Pekerjaan :

PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. NGILNGOF, KEC. MANYEWU

KAB. MALUKU TENGGARA

Lokasi :

KWS. NGILNGOF, KEC. MANYEWU KAB. MALUKU TENGGARA

Disetujui Oleh :

Kepala Satuan Kerja Pengembangan Sistem

Penyediaan Air Minum Provinsi Maluku

ANNIE L. LABOBAR, ST. MSi

NIP. 19650402 199403 2 008

Lokasi :

KWS. NGILNGOF, KEC. MANYEWU KAB. MALUKU TENGGARA

(2)

PETA ORIENTASI SPAM BARU TA.2018

Pemb. SPAM Di Kawasan Rawan Air Kws. Ngilngof, Kec. Manyewu

SATUAN KERJA SISTYM

PENYEDIAAN AIR MINUM

PROVINSI MALUKU

SATUAN KERJA SISTEM

PENYEDIAAN AIR MINUM

(3)

DANAU LAUT LAUT LAUT LAUT LAUT LAUT LAUT PIPA EXSISTING SUMUR EX R. GENSET/ POMPA EX R. GENSET/ POMPA EX PIPA DIA.(mm) GIP 100 PIPA DIA.(mm) GIP 75 KWS NGILNGOF DAERAH PELANYANAN PULAU OHOIEW RES. RENC. TOWER KAP. 50 M3 RES EX RES. RENC. KAP. 300 M3 PIPA DIA.(mm) HDPE 63 PIPA DIA.(mm) GIP 50 KETERANGAN :

RES. TOWER KAP. 50 M3=1UNIT RES KAP. 300 M3 = 1.500 m' PIPA GIP Ø 100 mm = 1.500 m' PIPA GIP Ø 75 mm = 2.442 m' PIPA GIP Ø 50 mm = 1.200 m' PIPA HDPE Ø 63 mm = 2.000 m' ASISTEN PERENCANA LORDY F. de WANNA,ST.MT NIP. 19730218 200801 1 004 KEPALA SATKER

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU

ANNIE L. LABOBAR, ST. MSi

NIP. 19650420 199403 2 008

(4)

: PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROPINSI MALUKU

PEKERJAAN : PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. NGILNGOF, KEC. MANYEWU

LOKASI : KWS. NGILNGOF, KEC. MANYEWU KAB. MALUKU TENGGARA

T. ANGGARAN : 2018

NO

A. PEMBUATAN TOWER DISTRIBUSI KAP. 50 M3 - 1 UNIT RP. 467,947,084.97

B. PEMBUATAN RESERVOIR KAP. 300 M3 - 1 UNIT RP. 1,062,292,430.74

C. PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 100 MM' = 1.500 M' RP. 563,749,672.50

D. PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 75 MM'= 2.442 M' RP. 584,219,449.82

E. PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 50 MM'= 1.200 M' RP. 189,769,084.63

F. PENGAD. / PEMAS. PIPA HDPE PN 10 DAN ACCES. DIA 63 mm = 1.800 M' RP. 167,477,668.59

Rp 3,035,455,391.25 Rp 303,545,539.12 Rp 3,339,000,930.37 Rp 3,339,000,000.00 JUMLAH PPN ( 10% ) TOTAL DIBULATKAN

REKAPITULASI

SATUAN KERJA

URAIAN PEKERJAAN JUMLAH HARGA

( Rp )

JUMLAH ( A + B + C )

DETAIL ENGINEERING DESIGN (DED)

Rp 3,339,000,000.00

Terbilang : Tiga Milyar Tiga Ratus Tiga Puluh Sembilan Juta

Rupiah,-Harga-harga tersebut di atas sudah termasuk PPn, PPh dan Pajak-Pajak Lain sesuai ketentuan yang berlaku.

Ambon, 2017

KEPALA SATUAN KERJA

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU

ANNIE L. LABOBAR, ST. M.Si

NIP. 19650420 199403 2 008

(5)

: PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROPINSI MALUKU PEKERJAAN : PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. NGILNGOF, KEC. MANYEWU

LOKASI : KWS. NGILNGOF, KEC. MANYEWU KAB. MALUKU TENGGARA

T. ANGGARAN : 2018

HARGA SATUAN JUMLAH HARGA

( Rp.) ( Rp.)

