Monthly Progress Report No. 39
Covering Project Activities During
PT. PERENTJANADJAJAin subconsultancy with ~ Yongma Engineering Co. Ltd and .iilPT. Epadascon Pennata Engineering ConsultantzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
CTCOffice:JI. Ciniru VII No. 25, Kebayoran Baru, Jakarta 5elatan, 12180 Phone /Fax: (02i) 7229823
Team Leader Cc:
1. Direktur Jenderal Bina Marga
2. Inspektorat Jenderal, Kementerian PU-PERA 3. Direktur Transportasi - Bappenas
4. Direktur Pengelolaan Kas Negara (PKN), Kementerian Keuangan 5. Direktur Pengembangan Jaringan Jalan, Dit.Jen Bina Marga
6. Direktur Jalan Bebas Hambatan, Perkotaan dan Fasilitasi Jalan Daerah, Dit.Jen Bina Marga 7. Direktur Pembangunan Jalan, DitJen Bina Marga
.8. Direktur Preservasi Jalan, Dit.Jen Blna Marga 9. Biro Perencanaan & KLN, Kementrian PU-PERA
10. Kepala Balai Besar Pelaksanaan JalanNaslonal t Medan 11. Kepala Balai Besar Pelaksanaan Jalan Nasional llPadanq 12. Kepala Balai Besar Pelaksanaan Jalan Nasionalill Palembang 13. Kasubdit Keterpaduan Perencanaan & Sistem Jaringan, DPJJ - DJBM 14. Kasubdit Manajemen Konstruksi, DPJ - DJBM
15. Kepala Satker Pembinaan Administrasi dan Pelaksanaan Pengendallan PHLN 16, PT. Perentjana Djaja
17. Yongma Engineering Co, Ltd
18. PT. Epadascon Pennata Engineering Consultant
19. File "
This Report is reproduced in twenty (20) copies for distribution to all concerned authorities.
In compliance with the Terms of Reference of our Consultancy Contract, we submit herewith the Monthly Progress Report NO.39 covering the month of March 2016.
Dear Sir,
Subject : Submission of March 2016 Monthly Progress Report No.39; WINRIP Loan IBRD
NO.8043·ID
Attention: Ir. Agusta Ersada Sinulingga, MT Officer In Charge PMU W1NRIP Directorate General of Highways, MPWH JI. Patimura 20 Kebayoran Baru\
Jakarta Selatan Indonesia
Jakarta,Apnl7,2016
: 03_02/C TAlO /M -03.2016
Our Ref.No.
Perentjana Ojaja
MINISTRY OF PUBLIC WORKS
&.HOUSING
DIitECTORATE GENERAL OF HIGHWAYS
DIRECTORATE OF ROAD NETWORK DEVELOPMENT
Core Team Consultant for
Monthly Progress Report March 2016
ANNEXES
Annex P-1 : Package No. 1
Annex P-2 : Package No. 2
Annex P-3 : Package No. 3
Annex P-4 : Package No. 4
Annex P-5 : Package No. 5
Annex P-6 : Package No. 6
Annex P-7 : Package No. 7
Annex P-11: Package No.11
Annex P-13: Package No.13
Annex P-15: Package No.15
Annex P-17: Package No.17
05-Jul-15 Status tanggal : 25-Mar-16
Amount Time ellaps Remaining
(incl VAT) days days Target Highest Avg The last
IDR million % % % % % %
BIHA - KRUI 25-Nov-13 640 10-Jan-16 154.073 100 100
-PT Jaya Konstruksi MP, Tbk
8-Jan-14 93 154.073 154.073
PADANG SAWAH-SIMPANG EMPAT 6-Dec-13 730 19-Apr-16 226.713 98,21 96,83 (1,37) 810 25 3,17 9,26 4,03 1,11
PT Jaya Konstruksi MP, Tbk 6-Jan-14 105 222.646 219.535 97,00% 3,00%
MANGGOPOH - PADANG SAWAH 6-Dec-13 730 20-Mar-16 165.157 100 100
-PT Jaya Konstruksi MP, Tbk 6-Jan-14 75
165.157 165.157
IPUH - BANTAL 14-Nov-13 730 11-Apr-16 196.438 96,29 91,62 (4,67) 803 17 8,38 9,09 3,82 6,98
PT WASKITA KARYA - PT DMT, JO 13-Jan-14 90 189.142 179.976 97,92% 2,08%
SIMPANG RAMPA - PORIAHA 17-Mar-15 540 8-Dec-16 107.321 52,88 10,11 (42,77) 282 258 9,99 2,74 1,26 2,74
PT. NUSA KONSTRUKSI ENJ Tbk. 18-Jun-15 - 56.748 10.847 52,13% 47,87%
KERKAP - PASAR PEDATI 27-Feb-15 450 31-Aug-16 86.517 85,36 27,55 (57,81) 291 159 36,22 7,76 2,50 1,67
PT. WASKITA KARYA Tbk 11-Mar-15 90 73.852 23.840 70,50% 29,50%
INDRAPURA-TAPAN 26-Nov-15 630 30-Aug-17 129.700 0,58 0,73 0,14 107 523 5,84 0,31 0,36 0,14
PT. ADHI KARYA 10-Dec-15 - 757 944 16,85% 83,15%
BANTAL - MUKOMUKO 18-Dec-14 720 11-Feb-17 262.611 43,85 38,87 (4,98) 397 323 5,56 6,20 3,89 5,83
PT. HUTAMA KARYA - PT. DMT, JO 23-Feb-15 - 115.155 102.082 55,08% 44,92%
SIMPANG RUKIS-TANJUNG KEMUNING 18-Dec-14 720 10-Jul-17 292.700 26,94 14,62 (12,32) 248 472 5,34 10,31 2,44 0,24
PT. WASKITA KARYA 22-Jul-15 - 78.858 42.784 34,35% 65,65%
SIBOLGA - Batas TAPSEL 13-Jul-15 810 6-Feb-18 260.100 5,57 1,69 (3,88) 127 683 4,27 0,50 0,84 0,27
PT. PEMBANGUNAN PERUMAHAN 20-Nov-15 - 14.488 4.391 15,57% 84,43%
Sp.Gn KEMALA-PUGUNG TAMPAK 17-Nov-14 720 23-Aug-17 199.551 6,10 6,16 0,06 204 516 5,21 2,05 1,54 2,05
PT Jaya Konstruksi MP, Tbk 4-Sep-15 - 12.169 12.288 - 28,23% 71,77%
BINTUNAN-LAIS 27-Feb-15 300 8-May-16 44.418 79,68 80,78 1,10 381 44 9,61 24,57 7,34 3,44
PT RODATEKNINDO PURAJAYA 11-Mar-15 125 35.392 35.882 89,62% 10,38%
KAMBANG-INDERAPURA 28-Jan-16 720 358.650
PT LANCARJAYA MA-CAHAYA TA,JO ?
