DETAIL ENGINEERING DESIGN (DED)
Pekerjaan :
PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. KOBA KAB. KEPULAUAN ARU
Lokasi :
KWS. KOBA KAB. KEPULAUAN ARU
Disetujui Oleh :
Kepala Satuan Kerja Pengembangan Sistem
Penyediaan Air Minum Provinsi Maluku
ANNIE L. LABOBAR, ST. MSi
NIP. 19650402 199403 2 008
KWS. KOBA KAB. KEPULAUAN ARU
PETA ORIENTASI SPAM BARU TA.2018
Pengembangan Jaringan Perpipaan di Kawasan Rawan Air
Kws. Koba, Kec. Aru Tengah
SATUAN KERJA SISTYM
PENYEDIAAN AIR MINUM
PROVINSI MALUKU
SATUAN KERJA SISTEM
PENYEDIAAN AIR MINUM
LAUT LAUT LAUT POMPA TENAGA SURYA BAK AIR EX LAP. SEPAK BOLA SD B. DESA SMP RS LAP. BOLA VOLLI PUSKESMAS LAUT LAUT LAUT POMPA TENAGA SURYA BAK AIR EX LAP. SEPAK BOLA SD B. DESA SMP RS LAP. BOLA VOLLI PUSKESMAS MESJID
SUMUR RESAPAN = 1 UNIT POMPA TENAGA SURYA PIPA HDPE Ø 90 mm = 4.150 M' PIPA HDPE Ø 63 mm = 4.250 M' HIDRAN UMUM S.C = 15 UNIT
KETERANGAN : PIPA DIA.(mm) HDPE 90 PIPA DIA.(mm) HDPE 63 ASISTEN PERENCANA LORDY F. de WANNA,ST.MT NIP. 19730218 200801 1 004 KEPALA SATKER
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
ANNIE L. LABOBAR, ST. MSi
NIP. 19650420 199403 2 008
PSPAM
SATKER : PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUN MALUKU
PEKERJAAN : PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. KOBA KAB. KEPULAUAN ARU
LOKASI : KWS. KOBA KAB. KEPULAUAN ARU
T. A. : 2018
I. PEMBUATAN SUMUR RESAPAN = 1 UNIT Rp. 111,078,942.56
III. PENGAD./PEMAS. POMPA TENAGA SURYA Q = 50 M3/Hari H = 50 M' Rp. 380,506,949.32
IV. PENGAD./PEMAS. HIDRAN UMUM KAP. 2200 LITER - 15 UNIT Rp. 246,940,710.51
V. PENGAD./PEMAS. PIPA DAN ACCESSORIES HDPE DIA. 63 S/D 90 MM Rp. 1,079,655,619.68
SEPANJANG - 8.400 METER
HARGA
DETAIL ENGINEERING DESIGN (DED)
REKAPITULASI
No. URAIAN PEKERJAAN
JUMLAH SEPANJANG - 8.400 METER Rp. 1,818,182,222.06 Rp. 181,818,222.21 Rp. 2,000,000,444.27 Rp. 2,000,000,000.00
Harga-harga tersebut di atas sudah termasuk PPn, PPh dan Pajak-Pajak Lain sesuai ketentuan yang berlaku.
