PRROOGGRRAAMM : P: PEEMMBBAANNGGUUNNAAN N JJAALLAAN N DDAAN N JJEEMMBBAATTAANN K

KEEGGIIAATTAANN : : PPEEMMBBAANNGGUUNNAAN N JJAALLAAN N DDEENNGGAAN N LLAAPPIIS S PPEERRMMUUKKAAAAN N AASSPPAALL NA

NAMA MA PEKPEKERJERJAAAANN : : LALAPEN PEN JAJALALAN N TAMTAMBABAN N LINLINGKGK. I. II KI KELELURURAHAHAN AN BUBUNUNUT T BABARARATT KEC.

KEC. KISARAN KISARAN BARATBARAT U

UNNIIT T KKEERRJJAA : D IN: D INAAS S PPEEKKEERRJJAAAAN N UUMMUUM M KKAABBUUPPAATTEEN N AASSAAHHAANN T

TAAHHUUN N AANNGGGGAARRAANN : 2: 2001122

No.

No. JUMLAH HARGAJUMLAH HARGA

( Rp ) ( Rp )

11 66

II PPEEKKEERRJJAAAAN N PPEERRSSIIAAPPAANN 9,332,000.009,332,000.00

II

II PEPEKKERERJAJAAAN LN LAPAPEN EN SESEPAPANJNJANANG 4G 4550 X 0 X 3 M3 M'' 186,718,842.27186,718,842.27

IIIIII PPEEKKEERRJJAAAAN N LLAAIINN--LLAAIINN 1,000,000.001,000,000.00

JUMLAH

JUMLAH TOTAL TOTAL 196,050,842.27196,050,842.27 DIBULATKAN 196,050,000.00 DIBULATKAN 196,050,000.00 TERBILANG :

TERBILANG : Seratus Sembilan Puluh Enam Juta Lima Puluh Ribu RupiahSeratus Sembilan Puluh Enam Juta Lima Puluh Ribu Rupiah

Kisaran, 11

Kisaran, 11 Juli Juli 20122012 Penawar,

Penawar, C

CVV..DDUUAAWWAARRNNAA DDiibbuuaattOOlleehh,,

F

FEERRRRY Y SSYYAAHHPPUUTTRRA A NNAASSUUTTIIOONN SSAARRIIA A GGIINNTTIINNGG D

Diirreekkttuurr TTeennaaggaaTTeekknniiss

URAIAN KEGIATAN URAIAN KEGIATAN

22

REKAPITULASI ANGGARAN BIAYA

REKAPITULASI ANGGARAN BIAYA

(2)

P

PRROOGGRRAAMM : P: PEEMMBBAANNGGUUNNAAN N JJAALLAAN N DDAAN N JJEEMMBBAATTAANN K

KEEGGIIAATTAANN : : PPEEMMBBAANNGGUUNNAAN N JJAALLAAN N DDEENNGGAAN N LLAAPPIIS S PPEERRMMUUKKAAAAN N AASSPPAALL NA

NAMA MA PEPEKEKERJRJAAAANN : : LAPLAPEN EN JAJALAN LAN TATAMBMBAN AN LINLINGK. GK. II II KEKELURLURAHAHAN AN BUBUNUNUT BT BARARATAT KEC.

KEC. KISARAN KISARAN BARATBARAT U

UNNIIT T KKEERRJJAA : D I: D INNAAS S PPEEKKEERRJJAAAAN N UUMMUUM M KKAABBUUPPAATTEEN N AASSAAHHAANN T

TAAHHUUN N AANNGGGGAARRAANN : 2: 2001122

No.

No. KODEKODE

ANALISA ANALISA HARGA SATUAN HARGA SATUAN (Rp.) (Rp.) HARGA TOTAL HARGA TOTAL (Rp.) (Rp.) 11 33 66 77 II PPEEKKEERRJJAAAAN N PPEERRSSIIAAPPAANN

11.. PPeemmbbuuaattaan n / / SSeewwa a KKaannttoor r DDiirreekkssi i KKeeeet t + + GGuuddaanngg LLss --    22,,000000,,000000..0000 2,000,000.002,000,000.00 22.. PPeenngguukkuurraan n ddaan n PPeemmaassaannggaan n PPaattook k KKeemmbbaallii LLss --    11,,220000,,000000..0000 1,200,000.001,200,000.00 33.. TTaanndda a PPeennggaammaan n LLaallu u LLiinnttaass LLss --    885500,,000000..0000 850,000.00850,000.00 44.. MMoobbiilliissaassi i ddaan n DDeemmoobbiilliissaassii LLss --    55,,228822,,000000..0000 5,282,000.005,282,000.00 9,332,000.00 9,332,000.00 II

II PEPEKEKERJRJAAAAN LN LAPAPEN EN SESEPAPANJNJANANG 4G 450 50 X 3 X 3 M'M'

11.. Peenngguuppaassaan P n TTaannaah h ddaan n PPeemmbbeerrssiihhaan n SSeemmaakk K 221100K    445500..0000 MM22    33,,112255..0000 1,406,250.001,406,250.00 22.. PPeerrbbaaiikkaan n EExxiissttiinng g ddeennggaan n TTeellffoorrd d / / PPeennaammbbaahhaan n LLeebbaarr K K 551166    8855..6699 MM33    336655,,447799..1199 31,317,911.5831,317,911.58 33.. LLaappiissaan n PPeenneettrraassi i MMaaccaaddaam m ( ( LLaappeen n )) K 661188K   11,,335500..0000 MM22    111144,,007700..1133 153,994,680.69153,994,680.69 186,718,842.27 186,718,842.27 IIIIII PPEEKKEERRJJAAAAN L AN L AIINN--LLAAIINN

11.. FFoottooDDookkuummeennttaassii LLss --    440000,,000000..0000 400,000.00400,000.00 22.. PPllaannkkNNaammaaPPrrooyyeekk LLss    11..0000 BBhh    660000,,000000..0000 600,000.00600,000.00 1,000,000.00 1,000,000.00 197,050,842.27 197,050,842.27 197,050,000.00 197,050,000.00 SARIA GINTING SARIA GINTING Kisaran, 11

Kisaran, 11 Juli Juli 20122012

Dibuat Oleh Dibuat Oleh

ANGGARAN BIAYA

ANGGARAN BIAYA

URAIAN KEGIATAN URAIAN KEGIATAN 22 SUB JUMLAH SUB JUMLAH KUANTITAS KUANTITAS Terbilang :

