• Tidak ada hasil yang ditemukan

Kyogle Road, Byangum

N/A
N/A
Protected

Academic year: 2025

Membagikan "Kyogle Road, Byangum"

Copied!
3
0
0

Teks penuh

(1)

TWEEII

Council Reference Your Reference:

4 October 2013

1

2 6 7 10

11

SHIRE COUNCIL

customer service | 1 300 292872 | (02) 6670 2400

[email protected],gov,au www.tweed,nsw.gov,au

F€/.(02)66702429 P0 Box 81 6

l\4urr,villumbah NSW 2484

Please address all communications to the General l\4anâger

ABN: 90 1 78 732 496

Dear

Riverbank Erosion

Firstly I must apolog¡se for the time it has taken to follow up with you on the meeting at on

17

July. Waterways Program staff have been dealing with

a

large number of projects, however I can assure you that this matter is a high priority for Council.

Attached with this letter is a plan showing the type and extent of works that will need to be undertaken on your property to arrest ongoing bank erosion. The plan breaks the bank into numbered Sections, and shows the length of each.

The areas identified as sections requiring high priority works are:

(160m) (185m) (105m) (50m) (60m) (1eOm)

Earthwork will

be

required

at

each of these sites

to

stabilise bank slips and allow revegetation with nat¡ve spec¡es. Works are required, as a priority, over

a

length of approximately 750 metres.

As discussed with you on site, the area where works are undertaken will need to be fenced to ensure that cattle do not continue to damage the banks or new plantings' Fences would need to be established at a minimum of five metres back from the top of the bank or newly constructed batter, and the river bank densely revegetated with native species from the fence to the water line.

(2)

v TWEED

SHIRE COUNCIL

lf

works are

to

proceed on

a

cooperative basis, the proposed tasks that would be completed by council and those requested of you would be as follows:

lf

you are prepared

to

proceed

in

principal, Council

will

arrange another meeting where

the

proposal can

be

discussed further, after which

cosl

estimates

can

be prepared.

Please contact either myself on 02 6670 2430, or Tom Alletson on 02 6670 2577, if you would like to clarify any aspect of this proposal.

Yours faithfully

David Oxenham

Director Community and Natural Resources Encl

Council Landowner

Detailed designs Fencing (construction and maintenance) Environmental provals Spreading of soil from bank battering Contracting and supervision of earth

works

Watering plants to achieve establishment Contracting and supervision of

revegetation

Maíntenance ofplantings

Page 2 of 3

(3)

Mix 0f sìtable and slipptng bank FrÉsenl

Small sD¡le bankbaltÐr¡ng,fencinq and planling requrrBd RèmovB ànd chip several larûe Damphor

¡qlajÐr b¡nk slipprtrg. Bänk ballering fencrnq and reveqetatton required.

gable Wate/ eccess poinl No work requrred

Steep and unEtable.

Fenr-rng ad revegÈtåltot No eañh workt re4uired

€l¡pping Eank batter¡ng, rÊvegetaliDn rÐqurrsd tulajor bank

ienc¡nq and Steep and unslable

Fencing and reve0Elat¡on No eadh wqrks required

Fencin¡¡ and Ievegelat¡on rB quired No earth wÐrkË

lVlajor bank slipptng Bank balterir¡g, fencing and r8vegetatìDn rÉqu¡red

Major bank slipping Bânk battering, fenÊrng aìd rs.egetatron required Fencing

I'lo Êârth

and revQgetãlion requrred works

Fenc¡ng and revt'!etat¡on requiled

Baker Property - Oxley River.

Proposed Rehab¡l¡tat¡on Works

1 bll

2 ItlS rir

t

3

'll

5

:ll.

6

\f.l' n I

,l

7 5Ll n

lL- ûl lfal r.I

.'\

t0 lt

,

Dl-l 11

rtl

v TWEED

SHIRE COUNCIL

Page 3 of 3

Referensi

Dokumen terkait

Ng Kee Choe Vice Chairman, DBSH and Chief Risk Officer.. Frank Wong Vice Chairman, DBS Bank

Berdasarkan hasil analisis dari matriks IFAS, EFAS, IE, SWOT serta QSPM maka strategi yang dapat diterapkan pada Harris Hotel and Residences Sunset Road Badung

In order to reduce soil loss and increase productivity in steep sloping lands, high-value contour hedgerows with sequential cropping sequences that include either corn (Zea mays L.)

dilakuk berapa inpu menunjukk pada ANF transforma ke-1 dan l Banyakny ng digunak e membersh ssian, mak ada Gaussia rt deviasi ( σ arameter no lgoritma LS g ng sar an pat an lai

Perusahaan Daerah dan Perkreditan Rakyat Bank Yogya Kota Yogyakarta (Lembaran Negara No. Kecuali Perda PD Bank Yogya yang merupakan penyempurnaan terhadap Perda yang

LAPORAN KUALITAS ASET PRODUKTIF DAN INFORMASI LAINNYA TRIWULANAN Bangkok Bank Pcl NO POS-POS BANK Sep 2011 Sep 2012 L DPK KL D M JUMLAH L DPK KL D M JUMLAH Jl.M.H.Thamrin No.3

Bank Central Asia Tbk, and/or its affiliated companies and/or their respective employees and/or agents makes any representation or warranty express or implied or accepts any

Currently, no other published studies have evaluated the correlation between the primary disease and the clinical success rate among patients with malignant biliary obstruction who