Ambon, 2017 KEPALA SATUAN KERJA
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM PROVINSI MALUKU
ANNIE L. LABOBAR, ST. M.Si NIP. 19650420 199403 2 008 PPN 10 %
JUMLAH TOTAL DIBULATKAN Terbilang : " DUA MILYAR RUPIAH "
SATKER : PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUN MALUKU
PEKERJAAN : PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. KOBA KAB. KEPULAUAN ARU
LOKASI : KWS. KOBA KAB. KEPULAUAN ARU
T. A. : 2018
Harga Jumlah
Satuan Harga
(Rp) (Rp)
I. PEMBUATAN SUMUR RESAPAN = 1 UNIT
I. PEKERJAAN PERSIAPAN
1 - Pembersihan lokasi pekerjaan M2 14.36 14,835.00 213,030.60 2 - Pembuatan dan Pemasangan Papan Proyek Bh 1.00 429,539.38 429,539.38 3 - Pengukuran dan Pemasangan Bouwplank M' 1.00 387,297.00 387,297.00 4 - Transportasi dan Mobilisasi LS 1.00 12,000,000.00 12,000,000.00
13,029,866.98
II. PEKERJAAN TANAH
1 Galian Tanah Keras Untuk Pembuatan Sumur Dangkal sedalam 1 s/d 4 M' M3 33.60 84,145.50 2,827,288.80 2 Timbunan Kembali Bekas Galian Tanah M3 8.50 49,795.00 423,257.50
3,250,546.30
III. PEKERJAAN GALIAN TANAH, PASANGAN DAN BETON 1 - Pengecoran Dinding Sumur, T = 15 cm
- Pembuatan Bakisting untuk Dinding M2 54.00 445,706.65 24,068,159.10 - Pembesian Plat Dinding Kg 744.58 38,795.37 28,886,252.87 - Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 10.00 1,524,872.40 15,248,724.00 2 - Pengecoran Plat Tutup Sumur beton, T = 10 cm
- Pembuatan Bakisting untuk Plat Penutup M2 9.81 445,706.65 4,372,382.24 - Pembesian Plat Penutup Kg 140.56 38,795.37 5,453,076.50 - Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 M3 1.10 1,524,872.40 1,677,359.64 3 - Pengecoran Rabat Beton Keliling, T = 7 cm
- Beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 2.00 1,308,447.00 2,616,894.00
82,322,848.35
IV. PEKERJAAN PLESTERAN, LANTAI DAN DINDING
1 - Pembuatan Menhole 60 x 60 cm Unit 1.00 800,000.00 800,000.00 2 - Tanggga operasional pipa GIP dia 40 mm Unit 1.00 1,250,000.00 1,250,000.00 3 - Pipa Vent GIP dia 50 mm Unit 1.00 500,000.00 500,000.00 4 - Plesteran Dinding ad 1 : 2 M2 70.00 74,807.39 5,236,516.95 5 - Acian semen untuk dinding M2 70.00 38,001.75 2,660,122.50 6 - Pengecatan Dinding Pengaman Sumur M2 14.00 33,720.65 472,089.03 7 - Urugan kerikil ut. Filter / Saringan M3 0.65 625,669.00 406,684.85 8 - Urugan pasir ut. Filter / Saringan M3 0.40 625,669.00 250,267.60 9 - Ijuk / Pipa PVC dia 150 m LS 1.00 900,000.00 900,000.00
12,475,680.93
I. PENGUMPULAN :
I. PEKERJAAN PERSIAPAN Rp. 13,029,866.98
II. PEKERJAAN TANAH Rp. 3,250,546.30
III. PEKERJAAN GALIAN TANAH, PASANGAN DAN BETON Rp. 82,322,848.35 IV. PEKERJAAN PLESTERAN, LANTAI DAN DINDING Rp. 12,475,680.93
Rp. 111,078,942.56
RENCANA ANGGARAN BIAYA
No. Uraian Pekerjaan Sat
JUMLAH
Harga Jumlah