-BATAS KOTA PARIAMAN-MANGGOPOH 28-Jan-16 720 12-Mar-18 355.500 3 717
PT PP - STATIKA JO 23-Mar-16 - 0,28% 99,72%
2.125.300 52,62 44,78 (7,84) ####### 951.799
-Review for Taking-Over Certificate. The 95.39% progress is equivalent to 100% because the amount of provisional sums General Item was never utilized in the implementetion of the works 01
02
03
Contractor Time Sch
extension
Review for Taking-Over Certificate. The 95.58% progress is equivalent to 100% because the amount of provisional sums General Item was never utilized in the implementetion of the works 04
06
19
T O T A L :
05
13
15
17 11 07
12
08
Time for Complation Actual Dev
Physical Progress (%)
CONTRACT SIGN DATE
COW
CIVIL WORKS PROGRESS
WESTERN INDONESIA ROAD IMPROVEMENT PROJECT (WINRIP)
Package No. & Name Taking
Over Certificate
(PHO)
Contract
PROGRESS ACHIEVEMENT Time for
Completion
ANNEX P-1
MONTH :
Package No. Time Elapsed (Days) 807
Name Time Elapsed (%) 110,1%
Project Manager Scheduled Progress (%) 96,08
Contractor Actual Overall Progress (%) 91,02
Supervision Consultant Balance (%) -5,06
Contract Sign Progress This Month (%) 14,46
Commencement Date
Time for Complation (Days) 733
Take Over Date Status date
Contract Amount Rp. Accumulative Rp. 71,80%
Contract Amount Add-1 (+ VAT) Rp. *) Include advance payment
Comp Add.2 Accum Actual Accum Accum Total Total Last this to this Sch to % % Month Month Month this
Month
I G e n e r a l 8,25 7,22 7,22 0,32 7,54 8,36
II D r a i n a g e 34,19 23,78 24,29 1,06 25,35 20,11
III Earthworks 3,95 6,56 4,14 0,51 4,65 7,41
IV Pavement Widening &
Shoulders 1,47 0,94 0,54 0,48 1,02 0,80
V Granular Pavement 9,22 7,04 7,07 0,42 7,49 6,94
VI Asphalt Pavement 40,14 46,76 38,74 2,32 41,07 44,78
VII S t r u c t u r e s 1,09 5,36 5,23 1,18 6,41 5,96
VIII Reinstatement &
Minor Works 1,20 1,91 3,47 2,58 6,05 5,16
IX Day Work 0,14 0,12 - 0,09 0,09 0,11
X Routine Maintenance
Works 0,36 0,32 0,31 0,01 0,33 0,37
TOTAL 100,00 100,00 91,02 8,98 100,0 100,0
Note :
2016
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
0,22 0,87 1,69 5,62 11,11 18,06 24,50 31,58 38,99 46,36 52,53 60,68 67,46
31,90 35,31 40,53 47,72 56,69 65,59 75,18 84,21 94,42 100,00
88,43 91,76 96,08 100,00
0,10 0,58 0,79 1,59 2,93 3,71 4,79 5,98 8,60 11,28 12,62 16,08 18,71 21,04 25,88 32,67 37,50 42,27 45,05 55,51 65,00 70,08 76,56 91,02 100,00
(0,12) (0,29) (0,90) (4,03) (8,18) (14,35) (19,71) (25,60) (30,39) (35,08) (39,91) (44,60) (48,75) (14,27) (14,65) (15,06) (19,18) (23,31) (30,13) (28,70) (29,43) (18,34) (15,19) (5,06)
-0,48 0,21 0,80 1,34 0,78 1,08 1,19 2,62 2,68 1,34 3,46 2,63 2,33
MAJOR PROBLEMS ACTION TO BE TAKEN
01
T
IM
E March 25, 2016
BIHA - KRUI
RENARDET S.A JV
Joko Wisargo, ST, MT
A M O U N T 08-Jan-14 25-Nov-13 DISBURSEMENT *) 110.630.337.746
EXECUTIVE SUMMARY REPORT
Mar- 16PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
31-Mar-16
PHYSICAL PROGRESS MONITORING TABLE
2014 Year
10-Jan-16
PHYSICAL WORK PROGRESS BY CATEGORY 134.909.211.000 154.073.015.000
2015 PT JAYA KONSTRUKSI MP, Tbk
Actual Progress (%) Balance (%)
Div Description
The month of time for complation
Rivised Progress Schedul Add.1 (%) Original Progress Schedul (%) Month
Actual progress should not 100 % because there are still has remaining items provisional sums IDR 7.10 billion even though civil works has complete 100%.The actual condition shall be compared with final quantity.Civil Works progress maximum 95.39%
Rivised Progress Schedul Add.2 (%)
0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
P H Y S IC A L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #01
Original
1st Revised Shc
2nd Revised Sch
ANNEX P-2
MONTH :
Package No. Time Elapsed (Days) 809
Name Time Elapsed (%) 96,89%
Project Manager Scheduled Progress (%) 98,21
Contractor PT JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 96,83
Supervision Consultant Balance (%) -1,37
Contract Sign Progress This Month (%) 1,11
Commencement Date
Time for Complation (Days) 730
Time for Complation (Days) 835 Status date
Take Over Date Accumulative Rp. 80,98%
Contract Amount Rp. *) Include advance payment
Contract Amount Add-1 (+ VAT) Rp.
Comp Accum Actual Accum Accum Total Last this to this Sch to % % Month Month Month this Month
I G e n e r a l 10,46 3,378 3,00 - 3,00 3,14
II D r a i n a g e 3,53 3,244 3,24 (0,05) 3,19 3,24
III Earthworks 4,44 4,691 4,69 (0,54) 4,15 4,69
IV Pavement Widening &
Shoulders 2,26 1,948 1,88 - 1,88 1,95
V Granular Pavement 10,49 10,944 10,94 (0,40) 10,55 10,94 VI Asphalt Pavement 52,09 57,028 56,06 1,34 57,40 56,36 VII S t r u c t u r e s 14,35 16,115 14,64 - 14,64 15,60 VIII Reinstatement & Minor
Works 1,65 2,002 0,74 0,70 1,44 1,43
IX Day Work 0,12 0,108 0,04 - 0,04 0,11
X Routine Maintenance
Works 0,62 0,541 0,49 0,05 0,54 0,54
TOTAL 100,00 100,00 95,73 1,11 96,83 98,00
Note :
Year
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Original Progress Schedul (%) 0,45 0,90 2,20 3,45 7,17 13,58 17,48 20,63 27,88 33,56 38,81 44,72 50,52 56,13 62,58 67,95 73,65 79,35
1st Revised Progress Schedul (%) 66,92 71,10 81,03 87,07 91,35 95,62 100,00
2nd Revised Progress Schedul (%) 92,53 95,62 96,75 97,25 98,21 100,00
Actual - 0,13 1,02 2,19 4,11 5,96 9,69 13,85 22,55 25,61 31,45 33,73 40,41 44,25 49,98 55,715 58,61 58,35 63,76 71,36 77,80 83,27 92,53 93,20 92,85 95,73 96,83
Balance (0,45) (0,77) (1,17) (1,26) (3,07) (7,62) (7,80) (6,78) (5,33) (7,95) (7,36) (10,99) (10,11) (11,88) (12,59) (12,23) (15,04) (8,57) (7,35) (9,67) (9,27) (8,08) (3,09) (2,41) (3,90) (1,52) (1,37)
0,89 1,17 1,91 1,86 3,72 4,17 8,69 3,07 5,84 2,28 6,68 3,84 38,29
The month of time for complation
DISBURSEMENT *) 31-Mar-16
183.591.477.365
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
PHYSICAL PROGRESS MONITORING TABLE
2014 2015 2016
226.713.217.000 19-Apr-16
EXECUTIVE SUMMARY REPORT
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
Mar- 1 6
197.936.699.000
Amandm 04
March 25, 2016
PADANG SAWAH-SIMPANG EMPAT 02
T
IM
E
MAJOR PROBLEMS ACTION TO BE TAKEN
A M O U N T
RENARDET S.A JV 06-Dec-13 06-Jan-14 0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
PH Y S IC A L PR O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #02
ORIGINAL 1st Revised Sch 2nd Revised Sch ACTUAL
ANNEX-P3
MONTH :
Package No. Time Elapsed (Days) 809
Name Time Elapsed (%) 100%
Project Manager Scheduled Progress (%) 99,31
Contractor Actual Overall Progress (%) 99,13
Supervision Consultant Balance (%) -0,18
Contract Sign Progress This Month (%) 0,75
Commencement Date
Time for Complation (Days) 730
Time for Complation (Days) 805 Status date
Take Over Date Accumulative Rp. 81,59%
Contract Amount Rp. *) Include advance payment
Contract Amount Add-1 (+ VAT) Rp.
