• Tidak ada hasil yang ditemukan

Implementasi Proyek Jalan Dan Jembatan Studi Kasus Mengenai Implementasi Proyek Jalan Dan Jembatan Thun Anggaran 2003 Pada Proyek Jalan Propinsi Medan Tembaung- Kuala Namu

N/A
N/A
Protected

Academic year: 2016

Membagikan "Implementasi Proyek Jalan Dan Jembatan Studi Kasus Mengenai Implementasi Proyek Jalan Dan Jembatan Thun Anggaran 2003 Pada Proyek Jalan Propinsi Medan Tembaung- Kuala Namu"

Copied!
136
0
0

Teks penuh

(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)

"IMPLEMENTASI PROYEKJALAN DAN JEMBATAN"

(Studi Kasus Mengenai Implementasi Proyek Jalan dan Jembatan Tahun

Anggaran 2003 pada Proyek Jalan Propinsi Medan - Tembung -Kuala Namu)

ABSTRAKS

Jalan dan Jembatan memegang peranan yang sangat penting dalam

berbagai aktifitas masyarakat, karena fungsinya yang menghubungkan suatu

daerah dengan daerah lainnya.

Tesis ini mencoba melihat bagaimana sistem dan prosedur sebuah proyek

jalan dan jembatan yang berada pada jalan propinsi Medan - Tembung- Kuala

Namu. Dengan melakukan penelitian yang bersifat deskriptif dengan pendekatan

kualitatif yang berjudul Implementasi Proyek Jalan dan Jembatan (Studi

Kasus

Mengenai

Implementasi Proyek Jalan dan Jembatan Tahun Anggaran 2003

pada Proyek Jalan Propinsi Medan - Tembung - Kuala Namu).

Peneliti mengambil kasus implementasi pada proyek jalan propinsi Medan

- Tembung - Kuala Namu karena merupakan proyek pembangunan yang sangat

penting. Proyek ini akan menjadi infra struktur penghubung sarana penting

rencana Bandara Kuala Namu dengan pusat kota.Selain itu juga menjadi jalan

penghubung kota Medan dengan Tembung dan Batang Kuis.

Hasil penelitian yang diperoleh adalah implementasi proyek jalan dan

jembatan Medan -Tembung- Kuala Namu sudah berada pada jalur yang

semestinya, hal ini berdasarkan kepada pentingnya fasilitas jalan dan jembatan

sebagai sarana penghubung antara Kota Medan dengan Kuala Namu.

Pada penelitian ini ditemukan bahwa proyek pembangunan jalan dan

jembatan masih menggunakan model top down dan peneliti melihat sangat

kecilnya

partisipasi

masyarakat

dalam

proses

pembangunan

tersebut.

Pembangunan proyek jalan dan jembatan masih dilakukan dengan tambal sulam

dalam pemeliharaannya. Hal ini sangat berkaitan dengan sumber dana dari APBD

yang sangat minim untuk pembangunan dan pemeliharan infra struktur jalan dan

jembatan,

xiii

(13)

THE IMPLEMENTATION OF ROAD AND BRIDGES PROJECT (CASE

STUDY CONCERNING THE IMPLEMENTATION OF ROAD AND

BRIDGES PROJECT FOR FISCAL YEAR 2003 ON THE PROVINCIAL

ROAD PROJECT OF LINE MEDAN - TEMBUNG - KUALA NAMU).

ABSTRACT

The road and bridges hold a very important role in serving public with

various activities, since its function is recognized to touch one location to other

region. This study is to make approach how the system and procedure in a road

and bridges project found in line of provincial road of Medan - Tembung - Kuala

Namu.

In

this case adopted a descriptive research with qualitative approach, in the

topic The Implementation of Road and Bridges Project (Case Study conceming

the Implementation of Road and Bridges Project for Fiscal year 2003 on the

Provincial Road Project ofline

Medan -

Tembung - Kuala Namu).

The writer in this case, takes the implementation on provincial road project

of

Medan -

Tembung - Kuala Namu line since well known as a great project for

development and it is very important. This project shall be categorized as an

infrastructure in connecting to vital superstructure particularly for the plans

development of Kuala Namu based airport, run into city. In addition, the existence

shall be a connecting road into

Medan

city with Tembung and to Kuala Namu.

On this study found that the road and bridges development project still use

a top down model applicated and beside it also seen so minimal people

participation in the process for that development. The road and bridges project

development still doing in repair and patching work particularly in its

maintenance. This case related very much with the fund resources by local

authority budget, seemly so lower rate for the development purpose and

maintenance for infrastructure for road and bridges as well as.

xiii

/

(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)
(25)
(26)
(27)
(28)
(29)
(30)
(31)
(32)
(33)
(34)
(35)
(36)
(37)
(38)
(39)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(51)
(52)
(53)
(54)
(55)
(56)
(57)
(58)
(59)
(60)
(61)
(62)
(63)
(64)
(65)
(66)
(67)
(68)
(69)
(70)
(71)
(72)
(73)
(74)
(75)
(76)
(77)
(78)
(79)
(80)
(81)
(82)
(83)
(84)
(85)
(86)
(87)
(88)
(89)
(90)
(91)
(92)
(93)
(94)
(95)
(96)
(97)
(98)
(99)
(100)
(101)
(102)
(103)
(104)
(105)
(106)
(107)
(108)
(109)
(110)
(111)
(112)
(113)
(114)
(115)
(116)
(117)
(118)
(119)
(120)
(121)
(122)
(123)
(124)
(125)
(126)
(127)
(128)
(129)
(130)
(131)
(132)
(133)
(134)
(135)
(136)

Referensi

Dokumen terkait

PERANAN MOTIVASI DALAM PELAKSANAAN KERJA SEKRETARIAT DEKAN PADA FAKULTAS EKONOMI UNIVERSITAS..

Jika seorang pasien rawat inap atau rawat jalan minta untuk keluar dari rumah sakit tanpa persetujuan dokter maka pasien harus diberitahu tentang risiko medis oleh dokter

Berdasarkan pemaparan data dan analisis data yang mengacu pada rumusan masalah yang ada, maka yang menjadi kesimpulan adalah menyuruh siswa membaca Al-Qur’an

Metode ini dianggap mampu menutupi kelemahan dari metode yang lebih dulu ada yaitu metode akuntansi biaya tradisional.Penelitian ini bertujuan untuk menganalisis

[r]

Sehubungan dengan selesainya masa sanggah terhadap Pengumuman Hasil Seleksi Umum pada tanggal 25 Mei 2015, dan tidak ada sanggahan dari peserta seleksi umum, maka kami Pokja ULP

Melalui penganggaran partisipatif pelanggaran kontrak psikologis tidak akan terjadi, maka trust antara manajer tingkat atas dan manajer tingkat menengah dapat terjaga

Rekapitulasi Hasil Penelitian Pengaruh Pemberian Pupuk Bokashi dan Pupuk Majemuk NPK Phonska Terhadap Pertumbuhan Bibit Kakao ( Theobroma cacao L). Keterangan : tn