62
Hana Rizkia Armis, 2016
ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN METODE NILAI HASIL
Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu
DAFTAR PUSTAKA
Al-Najjar, B., & Taylor, P. (2008). The Relationship between Capital Structure and Ownership Structure: New Evidence from Jordanian Panel Data. Managerial Finance Journal
Ardani, 2009. Analisa Penerapan Manajemen Waktu Pada Proyek Konstruksi Jalan, Universitas Sumatera Utara, Medan
Assaf, Sadi. A, et-al. 2005. Cause of Delay in Large Construction Project, International Journal of Project Management 24
Bordat, C. McCullouch, B.G., Labi, S., & Sinha, K.C. 2004. An Analysis of Cost Overruns and Time Delays of INDOT Project. Final Report FHWA/IN/JTRP-2004/7
Ekajaya, Lila, 2007. Evaluasi Sistem Pengendalian Biaya Proyek pada Perusahaan Jasa Konstruksi Berskala Besar di Surabaya, Tesis Universitas Kristen Petra, Surabaya
Ervianto, Wulfram, I, 2005. Manajemen Proyek Konstruksi (Edisi Revisi), Edisi III, Andi, Yogyakarta
Gunawan, 2015, Contoh Kontrak Kerja. (online), (detiklife.com, diakses 30 Desember 2015)
Henderson, K, 2007. A Breakthrough Extension to Earned Value Management, Skripsi, Sydney
Husen, Abrar, 2009. Manajemen Proyek: Perencanaan, Penjadwalan & Pengendalian Proyek, Penerbit Andi, Yogyakarta
Kim, Byung-Cheol, and Kenneth F. Reinschmidt, 2011.Combination of Project Cost Forecastsin Earned Value Management, Journal of Construction Engineering and Management, ASCE
63
Hana Rizkia Armis, 2016
ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN METODE NILAI HASIL
Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu
Le-Hoai.Long, Lee.Young Dai, Lee.Jun Yong. 2008. “Delay an Cost Overruns in Vietnam Large Consttruction Projects : A Comparison with Other Selected Countries”,
Korean Society of Civil Engineering, Journal of Civil Engineering, Construction Management
Lukas, Mr.Joseph A, 2008. Earned Value Analysis-Why it Doesn’t Work, AACE International Transactions
Luu, Van Truong, Nguyen Van Tuan, Stephen O.Ogunlana, 2009. Quantifying Schedule Risk in Construction Projects using Bayesian Belief Networks, International Journal of Project Management
Majid. I.A., 2006, Causes And Effect Of Delays In Construction Project, Jurnal Teknik Sipil, Universitas Syiah Kuala, Banda Aceh
PM Book, 2011. Earned Value Management: Advantages and Disadvantages
Riantini, L.S., Trigunarsyah, B., Abidin, I., dan Latief, Y., 2005. Penentuan Peringkat Faktor Risiko dalam Rekrutmen Tenaga Kerja yang Mempengaruhi Biaya Tenaga Kerja pada Proyek, Jurnal Teknik Sipil Vol. 12 No 3, Institut Teknologi Bandung, Bandung
Soeharto, Iman, 1999. Manajemen Proyek (Dari Konseptual Sampai Operasional), Jilid I, Edisi Kedua, Erlangga, Jakarta
Soemardi, B. W., Abduh, M., Wirahadikusumah, R. D., dan Pujoartanto, N., 2006. Konsep Earned Value untuk Pengelolaan Proyek Konstruksi, Institut Teknologi Bandung, Bandung