Comp Revised Accum Actual Accum Accum
Total Total Last this to this Sch to
% % Month Month Month this
Month
I G e n e r a l 10,21 10,21 2,07 0,32 2,39 2,39
II D r a i n a g e 13,17 13,17 10,09 - 10,09 10,09
III Earthworks 3,04 3,04 6,99 - 6,99 6,99
IV Pavement Widening &
Shoulders 2,45 2,45 1,38 0,54 1,92 1,92
V Granular Pavement 11,27 11,27 11,25 - 11,25 11,25 VI Asphalt Pavement 55,81 55,81 60,20 (0,48) 59,72 59,72 VII S t r u c t u r e s 0,80 0,80 5,35 (0,07) 5,28 5,28 VIII Reinstatement &
Minor Works 2,27 2,27 0,46 1 1,02 1,02
IX Day Work 0,22 0,22 0,69 - 0,69 0,69
X Routine Maintenance
Works 0,76 0,76 0,65 - 0,65 0,65
TOTAL 100 100 99,13 0,87 100 100
Note :
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
0,26 1,00 1,67 2,45 4,78 7,45 10,70 14,27 21,53 30,10 36,95 44,01 51,62 58,67 65,63 73,03 79,97 87,04
70,14 74,54 82,69 89,96 95,17 97,89 100,00
93,78 98,11 99,31 100,00
0,24 0,48 2,07 2,43 2,87 5,45 5,70 7,01 12,43 14,45 19,30 24,38 29,11 30,11 32,97 39,72 43,28 43,98 48,56 54,37 65,63 85,01 91,15 96,30 98,38 99,13 100,00
(0,02) (0,52) 0,40 (0,02) (1,91) (2,00) (5,00) (7,26) (9,10) (15,65) (17,65) (19,63) (22,51) (28,56) (32,66) (33,31) (36,69) (26,16) (25,98) (28,32) (24,33) (10,16) (6,74) 2,52 0,27 (0,18)
-0,24 1,59 0,36 0,44 2,58 0,25 1,31 5,42 2,02 4,85 5,08 4,73 1,00
03
T
IM
E March 25, 2016
MANGGOPOH - PADANG SAWAH MAJOR PROBLEMS ACTION TO BE TAKEN
EXECUTIVE SUMMARY REPORT
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
Mar- 1 6
A M O U N T
RENARDET S.A JV 06-Dec-13
PT JAYA KONSTRUKSI MP, Tbk
06-Jan-14
Actual progress should not 100 % because there are still has remaining items provisional sums IDR 7.30 billion even though civil works has complete 100%. The actual condition shall be compared with final quantity.Civil Works progress maximum 95.58%
DISBURSEMENT *) 20-Mar-16 31-Mar-16 Div Description 134.753.354.692 143.688.963.000 Balance (%) 2016
Rivised Progress Schedul (%)
165.157.772.000
Rivised Progress Schedul (%) Actual Progress (%)
PHYSICAL PROGRESS MONITORING TABLE
Year 2014
Month
The month of time for complation
2015 PHYSICAL WORK PROGRESS BY CATEGORY
Original Progress Schedul (%)
0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #03
ORIGINAL
1st Revised Sch
2nd Revised Sch
ANNEX P-4
MONTH :
Package No. Time Elapsed (Days) 802
Name Time Elapsed (%) 97,80%
Project Manager Scheduled Progress (%) 96,29
Contractor PT WASKITA KARYA - PT DAYA JO Actual Overall Progress (%) 91,62
Supervision Consultant Balance (%) -4,67
Contract Sign Progress This Month (%) 6,98
Commencement Date
Time for Complation (Days) 730
Time for Complation (Days) 820 Status date
Take Over Date Accumulative Rp. 58,0%
Contract Amount Rp. *)Include advance payment
Contract Amount Add-1 (+ VAT) Rp.
Comp Accum Actual Accum Accum Total Last this to this Sch to % Month Month Month this
Month
I G e n e r a l 7,59 0,52 (0,00) 0,52 5,89
II D r a i n a g e 12,26 7,92 (0,00) 7,92 6,92
III Earthworks 3,58 3,02 0,04 3,05 3,06
IV Pavement Widening &
Shoulders 3,39 3,04 (0,00) 3,04 3,04
V Granular Pavement 18,07 16,79 0,03 16,82 16,82 VI Asphalt Pavement 49,27 45,08 1,79 46,87 46,88 VII S t r u c t u r e s 2,55 4,68 (0,00) 4,68 4,68
VIII Reinstatement & Minor
Works 2,95 3,42 5,12 8,54 8,82
IX Day Work 0,14 0,00 0,00 0,00
X Routine Maintenance
Works 0,20 0,17 0,00 0,17 0,18
TOTAL 100 84,64 6,98 91,62 96,29
Note :
Year
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Schedl Progress Original (%) 0,11 0,32 0,75 1,14 6,57 10,29 12,85 15,81 20,08 24,22 32,76 40,88 47,93 55,61 63,45
1st Revised Schedule (%) 28,57 37,28 48,18 56,89 64,18 73,78 84,47 91,89 98,53
2nd Revised Schedule (%) 61,23 62,14 76,26 86,77 96,29 100,0
Actual Progress (%) - 0,18 0,40 0,53 0,56 0,78 0,87 1,45 3,73 5,35 8,10 9,35 13,79 21,76 27,67 35,43 39,36 42,14 44,24 46,28 50,09 53,17 61,23 70,32 78,69 84,64 91,62
Balance (%) (0,11) (0,14) (0,35) (0,61) (6,01) (9,51) (11,98) (14,36) (16,35) (18,88) (24,66) (31,53) (34,14) (33,85) (0,91) (1,86) (8,81) (14,75) (19,95) (27,51) (34,38) (38,72) (37,30) 8,18 2,43 (2,13) (4,67)
0,22 0,13 0,03 0,22 0,09 0,58 2,27 1,62 2,76 1,25 4,44 7,97
RENARDET S.A JV
MAJOR PROBLEMS ACTION TO BE TAKEN
2015 2016
2014
PHYSICAL PROGRESS MONITORING TABLE
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
196.438.084.000
EXECUTIVE SUMMARY REPORT
Mar- 1 6
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
13-Jan-14 14-Nov-13
04
T
IM
E March 25, 2016
IPUH - BANTAL
ENDRO KUSUMOJOYO, ST.MT
A M O U N T DISBURSEMENT *) 186.936.750.000 113.856.052.141,00 11-Apr-16 31-Mar-16 0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
P H Y S IC A L P R O G R E S ( %)
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #04
ORIGINAL 1st Revised Sch 2nd Revised Sch ACTUAL
ANNEX P-5
MONTH :
Package No. Time Elapsed (Days) 281
Name SIMPANG RAMPA - PORIAHA Time Elapsed (%) 52,04%
Project Manager Ir.Juara M.Siahaan Scheduled Progress (%) 52,88 Field engineering and technical justification Speed up the process of field engineering
Contractor PT. NUSA KONSTRUKSI ENJ Tbk. Actual Overall Progress (%) 10,11 unfinished
Supervision Consultant Balance (%) -42,77
Contract Sign Progress This Month (%) 2,74
Commencement Date
Time for Complation (Days) 540
Take Over Date Status date
Contract Amount Rp. Accumulative Rp. 13,58%
*)Include advance payment
Comp Accum Actual Accum Accum
Total Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 8,09 0,93 0,02 0,95 5,29
II D r a i n a g e 2,77 0,17 0,01 0,18 1,61
III Earthworks 21,28 2,85 0,59 3,44 12,47
IV Pavement Widening &
Shoulders 1,28 - - -
-V Granular Pavement 8,04 0,85 0,75 1,60 3,79
VI Asphalt Pavement 38,75 - - - 12,21
VII S t r u c t u r e s 16,22 2,58 1,36 3,94 15,24
VIII Reinstatement & Minor
Works 3,48 - - - 0,02
IX Day Work 0,10 0,00 0,00 0,00 0,06
X Routine Maintenance
Works - - - -
TOTAL 100,0 7,37 2,74 10,11 50,69
Note :
Year
Month Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Schedl Progress Original (%) 0,22 0,99 3,89 8,90 16,87 23,69 36,44 40,23 46,08 52,88 57,21 61,53 66,93 71,12 79,57 90,71 96,82 100,0 100,0
Actual Progress (%) - 0,57 1,09 1,69 2,72 3,08 3,53 5,77 7,37 10,11
Balance (%) (0,22) (0,42) (2,80) (7,20) (14,16) (20,61) (32,91) (34,45) (38,70) (42,77)
0,57 0,52 0,60 1,03 0,37 0,44 2,25 1,60 2,74 (10,11) - -
-2015
PHYSICAL PROGRESS MONITORING TABLE
107.321.260.310
2016
RENARDET S.A JV 05
T
IM
E March 25, 2016
MAJOR PROBLEMS ACTION TO BE TAKEN
A M O U N T
EXECUTIVE SUMMARY REPORT