Satuan Harga
(Rp) (Rp)
DESA KOBA DANGAR :
II. PEMBUATAN SUMUR DANGKAL / INTAKE - 1 UNIT ( Sumur Uji )
A Pekerjaan Persiapan
- Pembersihan Lapangan awal / akhir M2 25.00 14,835.00 370,875.00 - Biaya Mobilisasi dan penggunaan alat bantu pompa alcon dll LS 1.00 2,000,000.00 2,000,000.00 - Pembuatan Papan Nama Proyek Bh 1.00 429,539.38 429,539.38
2,800,414.38
B Pekerjaan Pembuatan Sumur Pekerjaan Galian / Pasangan / Beton
- Galian Tanah M3 11.50 84,145.50 967,673.25 - Urugan tanah bekas galian M3 3.00 49,795.00 149,385.00 - Pasangan batu kali Ut pondasi rabat beton ad 1 : 4 M3 1.70 1,454,341.75 2,472,380.98 - Pas. Batu Kosong dalam Sumur M3 18.60 943,074.75 17,541,190.35 - Cor Plat Dinding beton Ut. Sumur (K175) M3 1.00 1,524,872.40 1,524,872.40 Bakesting dinding M2 13.80 445,706.65 6,150,751.77 Pembesian dinding sumur Kg 135.87 38,795.37 5,271,126.24 - Cor Plat Tutup beton Ut. Sumur (K175) M3 0.15 1,524,872.40 228,730.86 Bakesting Penutup M2 1.00 517,437.90 517,437.90 Pembesian Penutup sumur Kg 25.41 38,795.37 985,790.22 - Rabat Keliling Sumur beton (K100) M3 1.43 1,308,447.00 1,871,079.21 - Plesteran dinding sumur 1:3 M2 16.25 74,807.39 1,215,620.01
38,896,038.19
C Pekerjaan Lain- lain
- Menhole uk. 60 x 60 cm + kunci gembok Unit 1.00 800,000.00 800,000.00 - Pipa vent GIP dia. 50 mm Unit 1.00 500,000.00 500,000.00 - Pemasangan Ijuk sebagai saringan pompa LS 1.00 1,250,000.00 1,250,000.00
2,550,000.00
II. PENGUMPULAN :
A Pekerjaan Persiapan Rp. 2,800,414.38 B Pekerjaan Pembuatan Sumur Rp. 38,896,038.19 C Pekerjaan Lain- lain Rp. 2,550,000.00
Rp. 44,246,452.56
Vol
No. Uraian Pekerjaan Sat
Harga Jumlah
Satuan Harga
(Rp) (Rp)
III. PENGAD./PEMAS. POMPA TENAGA SURYA Q = 50 M3/Hari H = 50 M'
A Pengad./Pemas. Pompa Submersible Lengkap Dengan Proteksi Set 1.00 57,400,000.00 57,400,000.00 - Pompa Submersibble
- AC/DC Electrikc Motor - Inverter Built In - Proteksi Over Load Built In - Protersi Thermail - Proteksi Dry Running
- Solar Module lengkap dengan accessories Solar Modle Cristaline Minimum Set 1.00 194,518,500.00 194,518,500.00 1.040 Wp. Terminal Socket Juncion Box
- Cable Array To Control Box c/w Socket & Plug Set 1.00 582,000.00 582,000.00 - Cable Intermodule Array to Array c/w Socket & Plug Set 1.00 288,000.00 288,000.00 - Control Box Complate With Termination Braker and Control Box Unit 1.00 3,530,000.00 3,530,000.00 - Flash Arrester c/w Grouding Cable Set 1.00 3,276,000.00 3,276,000.00 - Accessories Mekanikal Set 1.00 2,880,000.00 2,880,000.00
262,474,500.00
B Pengadaan dan Pemasangan Testing Comisionning & Trening Operator
- Pengadaan dan Pemasangan 1 unit support solar module lengkapdengan bolt-nut Set 1.00 52,380,000.00 52,380,000.00 - Pengadaan dan Pemasangan cable NYYHY 4C x 16 mm2 M' 100.00 175,000.00 17,500,000.00 - Testing Commissioning by principle/manufakture operator Lot 1.00 7,000,000.00 7,000,000.00
76,880,000.00
C Pekerjaan Pengad./Pemas Pagar BRC
- Pembuatan pondasi utk pagar BRC Camp. 1 : 4 M3 10.50 1,454,341.75 15,270,588.38 - Plesteran pondasi pagar BRC Camp. 1 : 4 M2 28.24 71,949.75 2,031,860.94 - Pengad. Pemas. Pagar BRC uk. 2 M' x 2.20 M' besi Ø 8 mm lengkap Lbr 12.00 1,800,000.00 21,600,000.00 - Pengad. Pemas. Pintu BRC uk. 2 M' x 1.00 M' besi Ø 8 mm lengkap Unit 1.00 2,250,000.00 2,250,000.00
41,152,449.32
III. PENGUMPULAN :
A Pengad./Pemas. Pompa Submersible Lengkap Dengan Proteksi Rp. 262,474,500.00 B Pengadaan dan Pemasangan Testing Comisionning & Trening Operator Rp. 76,880,000.00 C Pekerjaan Pengad./Pemas Pagar BRC Rp. 41,152,449.32
Rp. 380,506,949.32
No. Uraian Pekerjaan Sat Vol
Harga Jumlah
Satuan Harga
(Rp) (Rp)
IV. PENGAD./PEMAS. HIDRAN UMUM KAP. 2200 LITER - 15 UNIT
I. Pekerjaan Tanah
1 Galian tanah M3 2.13 52,865.50 112,603.52 2 Urugan tanah bekas galian M3 2.94 49,795.00 146,397.30 3 Urugan pasir dibawah lantai M3 0.23 625,669.00 143,903.87
402,904.69
II. Pekerjaan Beton
1 Pasangan Pondasi batu karang camp. 1 : 4 M3 3.50 1,454,341.75 5,084,902.32 2 Beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 1.09 1,379,512.40 1,503,668.52 3 Plesteran Kran umum camp. 1 : 4 M2 25.07 71,949.75 1,803,723.39
8,392,294.23
III. Pengad./Pemas. Tangki Hidran Umum
1 Pengad. / Pemas. Profil Tank Kap. 2200 liter Unit 1.00 5,800,000.00 5,800,000.00
5,800,000.00
IV. Pekerjaan Pengad. Pemas. Pipa dan Accessories
1 Pengadaan Pipa GIP dia 20 mm M' 12.00 51,626.26 619,515.12 2 Sock GIP dia 20 mm Bh 4.00 32,000.00 128,000.00 3 Knie GIP dia 20 - 90 drt Bh 3.00 37,000.00 111,000.00 4 Nipple dia 20 mm Bh 4.00 42,000.00 168,000.00 5 Water moer dia 20 mm Bh 2.00 40,000.00 80,000.00 6 Stop Kran Handel dia 20 mm Bh 6.00 63,000.00 378,000.00 7 Gate Valve Socket dia 20 mm Bh 1.00 190,000.00 190,000.00 8 Stop Kran Pelampung dia 20 mm Bh 1.00 193,000.00 193,000.00
1,867,515.12
IV. PENGUMPULAN :
I. Pekerjaan Tanah Rp. 402,904.69
II. Pekerjaan Beton Rp. 8,392,294.23
III. Pengad./Pemas. Tangki Hidran Umum Rp. 5,800,000.00 IV. Pekerjaan Pengad. Pemas. Pipa dan Accessories Rp. 1,867,515.12
UNTUK 1 UNIT HIDRAN UMUM = Rp. 16,462,714.03
15.00 Unit Rp. 246,940,710.51
No. Uraian Pekerjaan Sat Vol
Sat Vol Harga Jumlah
Satuan Harga
(Rp) (Rp)
V. PENGAD./PEMAS. PIPA DAN ACCESSORIES HDPE DIA. 63 S/D 90 MM SEPANJANG - 8.400 METER
I PENGAD. PIPA DAN ACCESSORIES HDPE DIA. 63 S/D 90 MM 905,821,250.00
SEPANJANG - 8.400 METER
A Pekerjaan Persiapan
- Transportasi Pipa & Acces. Ke lokasi Proyek LS 1.00 27,000,000.00 27,000,000.00
27,000,000.00
B Pekerjaan Pengad.Pipa HDPE
- Pipa HDPE PN. 10 SDR. 17 dia. 90 mm M' 4,150.00 129,600.00 537,840,000.00 - Pipa HDPE PN. 10 SDR. 17 dia. 63 mm M' 4,250.00 72,500.00 308,125,000.00
8,400.00 845,965,000.00
C Pekerjaan Pengadaan Accesories Pipa HDPE
- Joint kopling HDPE dia. 90 mm Bh 83.00 149,600.00 12,416,800.00 - Joint kopling HDPE dia. 63 mm Bh 45.50 73,300.00 3,335,150.00 - Reducer HDPE Kopling dia. 90 x 63 mm Bh 2.00 168,800.00 337,600.00 - Bend ( bock ) HDPE Kopling dia. 90 x 90 drj Bh 3.00 322,500.00 967,500.00 - Bend ( bock ) HDPE Kopling dia. 63 x 90 drj Bh 5.00 190,800.00 954,000.00 - Tee HDPE Kopling dia. 63 x 63 mm Bh 6.00 319,200.00 1,915,200.00 - Clamp saddle GIP dia. 90 x 20 mm Bh 2.00 118,000.00 236,000.00 - Clamp saddle GIP dia. 63 x 20 mm Bh 17.00 98,000.00 1,666,000.00 - Dop / Cap HDPE Kopling dia. 63 mm Bh 3.00 144,000.00 432,000.00 - Gate valve socket ONDA dia. 90 mm Bh 2.00 1,696,000.00 3,392,000.00 - Gate valve socket ONDA dia. 63 mm Bh 5.00 1,142,000.00 5,710,000.00 - Air Valve GIP dia. 20 mm Bh 6.00 249,000.00 1,494,000.00
32,856,250.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
II PEMAS. PIPA DAN ACCESSORIES GIP/PVC DIA. 63 S/D 90 MM 173,834,369.68
SEPANJANG - 8.400 METER
Pemasangan pipa lengkap dengan accessories,termasuk penggalian tanah, urugan pasir,timbunan kembali,perbaikan akibat galian,peyeberangan pipa pada,jalan/sungai,pengecatan dan pengelontoran serta perbaikan kembali semua kebocoran sesuai gambar spesifikasi teknis utk pipa diameter : A Pekerjaan Pemasangan Pipa PVC / GIP Medium
a - Pipa HDPE PN. 10 SDR. 17 dia. 90 mm M' 4,150.00 6,191.60 25,695,140.00 - Galian tanah M3 772.73 56,069.17 43,326,329.73 - Timbunan Tanah bekas galian M3 415.83 49,795.00 20,706,254.85 b - Pipa HDPE PN. 10 SDR. 17 dia. 63 mm M' 4,250.00 4,202.79 17,861,857.50 - Galian tanah M3 631.13 56,069.17 35,386,654.92 - Timbunan Tanah bekas galian M3 187.54 49,795.00 9,338,554.30
152,314,791.30
B Pek. Pembuatan penyangga dari Pipa GIP
- Biaya pikul pipa GIP dari Desa Ke Lokasi pemasangan Air ± 500 Meter Rool 84.00 75,000.00 6,300,000.00 - Pembuatan Box Ut gate valve flange / air reliese valve Unit 10.00 350,000.00 3,500,000.00 - Pembuatan trans block ut pipa/penyangga (K100) M3 3.37 1,308,447.00 4,403,578.38
14,203,578.38
C Pekerjaan Akhir
- Comussioning Test dan Perbaikan Kembali Ls 1.00 5,000,000.00 5,000,000.00 - Pembersihan Terakhir Ls 1.00 2,316,000.00 2,316,000.00
7,316,000.00
V. PENGUMPULAN :
I PENGAD. PIPA DAN ACCESSORIES HDPE DIA. 63 S/D 90 MM Rp. 905,821,250.00 SEPANJANG - 8.400 METER
II PEMAS. PIPA DAN ACCESSORIES GIP/PVC DIA. 63 S/D 90 MM Rp. 173,834,369.68 SEPANJANG - 8.400 METER
Rp. 1,079,655,619.68
No. Uraian Pekerjaan Sat Vol
JUMLAH