Terbilang : Seratus Sembilan Puluh Tujuh Seratus Sembilan Puluh Tujuh Juta Lima Juta Lima Puluh Ribu RupiahPuluh Ribu Rupiah

Tenaga Teknis Tenaga Teknis 44 SUB JUMLAH SUB JUMLAH Penawar; Penawar; CV. DUA WARNA CV. DUA WARNA

FERRY SYAHPUTRA NASUTION FERRY SYAHPUTRA NASUTION

Direktur  Direktur  DIBULATKAN DIBULATKAN JUMLAH TOTAL JUMLAH TOTAL SUB JUMLAH SUB JUMLAH

(3)

P

PRROOGGRRAAMM : P: PEEMMBBAANNGGUUNNAAN N JJAALLAAN N DDAAN N JJEEMMBBAATTAANN K

KEEGGIIAATTAANN : : PPEEMMBBAANNGGUUNNAAN N JJAALLAAN N DDEENNGGAAN N LLAAPPIIS S PPEERRMMUUKKAAAAN N AASSPPAALL NA

NAMA MA PEPEKEKERJRJAAAANN : : LAPLAPEN EN JAJALAN LAN TATAMBMBAN AN LINLINGK. GK. II II KEKELURLURAHAHAN AN BUBUNUNUT BT BARARATAT KEC.

KEC. KISARAN KISARAN BARATBARAT U

UNNIIT T KKEERRJJAA : D I: D INNAAS S PPEEKKEERRJJAAAAN N UUMMUUM M KKAABBUUPPAATTEEN N AASSAAHHAANN T

TAAHHUUN N AANNGGGGAARRAANN : 2: 2001122

No.

No. KODEKODE

ANALISA ANALISA HARGA SATUAN HARGA SATUAN (Rp.) (Rp.) HARGA TOTAL HARGA TOTAL (Rp.) (Rp.) 11 33 66 77 II PPEEKKEERRJJAAAAN N PPEERRSSIIAAPPAANN

11.. PPeemmbbuuaattaan n / / SSeewwa a KKaannttoor r DDiirreekkssi i KKeeeet t + + GGuuddaanngg LLss --    22,,000000,,000000..0000 2,000,000.002,000,000.00 22.. PPeenngguukkuurraan n ddaan n PPeemmaassaannggaan n PPaattook k KKeemmbbaallii LLss --    11,,220000,,000000..0000 1,200,000.001,200,000.00 33.. TTaanndda a PPeennggaammaan n LLaallu u LLiinnttaass LLss --    885500,,000000..0000 850,000.00850,000.00 44.. MMoobbiilliissaassi i ddaan n DDeemmoobbiilliissaassii LLss --    55,,228822,,000000..0000 5,282,000.005,282,000.00 9,332,000.00 9,332,000.00 II

II PEPEKEKERJRJAAAAN LN LAPAPEN EN SESEPAPANJNJANANG 4G 450 50 X 3 X 3 M'M'

11.. Peenngguuppaassaan P n TTaannaah h ddaan n PPeemmbbeerrssiihhaan n SSeemmaakk K 221100K    445500..0000 MM22    33,,112255..0000 1,406,250.001,406,250.00 22.. PPeerrbbaaiikkaan n EExxiissttiinng g ddeennggaan n TTeellffoorrd d / / PPeennaammbbaahhaan n LLeebbaarr K K 551166    8855..6699 MM33    336655,,447799..1199 31,317,911.5831,317,911.58 33.. LLaappiissaan n PPeenneettrraassi i MMaaccaaddaam m ( ( LLaappeen n )) K 661188K   11,,335500..0000 MM22    111144,,007700..1133 153,994,680.69153,994,680.69 186,718,842.27 186,718,842.27 IIIIII PPEEKKEERRJJAAAAN L AN L AIINN--LLAAIINN

11.. FFoottooDDookkuummeennttaassii LLss --    440000,,000000..0000 400,000.00400,000.00 22.. PPllaannkkNNaammaaPPrrooyyeekk LLss    11..0000 BBhh    660000,,000000..0000 600,000.00600,000.00 1,000,000.00 1,000,000.00 197,050,842.27 197,050,842.27 197,050,000.00 197,050,000.00 SARIA GINTING SARIA GINTING Kisaran, 11

Kisaran, 11 Juli Juli 20122012

Dibuat Oleh Dibuat Oleh

ANGGARAN BIAYA

ANGGARAN BIAYA

URAIAN KEGIATAN URAIAN KEGIATAN 22 SUB JUMLAH SUB JUMLAH KUANTITAS KUANTITAS Terbilang :

Terbilang : Seratus Sembilan Puluh Tujuh Seratus Sembilan Puluh Tujuh Juta Lima Juta Lima Puluh Ribu RupiahPuluh Ribu Rupiah

Tenaga Teknis Tenaga Teknis 44 SUB JUMLAH SUB JUMLAH Penawar; Penawar; CV. DUA WARNA CV. DUA WARNA

FERRY SYAHPUTRA NASUTION FERRY SYAHPUTRA NASUTION

Direktur  Direktur  DIBULATKAN DIBULATKAN JUMLAH TOTAL JUMLAH TOTAL SUB JUMLAH SUB JUMLAH

(4)

199,250,000 199,250,000 197,950,000 197,950,000

(5)

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

NO.

SATUAN

KODE

SATUAN UPAH

Per Hari ( Rp )

KET

A.