Mar- 16
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
DISBURSEMENT *)
18-Jun-15 17-Mar-15
Div Description
PHYSICAL WORK PROGRESS BY CATEGORY
31-Mar-16 14.576.527.316 08-Des-16 0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #05
Schedule
ANNEX P-06
MONTH :
Package No. Time Elapsed (Days) 380
Name Time Elapsed (%) 84,44%
Project Manager DINAR PANGAYOMAN, ST Scheduled Progress (%) 85,36 Field engineering and technical justification Speed up the process of contract amendment
Contractor PT. WASKITA KARYA Tbk Actual Overall Progress (%) 27,55 have finished
Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) -57,81
Contract Sign Progress This Month (%) 1,67
Commencement Date
Time for Complation (Days) 450 Calendar Days
Take Over Date Status date
Contract Amount Rp. Accumulative Rp. 27,90%
*) Include advance payment
Comp Accum Actual Accum Accum
Total Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 0,83 0,68 (0,0) 0,68 0,58
II D r a i n a g e 2,09 0,19 0,00 0,20 2,09
III Earthworks 7,20 6,45 (0,00) 6,45 7,20
IV Pavement Widening &
Shoulders 4,02 - - 1,88
V Granular Pavement 11,07 9,57 0,00 9,57 11,06
VI Asphalt Pavement 70,65 7,46 1,65 9,10 59,12
VII S t r u c t u r e s 0,92 0,88 (0,00) 0,88 0,92
VIII Reinstatement & Minor
Works 2,38 0,12 (0,00) 0,12 0,19
IX Day Work - - -
-X Routine Maintenance
Works 0,85 0,53 0,02 0,55 0,75
TOTAL 100 25,89 1,67 27,6 83,78
Note :
Year
Month March Apr May June July August Sep Oct Nop Dec Jan Feb March Apr May
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Schedl Progress Original (%) 0,17 0,59 1,28 3,09 4,38 8,17 14,27 25,82 38,49 49,93 62,08 75,00 85,36 95,41 100,00
Actual Progress (%) 0,07 0,33 0,76 1,04 1,18 2,27 10,03 15,13 18,75 20,54 23,04 25,89 27,55
Balance (%) -0,15 -0,26 -0,53 -2,04 -3,20 -5,90 -4,24 -10,69 -19,74 -29,38 -39,04 -49,11 -57,81
0,42 0,29 0,13 1,10 7,76 5,09 3,62 1,79 2,49 2,85 1,67 (27,55)
6
T
IM
E March 25, 2016
KERKAP - PASAR PEDATI MAJOR PROBLEMS
EXECUTIVE SUMMARY REPORT
Mar- 1 6
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
02-Jun-16
DISBURSEMENT *)
ACTION TO BE TAKEN
A M O U N T 27-Feb-15 11-Mar-15 24.138.322.996 31-Mar-16 2016 PHYSICAL PROGRESS MONITORING TABLE 2015
86.517.470.000
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description 0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #06
Schedule
Actual
ANNEX P-07
MONTH :
Package No. Time Elapsed (Days) 106
Name Time Elapsed (%) 16,83%
Sub Project Manager / PPK Scheduled Progress (%) 0,58 Field engineering and technical justification Speed up the process of field engineering
Contractor PT ADHI KARYA Actual Overall Progress (%) 0,73 unfinished
Supervision Consultant Balance (%) 0,14
Contract Sign Progress This Month (%) 0,14
Commencement Date
Time for Complation (Days) 630
Take Over Date Status date
Contract Amount (+ PPN) Rp. Accumulative Rp. 14,0%
*) Include advance payment
Comp Accum Actual Accum
Total Last this to this
% % Month Month Month
I G e n e r a l 2,45 0,54 0,06 0,60 0,43
II D r a i n a g e 21,84 - - -
-III Earthworks 5,38 - 0,00 0,00 0,00
IV Pavement Widening &
Shoulders 1,09 - - -
-V Granular Pavement 9,22 - - -
-VI Asphalt Pavement 51,16 - - -
-VII S t r u c t u r e s 6,08 - 0,04 0,04
-VIII Reinstatement & Minor
Works 2,48 - - -
-IX Day Work 0,09 - 0,01 0,01 0,01
X Routine Maintenance
Works 0,20 0,05 0,03 0,08 0,14
TOTAL 100,0 - 0,59 0,14 0,73 0,58
Note :
Year 2015
Month Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
The month for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Original Progress Schedul (%) 0,05 0,11 0,36 0,58 1,21 2,00 4,18 6,17 9,25 15,74 24,13 33,56 43,41 53,60 63,16 72,06 80,85 88,26 93,30 98,00 100,0
Actual Progress (%) - 0,31 0,59 0,73
Balance (%) (0,05) 0,21 0,23 0,14
0,38 0,14 (0,73) - - -
-March 25, 2016
MAJOR PROBLEMS ACTION TO BE TAKEN
DISBURSEMENT *) 30-Agust-17 31-Mar-16 10-Des-15 A M O U N T 7 T IM E
INDRAPURA - TAPAN
RENARDET S.A JV PT. SEECONS 03-Dec-15
18.093.136.050
129.699.900.000
PHYSICAL PROGRESS MONITORING TABLE
2016 2017
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description Amand ment Accum Sch to this Month
EXECUTIVE SUMMARY REPORT
Mar- 1 6
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE # 07
ANNEX P-11
MONTH :
Package No. Time Elapsed (Days) 396
Name Time Elapsed (%) 55,00%
Project Manager Satker Wilayah I Scheduled Progress (%) 43,85
Contractor PT. HUTAMA KARYA, Tbk JO PT. DMT Actual Overall Progress (%) 38,87
Supervision Consultant RENARDET S.A JV PT. CIPTA STRADA Balance (%) (4,98)
Contract Sign Progress This Month (%) 5,83
Commencement Date Take Over Date
Time for Complation (Days) 720 Calendar Days Status date
Contract Amount Rp. Accumulative Rp. 29,56%
Contract Amount Add-1 (+ VAT) Rp. *)Include advance payment
Comp Accum Actual Accum Accum
Total Last this to this Sch to this
% % Month Month Month Month
I G e n e r a l 0,89 0,854 0,874 - 0,874 0,854
II D r a i n a g e 1,97 2,493 1,238 0,04 1,277 1,917
III Earthworks 26,30 11,273 6,258 1,16 7,414 7,503
IV Pavement Widening &
Shoulders 5,13 3,597 - - 0,556 0,827
V Granular Pavement 7,31 14,409 6,847 1,36 8,204 8,525
VI Asphalt Pavement 48,54 52,347 11,401 2,67 14,070 17,634
VII S t r u c t u r e s 5,54 9,879 6,210 0,02 6,229 6,193
VIII Reinstatement & Minor
Works 4,00 4,873 0,036 0,03 0,062 0,249
IX Day Work - - -
-X Routine Maintenance
Works 0,32 0,278 0,179 0,01 0,187 0,150
TOTAL 100,00 100,00 33,04 5,27 38,87 43,85
Note :
Year
Month March Apr May June July August Sep Oct Nop Dec Jan Feb March Apr May June July August Sep Oct Nop Dec Jan Feb
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Schedl Progress Original (%) 0,39 2,18 4,68 7,70 9,91 14,17 18,72 22,96
20,01 22,98 25,39 29,15 36,74 43,85 51,45 58,80 66,39 70,16 77,18 84,00 89,39 93,63 96,19 99,45 100,00
Actual Progress (%) 1,477 5,59 6,59 9,13 10,00 11,28 15,09 17,23 23,22 24,82 26,84 33,04 38,87
Balance (%) 1,08 3,42 1,92 1,43 0,09 (2,89) (3,64) (2,78) 0,23 (0,56) (2,31) (3,70) (4,98)
1,00 2,54 0,87 1,28 3,80 2,15 5,99 1,61 2,02 6,20 5,83 (38,87)
Rivised Progress Schedul (%)
PHYSICAL PROGRESS MONITORING TABLE
2015 2016 2017
228.899.717.000,00 262.611.303.000,00
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description Amend-02 70.559.260.362 31-Des-15 23-Feb-15 DISBURSEMENT *) 11-Feb-17 18-Dec-14 A M O U N T
EXECUTIVE SUMMARY REPORT
Mar- 1 6
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
11
T
IM
E March 25, 2016