A. PEMBUATAN TOWER DISTRIBUSI KAP. 50 M3 - 1 UNIT I. Pekerjaan Persiapan

1 Pembersihan Lokasi Pekerjaan M2 48.00 17,825.00 855,600.00

2 Papan nama proyek BH 1.00 441,384.38 441,384.38

3 Pengukuran dan pemasangan bowplank M' 20.00 374,808.00 7,496,160.00

8,793,144.38 II. Pekerjaan Tanah

1 Galian Tanah M3 54.00 61,507.75 3,321,418.50

2 Urugan tanah kembali M3 13.50 54,625.00 737,437.50

4,058,856.00 III. Pekerjaan Pasangan/Beton/Plesteran

1 Cor lantai kerja

- Membuat beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 0.63 1,393,179.00 877,702.77

- Bakesting Untuk Lantai M2 5.40 508,282.75 2,744,726.85

2 Pemb. rabat beton keliling mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 2.52 1,393,179.00 3,510,811.08 3 Cor pondasi telapak

- Membuat beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 4.50 1,538,539.00 6,923,425.50

- Bakesting Untuk Pondasi Telapak M2 18.00 210,645.50 3,791,619.00

- Pembesian Besi polos uk. Pondasi Telapak Kg 134.25 39,185.10 5,260,416.81 4 Cor tiang beton Uk. 40x40 Cm

- Membuat beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 11.68 1,538,539.00 17,970,135.52

- Bakesting Untuk Tiang M2 116.80 407,514.00 47,597,635.20

SATUAN KERJA

VOLUME

RENCANA ANGGARAN BIAYA ( R A B )

No. URAIAN PEKERJAAN SATUAN

- Bakesting Untuk Tiang M2 116.80 407,514.00 47,597,635.20

- Pembesian Besi polos uk. Tiang Kg 966.00 39,185.10 37,852,806.60

5 Cor balok beton Uk. 40x55

- Membuat beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 19.80 1,538,539.00 30,463,072.20

- Bakesting Untuk Sloof M2 5.50 224,876.75 1,236,822.13

- Pembesian Besi polos uk. Sloof Kg 1,003.00 39,185.10 39,302,655.30

6 Cor plat lantai T= 20 Cm

- Membuat beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 6.36 1,538,539.00 9,785,108.04

- Bakesting Untuk Lantai M2 34.10 508,282.75 17,332,441.78

- Pembesian Besi polos uk. Lantai Kg 779.88 39,185.10 30,559,571.29

7 Cor plat dinding T= 15 Cm

- Membuat beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 6.90 1,538,539.00 10,615,919.10

- Bakesting Untuk Dinding M2 92.00 436,551.50 40,162,738.00

- Pembesian Besi polos uk. Dinding Kg 1,115.47 39,185.10 43,709,672.88

8 Cor plat dinding sekat T= 15 Cm

- Membuat beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 1.38 1,538,539.00 2,123,183.82

- Bakesting Untuk Dinding Sekat M2 18.40 436,551.50 8,032,547.60

- Pembesian Besi polos uk. Dinding Sekat Kg 195.42 39,185.10 7,657,562.69 9 Cor plat tutup T = 10 cm

- Membuat beton mutu f'c = 12,2 Mpa (K150), slump (12 ± 2) cm, w/c = 0,72 M3 2.70 1,488,859.00 4,025,874.74

- Bakesting Untuk Plat Penutup M2 28.09 508,282.75 14,277,662.45

- Pembesian Besi polos uk. Plat Penutup Kg 447.06 39,185.10 17,518,143.05 10 Plesteran dinding luar / dalam camp 1 : 3 M2 108.47 78,136.06 8,475,262.16 11 Plesteran Kolom/ Ring Balok camp 1 : 3 M2 127.40 78,136.06 9,954,534.04

