Lokasi :
KWS. TIANG BENDERA KAB. SERAM BAGIAN BARAT
DETAIL ENGINEERING DESIGN (DED)
Pekerjaan :
PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. TIANG BENDERA
KAB. SERAM BAGIAN BARAT
ANNIE L. LABOBAR, ST. MSi
NIP. 19650402 199403 2 008
Lokasi :
KWS. TIANG BENDERA KAB. SERAM BAGIAN BARAT
TAHUN ANGGARAN 2018
Disetujui Oleh :
Kepala Satuan Kerja Pengembangan Sistem
Penyediaan Air Minum Provinsi Maluku
PETA ORIENTASI SPAM BARU TA.2018
Pemb. SPAM Di Kawasan Rawan Air Kws. Tiang Bendera
Desa Tahalupu, Kec. Huamual Belakang
SATUAN KERJA SISTYM
PENYEDIAAN AIR MINUM
PROVINSI MALUKU
SATUAN KERJA SISTEM
PENYEDIAAN AIR MINUM
S
D
L A U T L A U T L A U T B T . KAR AN G R E S E R V O IR = 5 0 B R O N K A PG
IP
Ø
1
00
m
m
=
2
.0
00
G
IP
Ø
7
5
m
m
=
1
.5
78
G
IP
Ø
50
m
m
=
1
.4
22
R
ES
ER
V
O
IR
K
A
P
=
5
0 M
3
K
R
A
M
UM
UM
=
3
5 U
N
IT
B
R
O
N
C
A
PT
ER
IN
G
=
1
U
N
IT
L O R D Y . F . d e W a n n a , S T . M T N IP . 1 9 7 3 0 2 1 8 2 0 0 8 0 1 1 0 0 8 K E P A L A S A T U A N K E R J A P E N G E M B A N G A N S IS T E M P E N Y E D IA A N A IR M IN U M P R O V IN S I M A L U K U A N N IE . L . L A B O B A R .S T ,M S I N IP . 1 9 6 5 0 4 0 2 1 9 9 4 0 3 2 0 0 8: PENGEMBANGAN SISTIM PENYEDIAAN AIR MINUM PROVINSI MALUKU
PEKERJAAN
: PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. TIANG BENDERA KAB. SERAM BAGIAN BARAT
LOKASI
: KWS TIANG BENDERA KAB. SERAM BAGIAN BARAT
T. ANGGARAN
: 2018
NO
I.
PEMBANGUNAN BRONCAPTERING = 1 UNIT
Rp
113,902,050.93
II.
PEMBANGUNAN RESERVOIR KAPASITAS 50 M3 = 1 UNIT
Rp
179,690,699.20
II.
Rp
1,403,843,663.68
III. PEMBUATAN KRAN UMUM SISTIM CABANG - 35 UNIT
Rp
120,746,288.70
Rp
1,818,182,702.51
Rp
181,818,270.25
REKAPITULASI
DETAIL ENGINEERING DESIGN (DED)
JUMLAH PPN ( 10% )
SATUAN KERJA
TOTAL
JUMLAH HARGA
JUMLAH ( A + B + C )
( Rp )
URAIAN PEKERJAAN
PENGAD / PEMAS PIPA GIP SERTA ACCESSORIES DIA 50 mm - 150 mm SEPANJANG = 7.818
M'
Rp
1,818,182,702.51
Rp
181,818,270.25
Rp
2,000,000,972.76
Rp
2,000,000,000.00
Harga-harga tersebut di atas sudah termasuk PPn, PPh dan Pajak-Pajak Lain sesuai ketentuan yang berlaku.
