EFEKTIVITAS PERHITUNGAN VOLUME PEKERJAAN STRUKTUR DENGAN MENGGUNAKAN BANTUAN

BUILDING INFORMATION MODELING (BIM)

Studi Kasus: (Rumah Sakit Universitas Islam Malang)

SKRIPSI

Diajukan Kepada Universitas Muhammadiyah Malang Untuk Memenuhi Salah Satu Persyaratan Akademik

Dalam Menyelesaikan Program Sarjana Teknik

Disusun oleh :

AHMAD FIKRI 201610340311233

FAKULTAS TEKNIK JURUSAN TEKNIK SIPIL

UNIVERSITAS MUHAMMADIYAH MALANG

2022

(2)
(3)
(4)
(5)

KATA PENGANTAR

Bismillahirohmanirohim

Assalamu’alaikum warahmatullahi wabarakatuh

Puji syukur kehadirat Allah SWT, Tuhan semesta alam karena berkat rahmat dan ridho-Nya, penulis dapat menyelesaikan Tugas Akhir yang berjudul Efektivitas Perhitungan Volume Terhadap Pekerjaan Struktur Dengan Menggunakan Bantuan Software Building Information Modelling (BIM) (Studi Kasus Gedung Rumah Sakit Universitas Islam Malang)

Tugas akhir ini diajukan untuk memenuhi syarat untuk mencapai gelar sarjana Teknik pada Program Studi Teknik Sipil Fakultas Teknik Universitas Muhammadiyah Malang. Dalam penyusunan skripsi ini penulis tidak terlepas dari Kuasa Allah SWT, doa dari orang tua, peranan pembimbing dan bantuan dari seluruh pihak. Oleh karena itu, dengan segala kerendahan hati, penulis ingin mengucapkan beribu terima kasih atas bantuan yang tak ternilai kepada:

1. Allah SWT, Tuhan semesta alam yang maha pengasih lagi maha penyayang yang memberikan rahmat, nikmat dan hidayah kepada umat- Nya, Rasulullah SAW, yang sudah menuntun kita menuju jalan yang lurus.

2. Ketua Jurusan Teknik Sipil, Bapak Dr. Ir. Sulianto, MT, yang telah memberikan motivasi dan kesempatan penulis belajar di Program Studi Teknik Sipil Universitas Muhammadiyah Malang.

3. Bapak Zamzami Septiropa, ST., M.T, PhD. selaku dosen pembimbing I dan Ibu Rini Pebri Utari,. SPd,. MT, selaku dosen pembimbing II, yang dengan penuh kesabaran, membimbing, mengarahkan dan memeberikan pemahaman materi sehingga Tugas Akhir ini dapat diselesaikan dengan baik, semoga lelah bapak menjadi lillah dimata Allah SWT.

(6)

ii

4. Untuk seluruh Dosen dan staf Program Studi Teknik Sipil Universitas Muhammadiyah Malang yang sudah memberikan waktunya untuk mengajarkan ilmu-ilmu yang sangat berguna.

5. Skripsi ini saya persembahakan utamanya kepada diri saya pribadi.

Semoga perjuangan ini menjadi awal langkah saya untuk menjadi orang yang berguna untuk orang sekitar saya, Bangsa dan Negara serta diri saya sendiri.

6. Ayah yang saya hormati dan sayangi Muhammad Mansyur, dan Ibu yang saya sangat cintai Ibu Suryani selaku orang tua penulis, yang telah membantu dan mendukung secara materiil maupun moril. Tidak ada apapun yang saya punya untuk membalas kebaikan orang tua penulis, hanya doa sebagai anak yang bisa berharap agar orang tua penulis bahagia dunia dan akhirat.

7. Abang saya, Fida Akhyar, Ahmad Fanani yang selalu menyisihkan waktu untuk menjadi pendengar, terus memberikan dukungan, motivasi dan doa yang tulus.