HARGA SATUAN UPAH

1

Mandor

Orang

L061

102,000.00

2

 

Mekanik

Orang

L071

93,000.00

3

Pembantu

Mekanik

Orang

L072

78,000.00

4

Kepala

Tukang

Orang

L073

95,000.00

5

Tukang

Orang

L079

90,000.00

6

Operator

Terlatih

Orang

L081

110,000.00

7

Operator Kurang Terlatih

Orang

L082

87,500.00

8

Pembantu

Operator

Orang

L083

80,000.00

9

Sopir

Terampil

Orang

L091

85,000.00

10

Sopir Personil / Kernect

Orang

L092

80,000.00

11

Buruh

Tak

Terampil

Orang

L101

70,000.00

12

Buruh

Semi

Terlatih

Orang

L103

81,500.00

13

Buruh Terampil ( Pekerja )

Orang

L106

82,000.00

14

Masinis

Orang

117,000.00

15

Jaga

Malam

Orang

68,000.00

B

HARGA BAHAN / MATERIAL

1

Pasir

Pasang

/

Beton

M3

M

041

55,000.00

2

Pasir

Urug

M3

M

040

50,000.00

3

Semen

Zak

M

080

55,000.00

4

Tanah

Timbun

M3

M

040

60,000.00

5

Kayu

Bekisting

M3

M

180

3,000,000.00

6

Paku

Kg

M

166

52,000.00

7

Batu

Padas

10

-

15

cm

M3

M

020

230,000.00

8

Batu

Padas

5

-

7

cm

M3

M

022

389,000.00

9

Batu

Padas

3

-

5

cm

M3

M

023

442,000.00

10

Batu

Padas

2

-

3

cm

M3

M

024

481,000.00

11

Batu

Padas

1

-

2

cm

M3

M

025

502,000.00

12

Solar

/

Minyak

Diesel

Ltr

M

065

5,000.00

13

 

Bensin

Ltr

4,500.00

14

 

Pelumas

Btl

30,000.00

15

 

Aspal

Kg

14,080.00

C

ALAT BANTU DAN LAINNYA

1

Alat-alat

Kerja

( 3

set )

set

M 170

150,000.00

DAFTAR HARGA UPAH DAN BAHAN

(6)

Kisaran, 11 Juli 2012

Dibuat Oleh :

SARIA GINTING

Tenaga Teknis

Direktur 

CV. DUA WARNA

Penawar 

(7)

KODE

K 2 1 0

 URAIAN: ANGGAPAN/ASUMSI:

 1. Mengupas dan Membuang semak-semak 1. Menggunakan tenaga manusia (1200 M2/hari) dengan tenaga manusia pada damija 2. Tidak ada pohon besar pada damija ( hanya semak ) (Daerah Milik Jalan) 3. Bakar sampah pada pekerjaan

 4. Hasil kerja 25 m2 / orang - hari

 2. Lebar pengupasan dan pembersihan = damija-lebar 5. Umur alat bantu rata-rata 1 bulan / orang / set @ 3 alat badan jalan

JUMLAH

ORANG HARI KODE

JUMLAH HARI-KERJA UPAH (Rp/org/hari) B I A Y A ( Rp ) SUB TOTAL ( Rp ) Mandor   1.00 1 L061 1.00  102,000.00 102,000.00

Buruh tak terlatih   48.00 1 L101 48.00   70,000.00 3,360,000.00

PEKERJA 3,462,000.00 JUMLAH BAHAN VOLUME SATUAN KODE HARGA SATUAN ( Rp ) BIAYA ( Rp ) SUB TOTAL ( Rp )

 Alat Bantu 1.92 Set M170  150,000.00 288,000.00

MATERIAL 288,000.00 JUMLAH  ALAT HARI KERJA KODE JAM KERJA HARGA ( Rp / Jam ) B I A Y A ( Rp ) SUB TOTAL PERALATAN -TOTAL Rp 3,750,000.00

VOLUME : 1200 SATUAN M2 HARGA SATUAN Rp. 3,125.00 per M2

P E K E R J A P E R  A L  A T  A N P E K E R J  A MATERIAL M  A T E R I  A L P E R A L A T A N PROPINSI : SUMATERA

ANALISA BIAYA PEKERJAAN

PENGUPASAN & PEMBERSIHAN SEMAK PADA DAMIJA

( MENGGUNAKAN BURUH )

DINAS PEKERJAAN UMUM

KABUPATEN ASAHAN

TAHUN ANGGARAN 2012

 KABUPATEN :

 ASAHAN

KODE : DISIAPKAN OLEH :

(8)
(9)

KODE

K 5 1 6

 URAIAN: ANGGAPAN/ASUMSI:

1. Material disiapkan di lokasi pekerjaan 1. Menggunakan tenaga manusia (400 M2/hari) 2. Pasir dihampar setebal 5 cm 2. Material ditimbun di sepanjang jalan oleh pemasok

3. Batu Pecah Ukuran besar (10-15) di susun berdiri 3. Batu sudah dipecah (50% berat ukuran 10-15, 20% ukuran 5-7 dsb 30% pada hamparan pasir 5 cm Berat pasir urug

4. Batu pecah ukuran lebih kecil dihampar di atasnya sehingga 4. Tanah dasar jalan sudah disiapkan rata kemudian dipadatkan / digilas dengan mesin gilas 5. Dipadatkan sampai tebal 20 cm

 6. Koefisien pemadatan = 1,2  7. Umur alat bantu rata-rata 1 bulan

JUMLAH

ORANG HARI KODE

JUMLAH HARI-ORANG UPAH (Rp/org/hari) B I A Y A ( Rp ) SUB TOTAL ( Rp ) Mandor 2.00 1 L 061   2.00   102,000.00 204,000.00 Operator Terlatih 1.00 1 L 081   1.00   110,000.00 110,000.00 Pembantu Operator 1.00 1 L 089   1.00   80,000.00 80,000.00 Sopir 1.00 1 L 091   1.00   85,000.00 85,000.00 Pembantu Sopir 1.00 1 L 099   1.00   80,000.00 80,000.00

Buruh Tak Terampil 80.00 1 L 101   80.00   70,000.00 5,600,000.00

PEKERJA 6,159,000.00 JUMLAH BAHAN VOLUME SATUAN KODE HARGA SATUAN ( Rp ) BIAYA ( Rp ) SUB TOTAL ( Rp ) Batu Padas 10 - 15 cm 50.00 M3 M 020   230,000.00 11,500,000.00 Batu Pecah 5 - 7 cm 20.00 M3 M 022   389,000.00 7,780,000.00 PasirUrug 30.00 M3 M 040   50,000.00 1,500,000.00

 Alat Bantu ( set@3 alat ) 3.20 set M 170   150,000.00 480,000.00

MATERIAL 21,260,000.00 JUMLAH  ALAT HARI KERJA KODE JAM KERJA HARGA ( Rp / Jam ) B I A Y A ( Rp ) SUB TOTAL

Mesin Gilas Roda Besi 8-10 Ton 1.00 1.00 E 080 5.00   172,137.00 860,685.00 Truck Tangki Air 115 HP 1.00 1.00 E 182 5.00   191,730.00 958,650.00

