• Tidak ada hasil yang ditemukan

HUBUNGAN ANTARA BEBAN KERJA DENGAN KELELAHAN KERJA PADA PEKERJA BIG PRESS LINE B DI DIVISI STAMPING AND TOOLS PT X

N/A
N/A
Protected

Academic year: 2022

Membagikan "HUBUNGAN ANTARA BEBAN KERJA DENGAN KELELAHAN KERJA PADA PEKERJA BIG PRESS LINE B DI DIVISI STAMPING AND TOOLS PT X"

Copied!
11
0
0

Teks penuh

(1)

HUBUNGAN ANTARA BEBAN KERJA DENGAN KELELAHAN KERJA PADA PEKERJA BIG PRESS LINE B

DI DIVISI STAMPING AND TOOLS PT X

LAPORAN TUGAS AKHIR Untuk Memenuhi Persyaratan Memperoleh Gelar Ahli Madya

Aritta Maharani Purwita R.0015013

PROGRAM STUDI D.III HIPERKES DAN KESELAMATAN KERJA FAKULTAS KEDOKTERAN UNIVERSITAS SEBELAS MARET

Surakarta 2018

(2)

ii

(3)

iii

(4)

iv PRAKATA

Puji syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa atas berkat, rahmat, karunia, kesehatan, kekuatan dan kemudahan dalam pelaksanaan magang serta penyusunan laporan Tugas Akhir dengan judul “Hubungan antara Beban Kerja dengan Kelelahan Kerja pada Pekerja Big Press Line B Di Divisi Stamping And Tools PT. X”.

Laporan ini disusun sebagai salah satu persyaratan kelulusan untuk menyelesaikan studi di Program Studi D.III Hiperkes dan Keselamatan Kerja, Fakultas Kedokteran Universitas Sebelas Maret Surakarta. Dalam pelaksanaan magang dan penyusunan laporan ini penulis telah dibantu dan dibimbing oleh beberapa pihak. Oleh karena itu, perkenankan penulis menyampaikan ucapan terima kasih kepada :

1. Bapak Prof. Dr. dr. Hartono, M.Si, selaku Dekan Fakultas Kedokteran Universitas Sebelas Maret Surakarta.

2. Ibu Yeremia Rante Ada’, S.Sos., M.Kes, selaku Kepala Program Studi D.III Hiperkes dan Keselamatan Kerja Universitas Sebelas Maret Surakarta.

3. Ibu Maria Paskanita Widjanarti, SKM., M.Sc, selaku dosen pembimbing yang telah memberikan bimbingan dan saran dalam penyusunan laporan ini.

4. Ibu Siti Rachmawati, S.ST., M.Si, selaku penguji yang telah memberikan bimbingan dan saran dalam penyusunan laporan ini.

5. Wahid Andrika (Supervisor SHE), Putu Gede Oka Antara (Staff SHE Karoseri) dan Trio Aris C. (Staff SHE Stamping and Tools), selaku pembimbing lapangan yang telah bersedia memberi penjelasan mengenai perusahaan di bagian karoseri dan stamping and tools.

6. Kedua orang tua, Bapak Hari Purwanto, S.Pd dan Ibu Aniek Widyawati, S.E beserta seluruh keluarga besar yang telah memberikan kasih doa, kasih sayang, semangat, dukungan sehingga laporan ini dapat tersusun dengan baik.

7. Terryfena Ayu Mulatsih, sebagai rekan magang seperjuangan yang tiada henti saling mengingatkan, memberi motivasi, dukungan dan semangat kepada penulis serta menjadi sahabat yang baik selama ini bagi penulis.

8. Putri Nadhifah, Annisa Ari, Sari, , Khoirunisa Nindya, Wahyu, Adib, Chella, Bayu, Dian Septiyani, Erlina, Dita yang telah memberikan dukungan, semangat dan doa, serta menjadi sahabat yang baik selama ini bagi penulis.

9. Segenap keluarga Hiperkes dan Keselamatan Kerja angkatan 2015 terkhusus kelas A yang telah memberikan motivasi bagi penulis.

10. Serta seluruh pihak yang tidak dapat disebutkan satu persatu oleh penulis yang telah membantu dan memberikan semangat kepada penulis selama magang sehingga penulis dapat menyelesaikan laporan ini.

Surakarta, 2018 Penulis,

Aritta Maharani Purwita

(5)

v ABSTRAK

HUBUNGAN ANTARA BEBAN KERJA DENGAN KELELAHAN KERJA PADA PEKERJA BIG PRESS LINE B DI DIVISI STAMPING

AND TOOLS PT X

Aritta Maharani Purwita1, Maria Paskanita Widjanarti2

Latar Belakang : PT X Divisi Stamping and Tools merupakan perusahaan yang bergerak di bidang stamping and tools. Pada divisi ini, terdapat beban kerja yang dihasilkan dari peningkatan permintaan produk oleh konsumen. Beban kerja yang tinggi dapat menyebabkan terjadinya kelelahan kerja. Besarnya beban kerja yang tidak diimbangi dengan kemampuan pekerja akan menimbulkan kelelahan kerja.