8. Saudara-saudara hebat dan teman seperjuangan saya dalam berproses Mahendra, Rey Anggri Saputra. Semoga semangat berproses kalian tidak pernah padam.

9. Teman - teman nongkrong dan jalan dikala penulis merasa lelah dalam berjuang dan berproses selama kuliah Aida, Nisya, Arum, Rhiana. Semoga rindu menjadi alasan kita buat berkumpul kembali dilain waktu.

10. Saudara - saudara jauh penulis yang tetap terasa dekat Qisti, Rafika semoga kita segera bertemu kembali.

11. Seluruh teman dan sahabat yang telah membantu mendukung dan memberikan doa untuk selama ini, Sipil 2016 Kelas E. terima kasih untuk canda tawa kalian selama perkuliahan sampai dengan sekarang.

12. Teman-teman Teknik Sipil Angkatan 2016 yang banyak mengukir cerita selama seperjuangan dalam menuntut ilmu, semoga setiap langkah kita selalu diridhoi Allah SWT.

(7)

iii

13. Teman-teman Teknik Sipil Angkatan 2017 yang juga mewarnai cerita selama mengikuti perkuliahan di kampus, juga yang selalu menanyakan kapan wisuda terima kasih telah memberikan dukungan dan semangatnya.

14. Untuk semua pihak yang belum disebutkan namanya, penulis memohon maaf dan terima kasih yang sebesar-besarnya. Semua keberhasilan ini tak luput dari bantuan, dan doa baik yang kalian berikan.

Penulis tidak mampu membalas jasa dari semua pihak yang telah membantu dalam menyelesaikan Tugas Akhir ini, Jazakumullah Khairan. Semoga amal baik semua pihak mendapat imbalan dari Allah SWT. Penulis menyadari bahwa Tugas Akhir ini jauh dari kesempurnaan, oleh karena itu penulis mengharapkan saran dan kritik yang membangun dari pembaca demi kebaikan skripsi ini. Semoga Tugas Akhir ini dapat bernilai ibadah atas nama perjuangan kecil di jalan Allah SWT, Aamiin Allahuma Aamiin.

Wassalamualaikum Warohmatullahi Wabarokatuh

Malang, 2022

Ahmad Fikri

(8)

iv

ABSTRAK

Saat ini perhitungan volume proyek kebanyakan dilakukan secara manual dengan cara mengukur gambar kerja, kesalahan sering terjadi karana ketidaktelitian dan kompleksitas perhitungan volume. Software Revit dari Autodesk dengan basis Open BIM mampu melakukan proses pergitungan volume.

Hasil output yaitu mendapatkan Quantity Take Off pekerjaan struktural dengan mengimplementasikan konsep Building Information Modelling (BIM).

Building Information Modelling (BIM) berhubungan dengan biaya kontruksi yang mengacu pada model 3 dimensi, dimana didalamnya memuat informasi volume pekerjaan. Alat pendukung yang digunakan adalah Software Revit 2020, output dari proses authorizing sendiri mampu secara menyeluruh menampilkan informasi quantity take off (QTO), yang diperlukan dalam suatu proyek konstruksi sesuai studi kasus yang hanya dibatasi pekerjan struktural, kemudian menghitung berapa selisih volume existing (konvensional) dengan volume hasil Quantity Take Off menggunakan konsep BIM dan metode kualitatif dilaksankan dengan melakukan wawancara semi terstruktur kepada praktisi BIM.

Selisih perhitungan volume existing (Konvensional) dengan volume dari hasil Quantity Take Off menggunakan konsep Building Information Modeling (BIM) pada pekerjaan structural. pada pekerjaan tiang pancang memiliki rata-rata selisih sebesar -0.05%, pekerjaan plat pondasi memiliki rata-rata selisih sebesar 0.02 %, sedangkan pekerjaan sloof memiliki rata-rata selisih sebesar 0.54 %, adapun pada pekerjaan kolom pondasi memiliki rata-rata selisih sebesar 0 %, pekerjaan kolom struktur memiliki rata-rata selisih sebesar 0 % dan pekerjaan balok memiliki rata-rata selisih sebesar 0.03 %. Pada pekerjaan plat tangga memiliki rata-rata selisih sebesar 1.3 %, dan plat lantai memiliki rata-rata selisih sebesar -0.5 %.

