• Tidak ada hasil yang ditemukan

Engineering Geology Study at Gentan Small Dam Plan in Sukoharjo District fahmi

N/A
N/A
Protected

Academic year: 2017

Membagikan "Engineering Geology Study at Gentan Small Dam Plan in Sukoharjo District fahmi"

Copied!
1
0
0

Teks penuh

(1)

Engineering Geology Study at Gentan Small Dam Plan in Sukoharjo District,

Central Java

Fahmi, Herlian Agung. 2009. Engineering Geology Study at Gentan Small Dam Plan in Sukoharjo District, Central Java.Undergraduate thesis, Diponegoro University, Semarang.

Abstract

Development in agricultural areas, especially in Sukoharjo District conducted by agricultural intensification steps. One of the problems existing in several places in the region Sukoharjo district is drought and water shortages in the dry season especially during droughts. Taking advantage of terrain conditions on the basin area of hilly terrain to collect water when it rained and the water use during droughts. Small dam is an alternative water supply solutions that need to be planning to small dam engineering geological investigations aimed to determine engineering geological conditions throughout the area as the dam, around the intake, around the spillway and around the pool, determine the placement and small dam body building supplements, knowing the quantity, quality and location and availability of construction materials carrying capacity of land small dam foundation.

Research method used is a survey method of geological mapping techniques, descriptive methods to make the bore hole description and a qualitative analysis method for small dam design parameters which include the cross-section analysis of the surface of the foundation, feasibility analysis, construction materials and land carrying capacity. While quantitative methods to calculate the volume of the availability of construction materials by using the grid method.

Based on the analysis and field test results of core drilling at the site-1 Bore Hole, Bore Hole Bore Hole -2 and -3 with each depth 5m, 15m and 10m, can be known location engineering geological conditions around the puddle and foundations as well as supporting capacity small dam land. Based on geological analysis techniques, the carrying capacity of land areas where the candidate pool and small dam good foundation. But the foundation for Lu lugeon score> 5, then needed a curtain grouting as deep and 10 m deep consolidation grouting after 5 meters around 2:00-meter excavation to remove the rotting soil. Construction materials in the form of land situated in locations around the borrow area pools. Barrow clay sand hills located in the west with a volume of 23,352 m3, sand gravel along the river with a volume of 168 m3. As for broken rock riprap used in the hills of andesite to the east with a volume of 336 m3. In general, this pile of material fit for use for the foundation material.

Referensi

Dokumen terkait

but with language use, with ‘ ‘ rules of speaking rules of speaking … … the ways in which speakers associate particular the ways in which speakers associate particular.. modes

Dalam rangka pelaksanaan kegiatan APBN Tahun Anggaran 2017, Pokja ULP Paket Pekerjaan Pembangunan Dermaga Danau Lindu Pada Satuan Kerja Balai LLAJSDP Palu Tahun

bahwa berdasarkan pertimbangan sebagaimana dimaksud dalam huruf a dan huruf b, perlu menetapkan Keputusan Bupati Bantul tentang Pembentukan Tim Manajemen Bantuan

Pupuk adalah setiap bahan yang diberikan ke dalam tanah atau. disemprotkan pada tanaman dengan maksud menambah unsur

Puji dan syukur penulis ucapkan kepada Allah SWT karena atas nikmat dan karunia-Nya lah penulis dapat menyelesaikan skripsi dengan judul Hubungan Karakteristik Balita, Kondisi

Kabupaten /Kota Provinsi Sumatera Utara” Tesis S-2, belum diterbitkan, Medan: Pascasarjana Universitas Sumatera

Tujuan dari penelitian ini adalah untuk mengetahui pengaruh frekuensi penyajian ransum yang berbeda terhadap kualitas daging ayam kampung super dilihat dari kadar protein

Setelah dimensi assurance, dimensi responsivenes ditanggapi baik 73% dengan indikator konsistensi perawat untuk menyiapkan waktu menemani pasien dinilai benar 53%