12 Accian bak luar/dalam M2 108.47 23,546.25 2,554,014.65

13 Cat Reservoir 2x hingga merata M2 216.94 39,842.90 8,643,359.35

432,959,424.59 IV. Pek. Pengad.Pemas. Pipa dan Accessories

1 Pipa GIP dia. 75 mm ( In let ) M' 12.00 242,995.00 2,915,940.00

2 Pipa GIP dia. 100 mm ( Out Let ) M' 12.00 337,065.00 4,044,780.00

3 Pipa GIP dia. 75 mm ( Over flow / kuras ) M' 12.00 242,995.00 2,915,940.00

4 Pipa vent GIP dia. 50 mm Bh 4.00 500,000.00 2,000,000.00

5 Gate Valve GIP dia. 100 mm + baut+ moer Bh 1.00 3,229,000.00 3,229,000.00 6 Gate Valve GIP dia. 75 mm + baut+ moer Bh 1.00 2,770,000.00 2,770,000.00

(6)

8 Flange Las GIP dia. 75 mm K. 10 Bh 2.00 131,000.00 262,000.00

9 Tee GIP dia. 75 x 75 mm Bh 2.00 169,000.00 338,000.00

10 Sock pipa GIP dia. 100 mm Bh 1.00 101,000.00 101,000.00

11 Sock pipa GIP dia. 75 mm Bh 1.00 90,000.00 90,000.00

12 Bend Socket GIP dia 100 mm x 90 drj Bh 2.00 153,000.00 306,000.00

13 Bend Socket Gip dia 75 mm x 45 drj Bh 2.00 126,000.00 252,000.00

14 Bend Socket Gip dia 75 mm x 90 drj Bh 2.00 126,000.00 252,000.00

15 Pembuatan tangga naik dari pipa GIP dia. 40 mm di Las ( 12 Meter ) Ls 1.00 1,500,000.00 1,500,000.00 16 Menhole plat t = 3 mm 60 x 60 cm + kunci gembok Bh 1.00 835,000.00 835,000.00

22,135,660.00 A. PEMBUATAN TOWER DISTRIBUSI KAP. 50 M3 - 1 UNIT

I. Pekerjaan Persiapan RP. 8,793,144.38

II. Pekerjaan Tanah RP. 4,058,856.00

III. Pekerjaan Pasangan/Beton/Plesteran RP. 432,959,424.59

IV. Pek. Pengad.Pemas. Pipa dan Accessories RP. 22,135,660.00

RP. 467,947,084.97

(7)

HARGA SATUAN JUMLAH HARGA

( Rp.) ( Rp.)

B. PEMBUATAN RESERVOIR KAP. 300 M3 - 1 UNIT I. Pekerjaan Persiapan

1. - Pembersihan dan perataan lokasi M2 143.00 17,825.00 2,548,975.00

2. - Mobilisasi dan Demobilisasi Material LS 1.00 20,000,000.00 20,000,000.00

3. - Pengukuran dan pemasangan bowplank M' 48.00 374,808.00 17,990,784.00

40,539,759.00 II. Pekerjaan Tanah

1. - Galian Tanah M3 114.86 61,507.75 7,064,780.17

2. - Urugan Tanah Kembali M3 28.72 54,625.00 1,568,830.00

8,633,610.17 III. Pekerjaan pasangan, beton dan acian Bak Reservoir

1. - Pas. Batu kosong M3 47.86 954,511.50 45,682,920.39

2. - Urugan pasir bawah lantai M3 7.98 636,525.00 5,079,469.50

3. - Cor lantai kerja, beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87 M3 11.17 1,393,179.00 15,561,809.43

- Pekerjaan bekisting lantai kerja M2 2.61 508,282.75 1,326,617.98

4. - Pas. Pondasi rabat keliling camp. 1:4 M3 13.80 1,474,012.50 20,341,372.50 5. - Cor rabat keliling, beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 4.14 1,318,360.00 5,458,010.40 6. - Cor plat lantai, beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58 M3 47.86 1,621,684.00 77,613,796.24 - Pekerjaan besi tulangan polos (Lantai + Sloof) Kg 3,740.00 39,185.10 146,552,274.00

