1
ASIAN HIGHWAY NETWORK IN
INDONESIA
The 4
The 4
th
th
Meeting of th Working Group on
Meeting of th Working Group on
the Asian Highway Priority Routes
the Asian Highway Priority Routes
2
Introduction:
Asian Highway (AH) Routes
Denpasar – Surabaya – Surakarta –Semarang –
Cikampek – Jakarta –Merak.
Ferry : Ketapang-Gilimanuk
AH-2 :
Banda Aceh – Medan – Dumai –Pekanbaru –
Jambi – Palembang –Bakauheni.
Ferry : Bakauheni – Merak.
AH-25 :
Non Toll Road
1,128 km.
Toll Road
409 km.
Ferry
8 km.
Non Toll Road
2,586 km
Toll Road
- km.
Ferry
26 km.
Notes : AH-2 ~ same alignment as AH-2 in Asean Highway .
AH-25 ~ same alignment as AH-25 in Asean Highway.
Banda Aceh Medan Dumai Pekanbaru Jambi Palembang Lampung Bakauheni Serang Merak Jakarta Bandung Cikampek Tegal Semarang Surakarta Yogyakarta Surabaya Banyuwangi Denpasar Menggala Lhokseumawe Kisaran Rantauprapat Rengat To Singapore AH-25 AH-2 Ferry Route
Legend
(Road by AH-Code)
Sibolga Padang Batam Bengkulu PangkalpinangA
H
-25
AH - 2
3
Government Policy
on Development & Maintenance of AH Routes
Notes : AH-2 ~ same alignment as AH-2 in Asean Highway .
AH-25 ~ same alignment as AH-25 in Asean Highway.
Banda Aceh Medan Dumai Pekanbaru Jambi Palembang Lampung Bakauheni Serang Merak Jakarta Bandung Cikampek Tegal Semarang Surakarta Yogyakarta Surabaya Banyuwangi Denpasar Menggala Lhokseumawe Kisaran Rantauprapat Rengat 14 m (4 lane) 7 m (2 lane) 6 m ( 2 lane)
Legend
(Road by Minimum
Width of Design)
Sibolga Padang Batam Bengkulu PangkalpinangA
H
-25
AH - 2
Strategy
•
The optimization of existing road network and its operation
•
Widening the links to reach the minimum standard
•
Quality improvement of the links to desirable service level
•
The priority will be according to the following order : crossing
border, provision of proper road signs and road marking, technical
standard adjustment, road safety and the development of missing
links.
Mid-Term National Development Plan
•
Capacity Expansion of Eastern Trunk Road of Sumatera (where the majority
of AH-25 laid on) with minimum width 7 m.
•
Capacity Expansion of North Coast Trunk Road of Java (where AH-2 laid on
from Jakarta to Semarang) with minimum width 14 m.
•
Capacity Expansion of Middle Trunk Road of Java (where AH-2 laid on from
Surakarta to Surabaya) and continue to Banyuwangi via North Coast Trunk
Road with minimum width 7m.
•
Capacity Expansion of Southern Trunk Road of Bali (where AH-2 laid on
from Gilimanuk to Denpasar) with minimum width 6 m.
New Policies
•
Stipulation of eastern trunk road of Sumatera, some parts of North Coast
Trunk road of Java and all parts of Southern Trunk Road of Bali as part of
Six Economic Corridor
z
z
z
z
z
#
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
Jambi
Medan
Padang
Serang
Bandung
JAKARTA
Mataram
Bengkulu
Denpasar
Semarang
Surabaya
Palembang
Pekanbaru
Pontianak
Sa
Banda Aceh
Yogyakarta
Banjarmasin
Palangkaraya
Pangkalpinang
Bandar Lampung
Tanjung Pinang
Current Status of AH Network
Condition on June 2011
•
In General, Road Condition of AH Route are relatively good. More
than 93 % are in stable condition which mean there shouldn’t be
any obstacle using the road anytime, any weather. The driver may
run up to 60 km/hr in flat terrain on uncongested traffic.
