DESAIN PIT TAMBANG DAN PERENCANAAN OPERASIONAL PRODUKSI TAMBANG BATUBARA

N/A
N/A
Protected

Academic year: 2022

Membagikan "DESAIN PIT TAMBANG DAN PERENCANAAN OPERASIONAL PRODUKSI TAMBANG BATUBARA"

Copied!
11
0
0

Teks penuh

(1)

128

DAFTAR PUSTAKA

Adler, L., and Thompson, S.D., 2011, Mining Methods Classification System, in Darling, P., SME Mining Engineering Handbook: United States of America, Society for Mining, Metallurgical and Exploration, p. 349 – 355.

Adnannst, Maryanto, dan Guntoro, D., 2015, Rencana Rancangan Tapan Penambangan untuk Menentukan Jadwal Produksi, PT. Cipta Kridatama Kecamatan Meureubo, Kabupaten Aceh Barat, Provinsi Aceh: Prosiding Teknik Pertambangan, p. 87 - 91

Akdag, S., 2015, Determination of Optimum Overall Slope Angle for an Open Pit Iron Mine (Unpublished Thesis): Middle East Technical University, 127 p..

Ali, V.M.A., Maryanto, dan Munir, S., 2019, Kajian Perancangan dan Pentahapan Penambangan Batubara Jangka Pendek PT Baraya Inti Bumi Kecamatan Anggana, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur: Prosiding Teknik Pertambangan, p. 305 - 311.

Amijaya, H., and Littke, R., 2006, Properties of Thermally Metamorphosed Coal From Tanjung Enim Area, South Sumatra Basin, Indonesia with Special Reference to the Coalification path of Macerals: International Journal of Coal Geology 66, p. 271 - 295.

Andi, D., 2020, Target produksi batubara nasional berpotensi direvisi, ini tanggapan Bukit Asam: https://industri.kontan.co.id/news/target-produksi-batubara- nasional-berpotensi-direvisi-ini-tanggapan-bukit-asam (Accessed February 2020)

Arida, M.J., dan Yulhendra, D., 2018, Perencanaan Penambangan Jangka Menengah (Quarterly Plan) Batubara Tahun 2018 di Blok Jebak 2 PT. Nan Riang Desa Ampelu-Jebak Kecamatan Muara Tembesi Kabupaten Batanghari Provinsi Jambi: Jurnal Bina Tambang, Vol 3 no. 4, p. 1577 -1585.

(2)

129 Arif, I., 2016, Geoteknik Tambang: Jakarta, Gramedia Pustaka Utama, 397 p.

Aswandi, D., dan Yulhendra, D., 2019, Redesain Rancangan Ultimate Pit Dengan Menggunakan Software Minescape 4.118 Di Pit S41 PT. Energi Batu Hitam Kecamatan Muara Lawa dan Siluq Ngurai, Kabupaten Kutai Barat, Kalimantan Timur: Jurnal Bina Tambang Vol 4, p. 153 – 164.

Azizi, M.A., Nas, C., dan Oktavia, D., 2018, Pengaruh Geometri Lereng Terhadap Perolehan Batubara Tertambang di PT Arutmin Indonesia Site Kintap Kalimantan Selatan: Seminar Nasional Pakar ke 1, p. 267 – 276.

Bishop, M.G., 2001, South Sumatra Basin Province, Indonesia: The Lahat/Talang Akar-Cenozoic Total Petroleum System: U.S. Geological Survey Open File Report, 22 p.

Blake, 1989, The Geological Regional and Tectonic of South Sumatera Basins:

Proceeding Indonesia Petroleum Association 11th Annual Convention.

Britmindo, 2015, PTBA Updates Coal Reserves, Resources:

http://britmindo.com/britmindo/en/news/detail/2162/ptba-updates-coal- reserves-resources- (Accessed April, 2020)

Bowles, J.E., 1979, Physical and Geotechnical Properties of Soils: Japan, McGraw- Hill, 478 p.

Dyer, G., and Hill, K., 2011, Strip Mining, in Darling, P., SME Mining Engineering Handbook: United States of America, Society for Mining, Metallurgical and Exploration, p. 989 – 1012.

Ellis, M.S., Gunther, G.L., Flores, R.M., Stricker, G.D., Ochs, A.M., and Schuenemeyer, J.H., 2000, Preliminary Report on Methodology for Calculationg Coal Resources of the Wyodak-Anderson Coal Zone, Powder River Basin, Wyoming and Montana: U.S. Geological Survey Open-File Report 98-0789-B, 41 p.

Diniati, B., Yuliadi, dan Maryanto, 2015, Perancangan (Design) Batubara Pit S8 B dengan Nisbah Kupas (Stipping Ratio) 7:1 di PT. Asta Minindo, Desa

(3)

130 Jembayan, Kecamatan Loa Kulu, Kabupaten Kutai Kartanegara, Kalimantan Timur: Prosiding Penelitian SPeSIA, p. 47 - 54.

Febrian, D.T, Yuliadi, dan Guntoro, D., 2015, Rancangan Desain Pit Batubara di PT Cakra Persada Mandiri Mining (PT CPMM) Desa Panaan, Kec. Bintan Ara, Kabupaten Barito Utara, Provinsi Kalimantan Tengah: Prosiding Penelitian SPeSIA, p. 1 - 7.

Fernando, Maryanto, dan Chamid, C., 2015, Perancangan Pit II Penambangan Batubara Sistem Tambang Terbuka Pada Blok 3 PT. Tri Bakti Sarimas Desa Ibul, Kecamatan Kuantan Mudik, Kabupaten Kuantan Singingi Provinsi Riau:

Prosiding Penelitian SPeSIA, p. 30 -38.

Fleurisson J.A., 2012, Slope Design and Implementation in Open Pit Mines:

Geological and Geomechanical Approaches: Procedia Engineering 46, p. 27 – 38.

Frans, J.S., and Nurfalaq, M.H., 2019, Studi Geoteknik Pengaruh Muka Air Tanah Terhadap Kestabilan Lereng ambang Batubara: Indonesian Mining Professionals Journal, p. 12 – 21.

Gafoer, S., Cobrie, T., dan Purnomo, J., 1986, Geologi Lembar Lahat, Sumatra Selatan: Pusat Penelitian dan Pengembangan Geologi, skala 1:250.000, 1 lembar.

Gu, X., Wang, Q., Xu, X., Liu, J., Sun, T., and Du, K., 2017, Open Pit Waste Removal Optimization Through Euipment Fleet Scheduling: Transactions of Nonferrous Metals Society of China 27, p. 2682 – 2600.

Gunradi, R., Sabtanto, Hutamadi, R., dan Islah T., 2005, Pemantauan Dan Evaluasi Konservasi Sumber Daya Mineral, Di Daerah Kabupaten Muara Enim, Provinsi Sumatera Selatan: Kolokium Hasil Lapangan – DIM, p. 58-1 – 58-12.

Gusmaningsih, K., Murad, dan Yulhendra, D., 2018, Desain Pit Tambang Air Laya Barat Untuk Memenuhi Target Produksi Tahun 2018 PT. Bukit Asam (Persero) Tbk Sumatra Selatan: Jurnal Bina Tambang, Vol. 3, p. 963 - 973.

(4)

131 Hawley, P.M., and Stewart A.F., 1987, Design of Open Pit Coal Mine Slopes: An

Integrated Approach: International Journal of Surface Mining 1, p. 179 - 185.

Hoek, E., 2007, Practical Rock Engineering: Rocscience, 341 p.

Hustrulid, W., and Kuchta, M., 1995, Open Pit Mine Planning and Design: Vol 1. – Fundamentals: Netherlands, Taylor & Francis, 836 p.

Hustrulid, W., Kuchta, M., and Martin R., 2013, Open Pit Mine Planning and Design:

Vol 3. – Fudalmentals: United States of America, CRC Press, 1288 p.

Ichsan, M., Mukiat, dan Bochori, 2016, Penerapan Block Modelling dalam Perencanaan Tingkat Produksi Batubara di Pit Kuskus Departemen Hatari PT.

Kaltim Prima Coal Provinsi Kalimantan Timur: Jurnal Pertambangan Vol 1, p.

1 – 10.

Ikwal, R.F., dan Murad M.S., 2019, Perhitungan Sumberdaya Batubara dan Permodelan Pit 2 pada PT. Andhika Yoga Pratama (AYP), Kecamatan Pauh, Kabupaten Sorolangun, Jambi: Jurnal Bina Tambang, Vol. 4, p. 297 - 306.

Islamy, F., 2016, Geologi dan Pola Sebaran Serta Kemenerusan Lapisan Batubara Daerah Gunung Megang, Kecamatan Gunung Megang, Kabupaten Muara Enim, Provinsi Sumatra Selatan (undergraduate unpublished thesis):

Universitas Pembangunan Nasional Veteran Yogyakarta, 100 p.

Jones, N.S., Holloway, S., Creedy, D.P., Garner, K., Smith, N.J.P., Browne, M.A.E.

and Durucan, S., 2004, UK Coal Resource for New Exploitation Technologies Final Report: Commissioned Report CR/04/015N, 231 p.

Kang, K, Ponomarev, A., Zerkal, O., Huang, S., and Lin, Q., 2019, Shallow Landslide Suscepbility Mapping in Sochi Ski-Jump Area Using GIS and Numerical Modelling: International Journal of Geo-Information, p. 1 – 15.

Kaufman, W.W., and Ault J.C., 2001, Design of Surface Mine Haulage Roads – A Manual: US Department of Interior, Information Circular 8758, 49 p.

Kementrian Energi Sumberdaya Mineral, 2015, Menteri ESDM Resmikan 2 PLTU Mulut Tambang Di Sumsel: https://www.esdm.go.id/id/media-center/arsip-

(5)

132 berita/menteri-esdm-resmikan-2-pltu-mulut-tambang-di-sumsel (Accesed, June 2020)

Kementrian Energi Sumberdaya Mineral, 2016, Keputusan Menteri Energi dan Sumberdaya Mineral tentang Patokan Besaran Komponen Biaya Produksi Untuk Perhiungan Harga Dasar Batubara Untuk Pembangkit Listrik Mulut Tambang: Kementrian Energi Sumberdaya Mineral, 10 p.

Kementrian Energi Sumberdaya Mineral, 2020, Keputusan Menteri Energi dan Sumberdaya Mineral tentang Harga Mineral Logam Acuan dan Harga Batubara Acuan untuk Bulan Februari Tahun 2020: Kementrian Energi Sumberdaya Mineral, 10 p.

Kennedy, B.A., 1990, Surface Mining 2nd Edition: United States of America, Society for Mining, Metallurgy and Exploration, 1097 p.

Kumar, V., and Parkash, V., 2015, A Model Study of Slope Stability in Mines Situated in South India: Advances in Applied Science Research, p. 82 – 90.

Kurniawan, A., Amin, M., dan Bochari, 2019, Pengaruh Geometri Jalan Sebelum dan Setelah Perbaikan Jalan Terhadap Produktivitas dan Konsumsi Bahan Bakar Serta Rasio Bahan Bakar: Jurnal Pertambangan Vol 3., p.26 – 35.

Kurniawan, R., Yulhendra, D., dan Prabowo, H., 2015, Rancangan Pit Muara Tiga Besar Selatan Bulan Juni Tahun 2015 Unit Penambangan Tanjung Enim PT Bukit Asam (Persero) Tbk Sumatra Selatan. Jurnal Bina Tambang Vol 2, p. 1 - 14.

Laksono, A.D., Muchsin, A.M., dan Guntoro D., 2018, Permodelan dan Estimasi Sumberdaya Batubara (Studi kasus wilayah IUP CV. Atap Tri Utama Kecamatan Muarajawa, Kabupaten Kutai Kartanegara, Provinsi Kalimanta Timur): Prosiding Teknik Pertambangan, p. 49 - 56.

Labuz, J.F., and Zang, A., 2012, Mohr-Coulomb Failure Criterion: Rock Mechanics and Rock Engineering, p. 975 – 979.

(6)

133 Litvin, O., Tyulenev, M., Zhironkin, S, and Prokopenko, S., 2017, Methodology of coal losses calculation at open pit mining for complex geological conditions – review: Acta Montanistica Slovaca 22, p. 146 – 152.

Liu, X., Liu, Y., Lu, Y., Li, X., and Li, P., 2016, Numerical Analysis of Evaluation Methods and Influencing Factors for Dynamics Stability of Bedding Rocks:

Journal of Vibroengineering, p. 1937 – 1961.

Luppens, J.A., Scott, D.C., Haacke, J.E., Osmonson, L.M., and Pierce, P.E., 2015, Coal Geology and Assesment o Coal Resources and Reserves in the Powder River Basin, Wyoming and Montana: U.S. Geological Survey, 218 p.

Maryanto, 2013, Evaluasi dan Optimasi Cadangan Batubara: Bandung, Universitas Islam Bandung, 15 p.

Maharza, C., dan Octova A., 2018, Estimasi Sumberdaya Batubara dengan Menggunakan Metode Cross Section di PIT 2 PT. Tambang Bukit Jambi. Site Padang Kelapo. Kec. Muaro Sebo Ulu. Kab. Batanghari. Provinsi Jambi: Jurnal Bina Tambang, Vol 3, p. 1793 - 1803.

Marwanza, I., Nas, C., Hamdani, A.H., dan Haryanto, I., 2017, Quantitative Study or Classification of Geological Condition of Coal in Indonesian National Standard – Guidelines for Reporting Resources and Reserves of Coal: Journal of Agriculture and Life Sciences, p. 35 – 38.

Mazumder, B., 2012, Coal Science and Engineering: India, Woodhead Publishing India, 459 p.

Meagher, C., Dimitrakopoulos, R., and Avis, D., 2014, Optimized Open Pit Mine Design, Pushback and the Gap Problem – A Review: Journal of Mining Science, 2014, vol. 50, p. 508 – 526

Mende, O., 2010, Pemodelan dan Perhitungan Sumberdaya Batubara Daerah X, Kab.

Nunukan, Kalimantan Timur (unpublished undergraduate thesis): Institut Teknologi Bandung, 79 p.

Mondol, M.A.A., Quamruzzaman, C., Kabir, S.M.M., and Hossain, S.M.Z., 2013, Open Pit Slope Design of Barapukuria Coal Mine Using Limit Equilibrium

(7)

134 Methods of Slope Stability Analysis: International Journal of Emerging Technology and Advanced Engineering Volume 3, p. 49 – 53.

Nas, C. 1994. Spatial Variations in the Thickness and Coal Quality of the Sangatta Seam, Kutei Basin, Kalimantan, Indonesia (Doctor of Philosophy Thesis):

University of Wollongong, 517 p.

Noor, R.H., 2011, Pengembangan Metode Klasifikasi Sumberdaya Batubara dan Optimasi Jarak Pemboran Eksplorasi dengan Pendekatan Geostatistik (unpublished thesis): Institut Teknologi Bandung, 79 p.

Nwafor, C.G., Nwafor, and Michelle, O., 2018, Open Pit Optimization Processes of Okobo Coal Mine – Strateies for Improving The Economics of Mining Projects With Special Utilization of Minex Optimizer Program: International Journal of Scientific & Technology Research Volume 7, Issue3, p. 105 - 113.

Oktaviani, K., 2018, Rekonsiliasi Data, Sumber Daya Batubara Indonesia Kini 166 Miliar Ton, Cadangan 37 Miliar Ton: https://www.esdm.go.id/id/media- center/arsip-berita/rekonsiliasi-data-sumber-daya-batubara-indonesia-kini-166- miliar-ton-cadangan-37-miliar-ton (Accessed June 2019)

Pradhan, S.P., Vishal, V., Singh, T.N., and Singh, V.K., 2014, Optimisation of Dump Slope Geometry Vis-à-vis Flyash Utilisation Using Numerical Simulation:

American Journal of Mining and Metallurgy Vol.2, p. 1 – 7.