BANTAL - MUKOMUKO MAJOR PROBLEMS ACTION TO BE TAKEN
0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #11
Original Sch
Revised Sch
Actual
ANNEX P-13
MONTH :
Package No. Time Elapsed (Days) 247
Name SIMPANG RUKIS-TANJUNG KEMUNING Time Elapsed (%) 34,31%
Project Manager Scheduled Progress (%) 26,94 Field engineering and technical justification Speed up the process of field engineering
Contractor PT. WASKITA KARYA Actual Overall Progress (%) 14,62 unfinished
Supervision Consultant Balance (%) -12,32
Contract Sign Progress This Month (%) 0,24
Commencement Date
Time for Complation (Days) 720
Take Over Date Status date
Contract Amount Rp. Accumulative Rp. 21,32%
*) Include advance payment
Comp Accum Actual Accum Accum
Total Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 0,38 0,35 0,00 0,35 0,35
II D r a i n a g e 1,87 0,51 - 0,51 1,16
III Earthworks 16,52 2,86 - 2,86 8,90
IV Pavement Widening &
Shoulders 4,11 - -
-V Granular Pavement 8,43 3,99 0,14 4,13 4,93
VI Asphalt Pavement 64,33 6,13 0,10 6,23 10,41
VII S t r u c t u r e s 2,05 0,01 - 0,01 1,08
VIII Reinstatement & Minor
Works 2,14 0,53 - 0,53 0,04
IX Day Work - - -
-X Routine Maintenance
Works 0,18 - - - 0,07
TOTAL 100,0 14,37 0,24 14,62 26,94
Note :
Year
Month Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Schedl Progress Original (%) 0,02 0,21 1,65 4,18 6,69 9,61 14,62 20,36 26,94 33,58 41,24 47,87 50,63 58,32 63,60 68,28 72,97 77,66 82,62 86,79 91,19 95,75 99,36 99,74 100,00
Actual Progress (%) - 0,36 0,88 2,19 3,39 13,71 13,84 14,37 14,62
Balance (%) (0,02) 0,14 (0,77) (1,98) (3,30) 4,10 (0,78) (5,99) (12,32)
0,36 0,52 1,32 1,20 10,31 0,14 0,53 0,24 (14,62) - - -
-PHYSICAL PROGRESS MONITORING TABLE
2015 2016 2017
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description DISBURSEMENT *) 10-Jul-17 31-Mar-16 292.700.000.000,00 62.390.761.200 A M O U N T
RENARDET S.A JV 18-Dec-14 22-Jul-15
EXECUTIVE SUMMARY REPORT
Mar- 1 6
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
13
T
IM
E March 25, 2016
MAJOR PROBLEMS ACTION TO BE TAKEN
0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #13
SCHEDULE
ANNEX P-15
MONTH :
Package No. Time Elapsed (Days) 126
Name Time Elapsed (%) 15,6%
Project Manager Ir. ASNER SILALAHI, MT Scheduled Progress (%) 5,57 Field engineering and technical justification Speed up the process of field engineering
Contractor PT. PEMBANGUNAN PERUMAHAN Actual Overall Progress (%) 1,69 unfinished
Supervision Consultant Balance (%) -3,88
Contract Sign Progress This Month (%) 0,27
Commencement Date
Time for Complation (Days) 810
Take Over Date Status date
Contract Amount Accumulative Rp. 9,30%
*) Include advance payment
Comp Accum Actual Accum Accum
Total Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 2,30 1,05 0,01 1,05 1,13
II D r a i n a g e 19,42 0,03 0,03 0,06 2,34
III Earthworks 13,18 - 0,07 0,07 1,26
IV Pavement Widening &
Shoulders 1,95 - - -
-V Granular Pavement 11,46 - - - 0,21
VI Asphalt Pavement 45,06 - - -
-VII S t r u c t u r e s 3,81 0,20 0,15 0,35 0,19
VIII Reinstatement & Minor
Works 2,78 0,14 0,03 0,16 0,44
IX Day Work 0,04 0,00 - 0,00 0,01
X Routine Maintenance
Works - - - -
TOTAL 100,0 1,42 0,27 1,69 5,57
Note :
Year
Month Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Schedl Progress Original (%) 0,11 0,45 1,04 3,18 5,57 8,98 13,46 19,96 23,3 29,8 36,3 42,3 48,17 53,91 58,4 64,3 69,6 75,51 81,15 87,1 90,01 93,9 97,3 98,7 99,7 100,0
Actual Progress (%) 0,15 0,46 0,92 1,42 1,69
Balance (%) 0,03 0,02 (0,12) (1,76) (3,88)
0,32 0,46 0,50 0,27 (1,69) - - -
-SIBOLGA - BTS. TAPSEL
20-Nop-15
260.100.100.000
PHYSICAL PROGRESS MONITORING TABLE
2015 2016 2017
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
06-Feb-18 31-Mar-16
24.189.300.000
A Joint Venture of Renardet, S.A. 13-Jul-15 DISBURSEMENT *) A M O U N T 15 T IM
E March 25, 2016
MAJOR PROBLEMS ACTION TO BE TAKEN
Mar- 16
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
EXECUTIVE SUMMARY REPORT
0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #15
Schedule
Actual
ANNEX P-17
MONTH :
Package No. Time Elapsed (Days) 203
Name PUGUNG TAMPAK-Sp.Gn KEMALA Time Elapsed (%) 28,19%
Project Manager Scheduled Progress (%) 6,10 Field engineering and technical justification Speed up the process of field engineering
Contractor PT. JAYA KONSTRUKSI MP, Tbk Actual Overall Progress (%) 6,16 unfinished
Supervision Consultant Balance (%) 0,06
Contract Sign Progress This Month (%) 2,05
Commencement Date
Time for Complation (Days) 720
Take Over Date Status date
Contract Amount Rp. Accumulative Rp. 10,66%
*) Include advance payment
Comp Accum Actual Accum Accum
Total Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 8,05 1,482 0,024 1,506 1,250
II D r a i n a g e 12,92 0,40 0,247 0,65 1,43
III Earthworks 16,93 2,05 1,515 3,57 2,11
IV Pavement Widening &
Shoulders 7,36 - - - 0,16
V Granular Pavement 4,09 - - - 0,36
VI Asphalt Pavement 42,82 - - -
-VII S t r u c t u r e s 1,98 - 0,245 0,25 0,63
VIII Reinstatement & Minor
Works 5,30 0,001 - 0,001 0,03
IX Day Work 0,23 0,01 - 0,01 0,04
X Routine Maintenance
Works 0,34 0,16 0,019 0,18 0,08
TOTAL 100,0 4,11 2,05 6,16 6,09
Note :
Year
Month Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Jul Agt
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Schedl Progress Original (%) 0,18 0,70 1,18 1,51 2,39 3,80 6,10 10,09 14,15 18,21 21,04 26,32 33,01 39,79 46,73 54,12 61,80 69,15 75,00 80,05 85,25 90,26 95,19 100,0 100,0
Actual Progress (%) 0,921 1,13 1,42 3,05 3,45 4,11 6,16
Balance (%) 0,74 0,43 0,23 1,54 1,06 0,30 0,06
0,21 0,29 1,63 0,40 0,66 2,05 (6,16) - - -
-PHYSICAL PROGRESS MONITORING TABLE
2015 2016 2017
PHYSICAL WORK PROGRESS BY CATEGORY
Div Description
23-Agust-17 31-Mar-16
199.551.000.000 21.262.953.242,00
RENARDET S.A JV 17-Nov-14 04-Sep-15 DISBURSEMENT *) A M O U N T 17 T IM
E March 25, 2016
MAJOR PROBLEMS ACTION TO BE TAKEN
EXECUTIVE SUMMARY REPORT
Mar- 1 6
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #17
Schedule
ANNEX P-19
MONTH :
Package No. Time Elapsed (Days) 380
Name Time Elapsed (%) 89,41
Project Manager Scheduled Progress (%) 79,68
Contractor Actual Overall Progress (%) 80,78
Supervision Consultant Balance (%) 1,10
Contract Sign Progress This Month (%) 3,44
Commencement Date
Time for Complation (Days) 300 Calendar Days
Time for Complation (Days) 425 Calendar Days Status date
Take Over Date Accumulative Rp. 40,31%
Contract Amount Rp. *) Include advance payment
Contract Amount Add-1 (+ VAT) Rp.
