Beban Mati Berat Plat = 150 kg/cm2 = 150 kg/cm2 Dinding = 250 kg/cm2 * 4 = 1000 kg/cm Atap = 7500 kg/cm2 = 7500 kg/cm Partisi = 4800 kg/cm2 = 4800 kg/cm Tangga = 20000 kg/cm2 = 20000 kg/cm2 2) Beban Hidup Tangga = 36000 kg/cm2 = 36000 kg/cm2 Berat Plat = 250 kg/cm2 = 250 kg/cm2 B. SISTEM PONDASI

Berdasarkan hasil penyelidikan tanah yang dilaksanakan oleh PT Selimut Bumi, Semarang merekomendasikan pondasi berupa Konstruksi Sarang Laba-Laba (KSLL). Guna meminimalkan resiko beda penurunan pondasi, pondasi didirikan

pada lapisan pendukung yang relatif aman dan memberikan kemudahan pelaksanaan yakni -2.25 meter dengan tegangan ijin tanah = 3 kg/cm2 dan conus resistant qc = 120 kg/cm2. Pada struktur ini digunakan dilatasi untuk mengantisipasi beda penurunan antara bangunan. Pemilihan struktur pondasi KSLL juga didasarkan pada lokasi proyek yang berada di area rumah sakit yang memerlukan tingkat kebisingan penggerjaan rendah.

KSLL dimodelkan sebagai sebuah konstruksi menerus berupa balok rib yang memiliki kedalam (H) 115 cm dan 225 cm dengan lebar 11 cm. Konstruksi ini mempunyai rongga-rongga berbentuk segitiga yang nantinya diisi dengan tanah urug yang memiliki kualitas daya dukung tanah yang baik. Pada lapisan diatas tanah urug diberi material pasir urug kemudian dicor dengan beton dalam bentuk plat dengan kedalaman 12 cm.

KSLL merupakan sistem pondasi yang berlisensi, sehingga dalam perhitunganya tidak boleh dijabarkan secara umum. Penggunaan sistem pondasi KSLL ini harus mendapat ijin dari penemu.

Namun untuk kepentingan proyek akhir ini, dapat dilakukan perencanaan sistem pondasi KSLL dengan permodelan sendiri. Sistem pondasi KSLL ini dadpat demodelkan dengan Sturktur Analysis Program (SAP) dengan versi 8. sistem pondasi KSLL dalam SAP dimodelkan sebagai sebuah plat dengan sistem joint spring untuk menahan moment yang besar.

Langkah perhitungannya adalah sebagai berikut:

a. Membentuk permodelan konstruksi KSLL dengan kombinasi elemen frame dan shell.

b. Menentukan joint-joint yang akan diberi beban reaksi tumpuan kolom. c. Tumpuan pondasi KSLL berupa spring dengan nilai ks (modulus

subgrade rection) diambil 2,5 kg/cm2/cm untuk jenis tanah medium clay

d. Pengecekan penulangan balok dan plat serta tegangan ijin tanah dibawah pondasi digunakan program SAP 2000.

Dalam dokumen an Struktur Gedung Instalasi Rawat (Halaman 26-39)