•
The Fewer bad condition laid on north Sumatera and
Pemalang-Tegal, while the other poor laid on Jambi, Southern Sumatera and
Cirebon-Brebes.
Notes : AH-2 ~ same alignment as AH-2 in Asean Highway .
AH-25 ~ same alignment as AH-25 in Asean Highway.
A
H
-25
AH - 2
Legend
(Road by Average of
Condition)
0.001 - 4
4.001 - 8
8.001 - 12
12.001 - 100
Good
Fair
Poor
Bad
Good
Fair
Bad
AH2
882.68
618.80
36.01
AH25
968.91
1,445.70
171.74
Grand Total
1,851.58
2,064.50
207.75
Good
Fair
Bad
AH2
57%
40%
2%
AH25
37%
56%
7%
Grand Total
45%
50%
5%
Condition (Km)
AH‐Route
AH‐Route
Condition (%)
z
z
z
z
z
#
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
Jambi
Medan
Padang
Serang
Bandung
JAKARTA
Mataram
Bengkulu
Denpasar
Semarang
Surabaya
Palembang
Pekanbaru
Pontianak
Sa
Banda Aceh
Yogyakarta
Banjarmasin
Palangkaraya
Pangkalpinang
Bandar Lampung
Tanjung Pinang
Current Status of AH Network
Width of Carriage Way on June 2011
•
The most advanced route by the capacity point of view, is AH
Route No.2 that laid from Merak to Semarang which almost all
the road already meet 14 m.
•
The Java Island itself, all the road already has minimum width
7 m.
•
In order to meet government policy where the eastern trunk
road of Sumatera should have minimum width 7 m, there are
still several homework which scattered along the route, but
the most are Riau and Lampung.
Notes : AH-2 ~ same alignment as AH-2 in Asean Highway .
AH-25 ~ same alignment as AH-25 in Asean Highway.
Legend
(Road by Average of
Width of Carriageway)
0.1 - 4.499
4.5 - 5.499
5.5 - 5.999
6 - 6.999
7 - 13.999
14 - 100
< 4.5 m
4.5 – 5.5 m
5.5 – 6 m
6 – 7 m
7 – 14 m
>= 14 m
A
H
-25
AH - 2
*) the data is only covered non-toll road
< 4.5 m
4.5 ‐ 6 m
6 ‐ 7 m
7 ‐ 14 m
>= 14 m
AH2
‐
10.57
59.07
600.83
867.01
AH25
1.50
‐
862.84
1,593.44
128.57
Grand Total
1.50
10.57
921.92
2,194.27
995.58
< 4.5 m
4.5 ‐ 6 m
6 ‐ 7 m
7 ‐ 14 m
>= 14 m
AH2
0%
1%
4%
39%
56%
AH25
0.1%
0%
33%
62%
5%
Grand Total
0%
0%
22%
53%
24%
Carriageway Width (Km)
Carriageway Width (%)
AH‐Route
AH‐Route
Current Status of AH Network
Major On-Going Projects 2011
z
z
z
z
z
#
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
Jambi Medan Mamuju Padang Serang Bandung JAKARTA Mataram Bengkulu Denpasar Makassar Semarang Surabaya Palembang Pekanbaru Pontianak Samarinda Banda Aceh Yogyakarta Banjarmasin Palangkaraya Pangkalpinang Bandar Lampung Tanjung Pinang - AH Code : AH-25 - AH No. : 5 - Link No. : 005.1- Link Name : BTS. KOTA LHOKSEUMAWE - PANTON LABU/SIMPANG (KM 328) - Capacity Expansion Cost (mil Rp) : 45000000
- Betterment Cost (mil Rp) : 0 - Rehabillitation Cost (mil Rp) : 0
- AH Code : AH-25 - AH No. : 7 - Link No. : 006
- Link Name : BTS. KOTA LANGSA - BTS. PROV. SUMUT - Capacity Expansion Cost (mil Rp) : 45000000 - Betterment Cost (mil Rp) : 0