Comp Accum Actual Accum Accum
Total Last this to this Sch to this
% Month Month Month Month
I G e n e r a l 0,43 0,23 - 0,23 0,23
II D r a i n a g e 3,15 2,64 - 2,64 2,48
III Earthworks 11,96 11,31 - 11,31 11,31
IV Pavement Widening &
Shoulders 5,30 1,46 - 1,46 2,01
V Granular Pavement 10,69 8,82 - 8,82 8,82
VI Asphalt Pavement 59,66 48,63 3,45 52,1 50,62
VII S t r u c t u r e s 2,00 4,02 - 4,02 3,98
VIII Reinstatement & Minor
Works 6,79 0,20 - 0,20 0,20
IX Day Work 0,02
X Routine Maintenance
Works 0,03 0,02 - 0,02 0,02
TOTAL 100,00 77,34 3,45 80,8 79,69
Note :
Year
Month March April May June July Aug Sept Oct Nov Des Jan Feb March April May
The month of time for complation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Schedl Progress Original (%) 0,12 1,40 8,96 18,40 21,37 23,62 37,37 58,19 87,25 100,00
43,60 52,20 67,79 79,68 98,93 100,00
Actual Progress (%) 0,15 1,30 6,28 14,54 16,21 22,41 28,90 49,74 57,15 57,48 52,77 77,34 80,78
Balance (%) 0,03 -0,10 -2,68 -3,86 -5,16 -1,21 -8,47 -8,45 -30,10 13,88 0,57 9,55 1,10
4,98 8,26 1,67 6,20 6,49 20,84 7,42 0,32 (4,71) 24,57 3,44 (80,78)
2016 PHYSICAL PROGRESS MONITORING TABLE Div
PT RODATEKNINDO PURAJAYA
2015
PHYSICAL WORK PROGRESS BY CATEGORY
31-Mar-16
17.907.342.643
27-Feb-15 11-Mar-15 RENARDET S.A JV
33.689.452.000 44.419.760.000
Description
Rivised Progress Schedul Add.1 (%)
DISBURSEMENT *) A M O U N T
EXECUTIVE SUMMARY REPORT
Mar- 1 6
PROJECT DATA SUMMARY OF WORK PROGRESS PROGRESS STATUS
19
T
IM
E March 25, 2016
BINTUNAN-LAIS MAJOR PROBLEMS ACTION TO BE TAKEN
08-Mei-16 0 10 20 30 40 50 60 70 80 90 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
P H Y S ICA L P R O G R E S ( % )
THE MONTH OF TIME FOR COMPLATION
PROGRESS SCHEDULE PACKAGE #19
ORIGINAL
REVISED SCH
ACTUAL
Monthly Progress Report March 2016
ATTACHMENT No. 1
Attachment No.1 As of March 2016
1 2 3 5 6 7 8 9
1 Krui - Bha Lampung 1 SPPL November 2010 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013 /NOL
2 AMDAL Environmental Feasibility : 12 Oct 2012
Environmental permits: 21 Nov 2012 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013/NOL
3 Monitoring of Integration
AMDAL into Design
-
1X 15 August 2014 NN NN4 AMDAL Implementation Report
(PIU to BLH)
each 6 month
17 April 2015 ; 6 Oct 2015
29 April 2015 ; 19 Oct 2015
11 Mei 2015 ; 14 Des 2015
5 RKPPL
-
1X 28 Jan 2015 06 Feb 2015 23 Feb 2015/NOL6 RKPPL Implementation Report
-
Quarter 3 July 2015 ; 13 Nov2015
31 July 2015 ; 24 Nov 2015
13 August 2015: 14 Dec 15
7 HIV - AIDS Campaign Report
-
1X 8 January 2016 NY NY2 Padang Sawah - Sp Empat Sumatera Barat 1 SPPL Nov. 2013 1X - 20 Jan 2014 14 April 2014/NOL
Jembatan Air Gadang Sumatera Barat 2 UKL & UPL Recommendation: Nov 2013 1X - 09 June 2014 08 Auguts 2014/NOL
3 UKL&UPL Implementation
Report (PIU to BLH)
each 6 month
17 April 2015 ; 6 Oct 2015
29 April 2015 ; 19 Oct 2015
11 Mei 2015 ; 14 Des 2015
4 RKPPL
-
1X 11 Dec 2014 19 Dec 2014 30 Jan 2015/NOL5 RKPPL Implementation Report
-
Quarter 3 July 2015 ; 13 Nov2015
31 July 2015 ; 24 Nov 2015
13 August 2015: 14 Dec 15
6 HIV - AIDS Campaign Report
-
1X 8 January 2016 Ny NY3 Manggopoh - Padang Sawah Sumatera Barat 1 SPPL 30 Dec 2013 1X - 20 Jan 2014 14 April 2014
2 SPPL Implementation Report
(PIU to BLH)
each 6
month 17 April 2015 29 April 2015 11 Mei 2015
3 RKPPL
-
1X 11 Dec 2014 19 Dec 2014 30 Jan 2015/NOL4 RKPPL Implementation Report
-
Quarter 3 July 2015 ; 13 Nov2015
31 July 2015 ; 24 Nov 2015
13 August 2015: 14 Dec 15
5 HIV - AIDS Campaign Report
-
1X 8 January 2016 UP NY4 Ipuh - Bantal Bengkulu 1 SPPL (Initial study) 20 Dec 2013 1X April 2013 -
2 UKL & UPL Environmental permits : 6 Des 2014 1X - 06 Feb 2015
(Environment permits) 23 Feb 2015
3 UKL&UPL Implementation
Report (PIU to BLH)
each 6 month
17 April 2015 ; 6 Oct 2015
29 April 2015 ; 19 Oct 2015
11 Mei 2015 ; 14 Des 2015
4 RKPPL
-
1X 28 Jan 2015 06 Feb 2015 23 Feb 2015/NOL5 RKPPL Implementation Report
-
Quarter 3 July 2015 ; 13 Nov2015
31 July 2015 ; 24 Nov 2015
13 August 2015: 14 Dec 15
6 HIV - AIDS Campaign Report
-
1X 8 January 2016 UP NYSent to WB CTC Letters to PMU
4
Duarations Environmental Safeguard
Correspondence of Environmental Safeguard and Reporting on CTC WINRIP
Date of Recomendation/ Environmental Permits No of
Package Name of Link Province
Environmental Activity, CTC WINRIP
WB NOL/Letters
1 2 3 5 6 7 8 9
Sent to WB CTC Letters to PMU
4
Duarations Environmental Safeguard Date of Recomendation/
Environmental Permits No of
Package Name of Link Province WB NOL/Letters
5 Sp. Rampa - Poriaha Sumut 1 UKL & UPL Recommendation : 8 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design
-
1X 11 Nov 2014 NN NN3 UKL&UPL Implementation
Report (PIU to BLH)
each 6
month NY NY NY
4 RKPPL
-
1X UP UP NY6 RKPPL Implementation Report Quarter NY NY NY
6 HIV - AIDS Campaign Report
-
1X 29 February 2016 NY NY6 Ps. Pedati - Kerkap Bengkulu 1 UKL & UPL Recommendation : 9 Nov 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design
-
1X 29 Oct 2015 NN NN3 UKL&UPL Implementation
Report (PIU to BLH)
-
Quarter NY NY NY4 RKPPL
-
one time 4 Nov 2015 24-Nop-15 12/14/2015/NOL5 RKPPL Implementation Report Quarter 13 Nov 2015 24 Nov 2015 12/14/2015/NOL
6 HIV - AIDS Campaign Report
-
1X 12 February 2016 NY NY7 Indrapura - Tapan Sumatera Barat 1 AMDAL Environmental feasibility : 05 Feb 2014 ;
environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design
-
1X 2 Dec 2015 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYS5 RKPPL Implementation Report Quarter NYS NYS NYS
6 HIV - AIDS Campaign Report
-
1X NYS NYS NYS8 Bts. Kota Pariaman - Manggopoh Sumatera Barat 1 AMDAL Environmental permits : 23 July 2013 1X - 20 Jan 2014 14 April 2014
2 Monitoring of Integration
AMDAL into Design
-
1X 6 Oct 2015 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYS5 RKPPL Implementation Report Quarter NYS NYS NYS
1 2 3 5 6 7 8 9
Sent to WB CTC Letters to PMU
4
Duarations Environmental Safeguard Date of Recomendation/
Environmental Permits No of
Package Name of Link Province WB NOL/Letters
9 Bentungan- Tais (N.013.018 ; 43,42
km) Bengkulu
10 Sp. Empat - Air Balam Sumatera Barat 1 AMDAL Environmental permits : 23 July 2013 1X - 20 Jan 2014 14 April 2014
2 Monitoring of Integration
AMDAL into Design