Prinandi, A.R., 2015, Perancangan (Design) Pit Ef Pada Penambangan Batubara di PT Milagro Indonesia Mining Desa Sungai Merdeka, Kecamatan Samboja, Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur: Prosiding Teknik Pertambangan, Vol 1, p. 101 - 109.

PT. Bukit Asam Tbk., 2019, Corporate Presentation Q1 2019: PT. Bukit Asam Tbk, 19.p.

Pusat Sumber Daya Geologi, 2003, Pedoman Pelaporan dan Estimasi Sumberdaya dan Cadangan Batubara: Pusat Sumber Daya Geologi, 14 p.

Pulunggono, A., 1976, Recent Knowledge of Hydrocarbon Potentials in Sedimentary Basins of Indonesia: ABSTRACT. AAPG Bulletin ; 58 (7): 1454.

(8)

135 Purwaningsih, D.A., dan Mamas, 2017, Rancangan Teknis Desain Push Back pada Penambangan Batubara PIT 10 dan PIT 13 PT. Kayan Putra Utama Coal Kabupaten Kutai Kartanegara Kalimantan Timur: Jurnal Geologi Pertambangan Volume 1, p. 13 -27.

Putra, T.N., Maryanto dan Yuliadi, 2019, Rancangan Pentahapan Penambangan Batu Andesit di PT Mitra Sejahtera Mandiri, Kecamatan Cigudeg, Kabupaten Bogor, Provinsi Jawa Barat: Prosiding Teknik Pertambangan, p. 350 – 359.

Rahim, A., Heriyadi, B., dan Anaperta Y.M., 2015, Analisis Kestabilan Lereng Untuk Menentukan Geometri Lereng Pada Area Penambangan Pit Muara Tiga Besar SelatanPT.Bukit Asam (Persero) Tbk, Tanjung Enim, Sumatera Selatan: Jurnal Bina Tambang Vol 2, p. 1- 14.

Ridha, A.H., 2008, Rancangan Penambangan Batubara Studi Kasus: Pit Inul Departemen Hatari, PT.XYZ (Unpublished Undergraduate Thesis): Institut Teknologi Bandung, 128 p.

Roberts, L.N.R., Brownfield, M.E., Hettinger, R.D., and Johnson, E.A., 2001, Methodology for Calculating Coal Resources for the Colorado Plateau, U.S.

Geological Survey Coal Assesment: U.S. Geological Survey Professional Paper 1625–B, 34 p.

Saputra, D., Asof, M., Wiwik, E.D.H., 2014, Rancangan Teknis Penambangan Batubara Di Blok Selatan PT. Dizamatra Powerindo Lahat Sumatera Selatan:

Jurnal Ilmu Teknik Vol. 2, No. 3, p. 1 – 9.

Sasongko, W., 2009, Permodelan Optimasi Pit Tambang Terbuka Batubara:

Pendekatan Incremental Pit Expansion dan Model Cash Flow: International Conference Earth Science and Technology, p. 227 – 236.

Sasongko, W., dan Pradipta, A., 2011, Pemodelan Penilaian Ekonomi untuk Studi Kelayakan Sumberdaya Batubara: Seminar Nasional Ilmu Kebumian ke – 4, p.

201 – 214.

Sasra, N.S., dan Murad, M.S., 2019, The Planning of Supply Requirements for Heavy Equipments and Costs Coal Mine to Reach the Production Target at Langkok

(9)

136 Pit 1 Site PTBA UPO (Persero) Tbk, West Sumatra on 2017: Jurnal Bina Tambang Vol. 4, No.1, p. 188 – 197.

Scott, D.C., Shaffer, B.N., Haacke, J.E., Pierce, P.E., and Kinney, S.A., 2019, Coal Geology and Assesment of Resources and Reserves in the Little Snake River Coal Field and Red Desert Assesment Area, Greater Green River Basin, Wyoming: U.S. Geological Survey, 169 p.