- Rehabillitation Cost (mil Rp) : 0
- AH Code : AH-25 - AH No. : 26 - Link No. : 021
- Link Name : PEMATANG REBA - SIBERIDA - Capacity Expansion Cost (mil Rp) : 27450000 - Betterment Cost (mil Rp) : 4021109 - Rehabillitation Cost (mil Rp) : 3958500
- AH Code : AH-25 - AH No. : 27 - Link No. : 028
- Link Name : BTS. PROV. RIAU - MERLUNG - Capacity Expansion Cost (mil Rp) : 200000000 - Betterment Cost (mil Rp) : 0
- Rehabillitation Cost (mil Rp) : 0
- AH Code : AH-25 - AH No. : 34 - Link No. : 015
- Link Name : SIMPANG INDRALAYA - MERANJAT - Capacity Expansion Cost (mil Rp) : 7890000 - Betterment Cost (mil Rp) : 0
- Rehabillitation Cost (mil Rp) : 0
- AH Code : AH-25 - AH No. : 36 - Link No. : 013.1
- Link Name : BUJUNG TENUK - TERBANGGI BESAR - Capacity Expansion Cost (mil Rp) : 56573430 - Betterment Cost (mil Rp) : 0
- Rehabillitation Cost (mil Rp) : 0
- AH Code : AH-2 - AH No. : 29 - Link No. : 013
- Link Name : BTS. KOTA CIREBON - LOSARI (BTS. PROV. JATENG) - Capacity Expansion Cost (mil Rp) : 0
- Betterment Cost (mil Rp) : 51569964 - Rehabillitation Cost (mil Rp) : 0
Vol (Km)
Cost (mil. Rp)
Vol (Km)
Cost (mil. Rp)
Vol (Km)
Cost (mil. Rp)
AH‐2
10
95,243,674
49
212,578,499
45
127,167,805
AH‐25
284
1,209,975,462
22
77,980,418
96
124,717,035
Grand Total
295
1,305,219,136
71
290,558,917
140
251,884,840
Capacity Expansion
AH‐Code
Betterment/Reconstruction
Rehabillitation/Periodic Maint.
g
<= 6 Bil Rp
6 - 20 Bil Rp
20 - 45 Bil Rp
45 - 90 Bil Rp
> 90 Bil Rp
g
<= 6 Bil Rp
6 - 20 Bil Rp
20 - 45 Bil Rp
45 - 90 Bil Rp
> 90 Bil Rp
Future Priority Projects 2012
z
z
z
z
z
#
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
z
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
Jambi Medan Mamuju Padang Serang Bandung JAKARTA Mataram Bengkulu Denpasar Makassar Semarang Surabaya Palembang Pekanbaru Pontianak Samarinda Banda Aceh Yogyakarta Banjarmasin Palangkaraya Pangkalpinang Bandar Lampung Tanjung Pinang - AH Code : AH-25 - AH No. : 5 - Link No. : 005.2- Link Name : PANTON LABU - SP PEUREULAK - Rehabillitation Cost (mil Rp) : 0
- Betterment Cost (mil Rp) : 25000000 - Capacity Expansion Cost (mil Rp) : 25000000 - AH Code : AH-25
- AH No. : 7 - Link No. : 006
- Link Name : LANGSA - BTS.SUMUT - Rehabillitation Cost (mil Rp) : 0 - Betterment Cost (mil Rp) : 0
- Capacity Expansion Cost (mil Rp) : 51188000
- AH Code : AH-25 - AH No. : 30 - Link No. : 002.2
- Link Name : BTS. KODYA (MANDALA) - MUARA BULIAN - Rehabillitation Cost (mil Rp) : 8901912
- Betterment Cost (mil Rp) : 22500000 - Capacity Expansion Cost (mil Rp) : 30000000
- AH Code : AH-25 - AH No. : 21 - Link No. : 006.2
- Link Name : KANDIS - DURI - Rehabillitation Cost (mil Rp) : 3000000 - Betterment Cost (mil Rp) : 9750000 - Capacity Expansion Cost (mil Rp) : 31075000