- Pekerjaan bekisting lantai M2 15.18 508,282.75 7,715,732.15

7. - Cor Kolom, beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58 M3 3.46 1,621,684.00 5,611,026.64

- Pekerjaan besi tulangan polos Kg 699.00 39,185.10 27,390,384.90

- Pekerjaan Bekisting kolom M2 29.25 407,514.00 11,919,784.50

8. - Cor plat dinding, beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58 M3 34.85 1,621,684.00 56,515,687.40

- Pekerjaan besi tulangan polos Kg 2,767.00 39,185.10 108,425,171.70

- Pekerjaan bekisting dinding M2 208.50 436,551.50 91,020,987.75

9. - Cor balok, beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58 M3 1.02 1,621,684.00 1,654,117.68

- Pekerjaan besi tulangan polos Kg 876.00 39,185.10 34,326,147.60

- Pekerjaan bekisting balok M2 18.08 224,876.75 4,065,771.64

10. - Cor plat penutup, beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58 M3 17.66 1,621,684.00 28,638,939.44

- Pekerjaan besi tulangan polos Kg 2,224.00 39,185.10 87,147,662.40

- Pekerjaan bekisting plat penutup M2 152.96 508,282.75 77,746,929.44

11. - Plesteran dinding luar dalam, lantai dan plat penutup camp 1:3 M2 537.27 78,136.06 41,980,160.96 12. - Acian dinding luar/dalam dan lantai M2 390.13 23,546.25 9,186,098.51 13. - Pengecatan dinding bagian luar dan plat penutup dengan cat waterproof (2 kali) M2 268.63 39,842.90 10,702,998.23

No. URAIAN PEKERJAAN SATUAN VOLUME

13. - Pengecatan dinding bagian luar dan plat penutup dengan cat waterproof (2 kali) M2 268.63 39,842.90 10,702,998.23

921,663,871.37 IV. Pengadaan / Pemasangan Pipa dab Assesoris

1. - Pipa GIP dia. 75 mm (inlet/kuras/overflow) M' 6.00 242,995.00 1,457,970.00

2. - Pipa GIP dia. 100 mm (outlet) M' 6.00 337,065.00 2,022,390.00

3. - Pipa vent GIP dia. 50 mm Bh 4.00 500,000.00 2,000,000.00

4. - Gate Valve GIP dia. 100 mm + baut+ moer Bh 1.00 3,229,000.00 3,229,000.00 5. - Gate Valve GIP dia. 75 mm + baut+ moer Bh 2.00 2,770,000.00 5,540,000.00

6. - Flange GIP dia. 100 K10 Bh 2.00 162,000.00 324,000.00

7. - Flange GIP dia. 75 K10 Bh 4.00 131,000.00 524,000.00

8. - Bend GIP dia. 100 x 90˚ Bh 1.00 153,000.00 153,000.00

9. - Bend GIP dia. 100 x 45˚ Bh 2.00 153,000.00 306,000.00

10. - Bend GIP dia. 75 x 90˚ Bh 2.00 126,000.00 252,000.00

11. - Bend GIP dia. 75 x 45˚ Bh 2.00 126,000.00 252,000.00

12. - Tee GIP dia. 75 x 75 mm Bh 1.00 169,000.00 169,000.00

13. - Manhole 60 x 60 mm + Gembok Bh 4.00 835,000.00 3,340,000.00

14. - Tangga turun naik pipa GIP dia. 40 mm Bh 5.00 1,500,000.00 7,500,000.00

27,069,360.00 V. Pekerjaan Pasangan, Beton, Plesteran dan Acian Ruang Kontrol

1. - Pasang pondasi batu kali camp. 1:4 M3 3.50 1,474,012.50 5,159,043.75

2. - Cor lantai, beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 1.20 1,393,179.00 1,671,814.80 3. - Cor sloof, beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 0.30 1,538,539.00 461,561.70

Pekerjaan besi tulangan polos Kg 72.00 39,185.10 2,821,327.20

Pekerjaan bekisting sloof M2 5.50 224,876.75 1,236,822.13

4. - Cor kolom, beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 0.14 1,538,539.00 215,395.46

Pekerjaan besi tulangan polos Kg 42.00 39,185.10 1,645,774.20

Pekerjaan bekisting kolom M2 2.70 407,514.00 1,100,287.80

5. - Cor ring balok, beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 0.12 1,538,539.00 184,624.68

Pekerjaan besi tulangan polos Kg 60.00 39,185.10 2,351,106.00

(8)

6. - Cor plat penutup, beton mutu f'c = 19,3 Mpa (K225), slump (12 ± 2) cm, w/c = 0,58 M3 1.44 1,621,684.00 2,335,224.96

Pekerjaan besi tulangan polos Kg 200.00 39,185.10 7,837,020.00

Pekerjaan bekisting plat penutup M2 13.68 508,282.75 6,953,308.02

7. - Pasangan dinding batu bata camp. 1:4 M2 27.44 210,703.00 5,781,690.32 8. - Plesteran dinding, lantai dan plat penutup camp. 1:4 M2 78.87 75,285.90 5,937,798.93

9. - Acian dinding bagian dalam dan luar M2 54.87 23,546.25 1,291,982.74

10. - Pengecatan dinding bagian luar dan plat penutup dengan cat waterproof (2 kali) M2 66.87 39,842.90 2,664,294.72 11. - Pasang pintu plat baja 2,3 mm + rangka holow uk. 40 x 40 mm Ls 1.00 14,000,000.00 14,000,000.00

12. - Kosen pintu besi holow uk. 50 x 50 mm Ls 1.00 325,000.00 325,000.00

13. - Pasang batu angin uk. 25 x 25 cm M2 1.13 15,000.00 16,950.00

14. - Gembok Bh 1.00 35,000.00 35,000.00

64,385,830.21 B. PEMBUATAN RESERVOIR KAP. 300 M3 - 1 UNIT

I. Pekerjaan Persiapan RP. 40,539,759.00

II. Pekerjaan Tanah RP. 8,633,610.17

III. Pekerjaan pasangan, beton dan acian Bak Reservoir RP. 921,663,871.37

IV. Pengadaan / Pemasangan Pipa dab Assesoris RP. 27,069,360.00

V. Pekerjaan Pasangan, Beton, Plesteran dan Acian Ruang Kontrol RP. 64,385,830.21

RP. 1,062,292,430.74

(9)

HARGA SATUAN JUMLAH HARGA

( Rp.) ( Rp.)

C. PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 100 MM' = 1.500 M' I. Pekerjaan Persiapan

1. - Pembersihan lokasi LS 1.00 5,000,000.00 5,000,000.00

2. - Mobilisasi Pipa dan Accessories dari Pelabuhan Tual ke lokasi LS 1.00 30,000,000.00 30,000,000.00

35,000,000.00

II. PENGADAAN PIPA GIP DAN ACCESSORIES DIA 100 MM = 1.500 M' 405,826,000.00

a Pengadaan Pipa GIP dia 100 mm

1 Pipa GIP Medium dia 100 mm M' 1,500.00 245,700.00 368,550,000.00

368,550,000.00 b Pengadaan Accessories Pipa GIP dia 100 mm

1 Sock Pipa dia. 100 mm BH 250.00 101,000.00 25,250,000.00

2 Bend Socket GIP dia 100 mm - 90° BH 4.00 153,000.00 612,000.00

3 Bend Socket GIP dia 100 mm - 45° BH 6.00 153,000.00 918,000.00

4 Tee GIP dia 100 mm x 75 mm BH 1.00 169,000.00 169,000.00

5 Gibault Joint GIP dia 100 mm BH 4.00 276,000.00 1,104,000.00

6 Water moer dia 100 mm BH 2.00 160,000.00 320,000.00

7 Gate Valve Las dia 100 mm BH 2.00 3,215,000.00 6,430,000.00

8 Flange Las dia 100 mm BH 4.00 162,000.00 648,000.00

9 Niplle GIP dia 100 mm BH 2.00 104,000.00 208,000.00

10 Clamp saddle GIP dia 100 mm x 20" BH 2.00 139,000.00 278,000.00

11 Air reliese valve dia 20" BH 2.00 249,000.00 498,000.00

12 Reducer GIP dia 100 mm x 75 mm Bh 1.00 159,000.00 159,000.00

13 Karet Paking dia 100 mm Bh 2.00 53,000.00 106,000.00

14 Baut dia 5/8" Bh 32.00 10,000.00 320,000.00

15 Moer + Ring dia 5/8" Bh 64.00 4,000.00 256,000.00

37,276,000.00 III. PEMASANGAN PIPA GIP DAN ACCESSORIES DIA 100 MM

Pemasangan pipa lengkap dengan accessories termasuk Penggalian tanah, pasir, timbunan kembali, perbaikan akibat galian, penyeberangan pipa pada jalan / sungai, pengecatan serta perbaikan kembali semua kebocoran sesuai gambar spesifikasi teknis untuk pipa :

1 - Pipa GIP Medium dia 100 mm M' 1,500.00 66,700.00 100,050,000.00

- Galian Tanah M3 202.50 61,507.75 12,455,319.38

No. URAIAN PEKERJAAN SATUAN VOLUME

- Galian Tanah M3 202.50 61,507.75 12,455,319.38

- Timbunan Tanah Kembali M3 190.73 54,625.00 10,418,353.13

122,923,672.50 C. PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 100 MM' = 1.500 M'

I. PEKERJAAN PERSIAPAN RP. 35,000,000.00

II. PENGADAAN PIPA GIP DAN ACCESSORIES DIA 100 MM = 1.500 M' RP. 405,826,000.00

III. PEMASANGAN PIPA GIP DAN ACCESSORIES DIA 100 MM RP. 122,923,672.50

RP. 563,749,672.50

(10)

HARGA SATUAN JUMLAH HARGA

( Rp.) ( Rp.)

D. PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 75 MM'= 2.442 M'

I. PENGADAAN PIPA GIP DAN ACCESSORIES DIA 75 MM = 2.442 M' 418,199,600.00

a Pengadaan Pipa GIP dia 75 mm

1 Pipa GIP Medium dia 75 mm M' 2,304.00 161,400.00 371,865,600.00

371,865,600.00 b Pengadaan Accessories Pipa GIP dia 75 mm

1 Sock Pipa GIP dia 75 mm BH 384.00 90,000.00 34,560,000.00

2 Bend Socket GIP dia 75 mm - 90° BH 4.00 126,000.00 504,000.00

3 Bend Socket GIP dia 75 mm - 45° BH 6.00 126,000.00 756,000.00

4 Tee GIP dia 75 mm x 75 mm BH 2.00 169,000.00 338,000.00

5 Tee GIP dia 75 mm x 50 mm BH 3.00 159,000.00 477,000.00

6 Gibault Joint GIP dia 75 mm BH 4.00 220,000.00 880,000.00

7 Water moer dia 75 mm BH 2.00 126,000.00 252,000.00

8 Gate Valve Las dia 75 mm BH 2.00 2,756,000.00 5,512,000.00

9 Flange Las dia 75 mm BH 4.00 131,000.00 524,000.00

10 Niplle GIP dia 75 mm BH 4.00 87,000.00 348,000.00

11 Clamp saddle GIP dia 75 mm x 20 mm BH 2.00 118,000.00 236,000.00

12 Air reliese valve dia 20 mm BH 2.00 249,000.00 498,000.00

13 Reducer GIP dia 75 mm x 50 mm Bh 3.00 95,000.00 285,000.00

14 Karet Paking dia 75 mm Bh 6.00 50,000.00 300,000.00

15 Baut dia 5/8" Bh 48.00 10,000.00 480,000.00

16 Moer + Ring dia 5/8" Bh 96.00 4,000.00 384,000.00

46,334,000.00 II. PEMASANGAN PIPA GIP DAN ACCESSORIES DIA 75 MM

Pemasangan pipa lengkap dengan accessories termasuk Penggalian tanah, pasir, timbunan kembali, perbaikan akibat galian, penyeberangan pipa pada jalan / sungai, pengecatan serta perbaikan kembali semua kebocoran sesuai gambar spesifikasi teknis untuk pipa :

1 - Pipa GIP Medium dia 75 mm M' 2,304.00 58,362.50 134,467,200.00

- Galian Tanah M3 276.48 61,507.75 17,005,662.72

- Timbunan Tanah Kembali M3 266.31 54,625.00 14,546,987.10

166,019,849.82 D. PENGUMPULAN PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 75 MM

I. PENGADAAN PIPA GIP DAN ACCESSORIES DIA 75 MM = 2.442 M' RP. 418,199,600.00

No. URAIAN PEKERJAAN SATUAN VOLUME

I. PENGADAAN PIPA GIP DAN ACCESSORIES DIA 75 MM = 2.442 M' RP. 418,199,600.00

II. PEMASANGAN PIPA GIP DAN ACCESSORIES DIA 75 MM RP. 166,019,849.82

RP. 584,219,449.82

(11)

HARGA SATUAN JUMLAH HARGA

( Rp.) ( Rp.)

E. PENGAD./PEMAS. PIPA GIP DAN ACCES, DIA 50 MM'= 1.200 M'

I. PENGADAAN PIPA GIP DAN ACCEORIES DIA 50 MM' = 1.200 M' 135,245,000.00

a Pengadaan Pipa GIP dia 50 mm

1 Pipa GIP Medium dia 50 mm M' 1,200.00 97,300.00 116,760,000.00

116,760,000.00 b Accessories GIP dia 50 MM

1 Sock Pipa GIP dia 50 mm BH 200.00 63,000.00 12,600,000.00

2 Bend GIP socket dia 50 mm - 90° BH 4.00 103,000.00 412,000.00

3 Bend GIP socket dia 50 mm - 45° BH 5.00 103,000.00 515,000.00

4 Gibault Joint GIP dia 50 mm BH 4.00 163,000.00 652,000.00

5 Tee GIP 50 mm x 50 mm BH 2.00 143,000.00 286,000.00

6 Water moer dia 50 mm BH 2.00 83,000.00 166,000.00

7 Gate Valve Socket Kitz dia 50 mm BH 3.00 1,142,000.00 3,426,000.00

8 Niplle GIP dia 50 mm BH 4.00 68,000.00 272,000.00

9 Dop GIP dia 50 mm Bh 2.00 78,000.00 156,000.00

18,485,000.00 II. PEMASANGAN PIPA GIP DAN ACCESSORIES DIA 50 MM

1 - Pemasangan Pipa GIP dia 50 mm M' 1,200.00 33,350.00 40,020,000.00

- Galian Tanah M3 126.00 61,507.75 7,749,976.50

- Timbunan Tanah Kembali M3 123.65 54,625.00 6,754,108.13

54,524,084.63 E. PENGUMPULAN PEK. PEMAS.PIPA DAN ACCES, DIA 50 MM

I. PENGADAAN PIPA GIP DAN ACCEORIES DIA 50 MM' = 1.200 M' RP. 135,245,000.00

II. PEMASANGAN PIPA GIP DAN ACCESSORIES DIA 50 MM RP. 54,524,084.63

RP. 189,769,084.63

No. URAIAN PEKERJAAN SATUAN VOLUME

(12)

HARGA SATUAN JUMLAH HARGA

( Rp.) ( Rp.)

F. PENGAD. / PEMAS. PIPA HDPE PN 10 DAN ACCES. DIA 63 mm = 1.800 M'

I. PENGADAAN PIPA HDPE dan ACC, Diameter 63 mm 99,793,900.00

a. Pengadaan Pipa HDPE PN 10

1 Pipa HDPE PN 10 dia 63 mm M' 2,000.00 46,800.00 93,600,000.00

93,600,000.00 b. Pengadaan Accessories Pipa HDPE

1 Joint kopling HDPE dia. 63 mm Bh 23.00 73,300.00 1,685,900.00

2 Bend ( bock ) HDPE Kopling dia. 63 x 90 drj Bh 5.00 190,800.00 954,000.00

3 Clamp saddle GIP dia. 50 x 20 mm Bh 2.00 98,000.00 196,000.00

4 Dop / Cap HDPE Kopling dia. 63 mm Bh 4.00 144,000.00 576,000.00

5 Gate valve socket ONDA dia. 50 mm Bh 2.00 1,142,000.00 2,284,000.00

6 Air Valve GIP dia. 20 mm Bh 2.00 249,000.00 498,000.00

6,193,900.00 II. PEMASANGAN PIPA HDPE PN 10 dan ACC. Dia 63 mm

Pemasangan pipa lengkap dengan accessories termasuk Penggalian tanah, pasir, timbunan kembali, perbaikan akibat galian,penyeberangan pipa pada jalan / sungai, pengecatan serta perbaikan kembali semua kebocoran sesuai gambar spesifikasi teknis untuk pipa :

1 - Pipa HDPE PN 10 dia 63 mm M' 2,000.00 4,502.25 9,004,500.00

- Galian Tanah L = 500 m' M3 52.50 61,507.75 3,229,156.88

- Timbunan Kembali M3 51.52 54,625.00 2,814,211.72

15,047,868.59 III. PEKERJAAN LAIN-LAIN

1 Comisioning Test LS 1.00 5,000,000.00 5,000,000.00

2 Pembersihan Terakhir LS 1.00 5,000,000.00 5,000,000.00

3 Pemotongan Jalan dan perbaikan jalan akibat galian LS 1.00 13,000,000.00 13,000,000.00 4 Pembuatan trans block dan penyangga pipa LS 1.00 12,000,000.00 12,000,000.00

5 Pembuatan buis beton LS 1.00 17,635,900.00 17,635,900.00

52,635,900.00 F. PENGAD. / PEMAS. PIPA HDPE PN 10 DAN ACCES. DIA 63 mm = 1.800 M'

I. PENGADAAN PIPA HDPE dan ACC, Diameter 63 mm RP. 99,793,900.00

URAIAN PEKERJAAN SATUAN VOLUME

No.

I. PENGADAAN PIPA HDPE dan ACC, Diameter 63 mm RP. 99,793,900.00

II. PEMASANGAN PIPA HDPE PN 10 dan ACC. Dia 63 mm RP. 15,047,868.59

III. PEKERJAAN LAIN-LAIN RP. 52,635,900.00

RP. 167,477,668.59

Referensi

Dokumen terkait

Perencanaan Jaringan Transmisi Sistem Penyediaan Air Minum (SPAM) Regional Kamijoro Wilayah Layanan Kawasan Industri Sentolo (KIS)4.

Pemasangan pipa lengkap dengan accessories,termasuk penggalian tanah, urugan pasir,timbunan kembali,perbaikan akibat galian,peyeberangan pipa pada,jalan/sungai,pengecatan

Berdasarkan hasil survei topografi dapat disimpulkan bahwa penyediaan Sistem Penyediaan Air Minum (SPAM) di wilayah tersebut dapat digunakan sistem grafitasi dengan jaringan

Sistem Pengembangan Air Minum (SPAM) Regional, sektor Pengembangan Air Minum; Untuk kondisi Kota Pekalongan termasuk dalam skema Rencana Penyediaan Air Baku SPAM Perkotaan

Pemasangan pipa lengkap dengan accessories,termasuk penggalian tanah, urugan pasir,timbunan kembali,perbaikan akibat galian,peyeberangan pipa pada,jalan/sungai,pengecatan

Pemasangan pipa lengkap dengan accessories,termasuk penggalian tanah, urugan pasir,timbunan kembali,perbaikan akibat galian,peyeberangan pipa pada,jalan/sungai,pengecatan

Pemasangan pipa lengkap dengan Accessories termasuk penggalian tanah urugan pasir, timbunan kembali,perbaikan akibat galian,penyeberangan pipa pada jalan/sungai,pengecatan dan

Raya Padalarang-Cisarua KM 2,Mekarsari Ngamprah 40552 DETAIL ENGINEERING DESIGN DED KEGIATAN: PEMBANGUNAN PRASARANA PERTANIAN SUB KEGIATAN: PEMBANGUNAN, REHABILITASI DAN