• Tidak ada hasil yang ditemukan

Pembuatan Komposit Interpenetrasi Jaringan Polimer Antara Poliuretan - Karet Alam SIR-10 Dengan Penambahan Zeolit Sebagai Bahan Pengisi

N/A
N/A
Protected

Academic year: 2017

Membagikan "Pembuatan Komposit Interpenetrasi Jaringan Polimer Antara Poliuretan - Karet Alam SIR-10 Dengan Penambahan Zeolit Sebagai Bahan Pengisi"

Copied!
2
0
0

Teks penuh

(1)

PEMBUATAN KOMPOSIT INTERPENETRASI JARINGAN POLIMER ANTARA POLIURETAN-KARET ALAM

SIR-10 DENGAN PENAMBAHAN ZEOLIT SEBAGAI BAHAN PENGISI

ABSTRAK

Interpenetrasi Jaringan Polimer (IPN) telah disintesis menggunakan karet alam SIR-10 (NR) dan poliuretan (PU) secara serentak yang kemudian ditambahkan zeolit sebagai bahan pengisi dalam pembentukan komposit IPN. Prapolimer dari PU telah disintesis dengan menggunakan polipropilen glikol dan toluena Diisosianat dengan perbandingan mol antara NCO : OH = 2 : 1. NR divulkanisasi dengan menambahkan asam stearat, zeolit, MBTS, dan sulfur. Prapolimer PU dan NR tervulkanisasi dicampur dengan menggunakan suhu 140 oC untuk menghasilkan IPN NR-PU. Penambahan zeolit kedalam IPN NR-PU akan menghasilkan komposit IPN NR-PU-Zeolit. Selanjutnya komposit IPN NR-PU-zeolit yang terbentuk dikarakterisasi dengan uji sifat mekanik, uji persentase ikat silang, uji daya serap air dan SEM. Hasil penelitian menunjukkan bahwa komposit IPN NR-PU:zeolit dengan perbandingan 82 phr : 18 phr memiliki kekuatan tarik yang paling tinggi yaitu 22,9 x 10-3 Mpa dan nilai kemuluran 661,214 %. Komposit IPN NR-PU:zeolit dengan perbandingan 82 phr : 18 phr juga memiliki ikat silang yang paling tinggi yaitu 82,65% dan daya serap air yang paling kecil sebesar 7,09 %. Sifat morfologi dianalisa dengan Scanning Electron Microscopy (SEM), menunjukkan bahwa permukaan komposit membentuk fasa homogen antara karet alam, poliuretan dan zeolit.

Kata Kunci : Interpenetrasi Jaringan Polimer (IPN), Karet Alam SIR-10 (NR), Poliuretan (PU), Zeolit

(2)

PREPARATION OF INTERPENETRATING POLYMER NETWORK COMPOSITE FROM SIR-10 NATURAL

RUBBER -POLYURETHANE WITH ZEOLITE AS A FILLER

ABSTRACT

Interpenetrating polymer network (IPN) composite has been synthesized by using SIR-10 Natural Rubber (NR) and polyurethane (PU) simultaneously then added Zeolite as a filler. Prepolymer of PU has synthesized by using Polypropylene Glycol and Toluene Diisocyanates mole ratio between the NCO : OH = 2 : 1. NR vulcanised by adding Stearic Acid, Zeolite, MBTS and sulfur. PU prepolymer and NR vulcanised mixed by using a temperature of 140 oC to produce IPN NR-PU. The addition of Zeolite into IPN NR-PU will produce IPN NR-PU-Zeolite composite. Furthermore, IPN NR-PU-Zeolite composite that is formed characterized by Mechanical Properties Test, Water Absorption Test, Crosslink Percentage and SEM. The results showed that the composites ratio 82 phr:18 phr has the highest tensile strength is 22,9 x 10-3 Mpa and elongation value is 661,214 %. This composite also has the highest crosslink percentage is 82,65 % and has the smallest value of water absorption test is 7,09 %. Morphology of IPN was analyzed by Scanning Electron Microscopy (SEM), shows that the surface of composite has become Homogeneous phase of Natural Rubber, Polyurethane and Zeolite.

Keywords : Interpenetrating polymer network (IPN), SIR-10 Natural Rubber (NR),

Polyurethanes (PU), Zeolite

Referensi

Dokumen terkait

PANITIA PENGADAAN REHABILITASI GEDUNG SEKOLAH MADRASAH TSANAWIYAH NEGERI BIBRIK2. Jl, Dandang Gendis

Analisis Kecemasan dalam Olahraga Pertandingan Seminar Nasional Keolahragaan dalam Rangka POMNAS XIV Banda Aceh Tahun 2015.

Pada hari ini Rabu tanggal Dua Puluh Empat, bulan Agustus, tahun Dua Ribu Enambelas (24-08-2016) Panitia pengadaan Barang/Jasa telah melakukan rapat klarifikasi dan

Strategi, kebijakan, dan prioritas pengabdian kepada masyarakat di tingkat Prodi PPs-Unsyiah harus ditetapkan sesuai dengan visi, misi dan tujuan PPs- Unsyiah

[r]

106 ARGOMULYO SLAMET MADI WIYONO PEDUKUHAN SUROBAYAN RT 007 9. 107 ARGOMULYO WASIYEM PEDUKUHAN SUROBAYAN RT

Selain perbuatan atau tindakan sebagaimana dimaksud dalam Pasal 118 ayat (1), Penyedia Barang/Jasa yang terlambat menyelesaikan pekerjaan dalam jangka

172 TAMANTIRTO MARDANI MANGUN SUKARTO PEDUKUHAN KASIHAN RT 007 7 173 TAMANTIRTO WALJIMAN PEDUKUHAN KASIHAN RT 007 7 174 TAMANTIRTO SUPRIANTO PEDUKUHAN KASIHAN RT 007 7 175