Ambon, 2017
KEPALA SATUAN KERJA
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROVINSI MALUKU
ANNIE L. LABOBAR, ST. M.Si
NIP. 19650420 199403 2 008
JUMLAH PPN ( 10% )
DIBULATKAN
TOTAL
JUMLAH ( A + B + C )
: PENGEMBANGAN SISTIM PENYEDIAAN AIR MINUM PROVINSI MALUKU
PEKERJAAN : PEMBANGUNAN SPAM DI KAWASAN RAWAN AIR KWS. TIANG BENDERA KAB. SERAM BAGIAN BARAT LOKASI : KWS TIANG BENDERA KAB. SERAM BAGIAN BARAT
T. ANGGARAN : 2018
HARGA JUMLAH
NO SATUAN VOLUME SATUAN HARGA
( Rp ) ( Rp )
I. PEMBANGUNAN BRONCAPTERING = 1 UNIT A. Pekerjaan Awal
1 Pembersihan Lokasi Brocaptering M2 18.00 17,825.00 320,850.00
2 Pengadaan Pemasangan Papan Nama Proyek Bh 1.00 418,025.00 418,025.00
3 Pengukuran dan Pemasangan Bowplak M' 1.60 313,490.00 501,584.00
4 Mobilisasi Demobilisasi Peralatan dan Bahan - bahan Yang Dibutuhkan Ls 1.00 27,707,000.00 27,707,000.00
28,947,459.00 B. Pekerjaan Tanah
1 Galian tanah keras untuk pondasi broncaptering M3 7.35 61,507.75 452,081.96
2 Timbunan kembali tanah bekas galian M3 1.84 54,625.00 100,373.44
3 Pas Batu Kosong M3 2.78 756,426.99 2,105,892.74
4 Urugan Kerikil Untuk Saringan ( Grafel ) M3 1.50 611,742.50 917,613.75
3,575,961.89 C. Pekerjaan pasangan Batu Kali, Plesteran dan Pengecatan
1 Pasangan pondasi batu kali camp 1 Pc : 4 Ps. M3 9.45 1,350,929.15 12,766,280.47
2 Plesteran dinding luar dan dalam broncaptering T = 15 mm camp 1 Pc : 2 Ps M2 39.22 88,752.63 3,480,878.15
3 Acian dinding luar dan dalam M2 28.50 28,088.75 800,529.38
4 Pengecetan dinding Bronkaptering M2 11.88 28,227.33 335,340.62
17,383,028.61 D. Pekerjaan Beton
1 Beton tumbuk dibawah Lantai T = 5 cm camp 1 Pc : 3 Ps : 5 Kr
- Beton Mutu f'c = 7,4 Mpa (K100), Slump (3-6) cm, w/c = 0,87 ( camp 1 : 3 : 5 ) M3 0.70 1,343,660.00 935,187.36
2 Pengecoran Plat lantai Broncaptering T= 20 cm
- Pembesian untuk Plat Lantai Kg 338.47 20,130.18 6,813,526.68
- Bakesten untuk Plat Lantai M2 16.94 195,511.50 3,311,964.81
- Beton Mutu f'c = 9,8 Mpa (K125), Slump (12 ± 2) cm, w/c = 0,78 ( camp 1 : 1,5 : 2,5 ) M3 2.78 1,504,320.75 4,188,028.97
3 Pengecoran Plat Dinding Broncaptering T= 15 cm
RENCANA ANGGARAN BIAYA
R A B
SATUAN KERJA
URAIAN PEKERJAAN
3 Pengecoran Plat Dinding Broncaptering T= 15 cm
- Pembesian untuk Plat Dinding Kg 396.18 20,130.18 7,975,126.35
- Bakesten untuk Plat Dinding M2 29.30 348,110.75 10,199,644.98
- Beton Mutu f'c = 9,8 Mpa (K125), Slump (12 ± 2) cm, w/c = 0,78 ( camp 1 : 1,5 : 2,5 ) M3 2.22 1,504,320.75 3,339,592.07
4 Pengecoran Plat Penutup Broncaptering T= 10 cm
- Pembesian untuk Plat Penutup Kg 187.37 20,130.18 3,771,889.53
- Bakesten untuk Plat Penutup M2 5.00 382,610.75 1,913,053.75
- Beton Mutu f'c = 7,4 Mpa (K100), Slump (12 ± 2) cm, w/c = 0,87 ( camp 1 : 2 : 3 ) M3 0.61 1,432,560.75 870,996.94
43,319,011.42 E. Pekerjaan Pengadaan / Pemasangan Pipa dan Accessories