-
1X 6 Oct 2015 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYS5 RKPPL Implementation Report Quarter NYS NYS NYS
6 HIV - AIDS Campaign Report
-
1X NYS NYS NYS11 Bantal - Mukomuko Bengkulu 1 AMDAL Environmental permits : 3 April 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design
-
1X 10 Dec 2014 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NY NY NY
4 RKPPL
-
1X 10 Des 2015 23-Des-15 8 Jan 2016/NOL5 RKPPL Implementation Report Quarter 13 Nov 2015 24 Nov 2015 14 Des 2015
6 HIV - AIDS Campaign Report
-
1X 8 January 2016 UP NY12 Kambang - Indrapura Sumatera Barat 1 AMDAL Environmental Feasibility : 05 Feb 2014 ;
Environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design
-
1X 2 Dec 2015 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYS5 RKPPL Implementation Report Quarter NYS NYS NYS
6 HIV - AIDS Campaign Report
-
1X NYS NYS NYS13 Sp. Rukis - Tj. Kemuning Bengkulu 1 UKL & UPL
Recommendation : 31 Jan 2012 (Link of Sp Rukis Mana-Bts Kab Kaur & 4 Feb 2012 (Bts Kaur - Tj
Kemuning)
1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
UKL&UPL into Design
-
1X 6 Oct 2015 NN NN3 UKL&UPL Implementation
Report (PIU to BLH)
each 6
month NY NY NY
4 RKPPL
-
1X 4 Nov 2015 24-Nop-15 14 Dec 2015/NOL5 RKPPL Implementation Report Quarter NY NY NY
6 HIV - AIDS Campaign Report
-
1X 12 February 2016 NY NN1 2 3 5 6 7 8 9
Sent to WB CTC Letters to PMU
4
Duarations Environmental Safeguard Date of Recomendation/
Environmental Permits No of
Package Name of Link Province WB NOL/Letters
14 Painan - Kambang Sumatera Barat 1 AMDAL Environmental Feasibility : 05 Feb 2014 ;
Environmental permits : 5 Feb 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design
-
1X 2 Dec 2015 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYS5 RKPPL Implementation Report Quarter NYS NYS NYS
6 HIV - AIDS Campaign Report
-
1X NYS NYS NYS15 Sibolga - Bts. Tapsel Sumut 1 UKL & UPL Recommendation : 8 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design
-
1X 11 Nov 2014 NN NN3 UKL&UPL Implementation
Report (PIU to BLH)
each 6
month NY NY NY
4 RKPPL
-
1X UP UP NY5 RKPPL Implementation Report Quarter NY NY NY
6 HIV - AIDS Campaign Report
-
1X 29 February 2016 NY NN16 Sebelat-Ipuh Inc.Air Lalang & Air
Gunung Bridges Bengkulu 1 AMDAL Environmental permits : 3 April 2014 1X - 09 June 2014 08 August 2014
2 Monitoring of Integration
AMDAL into Design
-
1X 10 Dec 2014 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYS5 RKPPL Implementation Report Quarter NYS NYS NYS
6 HIV - AIDS Campaign Report
-
1X NYS NYS NYS17 Sp. Gunung Kemala-Pg. Tampak, Inc
Way Tauu Bridge Lampung 1 AMDAL
Environmental Feasibility : 12 Oct 2012
Environmental permits: 21 Nov 2012 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
AMDAL into Design
-
1X 11 Nov 2014 NN NN3 AMDAL Implementation Report
(PIU to BLH)
each 6
month NY NY NY
4 RKPPL
-
1X UP UP NY5 RKPPL Implementation Report Quarter NY NY NY
1 2 3 5 6 7 8 9
Sent to WB CTC Letters to PMU
4
Duarations Environmental Safeguard Date of Recomendation/
Environmental Permits No of
Package Name of Link Province WB NOL/Letters
18 Seblat - Ketahun (N.013.005 :
Panjang 42,07km) Bengkulu
19 Lais- Bintunan Bengkulu 1 UKL & UPL Recommendation : 9 Nov 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design
-
1X 6 Oct 2015 NN NN3 UKL&UPL Implementation
Report (PIU to BLH)
each 3
month NY NY NY
4 RKPPL
-
1X 4 Nov 2015 24-Nop-15 14 Dec 2015/NOL5 RKPPL Implementation Report Quarter 13 Nov 2015 24-Nop-15 14 Dec 2015/NOL
6 HIV - AIDS Campaign Report
-
1X 12 February 2016 NY NN20 Lubuk Alung - Sincin Sumatera Barat 1 UKL & UPL Recommendation : 27 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design
-
1X 29 Oct 2015 NN NN3 UKL&UPL Implementation
Report (PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYSRKPPL Implementation Report Quarter NYS NYS NYS
5 HIV - AIDS Campaign Report
-
1X NYS NYS NYS21 Lubuk Alung - Kuraitaji Sumatera Barat 1 UKL & UPL Recommendation : 27 Dec 2011 1X 24 Sep 2013 30 Sep 2013 20 Nov 2013
2 Monitoring of Integration
UKL&UPL into Design
-
1X 29 Oct 2015 NN NN3 UKL&UPL Implementation
Report (PIU to BLH)
each 6
month NYS NYS NYS
4 RKPPL
-
1X NYS NYS NYS5 RKPPL Implementation Report Quarter NYS NYS NYS
6 HIV - AIDS Campaign Report
-
1X NYS NYS NYSKeterangan :
NN : Not Need UP : Under Process incl. 1 Document Studi Amdal
incl. 1 Document Studi Amdal
NY : Not Yet incl. 1 Document Studi Amdal
NYS: Not Yet Started
Monthly Progress Report March 2016
Appendix A
Estimated Contractor(s) or Total Est. Budget
Starting Completion Consultant(s) Man-Month WB + GOI Remarks
Date Date Name (Excl. the (PIP) Original Physical Man-Month Physical Man-Month Physical Man-Month
Supp. Staff) (USD, Excl.VAT) In IDR In USD Amendment No. 1 InIDR Amendment No. 2 InIDR Amendment No. 3 InIDR Amendment No. 4 InIDR Amendment No. 5 InIDR Amendment No. 6 InIDR ( % ) ( MM ) ( % ) ( MM ) ( % ) ( MM )
1 Betterment and Capacity 308.730.000,00 $206.391.627,27
Expansion of National Roads
1.A AWP-1 ICB DGH 81.630.000,00 $57.821.551,95
1.A1 08-Jan-14 10-Jan-16 1. Krui-Biha (PT. Jaya Konstruksi) Rp 134.909.211.000,00 $11.757.337,74 Rp 154.073.015.000 100% 100% 0,00% Completed
1.A2 06-Jan-14 19-Apr-16 2. Pd. Sawah-Sp. Empat
(PT.Jaya Konstruksi) Rp 197.936.699.896,00 $17.250.183,32 Rp226.713.217.000 Rp 249.348.931.000 98,21% 96,83% -1,38% On - Going Construction
1.A3 06-Jan-14 20-Mar-16 3. Manggopoh-Pd. Sawah
(PT. Jaya Konstruksi) Rp 143.688.963.435,00 $12.522.493,13 Rp156.157.772.000 Rp 183.940.872.000 100% 100% 0,00% Completed
1.A4 10-Jan-14 11-Apr-16 4. Ipuh-Bantal (PT. Waskita Karya) Rp 186.936.750.000,00 $16.291.537,76 Rp 196.438.084.000 96,29% 91,62% -4,67% On - Going Construction
1.B AWP-2 and AWP-3 ICB & NCB DGH 227.100.000,00 $148.570.075,32
18-Jun-15 08-Des-16 5. Sp. Rampa - Poriaha (PT. Nusa
Konstruksi Enjiniring Tbk.) Rp 107.321.260.000,00 $8.084.464,03 52,88% 10,11% -42,77% On - Going Construction 11-Mar-15 02-Jun-16 6. Ps Pedati - Kerkap (PT. Waskita Karya
Tbk) Rp 86.517.470.000,00 $6.641.396,33 85,36% 27,55% -57,81% On - Going Construction
10-Des-15 30-Agust-17 7. Indrapura - Tapan (PT. Adhi Karya) Rp 129.699.900.000,00 $9.350.065,79 0,58% 0,73% 0,15% On-Going Construction 8. Bts. Kt Pariaman - Manggopoh (PT.