Kata Kunci: BIM, Struktural, QTO, Revit. selisih

(9)

v

ABSTRACT

Currently, most project volume calculations are done manually by measuring working drawings, errors often occur due to inaccuracy and complexity of volume calculations. Revit software from Autodesk based on Open BIM is capable of performing volume calculations. The output result is getting the Quantity Take Off of structural work by implementing the concept of Building Information Modeling (BIM).

Building Information Modeling (BIM) relates to construction costs which refers to a 3-dimensional model, which contains information on the volume of work. The supporting tool used is the Revit 2020 Software, the output of the Revit 2020 software authorizing process itself is able to thoroughly display the quantity take off (QTO) information needed in a construction project according to the case study which is only limited to structural work, then calculate the difference in the existing volume (conventional) with the volume of Quantity Take Off results using the BIM concept and qualitative methods carried out by conducting semi- structured interviews with BIM practitioners.

The difference between the calculation of the existing (conventional) volume and the volume from the results of Quantity Take Off using the concept of Building Information Modeling (BIM) on structural work. the pile work has an average difference of -0.05%, the foundation plate work has an average difference of 0.02%, while the sloof work has an average difference of 0.54%, while the foundation column work has an average difference of 0 %, structural column work has an average difference of 0% and beam work has an average difference of 0.03 %. On the ladder plate work has an average difference of 1.3%, and the floor plate has an average difference of -0.5%.

Keywords: BIM, Structural, QTO, Revit. difference

(10)

vi

DAFTAR ISI

KATA PENGANTAR ... i

ABSTRAK ... iv

DAFTAR GAMBAR ... ix

BAB I PENDAHULUAN ... 1

1.1 Latar Belakang ... 1

1.2 Rumusan Masalah ... 3

1.3 Tujuan ... 3

1.4 Manfaat ... 4

1.5 Batasan Masalah ... 4

BAB II LANDASAN TEORI ... 6

2.1 Peneliti Terdahulu ... 6

2.2 Software Autodesk Revit ... 8

2.3 Building Information Modeling ... 12

2.3.1 Manfaat BIM ... 15

2.3.2 Dimensi Kontruksi Dan Tingkat Implementasi ... 20

2.3.3 Informasi Standar BIM ... 23

2.4 Perhitungan Quantity Take Off Material Pekerjaan Struktural ... 26

2.4.1 Volume Pekerjaan ... 28

2.5 Keunggulan Integrasi dan Kolaborasi BIM ... 29

2.6 Proyek ... 29

2.7 Manajemen proyek ... 30

2.8 Pekerjaan struktur ... 31

2.8.1 Prinsip_prinsip dasar struktur ... 31

2.8.2 Modal structural ... 32

(11)

vii

2.8.3 Manfaat BIM ... 32

2.9 Quantity Take Off Material ... 35

2.9.1 Volume Pekerjaan ... 36

BAB III METODE PENELITIAN ... 38

3.1 Jenis Penelitian ... 38

3.2 Lokasi Penelitian ... 38

3.3 Objek Penelitiana... 39

3.4 Data Penelitian... 39

3.5 Alat Penelitian ... 39

3.6 Perangkat Lunak ... 39

3.7 Tahapan Penelitian ... 40

3.7.1 Studi Literatur ... 40

3.7.2 Pengumpulan Data ... 41

3.7.3 Input data dengan software Revit ... 41

3.7.4 Pemodelan dan Analisis Estimasi Quantity Take Off Material Struktur . . . 41

3.7.5 Diagram Alur Perencanaan ... 43

BAB IV HASIL DAN PEMBAHASAN ... 44

4.1 Data Penelitian... 44

4.1.1 Data Kuantitatif ... 44

4.1.2 Detail Engineering Design Proyek ... 44

4.1.3 Rencana anggaran biaya ... 45

4.2 Analisa data kuantitatif ... 45

4.2.1 Input Spesifikasi Teknik Material Structural Kedalam Model 3D . 45 4.3 Proses memasukkan gambar kedalam software revit ... 45