1 Pengad / Pemas Pipa Outlet dia. 100 mm M 6.00 355,005.00 2,130,030.00
2 Pengad / Pemas Pipa Inlet dia. 100 mm M 6.00 355,005.00 2,130,030.00
3 Pengad / Pemas Pipa Overflow/ Penguras dia. 100 mm M 6.00 355,005.00 2,130,030.00
5 Foor Valve dia. 100 mm Bh 1.00 320,000.00 320,000.00
6 Gate Valve flange dia 100 mm Bh 3.00 3,291,600.00 9,874,800.00
7 Flange Las dia.100 mm 10 K Bh 4.00 151,500.00 606,000.00
8 Bend Socket GIP dia 100 mm x 90 drj Bh 1.00 302,000.00 302,000.00
9 Bend Socket GIP dia 100 mm x 45 drj Bh 2.00 302,000.00 604,000.00
10 Karet paking dia 100 mm Bh 6.00 54,800.00 328,800.00
18,425,690.00 F. Pekerjaan Lain -Lain
1 Pipa Vent dia. 50 mm Unit 1.00 420,000.00 420,000.00
2 Menhole Plat baja 60 X 60 Cm Unit 1.00 782,600.00 782,600.00
3 Gembok Bh 3.00 14,500.00 43,500.00
4 Baut 5/8 panjang 7 cm Bh 24.00 10,700.00 256,800.00
5 Ring Baut Bh 48.00 4,300.00 206,400.00
6 Biaya pengelasan Flange dia 100 mm Bh 4.00 135,400.00 541,600.00
2,250,900.00
I. PENGUMPULAN
A. Pekerjaan Awal Rp 28,947,459.00
B. Pekerjaan Tanah Rp 3,575,961.89
C. Pekerjaan pasangan Batu Kali, Plesteran dan Pengecatan Rp 17,383,028.61
D. Pekerjaan Beton Rp 43,319,011.42
E. Pekerjaan Pengadaan / Pemasangan Pipa dan Accessories Rp 18,425,690.00
F. Pekerjaan Lain -Lain Rp 2,250,900.00
Rp 113,902,050.93
HARGA JUMLAH
NO SAT VOL SATUAN HARGA
( Rp ) ( Rp )
II. PEMBANGUNAN RESERVOIR KAPASITAS 50 M3 = 1 UNIT A. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi pekerjaan M2 80.00 17,825.00 1,426,000.00
2 Pengadaan Pemasangan Papan Nama Proyek Bh 1.00 418,025.00 418,025.00
3 Pengukuran dan Pemasangan Bouwplank M2 1.60 313,490.00 501,584.00
2,345,609.00 B. PEKERJAAN TANAH
1 Galian Tanah Pond, Reservoir & Ruang Kontrol M3 25.92 61,507.75 1,594,280.88
2 Urugan Tanah Kembali M3 6.48 54,625.00 353,970.00
1,948,250.88 C. PEKERJAAN PASANGAN BATU KALI / KARANG
1 Pasangan Batu Kosong M3 4.75 756,426.99 3,593,028.20
2 Urugan Pasir Dibawah Lantai Pondasi M3 1.58 487,209.00 769,790.22
3 Pas, Pondasi Batu Kali/Karang Keliling Reservoir camp : 1pc : 4ps M3 3.36 1,350,929.15 4,539,121.94
8,901,940.37 D. PEKERJAAN BETON
1 Beton Tumbuk dibawah Lantai Reservoir, T = 7 cm
Beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 ( 1 : 3 : 5 ) M3 2.22 1,343,660.00 2,982,925.20
Bakisting Lantai M2 4.80 195,511.50 938,455.20
2 Pengecoran Plat Lantai Reservoir, T = 25 cm
Bakisting untuk Lantai M2 3.42 195,511.50 668,649.33
Pembesian Plat Lantai Kg 763.00 20,130.18 15,359,323.53
Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 ( camp, 1 : 1.5 : 2.5 ) M3 4.75 1,626,795.75 7,727,279.81
3 Pengecoran Plat Dinding dan Sekat Reservoir, T = 20 cm
Bakisting untuk Dinding M2 108.00 348,110.75 37,595,961.00
Pembesian Plat Dinding Kg 1435.00 20,130.18 28,886,801.13
Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 ( camp, 1 : 1.5 : 2.5 ) M3 8.09 1,626,795.75 13,160,777.62
4 Pengecoran Plat Penutup Reservoir Camp : 1 : 2 : 3 (108 kg/M3 )
Bakisting Plat Penutup M2 30.50 382,610.75 11,669,627.88
Pembesian Plat Penutup Kg 475.00 20,130.18 9,561,833.13
Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,65 ( camp, 1 : 1.5 : 2.5 ) M3 2.48 1,626,795.75 4,034,453.46
132,586,087.27 E. PEKERJAAN PLESTERAN, ACIAN DAN PENGECATAN
1 Plesteran Dinding Luar, Dalam, Lantai & Plat Penutup Camp : 1pc : 2ps M2 164.57 88,752.63 14,606,020.32
2 Acian dinding Luar dan Dalam Reservoir M2 139.37 28,088.75 3,914,729.09
3 Pengecetan Diding Luar Reservoir M2 69.69 28,227.33 1,967,162.28
20,487,911.69 F. PEK. PENGADAAN PEMASANGAN PIPA GIP DAN ACCESSORIES
1 Pipa Outlet, Inlet, Penguras dia 100 MM M 6.00 245,700.00 1,474,200.00
2 Pipa Overflow dia 75 MM M 6.00 169,100.00 1,014,600.00
3 Gate Valve Flange dia 100 mm Bh 2.00 3,291,600.00 6,583,200.00
4 Flange Las dia 100 mm Bh 4.00 151,500.00 606,000.00
5 Bend Socket Gip dia 100 mm x 90 drj Bh 2.00 155,800.00 311,600.00
URAIAN PEKERJAAN
5 Bend Socket Gip dia 100 mm x 90 drj Bh 2.00 155,800.00 311,600.00
6 Bend Socket Gip dia 100 mm x 45 drj Bh 2.00 155,800.00 311,600.00
7 Pipa vent dia 50 mm Unit 2.00 420,000.00 840,000.00
8 Kunci Gembok Bh 1.00 14,500.00 14,500.00
9 Pembuatan Tangga Monyet Dari Pipa GIP dia 40 mm Unit 2.00 350,000.00 700,000.00
10 Pembuatan manhole 60 cm x 60 cm Unit 2.00 782,600.00 1,565,200.00
13,420,900.00
II. PENGUMPULAN
A. PEKERJAAN PERSIAPAN Rp 2,345,609.00
B. PEKERJAAN TANAH Rp 1,948,250.88
C. PEKERJAAN PASANGAN BATU KALI / KARANG Rp 8,901,940.37
D. PEKERJAAN BETON Rp 132,586,087.27
E. PEKERJAAN PLESTERAN, ACIAN DAN PENGECATAN Rp 20,487,911.69
F. PEK. PENGADAAN PEMASANGAN PIPA GIP DAN ACCESSORIES Rp 13,420,900.00
Rp 179,690,699.20
HARGA JUMLAH
NO SAT VOL SATUAN HARGA
( Rp ) ( Rp )
II. PENGAD / PEMAS PIPA GIP SERTA ACCESSORIES DIA 50 mm - 150 mm SEPANJANG = 7.818 M'
A. Pekerjaan Pengadaan Pipa GIP Dan Accessories 1,014,453,700.00
a
1 Pipa GIP Kls Medium Dia 100 mm M' 2,000.00 245,700.00 491,400,000.00
2 Pipa GIP Kls Medium Dia 75 mm M' 1,578.00 169,100.00 266,839,800.00
3 Pipa GIP Kls Medium Dia 50 mm M' 1,422.00 102,000.00 145,044,000.00
5,000.00 903,283,800.00
b Pengadaan Accessories Pipa
1 Socket GIP dia 100 mm Bh 333.33 103,200.00 34,400,000.00
2 Socket GIP dia 75 mm Bh 263.00 91,300.00 24,011,900.00
3 Socket GIP dia 50 mm Bh 237.00 64,500.00 15,286,500.00
4 Bend Socket GIP dia. 100 mm x 22.5o Bh 8.00 155,800.00 1,246,400.00
5 Bend Socket GIP dia. 100 mm x 45o Bh 6.00 155,800.00 934,800.00
6 Bend Socket GIP dia. 100 mm x 90o Bh 2.00 155,800.00 311,600.00
7 Bend Socket GIP dia. 75 mm x 22.5o Bh 6.00 129,000.00 774,000.00
8 Bend Socket GIP dia. 75 mm x 45o Bh 4.00 129,000.00 516,000.00
9 Bend Socket GIP dia. 75 mm x 90o Bh 2.00 129,000.00 258,000.00
10 Bend Socket GIP dia. 50 mm x 22.5o Bh 4.00 105,300.00 421,200.00
11 Bend Socket GIP dia. 50 mm x 45o Bh 4.00 105,300.00 421,200.00
12 Bend Socket GIP dia. 50 mm x 90o Bh 2.00 105,300.00 210,600.00
13 Tee GIP dia. 100 x 75 mm Bh 2.00 173,000.00 346,000.00
14 Tee GIP dia. 75 x 75 mm Bh 2.00 173,000.00 346,000.00
15 Tee GIP dia. 75 x 50 mm Bh 6.00 162,300.00 973,800.00
16 Nepel GIP dia. 75 mm Bh 10.00 89,200.00 892,000.00
17 Nepel GIP dia. 50 mm Bh 14.00 69,800.00 977,200.00
18 Gate Valve Socket dia. 75 mm Bh 5.00 2,821,800.00 14,109,000.00
19 Gate Valve Socket dia. 50 mm Bh 7.00 846,000.00 5,922,000.00
20 Gilbaut Joint dia. 100 mm Bh 2.00 194,500.00 389,000.00
21 Gilbaut Joint dia. 75 mm Bh 2.00 173,000.00 346,000.00
22 Gilbaut Joint dia. 50 mm Bh 2.00 129,000.00 258,000.00
23 Dop GIP dia. 75 mm Bh 4.00 108,500.00 434,000.00
24 Dop GIP dia. 50 mm Bh 7.00 79,500.00 556,500.00
25 Air Relief Valve dia. 3/4 mm Bh 3.00 255,800.00 767,400.00
26 Clamp Saddle GIP dia. 100 x 3/4 mm Bh 2.00 196,700.00 393,400.00
27 Clamp Saddle GIP dia. 75 x 3/4 mm Bh 16.00 174,100.00 2,785,600.00
28 Clamp Saddle GIP dia. 50 x 3/4 mm Bh 18.00 160,100.00 2,881,800.00
111,169,900.00 B. Pekerjaan Pemasangan Pipa dan Accessories
Pemasangan pipa lengkap dengan Accessories termasuk pengecatan serta perbaikan kembali semua kebocoran sesuai gambar spesifikasi teknis
URAIAN PEKERJAAN
Pengadaan Pipa
semua kebocoran sesuai gambar spesifikasi teknis
1 Pemas Pipa GIP Kls Medium Dia 100 mm ( Termasuk Galian Tanah ) M 2,000.00 72,450.00 144,900,000.00
- Galian Tanah Biasa Untuk Pemasangan Pipa M3 270.00 61,507.75 16,607,092.50
- Urugan Tanah Kembali M3 251.00 54,625.00 13,711,038.88
2 Pemas Pipa GIP Kls Medium Dia 75 mm ( Termasuk Galian Tanah ) M 1,578.00 63,393.75 100,035,337.50
- Galian Tanah Biasa Untuk Pemasangan Pipa M3 189.36 61,507.75 11,647,107.54
- Urugan Tanah Kembali M3 179.33 54,625.00 9,795,698.43
3 Pemas Pipa GIP Kls Medium Dia 50 mm ( Termasuk Galian Tanah ) M' 1,422.00 36,225.00 51,511,950.00
- Galian Tanah Biasa Untuk Pemasangan Pipa M3 124.43 61,507.75 7,653,101.79
- Urugan Tanah Kembali M3 119.99 54,625.00 6,554,700.89
5 Pekerjaan Beton untuk penyanga Pipa Camp. 1 Pc : 2 Ps : 3 Kr M3 3.75 1,432,560.75 5,372,102.81
6 Mobilisasi Pipa GIP dia. 100 mm dari Kampung ke sumber Air Stap 333.33 37,000.00 12,333,333.33
7 Mobilisasi Pipa GIP dia. 75 mm dari Kampung ke sumber Air Stap 63.00 30,000.00 1,890,000.00
8 StreBox dia 150 mm bh 12.00 180,000.00 2,160,000.00
384,171,463.68 C. Pekerjaan Akhir ( Commisioning Test )
1 Uji Coba dan Perbaikan Kembali Ls 1.00 3,218,500.00 3,218,500.00
2 Pembersihan akhir Ls 1.00 2,000,000.00 2,000,000.00
5,218,500.00
II. PENGUMPULAN
A. Pekerjaan Pengadaan Pipa GIP Dan Accessories Rp 1,014,453,700.00
B. Pekerjaan Pemasangan Pipa dan Accessories Rp 384,171,463.68
C. Pekerjaan Akhir ( Commisioning Test ) Rp 5,218,500.00
Rp 1,403,843,663.68 JUMLAH
HARGA JUMLAH
NO SAT VOL SATUAN HARGA
( