Lokasi :
KWS. WUNIN ELDEDORA, KAB. SERAM BAGIAN TIMUR
DETAIL ENGINEERING DESIGN (DED)
Pekerjaan :
PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. WUNIN ELDEDORA, KAB. SERAM BAGIAN TIMUR
ANNIE L. LABOBAR, ST. MSi NIP. 19650402 199403 2 008
Lokasi :
KWS. WUNIN ELDEDORA, KAB. SERAM BAGIAN TIMUR
TAHUN ANGGARAN 2018
Disetujui Oleh :
Kepala Satuan Kerja Pengembangan Sistem
Penyediaan Air Minum Provinsi Maluku
PETA ORIENTASI SPAM BARU TA.2018
Pemb. SPAM Di Kawasan Rawan Air Kws. Wunin Eldedora, Kec. Wakate
SATUAN KERJA SISTYM PENYEDIAAN AIR MINUM
PROVINSI MALUKU
SATUAN KERJA SISTEM PENYEDIAAN AIR MINUM
PROVINSI MALUKU
RENC.
T. SURYA &
PAGAR BRC RENC. INTAKE
± 0.00 M' RENC. BRONCAPTERING KAP. 1.5
L/Det
± 26 M'
RENC. RESERVOIR KAP. 50 M3
± 140 M' GIP Ø 75 mmL = 630 M' GIP Ø 100 mm
L = 240 M'
GIP Ø 75 mm L = 450 M'
PVC Ø 90 mm
L = 150 M' PVC Ø 90 mmL = 100 M'
PVC Ø 63 mm L = 200 M'
PVC Ø 90 mm L = 450 M'
PVC Ø 90 mm L = 200 M'
PVC Ø 63 mm L = 290 M' PVC Ø 63 mm L = 290 M' SD
GEREJA KU
KU
KU KU
KU KU
KU KU
KU
KU
KU KU
KU
KU
KU
SITUASI DESA WUNIN ELDODOR
JENIS & DIMENSI PIPA DENAH PENEMPATAN KRAN UMUM
Kode Gambar
No. Gambar Jml. Gambar
Skala Nama Gambar
Mengetahui / Menyetujui Output
SATKER
Lokasi
Diperiksa Direncanakan
Sub Output
PEMBANGUNAN SPAM KAWASAN RAWAN AIR KWS. DESA WUNIN ELDODOR
KEMENTERIAN PU & PR DIREKTORAT JENDERAL CIPTA KARYA
SATUAN KERJA PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU Jl. D. I. Pandjaitan No. 2, Telp. (0911) 315060 - Ambon
DESA WUNIN ELDODOR KAB. SERAM BAGIAN TIMUR
PERENCANA GIP Ø 100 mm = 240 M'
GIP Ø 75 mm = 450 M' GIP Ø 75 mm = 630 M' (T. SURYA) GIP Ø 50 mm = 450 M' PVC Ø 90 mm = 900 M' PVC Ø 63 mm = 780 M'
= RENC. INTAKE - 1 UNIT
= RENC. RESERVOIR KAP. 50 M3 -1 UNIT
= RENC. PEMAS. T. SURYA & PAGAR BRC - 1 UNIT
= KRAN UMUM - 15 UNIT KETERANGAN
Kepala Satuan Kerja Pengembangan Sistim Penyediaan
Air Minum Provinsi Maluku
A. L. LABOBAR, ST, Msi NIP. 19650402 199403 2 008 LORDY. F. de Wanna, ST. MT NIP. 19730218 200801 1 008
PSPAM
PROVINSI MALUKU
SATUAN KERJA : PENGEMBANGAN PENGELOLAAN AIR MINUM DAN SANITASI MALUKU
PEKERJAAN
: PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. WUNIN ELDEDORA, KAB. SERAM BAGIAN TIMURLOKASI : KWS. WUNIN ELDEDORA, KAB. SERAM BAGIAN TIMUR
TAHUN ANGG. : 2016
JUMLAH HARGA ( Rp. )
I. PEMBANGUNAN BRONCAPTERING KAP. 5 L/Det = 1 UNIT Rp. 102,384,700.86 II. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 100 MM Sep. = 1.554 M' Rp. 597,894,125.65 III. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 75 MM Sep. = 2.772 M' Rp. 684,000,099.66
DETAIL ENGINEERING DESIGN (DED)
NO URAIAN PEKERJAAN
REKAPITULASI
III. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 75 MM Sep. = 2.772 M' Rp. 684,000,099.66 IV. PENGAD./PEMAS. PIPA DAN ACCESSORIES PVC dia. 90 MM Sep. 1.902 M' Rp. 289,586,820.01 V. PENGAD./PEMAS. PIPA DAN ACCESSORIES PVC dia. 63 MM Sep. 1.812 M' Rp. 200,224,781.49 VI. PEMABANGUNAN KRAN UMUM SISTIM CABANG 10 UNIT Rp. 35,000,566.15
1,909,091,093.82 190,909,109.38 Rp. 2,100,000,203.20 Rp. 2,100,000,000.00
Harga-harga tersebut di atas sudah termasuk PPn, PPh dan Pajak-Pajak Lain sesuai ketentuan yang berlaku.
Ambon, 2017
KEPALA SATUAN KERJA
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
ANNIE L. LABOBAR, ST. M.Si
NIP. 19650420 199403 2 008PPN 10%
DIBULATKAN
TERBILANG : DUA MILYAR SERATUS JUTA RUPIAH,- JUMLAH
JUMLAH
SATUAN KERJA : PENGEMBANGAN PENGELOLAAN AIR MINUM DAN SANITASI MALUKU
PEKERJAAN : PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. WUNIN ELDEDORA, KAB. SERAM BAGIAN TIMUR LOKASI : KWS. WUNIN ELDEDORA, KAB. SERAM BAGIAN TIMUR
TAHUN ANGG. : 2016
HARGA JUMLAH
SATUAN HARGA
( Rp.) ( Rp.)
I. PEMBANGUNAN BRONCAPTERING KAP. 5 L/Det = 1 UNIT 1 Pekerjaan Persiapan
1 Pembersihan Seluruh Lokasi Pekerjaan LS 1.00 1,500,000.00 1,500,000.00
2 Pengukuran dan Pemasangan Bouwplak LS 1.00 750,000.00 750,000.00
2 Mobilisasi Demobilisasi Peralatan dan Bahan-Bahan LS 1.00 25,344,000.00 25,344,000.00
27,594,000.00 2 Pekerjaan Tanah
1 Galian Tanah M3 6.36 25,920.00 164,851.20
2 Timbunan Tanah Kembali M3 2.09 12,426.00 25,970.34
3 Timbunan Pasir diBawah Pondasi M3 2.80 529,560.00 1,482,768.00
1,673,589.54 3 Pek. Pasangan Batu Kali, Beton Plesteran dan Pengecatan
1 Pasangan Batu Kosong M3 6.33 486,000.00 3,076,380.00
2 Pasang Batu Kali camp. 1pc : 4ps M3 6.77 980,849.00 6,640,347.73
3 Pengecoran Slof, Kolom dan Rring balok Camp 1 : 1,5 : 2,5 ( 110 kg/M3 ) M3 0.80 7,098,675.26 5,678,940.21
4 Pengecoran Dinding Camp, 1 : 1,5 : 2,5 ( 110 Kg / M3 ) M3 2.43 7,098,675.26 17,249,780.88
5 Pengecoran Lantai Camp 1 : 1,5 : 2,5 ( 85 kg/M3 ) M3 2.03 5,981,225.26 12,125,139.85
6 Pengecoran Plat Penutup Camp 1 : 2 : 3 ( 85 kg/M3 ) M3 1.16 5,981,225.26 6,938,221.30
7 Beton Rabat camp 1pc : 3ps : 5kr M3 0.78 1,452,846.00 1,133,219.88
8 Plesteran Dinding Camp : 1pc : 3ps M2 119.00 31,512.90 3,750,035.10
9 Acian Dinding luar dan dalam bak M2 72.69 14,845.00 1,079,083.05
10 Pengecatan Broncatering M2 33.12 33,702.00 1,116,210.24
58,787,358.24 4 Pek. Pengadaan Pemasangan Pipa dan Accessories
1 Pipa Inlet dan Outlet GIP Medium dia 100 MM M 6.00 377,479.42 2,264,876.54
RENCANA ANGGARAN BIAYA (RAB)
No. URAIAN PEKERJAAN SAT VOL
1 Pipa Inlet dan Outlet GIP Medium dia 100 MM M 6.00 377,479.42 2,264,876.54
2 Pipa Penguras dan Overflow GIP dia 100 mm M 6.00 377,479.42 2,264,876.54
3 Bend Flange GIP dia 100 mm x 90 drj Bh 2.00 210,000.00 420,000.00
4 Bend Flange GIP dia 100 mm x 45 drj Bh 2.00 210,000.00 420,000.00
5 Flange Las GIP dia 100 mm Bh 4.00 180,000.00 720,000.00
6 Gate Valve Flange dia 100 mm Bh 2.00 3,500,000.00 7,000,000.00
7 Paking Karet dia 100 mm Bh 2.00 30,000.00 60,000.00
8 Baut dan Moer dia 5/8" Bh 80.00 6,000.00 480,000.00
13,629,753.08 5 Pekerjaan Lain - lain
1 Manhole Plat = 3 mm 60 x 60 cm Unit 1.00 500,000.00 500,000.00
3 Pipa Vent dia 50 mm Unit 1.00 200,000.00 200,000.00
700,000.00
I. PENGUMPULAN
PEMBANGUNAN BRONCAPTERING KAP. 5 L/Det = 1 UNIT
1 Pekerjaan Persiapan Rp. 27,594,000.00
2 Pekerjaan Tanah Rp. 1,673,589.54
3 Pek. Pasangan Batu Kali, Beton Plesteran dan Pengecatan Rp. 58,787,358.24
4 Pek. Pengadaan Pemasangan Pipa dan Accessories Rp. 13,629,753.08
5 Pekerjaan Lain - lain Rp. 700,000.00
JUMLAH : Rp. 102,384,700.86
HARGA JUMLAH
SATUAN HARGA
( Rp.) ( Rp.)
II. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 100 MM Sep. = 1.554 M'
1 PENGADAAN PIPA GIP DIA 100 MM DAN ACCES 456,508,400.00
a - Pipa GIP Medium A Dia. 100 mm M 1,500.00 285,000.00 427,500,000.00
427,500,000.00 b PENGADAAN ACCESSORIES
- Socket GIP dia. 100 mm Bh 250.00 93,000.00 23,250,000.00
- Bend GIP dia 100 mm X 90 drt Bh 6.00 203,250.00 1,219,500.00
- Bend GIP dia 100 mm X 45 drt Bh 6.00 203,250.00 1,219,500.00
- Bend GIP dia 100 mm X 22.5 drt Bh 4.00 203,250.00 813,000.00
- Reduser Socket GIP dia. 100 X 75 mm Bh 2.00 195,700.00 391,400.00
- Watermur GIP dia. 100 mm Bh 3.00 167,000.00 501,000.00
- Gilbout Joint GIP dia. 100 mm Bh 3.00 173,000.00 519,000.00
- Clem Sadle 100 mm x 3/4" Bh 2.00 152,500.00 305,000.00
- Air Valve 100 mm x 3/4" Bh 2.00 225,000.00 450,000.00
- Nipple GIP dia. 100 mm Bh 2.00 170,000.00 340,000.00
29,008,400.00 2 PEMASANGAN PIPA DAN ACCESSORIES
Pemasangan pipa lengkap dengan Accessories termasuk penggalian tanah urugan pasir, timbunan kembali,perbaikan akibat galian,penyeberangan pipa pada jalan/sungai,pengecatan dan serta perbaikan kembali
semua kebocoran sesuai gambar spesifikasi teknis . - Pemasangan Pipa GIP dia. 100 mm
M 1,500.00 92,479.42 138,719,135.40
138,719,135.40 3 PEKERJAAN LAIN - LAIN
- Pek Beton Penyangga Pipa camp. 1:2:3 M3 1.88 1,417,645.00 2,666,590.25
2,666,590.25
No. URAIAN PEKERJAAN SAT VOL
2,666,590.25
II. PENGUMPULAN
PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 100 MM Sep. = 1.554 M'
1 PENGADAAN PIPA GIP DIA 100 MM DAN ACCES Rp.
2 PEMASANGAN PIPA DAN ACCESSORIES Rp.
3 PEKERJAAN LAIN - LAIN Rp.
JUMLAH : Rp.
138,719,135.40 2,666,590.25 597,894,125.65 456,508,400.00
HARGA JUMLAH
SATUAN HARGA
( Rp.) ( Rp.)
III. PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 75 MM Sep. = 2.772 M'
1 PENGADAAN PIPA GIP DIA 75 MM DAN ACCESSORIES 491,643,600.00
a PENGADAAN PIPA
- Pipa GIP dia.75 mm M 2,400.00 190,500.00 457,200,000.00
457,200,000.00 b PENGADAAN ACCESSORIES
- Socket Gip dia 75 mm Bh 400.00 75,000.00 30,000,000.00
- Reducer GIP dia.75 mm x 50 mm Bh 4.00 102,500.00 410,000.00
- Bend GIP dia.75 mm x 90 drj Bh 6.00 130,000.00 780,000.00
- Bend GIP dia.75 mm x 45 drj Bh 6.00 130,000.00 780,000.00
- Tee GIP dia.75 x 75 mm Bh 8.00 150,200.00 1,201,600.00
- Water Moer 75 mm Bh 6.00 99,500.00 597,000.00
- Gilbaut Joint 75 mm Bh 6.00 112,500.00 675,000.00
34,443,600.00 2 PEMASANGAN PIPA DAN ACCESSORIES
Pemasangan pipa lengkap dengan Accessories termasuk penggalian tanah urugan pasir, timbunan kembali,perbaikan akibat galian,penyeberangan pipa pada jalan/sungai,pengecatan dan serta perbaikan kembali
semua kebocoran sesuai gambar spesifikasi teknis .
- Pipa GIP dia.75 mm M 2,400.00 77,561.34 186,147,214.56
186,147,214.56 3 PEKERJAAN LAIN - LAIN
- Pek Beton Penyangga Pipa camp. 1:2:3 M3 4.38 1,417,645.00 6,209,285.10
6,209,285.10
III. PENGUMPULAN
PENGAD./PEMAS. PIPA DAN ACCESSORIES GIP dia. 75 MM Sep. = 2.772 M'
1 PENGADAAN PIPA GIP DIA 75 MM DAN ACCESSORIES Rp.
2 PEMASANGAN PIPA DAN ACCESSORIES Rp.
3 PEKERJAAN LAIN - LAIN Rp.
491,643,600.00 URAIAN PEKERJAAN
No.
186,147,214.56 6,209,285.10 VOL
SAT
2 PEMASANGAN PIPA DAN ACCESSORIES Rp.
3 PEKERJAAN LAIN - LAIN Rp.
JUMLAH : Rp.
186,147,214.56 6,209,285.10 684,000,099.66
HARGA JUMLAH
SATUAN HARGA
( Rp.) ( Rp.)
IV. PENGAD./PEMAS. PIPA DAN ACCESSORIES PVC dia. 90 MM Sep. 1.902 M'
1 PENGADAAN PIPA PVC DIA 90 MM DAN ACCESSORIES 96,326,000.00
a PENGADAAN PIPA
- Pipa PVC Rubber Ring (S-10) dia.90 mm M 1,530.00 45,000.00 68,850,000.00
68,850,000.00 b PENGADAAN ACCESSORIES
- Gate Valve dia.75 mm Bh 6.00 2,500,000.00 15,000,000.00
- Reducer Socket RR dia.75 mm x 50 mm Bh 12.00 165,000.00 1,980,000.00
- Bend RR Spigot dia.90 mm x 90 drj Bh 12.00 325,000.00 3,900,000.00
- Bend RR Spigot dia.90 mm x 45 drj Bh 10.00 325,000.00 3,250,000.00
- Reducer Tee Flange GIP dia.90 x 63 mm Bh 6.00 135,000.00 810,000.00
- Flange Spigot RR dia.90 mm Bh 8.00 132,000.00 1,056,000.00
- Flange Adaptor RR dia.90 mm Bh 8.00 185,000.00 1,480,000.00
27,476,000.00 2 PEMASANGAN PIPA DAN ACCESSORIES
Pemasangan pipa lengkap dengan Accessories termasuk penggalian tanah urugan pasir, timbunan kembali,perbaikan akibat galian,penyeberangan pipa pada jalan/sungai,pengecatan dan serta perbaikan kembali
semua kebocoran sesuai gambar spesifikasi teknis .
- Pipa PVC Rubber Ring (S-10) dia.90 mm M 1,530.00 107,881.04 165,057,990.28
165,057,990.28 3 PEKERJAAN LAIN - LAIN
- Pek. Box Pengaman Gate Valve ad. 1:2:3 M3 3.85 1,417,645.00 5,452,829.73
- Rehabilitasi (Bongkar/Pasang) Pipa PVC dia. 90 mm (Eksisting) Staf 50.00 455,000.00 22,750,000.00 28,202,829.73
IV. PENGUMPULAN
PENGAD./PEMAS. PIPA DAN ACCESSORIES PVC dia. 90 MM Sep. 1.902 M'
1 PENGADAAN PIPA PVC DIA 90 MM DAN ACCESSORIES Rp.
2 PEMASANGAN PIPA DAN ACCESSORIES Rp.
28,202,829.73
No. URAIAN PEKERJAAN SAT VOL
96,326,000.00 165,057,990.28
1 PENGADAAN PIPA PVC DIA 90 MM DAN ACCESSORIES Rp.
2 PEMASANGAN PIPA DAN ACCESSORIES Rp.
3 PEKERJAAN LAIN - LAIN Rp.
JUMLAH : Rp.
28,202,829.73 289,586,820.01 96,326,000.00 165,057,990.28
HARGA JUMLAH
SATUAN HARGA
( Rp.) ( Rp.)
V. PENGAD./PEMAS. PIPA DAN ACCESSORIES PVC dia. 63 MM Sep. 1.812 M'
1 PENGADAAN PIPA PVC DIA 63 MM DAN ACCESSORIES 80,976,000.00
a PENGADAAN PIPA
- Pipa PVC Rubber Ring (S-10) dia.63 mm M 1,740.00 38,600.00 67,164,000.00
67,164,000.00 b PENGADAAN ACCESSORIES
- Gate Valve dia.50 mm Bh 8.00 750,000.00 6,000,000.00
- Bend RR Spigot dia.63 mm x 90 drj Bh 12.00 280,000.00 3,360,000.00
- Bend RR Spigot dia.63 mm x 45 drj Bh 8.00 280,000.00 2,240,000.00
- Reducer Tee Flange GIP dia.63 x 63 mm Bh 2.00 110,000.00 220,000.00
- Flange Spigot RR dia.63 mm Bh 8.00 99,000.00 792,000.00
- Flange Adaptor RR dia.63 mm Bh 8.00 150,000.00 1,200,000.00
13,812,000.00 2 PEMASANGAN PIPA DAN ACCESSORIES
Pemasangan pipa lengkap dengan Accessories termasuk penggalian tanah urugan pasir, timbunan kembali,perbaikan akibat galian,penyeberangan pipa pada jalan/sungai,pengecatan dan serta perbaikan kembali
semua kebocoran sesuai gambar spesifikasi teknis .
- Pipa PVC Rubber Ring (S-10) dia.63 mm M 1,740.00 66,665.18 115,997,412.68
115,997,412.68 3 PEKERJAAN LAIN - LAIN
- Pek. Box Pengaman Gate Valve ad. 1:2:3 M3 2.29 1,417,645.00 3,251,368.81
3,251,368.81
V. PENGUMPULAN
PENGAD./PEMAS. PIPA DAN ACCESSORIES PVC dia. 63 MM Sep. 1.812 M'
1 PENGADAAN PIPA PVC DIA 63 MM DAN ACCESSORIES Rp.
2 PEMASANGAN PIPA DAN ACCESSORIES Rp.
3 PEKERJAAN LAIN - LAIN Rp.
80,976,000.00 115,997,412.68 3,251,368.81
No. URAIAN PEKERJAAN SAT VOL
3 PEKERJAAN LAIN - LAIN Rp.
JUMLAH : Rp.
3,251,368.81 200,224,781.49
HARGA JUMLAH
SATUAN HARGA
( Rp.) ( Rp.)
VI. PEMABANGUNAN KRAN UMUM SISTIM CABANG 10 UNIT 1 Pekerjaan Persiapan
a Pengukuran dan pemasangan bouwplak Ls 1.00 500,000.00 500,000.00
500,000.00 2 Pekerjaan Tanah
a Galian tanah untuk pondasi hidran umum M3 4.70 25,920.00 121,824.00
b Urugan tanahkembali bekas galian M3 1.70 12,426.00 21,124.20
c Urugan pasir dibawah pondasi M3 1.94 486,000.00 944,784.00
1,087,732.20 3 Pekerjaan Pasangan Dan Beton
a Pasangan batu Kali camp 1 : 4 M3 2.06 980,849.00 2,020,548.94
b Pengecoran Lantai kerja camp 1 : 3 : 5 M3 0.40 1,452,846.00 581,138.40
c Pengecoran beton tumbuk camp 1 : 2 : 3 M3 0.40 1,417,645.00 567,058.00
d Pengecoran Plat lantai Dudukan tengki camp. 1 : 2 : 3 (K. 98 kg) M3 1.40 6,500,920.26 9,072,034.22
e Plesteran dinding pondasi dan lantai camp 1 ; 4 M2 13.60 27,995.40 380,737.44
12,621,517.00 4 Pekerjaan Pengadaan / Pemasangan Tangki Hidran Umum
a Pengadaan / Pemasangan Profil Tangki kap 2.000 Liter Unit 2.00 5,117,000.00 10,234,000.00
10,234,000.00 5 Pekerjaan Pengadaan / Pemasangan Pipa Dan Accessories
a Pengadaan / Pemasangan Pipa GIP dia 3/4" M 90.00 69,636.86 6,267,316.95
b Socket GIP dia 3/4" Bh 15.00 22,000.00 330,000.00
c Tee Socket GIP dia 3/4" Bh 2.00 28,000.00 56,000.00
d Kney GIP dia 3/4" Bh 16.00 28,000.00 448,000.00
e Nepel GIP dia 3/4" Bh 8.00 31,000.00 248,000.00
f Water Mur GIP dia 3/4" Bh 4.00 60,000.00 240,000.00
g Stop Kran Handel dia 3/4 mm Bh 8.00 60,000.00 480,000.00
h Gate Valve Socket dia 3/4 mm Bh 2.00 182,500.00 365,000.00
i Stop Kran Pelampung dia 3/4 mm Bh 2.00 61,500.00 123,000.00
8,557,316.95 6 Pekerjaan Akhir
a Pembersihan Terakhir Seluruh Lokasi Pekerjaan Ls 1.00 2,000,000.00 2,000,000.00
2,000,000.00
No. URAIAN PEKERJAAN SAT VOL
2,000,000.00
VI. PENGUMPULAN
PEMABANGUNAN KRAN UMUM SISTIM CABANG 10 UNIT
1 Pekerjaan Persiapan Rp.
2 Pekerjaan Tanah Rp.
3 Pekerjaan Pasangan Dan Beton Rp.
4 Pekerjaan Pengadaan / Pemasangan Tangki Hidran Umum Rp.
5 Pekerjaan Pengadaan / Pemasangan Pipa Dan Accessories Rp.
6 Pekerjaan Akhir Rp.
JUMLAH : Rp.
500,000.00 1,087,732.20 12,621,517.00
35,000,566.15 10,234,000.00 8,557,316.95 2,000,000.00