Shonts Jr, E.T., and Nettleton J.M.. 2011. Strip Mine Planning and Design, in Darling, P., SME Mining Engineering Handbook: United States of America, Society for Mining, Metallurgical and Exploration, p. 1013 - 1026.

Sidiq, H., Supandi, Santoso, A.B., 2014, Optimalisasi Pit Design Highwall Berdasarkan Hasil Pemodelan Parameter Geoteknik: Prosiding TPT XXIII PERHAPI, p. 296 – 305.

Standar Nasional Indonesia, 1999, Klasifikasi Sumberdaya dan Cadangan Batubara.

SNI 13-6011-1999: Indonesia, Standar Nasional Indonesia, p. 1 -12.

Standar Nasional Indonesia, 2011, Pedoman Pelaporan, sumberdaya dan cadangan mineral. SNI 4726:2011: Indonesia, Standar Nasional Indonesia, p. 1 -13.

Susilawati, R, and Ward, C.R., 2006, Metamorphism of mineral matter in coal from the Bukit Asam deposit, south Sumatra, Indonesia: International Journal of Coal Geology 68: p. 171 – 195.

Tantri, I., 2017, Pegaruh Seepage Sungai Lawai Terhadap Kestabilan Lereng dan Optimalisasi Lereng pada Tambang Air Laya (TAL) Barat PT. Bukit Asam (Persero) Tbk (unpublished undergraduate thesis): Yogyakarta, Universitas Gadjah Mada, p.

Tarigan, M., 2014, Studi Komparasi Pemodelan Sumberdaya Batubara Menggunakan Perangkat Lunak Minescape dan Surpac (Studi Kasus IUP PT Arzara Baraindo Energi Tama, Kecamatan Tenggarong, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur (unpublished undergraduate thesis): Universitas Gadjah Mada.

Thomas, L., 2013, Coal Geology: United Kingdom, Wiley – Blackwell, 444 p.

(10)

137 Turnip, T., 2010, Analisis Getaran Peledakan Terhadap Kemantapan Lereng Highwall di Tambang Tutupan, PT. Adaro Indonesia (Unpublished Undergraduate Thesis): Bandung, Institut Teknologi Bandung, 80p.

Wetherelt, A., and van der Wielen, K.P., 2011, Introduction to Open Pit Mining, in Darling, P., SME Mining Engineering Handbook: United States of America, Society for Mining, Metallurgical and Exploration, p. 857 - 876.

Wicaksono, R.I., Zaenal, dan Widayati, S., 2017, Rancangan Teknis dan Ekonomi Kegiatan Penambangan Batubara dengan Target Produksi 65.000 ton/bulan di PT BMQ site Kecamatan Taba Penanjung, Kabupaten Bengkulu Tengah, Provinsi Bengkulu: Prosiding Teknik Pertambangan, p. 490 - 497.

Wijaya, A.A., 2014, Rancangan Teknis Penambangan Batubara di PIT 1 PT Dewa Ruci Mandiri, Kecamatan Sebuku, Kabupaten Nunukan Utara, Provinsi Kalimantan Utara (unpublished undergraduate thesis): Yogyakarta, Universitas Pembangunan Nasional “Veteran”, 101 p.

Wijaya, K.G., Idrus, A., dan Sasongko, W., 2012, Analisis Break Even Stripping Ratio dan Desain PIT Tambang Batubara PT.X: Proceeding Pit IAGI 2012, p.

485 – 489.

Wibisono, R.A, Yuliadi, dan Maryanto, 2018, Perancangan Pentahapan Kemajuan Tambang Batubara dan Perencanaan Fleet di PT Bukit Intan Indoperkasa, Desa Batang Kulur Kiri, Kecamatan Sungai Raya, Kabupaten Hulu Sungai Selatan, Provinsi Kalimantan Selatan: Prosiding Teknik Pertambangan, p. 352 - 361.

Wood Jr, G.H., Kehn, T.M., Carter, M.D., and Culbertson W.C., 1983, Coal Resource Classification System of the U.S. Geological Survey: United States of America, United States Geological Survey, 65 p.