4.3.1 Import gambar 2D Autocad ke Revit ... 45

4.4 Proses Pemodelan Struktural Template ... 47

4.4.1 Tahapan-tahapan modelling bangunan ... 47

(12)

viii

4.4.2 Volume Quantity Take Off Masing-Masing Family ... 55

4.4.3 Total Quantity Take Off Material Struktural ... 60

4.4.4 Output quantity take off material dari software revit 2020 dan software pendukung ... 61

4.4.5 Laporan Total Quantity Take Off Material Pekerjaan Struktural ... 67

4.4.6 Laporan Total Estimasi Anggaran Biaya Pekerjaan Struktural ... 68

BAB V PENUTUP ... 69

5.1 Kesimpulan ... 69

5.2 Saran ... 69

DAFTAR PUSTAKA ... 72

LAMPIRAN ... 73

(13)

ix

DAFTAR GAMBAR

Gambar 2.1 Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Dalam

Penggunaan Building Information Modeling ... 7

Gambar 2.2 Interface Revit 2020 ... 8

Gambar 2.3 Main Screen ... 9

Gambar 2.4 Implementasi BIM Dalam Kontruksi ... 13

Gambar 2.5 Quantity Report ... 27

Gambar 3.1 Denah Lokasi penelitian ... 38

Gambar 3.2 Diagram Alur ... 43

Gambar 4.1 Tampilan Data Detail Engineering Design ... 46

Gambar 4.2 Tampilan Gambar Rencana Pondasi ... 47

Gambar 4.3 Tampilan Settingan Project Units Structural ... 48

Gambar 4.4 Tampilan template pada browser ... 48

Gambar 4.5 tampilan mengintegrasikan project architectural kedalam structural template ... 49

Gambar 4.6 Tampilan Grid Pada Project Architectural ... 50

Gambar 4.7 Tampilan Level Pada Project Architectural ... 50

Gambar 4.8 Tampilan Load Family Foundation Pada Project Architectural ... 51

Gambar 4.9 Tampilan Denah Pondasi Pada Project Architectural ... 51

Gambar 4.10 Tampilan Denah Kolom Pada Project Architectural ... 52

Gambar 4.11 Tampilan Denah Balok Pada Project Architectural ... 53

Gambar 4.12 Struktur Lantai Tampilan 3d ... 54

Gambar 4.13 Tampilan 3d Penulangan ... 55

Gambar 4.14 Tampilan New Schedule ... 56

Gambar 4.15 Tampilan Fields ... 56

Gambar 4.16 Tampilan calculated value ... 57

Gambar 4.17 Tampilan schedule properties ... 58

Gambar 4.18 Tampilan formatting schedule properties ... 59

Gambar 4.19 Tampilan Volume Quantity Take Off ... 60

(14)

x

Gambar 4.20 Tampilan Modelling Keseluruhan Struktur Bangunan ... 61

Gambar 4.21 Tampilan Quantity Take off Beton Pile Cap dan Bore Pile... 62

Gambar 4.22 Tampilan Quantity Take Off Pembalokan ... 63

Gambar 4.23 Tampilan Quantity Take Off Kolom ... 64

Gambar 4.24 Tampilan Quantity Take Off Plat Lantai ... 65

Gambar 4.25 Tampilan Quantity Take Off Tangga ... 66

(15)

xi

DAFTAR TABEL

Tabel 2.1 Software BIM untuk menggambar Shop Drawing dan Fabrication ... 35 Tabel 4.1 Rekapitulasi Total Selisih Hasil Quantity Take Off Material Pekerjaan Struktural ... 67

Tabel 4.2 Rekapitulasi Rencana Anggaran Biaya Pekerjaan Struktural ... 68

(16)

xii

DAFTAR PUSTAKA

(Howell & Batcheler, 2003). Jurnal Jonathan Raymond 2021 : Perbandingan Perhitungan Volume Pekerjaan Dak Beton Bertulang Antara Metode Bim Dengan Konvensional.

Eastman, C., P. Teicholz, R. Sacks, dan K. Liston. 2008. BIM Handbook.

New York: Wiley. Jurnal Berlian P Cinthia Ayu : perbandingan efisiensi waktu, biaya, dan sumber daya manusia antara metode building information modelling (bim) dan konvensional (studi kasus:

perencanaan gedung 20 lantai).

Aditya Kurnia Nugraha. 2019. Implementasi Konsep Building Information System (BIM) Dalam Estimasi Biaya Pada Pekerjaan Plambing.

Tugas Akhir Pada Jurusan Tekni Sipil Fakultas Teknik Sipil Dan Perencanaan Universitas Islam Indonesia.

Alghiffari, Luqman. 2017. Perhitungan Kebutuhan Beton dan Tulangan Menggunakan Aplikasi Berbasis BIM pada Struktur Gedung Tiga Lantai. Tugas Akhir Jurusan Teknik Sipil UGM. Yogyakarta.

Smith, Deke 2007. Jurnal Berlian P Cinthia Ayu : perbandingan efisiensi waktu, biaya, dan sumber daya manusia antara metode building information modelling (bim) dan konvensional (studi kasus:

perencanaan gedung 20 lantai).

(Prabhakaran et al., 2020). Nugrahini Fibria Conytin : Building Information Modelling (BIM) dalam Tahapan Desain dan Konstruksi di Indonesia, Peluang Dan Tantangan : Studi Kasus Perluasan T1 Bandara Juanda Surabaya

Azhar, S., Nadeem, A., Mok, J.Y.N. and Leung, B.H.Y. (2008) Building Information Modeling (BIM): A New Paradigm for Visual Interactive Modeling and Simulation for Construction Projects.

(17)

xiii

Referensi

Dokumen terkait

Laju dekomposisi maksimum dari proses pirolisis sekam padi terjadi pada temperatur antara 590-626 K untuk ketiga variasi temperatur dinding. Semakin besar temperatur dinding

Berdasarkan pendapat di atas dapat disimpulkan bahwa karakteristik pembelajaran pendekatan konstruktivisme meliputi: (1) pengetahuan awal siswa; (2) memberikan

Sedangkan pada data responden eksternal, dimensi pembentuk CSR yang memiliki hubungan signifikan atau yang lebih berpengaruh terhadap Corporate Image and Reputation yaitu

Dalam penelitian ini, sebuah motor induksi jenis kapasitor telah dimodifikasi menjadi generator satu fase berdaya kecil yang digunakan untuk memasok beban listrik

Tidak terserapnya tenaga kerja karena lapangan kerja yang ada memerlukan ketrampilan khusus yang tidak dipunyai oleh pencari kerja, ini dapat terjadi karena

2) Penempatan siswa ke dalam situasi belajar mengajar yang tepat dan serasi sesuai dengan tingkat kemampuan, minat dan berbagai karakteristik yang dimiliki

Hak imunitas advokat untuk tidak dapat dituntut baik secara perdata maupun pidana ketika melakukan pembelaan terhadap kliennya tersebut juga melindungi advokat

Orang tua yang biasanya mempunyai banyak waktu untuk bekerja atau pun aktvitas lain di rumah, saat ini dituntut untuk mampu menjadi guru sekaligus pendamping