Kelelahan kerja memberikan kontribusi terhadap terjadinya kecelakaan kerja di perusahaan. Tujuan penelitian ini adalah mengetahui hubungan antara beban kerja dengan kelelahan kerja pada pekerja big press line B di Divisi Stamping and Tools PT X.

Metode : Penelitian ini menggunakan jenis penelitian analitik observasional dengan metode analitik cross sectional atau potong silang. Teknik sampling yang digunakan dalam penelitian ini adalah total sampling. Populasi pekerja di big press line B berjumlah 35 orang. Data diperoleh dengan pengukuran denyut nadi menggunakan menggunakan 3 jari tangan (jari telunjuk, jari tengah, jari manis) dan pengukuran kelelahan kerja menggunakan alat Reaction Timer merk Lakassidaya L-77. Teknik pengolahan dan analisis data menggunakan pengujian statistik yaitu uji Spearman dengan program SPSS versi 16.0.

Hasil : Dari analisis uji hubungan antara beban kerja dengan kelelahan kerja pada pekerja di big press line B di Divisi Stamping and Tools PT X yang dilakukan oleh peneliti diperoleh hasil p = 0,563 atau lebih dari 0,05 (p>0,05) sehingga dinyatakan tidak signifikan.

Simpulan : Disimpulkan bahwa tidak ada hubungan antara beban kerja dengan kelelahan kerja pada pekerja di big press line B di Divisi Stamping and Tools PT X.

Kata kunci :Denyut Nadi, Beban Kerja, Kelelahan Kerja

1. Program Studi Diploma III Hiperkes dan Keselamatan Kerja, Fakultas Kedokteran, Universitas Sebelas Maret Surakarta.

2. Dosen Program Studi Diploma III Hiperkes dan Keselamatan Kerja, Fakultas Kedokteran, Universitas Sebelas Maret Surakarta.

(6)

vi ABSTRACT

RELATIONSHIP BETWEEN WORK LOAD WITH WORK FATIGUE ON BIG PRESS LINE B WORKERS DIVISION OF STAMPING

AND TOOLS PT X

Aritta Maharani Purwita1, Maria Paskanita Widjanarti2

Background: PT X Division Stamping and Tools is a company engaged in the field of stamping and tools. In this division, there is a work load resulting from increased demand for products by consumers. High work load can cause fatigue.

The magnitude of work load that is not matched by the ability of workers will cause work fatigue. Work fatigue contributes to the occurrence of accidents in the company. The purpose of this research is to know the relation between work load and work fatigue on big press line B worker in Stamping and Tools Division PT X.

Method: This research method used observational analytic research with cross sectional analytic method. The sampling technique used in this research is total sampling. The population of workers in the big press line B is 35 people. The data were obtained by measuring the pulse using 3 fingers (index finger, middle finger, ring finger) and work fatigue measurement using Reaction Timer tool Lakassidaya L-77. Technique of processing and data analysis using statistical test that was Spearman test with program SPSS version 16.0.

Result: From the test analysis of the relationship between work load and work fatigue on the workers in big press line B in Division Stamping and Tools PT X conducted by researchers obtained the results p = 0,563 or more than 0.05 (p>0,05), so it was not significant.

Conclusion: It is concluded that there is no relation between work load and work fatigue on workers in big press line B in Stamping and Tools Division PT X.

Keywords: Pulse Rate, Work Load, Work Fatigue

1. Industrial Hygiene, Occupational Health and Safety Program, Faculty of Medicine, SebelasMaret University Surakarta.

2. Lecturer of Industrial Hygiene, Occupational Health and Safety Program, Faculty of Medicine, SebelasMaret University Surakarta.

(7)