Wu, D., Wang, Y., Qiu, Y., Zhang, J., ad Wan, Y., 2019, Determination of Mohr – Coulomb from Nonlinear Strength Criteria For 3D Slopes: Mathematical Problems in Engineering, p. 1 – 12.S

(11)

138 Wulandari, C., dan Octova, A., 2018, Optimalisasi Produksi Batubara dengan Meminimalisir Coal Loose pada Area Pit Penambangan di PT. Artamulia Tatapratama: Jurnal Bina Tambang, Vol 3 no. 4, p. 1682 - 1691.

Wyllie, C.D., and Mah, C.W., 2004, Rock Slope Engineering: Civil and Mining 4th Edition: United States of America, Taylor & Francis, 431 p.

Yuliandy, F., 2012, Kajian Teknis Produktifitas Alat Muat dan Alat Angkut Batubara pada Penambangan Batubara Di PT. Bukit Asam (Unpublished Undergraduate Thesis): Yogyakarta, Universitas Pembangunan Nasional Yogyakarta.

Yulloh, R., Yunus, A., dan Usman, D.N., 2019, Estimasi Sumberdaya Batubara Blok D dan Blok E di Wilayah Konsesi IUP PT. Andhika Yoga Pratama, Kecamatan Pauh, Kabupaten Sarolangun, Provinsi Jambi: Prosiding Teknik Pertambangan, p. 343 – 351.

Zainassolihin, A.A., Maryanto dan Pulungan, L., 2015, Penjadwalan Tambang (Mine Scheduling) untuk Mencapai Target Produksi Batubara 25.000 Ton/Bulan di PT. Milagro Indonesia Mining Desa Bukit Merdeka Kecamatan Samboja Kabupaten Kutai Kartanegara Provinsi Kalimantan Timur: Prosiding Teknik Pertambangan, p. 51 - 57.

Zhengao, Z., Li, M., Kemin, Li., Ziaohua, D., and Suangshuang, X., 2017, Comparative study of mining methods for reserves beneath end slope in flat surfaces mines with ulra-thick coal seams: International Journal of Mining Science and Technology, p. 1065 – 1071.

Zhu, D.Y., 2008, Investigation on The Accuracy of the Simplified Bishop Methods, in Chen, Z., Zhang, J., Li, Z., Wu, F., Ho, K., Landslides and Engineered Slopes: Netherlands, CRC Press, 2124 p.

Referensi

Dokumen terkait

Tujuan dari penelitian ini adalah memperoleh besaran biaya produksi yang diperlukan untuk mendapatkan madu agar dapat menentukan harga pokok Madu Hutan,

Full Costing adalah metode penentuan harga pokok produk dengan memasukkan seluruh komponen biaya produksi sebagai unsur harga pokok, yang meliputi biaya bahan baku,

Dalam usahatani petani akan mengeluarkan biaya produksi yang besarnya biaya produksi tersebut tergantung kepada komponen biaya yang dikeluarkan petani seperti harga dari

Karena banyaknya metode yang dapat digunakan untuk menghitung biaya produksi dan harga jual untuk mengetahui atau menentukan besaran pendapatan yang didapatkan, maka dalam

Pada perhitungan harga pokok produksi di D’Shiqa Takoyaki Samarinda bulan Mei tahun 2022 besaran biaya yang menjadi dasar perhitungan alokasi biaya bersama adalah biaya

Tinggi rendahnya pendapatan petani tergantung pada produksi kopi, harga jual dan biaya produksi yang dikeluarkan selama proses produksi. Besaran pendapatan adalah

Harga pokok produksi meliputi seluruh komponen biaya yang dikeluarkan selama proses produksi, harga pokok produksi akan menunjukan total harga perolehan barang

Kriteria Keberhasilan Reklamasi Tahap Operasi Produksi Lampiran X dalam Peraturan Menteri Energi dan Sumber Daya Mineral No 7 tahun 2014 mengenai kriteria keberhasilan reklamasi tahap