• Tidak ada hasil yang ditemukan

S TS 1103800 Bibliography

N/A
N/A
Protected

Academic year: 2017

Membagikan "S TS 1103800 Bibliography"

Copied!
2
0
0

Teks penuh

(1)

62

Hana Rizkia Armis, 2016

ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN METODE NILAI HASIL

Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu

DAFTAR PUSTAKA

Al-Najjar, B., & Taylor, P. (2008). The Relationship between Capital Structure and Ownership Structure: New Evidence from Jordanian Panel Data. Managerial Finance Journal

Ardani, 2009. Analisa Penerapan Manajemen Waktu Pada Proyek Konstruksi Jalan, Universitas Sumatera Utara, Medan

Assaf, Sadi. A, et-al. 2005. Cause of Delay in Large Construction Project, International Journal of Project Management 24

Bordat, C. McCullouch, B.G., Labi, S., & Sinha, K.C. 2004. An Analysis of Cost Overruns and Time Delays of INDOT Project. Final Report FHWA/IN/JTRP-2004/7

Ekajaya, Lila, 2007. Evaluasi Sistem Pengendalian Biaya Proyek pada Perusahaan Jasa Konstruksi Berskala Besar di Surabaya, Tesis Universitas Kristen Petra, Surabaya

Ervianto, Wulfram, I, 2005. Manajemen Proyek Konstruksi (Edisi Revisi), Edisi III, Andi, Yogyakarta

Gunawan, 2015, Contoh Kontrak Kerja. (online), (detiklife.com, diakses 30 Desember 2015)

Henderson, K, 2007. A Breakthrough Extension to Earned Value Management, Skripsi, Sydney

Husen, Abrar, 2009. Manajemen Proyek: Perencanaan, Penjadwalan & Pengendalian Proyek, Penerbit Andi, Yogyakarta

Kim, Byung-Cheol, and Kenneth F. Reinschmidt, 2011.Combination of Project Cost Forecastsin Earned Value Management, Journal of Construction Engineering and Management, ASCE

(2)

63

Hana Rizkia Armis, 2016

ANALISA KINERJA BIAYA DAN WAKTU PADA PROYEK KONSTRUKSI DENGAN PENDEKATAN METODE NILAI HASIL

Universitas Pendidikan Indonesia | repository.upi.edu| perpustakaan.upi.edu

Le-Hoai.Long, Lee.Young Dai, Lee.Jun Yong. 2008. “Delay an Cost Overruns in Vietnam Large Consttruction Projects : A Comparison with Other Selected Countries”,

Korean Society of Civil Engineering, Journal of Civil Engineering, Construction Management

Lukas, Mr.Joseph A, 2008. Earned Value Analysis-Why it Doesn’t Work, AACE International Transactions

Luu, Van Truong, Nguyen Van Tuan, Stephen O.Ogunlana, 2009. Quantifying Schedule Risk in Construction Projects using Bayesian Belief Networks, International Journal of Project Management

Majid. I.A., 2006, Causes And Effect Of Delays In Construction Project, Jurnal Teknik Sipil, Universitas Syiah Kuala, Banda Aceh

PM Book, 2011. Earned Value Management: Advantages and Disadvantages

Riantini, L.S., Trigunarsyah, B., Abidin, I., dan Latief, Y., 2005. Penentuan Peringkat Faktor Risiko dalam Rekrutmen Tenaga Kerja yang Mempengaruhi Biaya Tenaga Kerja pada Proyek, Jurnal Teknik Sipil Vol. 12 No 3, Institut Teknologi Bandung, Bandung

Soeharto, Iman, 1999. Manajemen Proyek (Dari Konseptual Sampai Operasional), Jilid I, Edisi Kedua, Erlangga, Jakarta

Soemardi, B. W., Abduh, M., Wirahadikusumah, R. D., dan Pujoartanto, N., 2006. Konsep Earned Value untuk Pengelolaan Proyek Konstruksi, Institut Teknologi Bandung, Bandung

Referensi

Dokumen terkait

3.2 Menguraikan teks instruksi tentang pemeliharaan panca indera serta penggunaan alat teknologi modern dan tradisional dengan bantuan guru dan teman dalam bahasa Indonesia lisan

The proposed content-based recommender system is enhanced using the ontological information about tourism domain to represent both the user profile and the recommendable POIs..

Berdasarkan sasaran di dalam Renstra yang ingin dicapai pada tahun 2016,.. disusun Rencana Kinerja Tahunan

Data from synoptic stations were used to specify which stations in terms of location ( x,y) have the highest precipitation rate and better potential for

dari 4 sasaran yang ditetapkan dalam Rencana Kinerja tahun 2016 sudah. dapat

The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XL-3/W4, 2016 EuroCOW 2016, the European Calibration and Orientation

[r]

1) Bagian awal Laporan PKLmulai dari halaman judul sampai ke daftar lampiran diberi nomor dengan angka romawi kecil yang diletakkan ditengah-tengah pada bagian bawah.. (khusus