PP/PT. Statika) Rp 355.500.000.000,00 $25.627.995,00 NTP issued on March 23, 2016 9. R. Tikang - Kt. Agung Cancelled
10. Sp Empat - Sp Air Balam NOL on BER already issued by WB 23-Feb-15 11-Feb-17 11. Bantal - Mukomuko
(PT. Hutama Karya - PT. DMT, JO) Rp 228.899.717.000,00 $18.765.198,80 Rp 262.611.303.000 43,85% 38,87% -4,98% On - Going Construstion 12. Kambang - Indrapura (PT.
Lancarjaya/PT. Cahaya T.A) Rp 358.650.400.000,00 $25.855.107,34
Contract signed on January 28, 2016
22-Jul-15 10-Jul-17 13. Sp. Rukis - Tj. Kemuning(PT. Waskita Karya) Rp 292.700.000.000,00 $23.454.051,00 26,94% 14,62% -12,32% On-going construction 14. Painan -Kambang Bids opened on Jan 5, 2016 20-Nop-15 06-Feb-18 15. Sibolga - Bts Tap Sel (PT. PP) Rp 260.100.000.000,00 $19.954.872,00 5,57% 1,69% -3,88% On-Going Construction
16. Seblat - Ipuh NOL on BER issued by WB 04-Sep-15 23-Aug-17 17. Sp. Gunung Kemala - Pg. Tampak(PT. Jaya Konstruksi) Rp 199.551.233.000,00 $16.335.263,93 6,10% 6,16% 0,06% On-going construction
18. Mukomuko - Bts. Sumbar Cancelled 11-Mar-15 08-Mar-16 19. Lais- Bintunan (PT. RodatekindoPurajaya) Rp 33.689.452.000,00 $2.586.125,12 Rp 44.419.760.000 79,68% 80,78% 1,10% On - Going Construction
20. Lubuk Alung - Sicincin NOL issued by WB on March 23, 2016
21. Lubuk Alung -Kuraitaji NOL issued by WB on March 23, 2016
1.C Contingency - DGH 6.170.000,00
2 Implementation Support 16.000.000,00
2.A Core Team Consultants (CTC) QCBS DGH 06-Nop-12 06-Mar-16 PT. Perentjana Djaja 556 5.000.000,00 $1.276.700,00 $1.315.925,00 $1.371.925,00 $1.339.925,00 $1.743.780,00 $1.743.780,00 212.95 187.95 25.00 Supporting PMU. Joint Venture with Rp21.415.400.000,00 Rp22.426.175.000 Rp22.458.676.500 Rp23.934.595.000 Rp37.161.972.299 Rp37.161.972.299
Yongma Engineering Co.Ltd. Or US$ equivalent total : 25-Okt-13 03-Sep-14 30-Nop-15 04-Mar-16 04-Mar-16
PT. Epadascon Permata $3.512.681,91 $3.641.077,48
2.B Design & Superv. Consultants QCBS DGH 19-Jun-13 18-Nop-16 Renardet S.A. 1.068 10.000.000,00 $820.600,00 42.33 36.33 -6.00 Design preparation and construction supervision. Joint Venture with Rp51.818.705.000,00
PT Cipta Strada Or US$ equivalent total : PT. Daya Creasi Mitrayasa $6.465.729,72
PT. Seecons PT. Yodya Karya
2.C Incremental Operating Cost Varies PMU 1.000.000,00
Including Technical Audits
3 Road Sector Institutional 1.000.000,00
Development
3.A Capacity Building for NCB DGH 1.000.000,00 TOR has been finalized
Disaster Risks Reduction
4 Contingency for Disaster DGH
-Risk Response
5 Unallocated DGH 18.100.000,00
Total 343.830.000,00 216.370.038,90
31 March 2016
Contract Value Total ( WB + GOI )
PROGRESS
Respon-sibility Revised (in 000)
Appendix - A
OVERALL PROGRESS STATUS
Description
WESTERN INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT (WINRIP) IBRD LOAN No. 8043-ID
Proc. Method Category
Monthly Progress Report March 2016
Appendix B
Appendix B. Road Safety Audit Progresss (March 2016)
Old (2004) New (2009) Site Visiting Submission of
Report Site Visiting
Submission of
Report Site Visiting
Submission of Report
1. No Road Safety Audit at Design Stage.
2. Road Safety Engineering Review by CTC, Dec, 2014
3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014 Date 13-Nop-14 29-Des-14 13-Nop-14 29-Des-14 11-Feb-16 22-Feb-16 4. RSA at PHO stage by CTC, Feb, 2016
1. No Road Safety Audit at Design Stage.
2. Road Safety Engineering Review by CTC, Nov, 2014
3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Nov, 2014 Date 09-Okt-14 05-Nop-14 09-Okt-14 05-Nop-14
1. No Road Safety Audit at Design Stage. 2. Road Safety Engineering Review by CTC
3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Nov, 2014 Date 09-Okt-14 05-Nop-14 09-Okt-14 05-Nop-14 17-Mar-16 23-Mar-16 4. RSA at PHO stage by CTC, Mar, 2016
1. No Road Safety Audit at Design Stage. 2. Road Safety Engineering Review by CTC
3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2014 Date 13-Nop-14 29-Des-14 13-Nop-14 29-Des-14
1. Technical Advisory Report by International RSA CTC, Sept 2013
Date 08-May-13 17-Sep-13
1. Technical Review & RSA at Design Stage done by International RSA CTC 3. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Sep, 2015
Date 18-Jul-13 17-Sep-13 25-Agust-15 08-Sep-15
1. Technical Advisory Report by International RSA CTC, Sept 2013
27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014
3. Result of Highway and RSA Final DED Review by CTC, Nov 2014
Date Apr-14 Mei-14
1. Technical Advisory Report by CTC, Sept 2013
27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014
3. Result of Highway and RSA Final DED Review by CTC, Nov 2014
Date Apr-14 Mei-14
1. Technical Advisory Report by CTC, Sept 2013
27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014
3. Result of Highway and RSA Final DED Review by CTC, Nov 2014
Date Apr-14 Mei-14
1. Technical Review & RSA at Design Stage by International RSA CTC , Jul, 2013 2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Dec, 2015
Date 18-Jul-13 18-Jul-13 17-Des-15 29-Des-15
1. Technical Advisory Report by International RSA CTC, Sept 2013
27-Sep-13 2. Road Safety Audit by Dit. EA & RS, May 2014
3. Result of Highway and RSA Final DED Review by CTC, Nov 2014
Date Apr-14 Mei-14
1. Technical Advisory Report by International RSA CTC, Sept 2013
Date 18-Jul-13 18-Jul-13
1. RSA DED Report by CTC, June, 2015
Date 15-Apr-15 15-Jun-15
1. Technical Advisory Report by International RSA CTC, Sept 2013
Date 08-May-13 23-Sep-13
1. RSA DED Report by CTC, Sept, 2014
Date 14-Agust-14 01-Sep-14
Date
1. Technical Advisory Report by International RSA CTC, Sept 2013
2. RSA at Construction Stage/Monitoring of Traffic Mgmt & Safety by CTC, Sep, 2015
Date 18-Jul-13 17-Sep-13 25-Agust-15 08-Sep-15
1. RSA DED Report by CTC, June, 2015
Date 15-Apr-15 15-Jun-15
1. RSA DED Report by CTC, June, 2015
Date 15-Apr-15 15-Jun-15
Notes :
Road Safety Engineering Review by CTC Road Safety Audit by International RSA CTC Road Safety Audit by Dit. EA & RS DGH Road Safety Audit by CTC
7 54.557 Process
16.80 7 65.788 Process 33%
Lais