vii DAFTAR ISI

HALAMAN JUDUL ... i

HALAMAN PENGESAHAN ... ii

HALAMAN PENGESAHAN PERUSAHAAN ... iii

PRAKATA ... iv

ABSTRAK ... v

ABSTRACT ... vi

DAFTAR ISI ... vii

DAFTAR TABEL ... viii

DAFTAR GAMBAR ... ix

DAFTAR SINGKATAN... x

DAFTAR LAMPIRAN ... xi

BAB I PENDAHULUAN ... 1

A. Latar Belakang Masalah ... 1

B. Rumusan Masalah ... 4

C. Tujuan Penelitian... 4

D. Manfaat Penelitian ... 5

BAB II LANDASAN TEORI ... 6

A. Tinjauan Pustaka ... 6

B. Kerangka Pemikiran ... 38

C. Hipotesis ... 38

BAB III METODE PENELITIAN ... 39

A. Jenis Penelitian ... 39

B. Lokasi dan Waktu Penelitian... 39

C. Populasi Penelitian ... 40

D. Teknik Sampling ... 40

E. Sampel Penelitian ... 40

F. Definisi Operasional ... 40

G. Sumber Data ... 42

H. Instrumen Penelitian ... 43

I. Teknik Pengumpulan Data ... 45

J. Analisis Data ... 45

BAB IV HASIL PENELITIAN ... 47

BAB V PEMBAHASAN ... 53

BAB VI SIMPULAN DAN SARAN ... 60

A. Simpulan ... 60

B. Saran ... 60

DAFTAR PUSTAKA ... 61 LAMPIRAN

(8)

viii

DAFTAR TABEL

Tabel 1. Penyebaran frekuensi responden berdasarkan indeks massa tubuh (IMT) ... 35 Tabel 2. Penyebaran frekuensi responden berdasarkan usia ... 36 Tabel 3. Penyebaran frekuensi responden berdasarkan masa kerja ... 36 Tabel 4. Hasil Pengukuran Beban Kerja Pekerja Bagian Big Press

Line B ... 37 Tabel 5. Hasil Pengukuran Kelelahan Kerja Pekerja Bagian Big

Press Line B ... 38 Tabel 6. Hasil Uji Statistik Spearman Hubungan Beban Kerja

dengan Kelelahan Kerja ... 38 Tabel 7. Hasil Uji Statistik Hubungan Faktor Lain dengan

Kelelahan Kerja ... 39

(9)

ix

DAFTAR GAMBAR

Gambar 1. Teori Penyebab Kelelahan dan Penyegaran ... 25 Gambar 2. Kerangka Pemikiran ... 29

(10)

x

DAFTAR SINGKATAN

IMT : Indeks Massa Tubuh

ILO : International Labour Organization IFRC : Industrial Fatigue Research Committee

(11)

xi

DAFTAR LAMPIRAN

Lampiran 1. Data Responden

Lampiran 2. Data Frekuensi Indeks Masa Tubuh (IMT) Lampiran 3. Data Frekuensi Usia

Lampiran 4. Data Frekuensi Massa Kerja Lampiran 5. Data Frekuensi Beban Kerja Lampiran 6. Data Frekuensi Kelelahan Kerja Lampiran 7. Uji Normalitas Data

Lampiran 8. Uji Transformasi Data

Lampiran 9. Uji Hubungan Beban Kerja dengan Kelelahan Kerja Lampiran 10. Uji Karakteristik Responden dengan Kelelahan Kerja Lampiran 11. Dokumentasi Pengukuran

Gambar

Tabel 1.   Penyebaran  frekuensi  responden  berdasarkan  indeks  massa tubuh (IMT) ................................................................
Gambar 1.  Teori Penyebab Kelelahan dan Penyegaran ..............................  25  Gambar 2

Referensi

Dokumen terkait

Berdasarkan nilai yang diperoleh, nilai pada kelas eksperimen lebih tinggi dari pada kelas kontrol sehingga dapat disimpulkan bahwa model project based learning

Puji syukur kehadirat Allah SWT yang telah melimpahkan segala rahmat, hidayah, serta inayah-Nya, sehingga peneliti dapat menyelesaikan skripsi dengan judul “PENERAPAN MODEL TAKE

Salah satu metode yang dapat yang diterapkan untuk menanamkan nilai-nilai profetik dalam pengembangan kurikulum PAI ini dapat menggunakan strategi pemecahan masalah

a) Menggunakan teknologi yang telah ada, karena teknologi dapat mempermudah banyak hal termasuk dalam kegiatan pembelajaran di sekolah. B) Mempermudah pendidik

Pada bagian ini akan menjelaskan tentang deskripsi atau penyebaran data penelitian yang meliputi variabel sebelum dan sesudah hari libur idul fitri (X1) yang diproksikan

Puji syukur penulis penjatkan kehadirat Tuhan Yang Maha Esa atas berkat, rahmat, karunia, kesehatan, kekuatan dan kemudahan dalam pelaksanaan magang serta penyusunan laporan Tugas

Puji syukur penulis panjatkan kehadirat Tuhan Yang Maha Esa atas berkat, rahmat, karunia, kesehatan, kekuatan dan kemudahan dalam pelaksanaan magang serta penyusunan laporan Tugas

Berdasarkan permasalahan tersebut, maka tujuan penulisan skripsi ini adalah membahas penyebab terjadinya wanprestasi dalam perjanjian pinjam uang pada KPRI Dewi Sri,