PERALATAN 1,819,335.00 TOTAL Rp 29,238,335.00 P E R A L A T A N P E R  A L  A T  A N P E K E R J A P E K E R J  A MATERIAL M  A T E R I  A L KODE :

KABUPATEN :

 ASAHAN

DISIAPKAN OLEH : TANGGAL : PROPINSI : SUMATERA

DINAS PEKERJAAN UMUM

KABUPATEN ASAHAN

TAHUN ANGGARAN 2012

ANALISA BIAYA PEKERJAAN

PENGUPASAN & PEMBERSIHAN SEMAK PADA DAMIJA

( MENGGUNAKAN BURUH )

(10)
(11)
(12)

KODE

K 6 1 8

KODE

( 12 ) KODE

 URAIAN : ANGGAPAN / ASUMSI :

 1. Hampar agregat kasar 20 m2 / m3 1. Menggunakan Tenaga Buruh

 2. Digilas & dipadatkan dengan mesin gilas roda tiga 2. Agregat pecah tersaring dikirim ke lokasi pekerjaan oleh pemasok 6 - 8 ton 3. Digunakan agregat pecah tersaring yang termurah

3. Semprotkan aspal pengunci 64 m2 / m3 4. Agregat dihampar dengan tenaga manusia  4. Semprotkan aspal binder 2,5 kg / m2 5. Tebal padat perkerasan 5 cm

 5. Hamparkan lapis seal dengan 12,5 mm 6. Permac sesuai rev. Spek. Umum B.M. Maret '89 - Buku chip 80 m2 / m3 & aspal 1,5 kg / m2

JUMLAH

ORANG HARI KODE

JUMLAH HARI-ORANG UPAH (Rp/org/hari) B I A Y A ( Rp ) SUB TOTAL ( Rp ) Mandor 6.00 3 L061 6.00  102,000.00 612,000.00 Operator Terlatih 6.00 3 L061 6.00  110,000.00 660,000.00 Supir Terampil 3.00 3 L091 3.00   85,000.00 255,000.00 Pembantu Supir 3.00 3 L101 3.00   80,000.00 240,000.00

Pekerja Tak Terampil 174.00 3 L101 174.00   70,000.00 12,180,000.00

Pekerja Terampil 6.00 3 L106 6.00   82,000.00 492,000.00 PEKERJA 13,947,000.00 JUMLAH VOLUME SATUAN KODE HARGA SATUAN ( Rp ) BIAYA ( Rp ) SUB TOTAL ( Rp ) Batu Pecah 3 - 5 cm 56.00 M3 M 023   442,000.00 24,752,000.00 Batu Pecah 2 - 3 cm 31.11 M3 M 024   481,000.00 14,963,910.00 Batu Pecah 1 - 2 cm 15.55 M3 M 025   502,000.00 7,806,100.00 PasirBeton 3.50 M3 M 041   55,000.00 192,500.00  Aspal 6,160.00 Kg M 061   14,080.00 86,732,800.00 Minyak Bakar 450.00 Ltr M 065   4,500.00 2,025,000.00

 Alat Bantu 8.16 Set M 170   150,000.00 1,224,000.00

MATERIAL 137,696,310.00 JUMLAH  ALAT HARI KERJA KODE JAM KERJA HARGA ( Rp / Jam ) B I A Y A ( Rp ) SUB TOTAL

Mesin Gilas 3 Roda 8 - 10 T   1.00 3.00 E080 15.00   160,599.79 2,408,996.88

 Aspal Sprayer 200 L   1.00 3.00 E154 15.00   203,676.54 3,055,148.06

Dump Truck 3,5 T   1.00 3.00 E211 15.00   172,715.50 2,590,732.44

KABUPATEN ASAHAN DISIAPKAN OLEH : TANGGAL :

P E K E R J A

DIREKTORAT JENDERAL BINA MARGA DIREKTORAT BINA PROGRAM JALAN SUB DIT. PERENCANAAN JALAN LOKAL &

KABUPATEN

 ANALISA BIAYA PEKERJAAN LAPIS PENETRASI MACADAM

( MENGGUNAKAN BURUH ) P E R  A L  A T  A P E K E R J  A MATERIAL M  A T E R I  A L P E R A L A T A N PROPINSI SUMATERA

(13)

PERALATAN 8,054,877.38 TOTAL Rp 159,698,187.38

VOLUME : 1400 SATUAN M2 HARGA SATUAN Rp. 114,070.13 per M3

(14)

KODE

E 080

0 6

JENISALAT : ROLLER 3 WHEEL 6 - 8 TON TENAGA 37 HP

HARGA :

UMUR KERJA : 10 Year : Jam

1Thn : HariKerja

Atau : 5 Jam Kerja : 1,500 jam FAKTOR (CRF) :

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi : 90 % x (CRF) x 1 Jam /Tahun x x x 1 2. Lain-lain : Asuransi 3% Thn + PPN 10% % x Harga Jam/Tahun x SUB TOTAL =

B. BIAYA OPERASI (OPERATING COST) ( Rp / Jam )

Kebutuhan Bahan Bakar dan Pelumas tiap HP :

Diesel = Liter/HP/Jam

Bensin = Liter/HP/Jam

Pelumas = Liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. / Liter  

Bensin = Rp. /Liter  

Pelumas = Rp. /Liter  

BahanBakar = x 51 x =

Pelumas = x 51 x =

PerbaikandanPareparts = x x =

( 60 % x depresiasi )

SUB TOTAL =

30,000.00

DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN

SUBDIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN

DAN KABUPATEN

PROPINSI KODE

SUMATERAUTARA 1 DISIAPKANTANGGAL

571,988,300.00 2 ASAHAN 1Hari 0.18062 15,000 300 Alat =   0.90 571,988,300.00 KABUPATEN KODE 61,987.516 Rp 1,500.00 3.3 0.03 571,988,300.00 = Rp 11,439.766 1,500.00 0.18062 = 87,172.510 Rp 73,427.282 Rp 0.160 1.170 0.006 0.160   Rp 5,000.00 Rp 40,800.000 5,000.00 4,500.00 0.006   Rp 30,000.00 Rp 9,180.000 0.6   Rp 61,987.52 Rp 37,192.51

(15)

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL

A + B = + = / Jam

KODE

E 182

0 6

JENISALAT : WATER TANK TRUCK  TENAGA 115 HP

HARGA :

UMUR KERJA : 8 Year : Jam

1 Thn : HariKerja

Atau : 5 Jam Kerja : 1,200 jam FAKTOR (CRF) :

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi : 90 % x (CRF) x 1 Jam /Tahun x x x 1 2. Lain-lain : Asuransi 3% Thn + PPN 10% % x Harga Jam/Tahun x SUB TOTAL =

B. BIAYA OPERASI (OPERATING COST) : ( Rp / Jam )

Kebutuhan Bahan Bakar d an Pelumas tiap :

Diesel = Liter/HP/Jam Bensin = Liter/HP/Jam Pelumas = Liter/HP/Jam 4,249.57 Rp 30,362.75 Rp 0.160 1.170 3.3 0.03 169,982,800.00 = 1,200.00 0.006 0.20483 Alat = 0.9 169,982,800.00 0.20483 = Rp 26,113.18 1,200.00 1 Hari DISIAPKAN TANGGAL 169,982,800.00 9,600 300 KODE

SUMATERA UTARA 1 2 ASAHAN

KODE KABUPATEN

DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN

SUBDIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN

73,427.282

Rp Rp 87,172.510 Rp 160,599.79

DAN KABUPATEN PROPINSI

(16)

Harga : Solar / Minyak Diesel = Rp. / Liter  

Bensin = Rp. /Liter  

Pelumas = Rp. /Liter  

BahanBakar = x 115 x =

Pelumas = x 115 x =

PerbaikandanPareparts = x =

( 60 % x depresiasi ) =

SUB TOTAL =

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL

A + B = + = / Jam

KODE

E 153

0 9

JENISALAT : ASPHALT SPRAYER TOWED 200 L TENAGA 25 HP

HARGA :

UMUR KERJA : 6 Year : Jam

1Thn : HariKerja

Atau : 5 Jam Kerja : 1,200 jam FAKTOR (CRF) :

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi : 90 % x (CRF) x 1 Jam /Tahun x x x 1 2. Lain-lain : Asuransi 3% Thn + PPN 10% % x Harga Jam/Tahun x 30,362.75 Rp Rp 128,367.91 Rp 158,730.66 0.6     26,113.18 Rp 15,667.91 128,367.910 Rp 0.160   Rp 5,000.00 Rp 92,000.000 0.006   Rp 30,000.00 Rp 20,700.000 5,000.00 4,500.00 30,000.00

DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN

SUMATERA UTARA 1 2

SUBDIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN

DAN KABUPATEN

ASAHAN DISIAPKAN TANGGAL

396,000,000.00 7,200 300 3.3 0.033 396,000,000.00 = 750.00

PROPINSI KODE KABUPATEN KODE

1Hari 0.23668

Alat

(17)

SUB TOTAL =

B. BIAYA OPERASI (OPERATING COST) : ( Rp / Jam )

Kebutuhan Bahan Bakar d an Pelumas tiap :

Diesel = Liter/HP/Jam

Bensin = Liter/HP/Jam

Pelumas = Liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. / Liter  

Bensin = Rp. /Liter  

Pelumas = Rp. /Liter  

BahanBakar = x 7 x =

Pelumas = x 7 x =

PerbaikandanPareparts = x =

( 60 % x depresiasi ) =

SUB TOTAL =

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL

A + B = + = /Jam

KODE

E 211

0 9

JENISALAT : DUMP TRUCK  TENAGA 115 HP

HARGA :

UMUR KERJA : 6 Year : Jam

1Thn : HariKerja

Atau : 5 Jam Kerja : 1300 jam FAKTOR (CRF) :

A. BIAYA PEMILIKAN (OWNERSHIP COST) : ( Rp. / Jam )

1. Despresiasi : 90 % x (CRF) x 1 , 750.00 129,894 Rp 4,500.00 0.160 1.170 0.006 5,000.00 0.006   Rp 30,000.00 Rp 1,260.000 30,000.00 0.160   Rp 4,500.00 Rp 5,040.000

DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN

73,782.202 Rp

129,894

Rp Rp 73,782.202 Rp 203,676.54

SUMATERA UTARA 1 2

SUBDIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN

DAN KABUPATEN

ASAHAN DISIAPKAN TANGGAL

258,900,500.00 7,800

300

67,482.20 Rp

PROPINSI KODE KABUPATEN KODE

0.6

  Rp 112,470.34

1Hari 0.24668

(18)

Jam /Tahun x x x 1 2. Lain-lain : Asuransi 3% Thn + PPN 10% % x Harga Jam/Tahun x SUB TOTAL =

B. BIAYA OPERASI (OPERATING COST) ( Rp / Jam )

Kebutuhan Bahan Bakar d an Pelumas tiap :

Diesel = Liter/HP/Jam

Bensin = Liter/HP/Jam

Pelumas = Liter/HP/Jam

Harga : Solar / Minyak Diesel = Rp. / Liter  

Bensin = Rp. /Liter  

Pelumas = Rp. /Liter  

BahanBakar = x 106 x =

Pelumas = x 106 x =

PerbaikandanPareparts = x =

( 60 % x depresiasi ) =

SUB TOTAL =

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASIONAL

A + B = + = /Jam 1.170 0.006 5,000.00 6,572 Rp 1,300.00 0.160   Rp 4,500.00 Rp 76,320.000 50,787 Rp 3.3 4,500.00 0.033 258,900,500.00 = 0.160 172,715.50 Rp 0.006   Rp 30,000.00 Rp 19,080.000 30,000.00 = 0.9 258,900,500.00 0.24668 = Rp 44,215 1,300.00 0.6   Rp 44,214.63 Rp 26,528.78 121,928.777 Rp 50,787 Rp Rp 121,928.777

(19)
(20)

160,599.79 Rp

(21)

158,730.66 Rp

(22)

203,676.54 Rp

(23)

172,715.50 Rp

(24)

TOTAL TAHUN JAM PER TAHUN TOTAL JAM 1 Grader 115 HP E 010   1,200,000,000 8   1,500   12,000 100 0.20483 2 Roller 3 Wheel 8-10 ton E 080   571,988,300 10   1,500   15,000 37 0.18062 3 Roller Tandem 6-8 ton E 081   532,200,000 10   1,500   15,000 40 0.18062 4 Roller Preumatic 8-15 ton E 084   1,056,000,000 10   1,500   15,000 95 0.18062 5 Concrete Vibrator E 089   55,200,000 5   600   3,000 4 0.28085 6 Asphalt Finisher 1,820 mm/ 30 HP E 157   481,000,000 7   1,200   8,400 30 0.22600 7 Asphall Sprayer Towed 200 ltr E 154   94,434,200 6   1,200   7,200 25 0.23668 8 Water Tank Truck E 182   169,982,800 8   700   5,600 115 0.20483 9 Truck Picp Up 39 HP E 222   196,400,000 8   700   5,600 115 0.20483 10 Concrete Mixer 125 L E 251   73,700,000 4   1,500   6,000 6 0.33271 11 Compressor 210 m3 / jam E 301   126,000,000 8   750   6,000 35 0.20483 12 Water Pump Ø 5 cm E 341   37,380,000 4   750   3,000 8 0.20483 13 Dump Truck 3,5 T / 115 HP E 211   258,900,500 6   1,300   7,800 115 0.23668 Kisaran, 11 Ju Penawar, CV. DUA WA FERRY SYA Direktur 

DAFTAR HARGA DASAR PERALATAN PEKERJAAN JALAN

KABUPATEN ASAHAN TAHUN ANGGARAN 2012

KAPASITAS ALAT (HORSE POWER) No NAMA ALAT DAN KAPASITAS KODE TOTAL BIAYA

MODAL ( Rp )

UMUR DAN KAFASITAS ALAT

CRF Rp / Jam Rp / Hari 372,665.00   1,863,325.00 160,599.79   802,998.96 146,926.00   734,630.00 308,726.00   1,543,630.00 44,366.00   88,732.00 173,510.00   694,040.00 203,676.54   1,018,382.69 158,730.66   793,653.31 191,730.00   440,979.00 30,893.00   154,465.00 76,592.00   191,480.00 33,213.00   83,032.50 172,715.50   863,577.48 HARGA ALAT

(25)

Rp / Jam Rp / Hari 372,665.00   1,863,325.00 160,599.79   802,998.96 146,926.00   734,630.00 308,726.00   1,543,630.00 44,366.00   88,732.00 173,510.00   694,040.00 203,676.54   1,018,382.69 158,730.66   793,653.31 191,730.00   440,979.00 30,893.00   154,465.00 76,592.00   191,480.00 33,213.00   83,032.50 172,715.50   863,577.48 li 2012 NA PUTRA NASUTION HARGA ALAT

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4

I PEKERJAAN PERSIAPAN

1 Pembuatan / Sewa Kantor Direksi Keet + Gudang  2,000,000.00   1.01 1.01 2 Pengukuran dan Pemasangan Patok Kembali  1,200,000.00   0.61 0.61

3 Tanda Pengaman Lalu Lintas   850,000.00   0.43 0.43

4 Mobilisasi dan Demobilisasi  5,282,000.00   2.68 1.34

II PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'

1 Pengupasan Tanah dan Pembersihan Semak  1,406,250.00   0.71  0.36 0.35

2 Perbaikan Existing dengan Telford / Penambahan Lebar  31,317,911.58  15.89  1.99  1.99  1.99  1.99  1.99  1.98  1.98 1.98

3 Lapisan Penetrasi Macadam ( Lapen ) 153,994,680.69  78.15  8.69  8.69  8.69  8.69 8.69

III PEKERJAAN LAIN-LAIN

1 Photo Dokumentasi   400,000.00   0.20  0.07 0.07

2 Plank Proyek   600,000.00   0.30 0.30

JUMLAH 197,050,842.27 100.00

RENCANA MINGGUAN  3.76  0.36  0.35  1.99  1.99  1.99  1.99  1.99  1.98  1.98  2.05  8.69  8.69  8.69  8.69 8.69

JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

NO URAIAN KEGIATAN HARGA TOTAL

( Rp )

BOBOT ( % )

BULANI BULANII BULAN III BULANIV

0 3.76 4.12 4.47 6.46 8.45 10.44 12.43 14.42 16.40 18.38 20.43 29.12 37.81 46.50 55.19 63.88

(26)

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT

KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4

I PEKERJAAN PERSIAPAN

1 Pembuatan / Sewa Kantor Direksi Keet + Gudang  2,000,000.00   1.01 1.01 2 Pengukuran dan Pemasangan Patok Kembali  1,200,000.00   0.61 0.61

3 Tanda Pengaman Lalu Lintas   850,000.00   0.43 0.43

4 Mobilisasi dan Demobilisasi  5,282,000.00   2.68 1.34

II PEKERJAAN LAPEN SEPANJANG 450 M X 3 M'

1 Pengupasan Tanah dan Pembersihan Semak  1,406,250.00   0.71  0.36 0.35

2 Perbaikan Existing dengan Telford / Penambahan Lebar  31,317,911.58  15.89  1.99  1.99  1.99  1.99  1.99  1.98  1.98 1.98

3 Lapisan Penetrasi Macadam ( Lapen ) 153,994,680.69  78.15  8.69  8.69  8.69  8.69 8.69

III PEKERJAAN LAIN-LAIN

1 Photo Dokumentasi   400,000.00   0.20  0.07 0.07

2 Plank Proyek   600,000.00   0.30 0.30

JUMLAH 197,050,842.27 100.00

RENCANA MINGGUAN  3.76  0.36  0.35  1.99  1.99  1.99  1.99  1.99  1.98  1.98  2.05  8.69  8.69  8.69  8.69 8.69 RENCANA KUMULATIF MINGGUAN 0  3.76  4.12  4.47  6.46  8.45  10.44  12.43  14.42  16.40  18.38  20.43  29.12  37.81  46.50  55.19 63.88

Kisara

PENAWAR, Dibuat

CV. DUA WARNA

FERRYSYAHPUTRANASUTION SARIA

Direktur Tenag

JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

NO URAIAN KEGIATAN HARGA TOTAL

( Rp )

BOBOT ( % )

BULANI BULANII BULAN III BULANIV

0 3.76 4.12 4.47 6.46 8.45 10.44 12.43 14.42 16.40 18.38 20.43 29.12 37.81 46.50 55.19 63.88 M1 M2 M3 M4 1.34 8.68    8.68  8.68 8.68 0.06 8.68    8.68  8.68 10.08 BULAN V KEMAJUAN PEKERJAAN KET  - 20  40  60  80  100 72.56 81.24 89.92 100.00

(27)

M1 M2 M3 M4 1.34 8.68    8.68  8.68 8.68 0.06 8.68    8.68  8.68 10.08 72.56    81.24  89.92 100.00 n, 11 Juli 2012  Oleh,  GINTING a Teknis BULAN V KEMAJUAN PEKERJAAN KET  - 20  40  60  80  100 72.56 81.24 89.92 100.00

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3

II PEKERJAAN LAPEN SEPANJANG 450 M X 3 M' 1 Perbaikan Existing dengan Telford / Penambahan Lebar 

Batu Padas 10 - 15 cm 53.56 M3   6.69   6.69   6.69   6.69   6.70   6.70   6.70 6.70

Batu Pecah 5 - 7 cm 21.42 M3   2.68   2.68   2.68   2.68   2.68   2.68   2.67 2.67

PasirUrug 32.13 M3   4.02   4.02   4.02   4.02   4.02   4.01   4.01 4.01

2 Lapisan Penetrasi Macadam ( Lapen )

Batu Pecah 3 - 5 cm 54.00 M3   6.00   6.00   6.00 6.00 Batu Pecah 2 - 3 cm 30.00 M3   3.33   3.33   3.33 3.33 Batu Pecah 1 - 2 cm 14.99 M3   1.67   1.67   1.67 1.67 PasirBeton 3.38 M3   0.38   0.38   0.38 0.38  Aspal 5,940.00 Kg  660.00  660.00  660.00 660.00 MinyakBakar  433.93 Ltr  48.21  48.21  48.21 48.21 BULAN IV

JADWAL PENGGUNAAN BAHAN

(28)

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3

II PEKERJAAN LAPEN SEPANJANG 450 M X 3 M' 1 Perbaikan Existing dengan Telford / Penambahan Lebar 

Batu Padas 10 - 15 cm 53.56 M3   6.69   6.69   6.69   6.69   6.70   6.70   6.70 6.70

Batu Pecah 5 - 7 cm 21.42 M3   2.68   2.68   2.68   2.68   2.68   2.68   2.67 2.67

PasirUrug 32.13 M3   4.02   4.02   4.02   4.02   4.02   4.01   4.01 4.01

2 Lapisan Penetrasi Macadam ( Lapen )

Batu Pecah 3 - 5 cm 54.00 M3   6.00   6.00   6.00 6.00 Batu Pecah 2 - 3 cm 30.00 M3   3.33   3.33   3.33 3.33 Batu Pecah 1 - 2 cm 14.99 M3   1.67   1.67   1.67 1.67 PasirBeton 3.38 M3   0.38   0.38   0.38 0.38  Aspal 5,940.00 Kg  660.00  660.00  660.00 660.00 MinyakBakar  433.93 Ltr  48.21  48.21  48.21 48.21 PENAWAR, CV. DUA WARNA

FERRY SYAHPUTRA NASUTION Direktur 

BULAN IV

JADWAL PENGGUNAAN BAHAN

NO URAIAN KEGIATAN VOL SAT BULAN I BULAN II BULAN III

M4 M1 M2 M3 M4 6.00     6.00   6.00   6.00 6.00 3.33     3.33   3.34   3.34 3.34 1.67     1.66   1.66   1.66 1.66 0.38     0.37   0.37   0.37 0.37 660.00    660.00  660.00  660.00 660.00 48.21    48.21  48.21  48.21 48.21 Kisaran, 11 Juli 2012 BULAN V KET

(29)

M4 M1 M2 M3 M4 6.00     6.00   6.00   6.00 6.00 3.33     3.33   3.34   3.34 3.34 1.67     1.66   1.66   1.66 1.66 0.38     0.37   0.37   0.37 0.37 660.00    660.00  660.00  660.00 660.00 48.21    48.21  48.21  48.21 48.21 Kisaran, 11 Juli 2012 Dibuat Oleh, SARIA GINTING Tenaga Teknis BULAN V KET

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3

II PEKERJAAN LAPEN SEPANJANG 450 X 3 M' 1 Pengupasan Tanah dan Pembersihan Semak

 Alat Bantu 0.72 set  0.36 0.36

2 Perbaikan Existing dengan Telford / Penambahan Lebar 

Mesin Gilas 3 Roda 6 - 8 T   5.36 jam  0.67  0.67  0.67  0.67  0.67  0.67  0.67 0.67 TruckTangkiAir   5.36 jam  0.67  0.67  0.67  0.67  0.67  0.67  0.67 0.67  Alat Bantu   3.43 set  0.43  0.43 0.43  0.43  0.43  0.43  0.43 0.42

3 Lapisan Penetrasi Macadam ( Lapen )

Mesin Gilas 3 Roda 6 - 8 T 14.46 jam  1.61  1.61  1.61 1.61

 Aspal Sprayer 200 L 14.46 jam  1.61  1.61  1.61 1.61

DumpTruck3,5T 14.46 jam  1.61  1.61  1.61 1.61

 Alat Bantu   7.87 set  0.87  0.87  0.87 0.87 BULAN IV

JADWAL PENGGUNAAN ALAT

NO URAIAN KEGIATAN

TOTAL WAKTU (JAM)

SAT

(30)

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3

II PEKERJAAN LAPEN SEPANJANG 450 X 3 M' 1 Pengupasan Tanah dan Pembersihan Semak

 Alat Bantu 0.72 set  0.36 0.36

2 Perbaikan Existing dengan Telford / Penambahan Lebar 

Mesin Gilas 3 Roda 6 - 8 T   5.36 jam  0.67  0.67  0.67  0.67  0.67  0.67  0.67 0.67 TruckTangkiAir   5.36 jam  0.67  0.67  0.67  0.67  0.67  0.67  0.67 0.67  Alat Bantu   3.43 set  0.43  0.43 0.43  0.43  0.43  0.43  0.43 0.42

3 Lapisan Penetrasi Macadam ( Lapen )

Mesin Gilas 3 Roda 6 - 8 T 14.46 jam  1.61  1.61  1.61 1.61

 Aspal Sprayer 200 L 14.46 jam  1.61  1.61  1.61 1.61

DumpTruck3,5T 14.46 jam  1.61  1.61  1.61 1.61

 Alat Bantu   7.87 set  0.87  0.87  0.87 0.87

Kisar

PENAWAR, Dibua

CV. DUA WARNA

FERRYSYAHPUTRANASUTION SARI

Direktur Tena

BULAN IV

JADWAL PENGGUNAAN ALAT

NO URAIAN KEGIATAN

TOTAL WAKTU (JAM)

SAT

BULAN I BULAN II BULAN III

M4 M1 M2 M3 M4 1.61    1.61  1.60  1.60 1.60 1.61    1.61  1.60  1.60 1.60 1.61    1.61  1.60  1.60 1.60 0.87    0.88  0.88  0.88 0.88 BULAN V KET

(31)

M4 M1 M2 M3 M4 1.61    1.61  1.60  1.60 1.60 1.61    1.61  1.60  1.60 1.60 1.61    1.61  1.60  1.60 1.60 0.87    0.88  0.88  0.88 0.88 n, 11 Juli 2012 t Oleh,  GINTING a Teknis BULAN V KET

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

NO

VOLUME

SATUAN

KETERANGAN

1

Batu Padas 10 - 15 cm 50.00

M3

Bahan dalam Negeri

2

Batu Pecah 5 - 7 cm 20.00

M3

Bahan dalam Negeri

3

PasirUrug 30.00

M3

Bahan dalam Negeri

4

Batu Pecah 3 - 5 cm 56.00

M3

Bahan dalam Negeri

5

Batu Pecah 2 - 3 cm 31.11

M3

Bahan dalam Negeri

6

Batu Pecah 1 - 2 cm 15.55

M3

Bahan dalam Negeri

7

M3

B h

d l

N

i

JENIS BAHAN KERJA YANG DIGUNAKAN

(32)

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

NO

VOLUME

SATUAN

KETERANGAN

1

Batu Padas 10 - 15 cm 50.00

M3

Bahan dalam Negeri

2

Batu Pecah 5 - 7 cm 20.00

M3

Bahan dalam Negeri

3

PasirUrug 30.00

M3

Bahan dalam Negeri

4

Batu Pecah 3 - 5 cm 56.00

M3

Bahan dalam Negeri

5

Batu Pecah 2 - 3 cm 31.11

M3

Bahan dalam Negeri

6

Batu Pecah 1 - 2 cm 15.55

M3

Bahan dalam Negeri

7

PasirBeton 3.50

M3

Bahan dalam Negeri

8

 Aspal 6,160.00

Kg

Bahan dalam Negeri

9

MinyakBakar 450.00

Ltr

Bahan dalam Negeri

Kisaran, 11 Juli 2012

Dibuat Oleh;

SARIA GINTING

Tenaga Teknis

FERRY SYAHPUTRA NASUTION

Direktur 

JENIS BAHAN KERJA YANG DIGUNAKAN

JENIS BAHAN

Diketahui Oleh;

CV. DUA WARNA

(33)

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

NO

TAHUN

PEMBUATAN

JUMLAH

ALAT

MERK ALAT

HARGA

1

MESIN GILAS 3 RODA 6 - 8 Ton

2002

1

SAKAI R25-3

571,988,300

2

WATER

TANK

TRUCK

2003

1

MITSUBISHI

169,982,800

3

 ASPAL SPRAYER 200 L

2000

1

SAKAI

AS

155

94,434,200

4

DUMP TRUCK

2007

5

MITSUBISHI

258,900,500

Kisaran, 11 Juli 2012

Dibuat Oleh;

SARIA GINTING

Tenaga Teknis

FERRY SYAHPUTRA NASUTION

Direktur 

DAFTAR DAN HARGA PERALATAN UTAMA

NAMA PERALATAN

Diketahui Oleh;

CV. DUA WARNA

(34)

PEKERJAAN : LAPEN JALAN TAMBAN LINGK. II KELURAHAN BUNUT BARAT KECAMATAN : KISARAN BARAT

KABUPATEN : ASAHAN

NO

TAHUN

PEMBUATAN

JUMLAH

ALAT

MERK ALAT

KETERANGAN

1

MESIN

GILAS

3

RODA 6

-

8

Ton

2002

1

SAKAI

R25-3

DUKUNGAN

2

WATER

TANK

TRUCK

2003

1

MITSUBISHI

DUKUNGAN

3

 ASPAL SPRAYER 200 L

2000

1

SAKAI

AS

155

DUKUNGAN

4

DUMP TRUCK

2007

5

MITSUBISHI

DUKUNGAN

5

ALAT

BANTU

2010

3

set

variasi

MILIK

Kisaran, 11 Juli 2012

Dibuat Oleh;

SARIA GINTING

Tenaga Teknis

FERRY SYAHPUTRA NASUTION

Direktur 

NAMA PERALATAN

DAFTAR PERALATAN YANG DIPAKAI / UTAMA

Diketahui Oleh;

CV. DUA WARNA

Referensi

Dokumen terkait

Gambar 4.35 Perbandingan Grafik Kecepatan Motor Menggunakan Kontrol P, PI, PID dan Tanpa Kontrol PID dengan Beban Torsi 60 N.m dalam range waktu 0.82 detik sampai 0.94 detik

Karena perilaku politik yang didasari oleh paham keagamaan, maka dengan sendirinya kelompok mereka menggagas pemiki- ran keagamaan baik di bidang akidah mupun hukum fiqih, berb-

Dasar pengeluaran anggaran belanja tidak terduga yang dianggarkan dalam APBD untuk mendanai tanggap darurat, penanggulangan bencana alam dan/atau bencana sosial, termasuk

Pengurus Komite : Ketua Nama ..... Bendahara Komite,

Murabahah pada awalnya tidak memiliki keterkaitan dengan pembiayaan karena murabahah dalam wacana Islam klasik adalah bentuk jual beli di mana penjual menawarkan

Berfungsi membuat garis, berbeda dengan freehand tool, garis tidak akan tercipta mengikuti gerak mouse kita, tapi kita harus melakukan klik pada suatu titik, sehingga akan

Hari Sabtu , Tanggal 19, Bulan Juni , Tahun 2010, Halaman C Kolom --.

Dalam upaya menambah wawasan dan memberikan pengalaman internasional tersebut, kepada para dosen tetap PTAI yang sedang melaksanakan studi S3-nya di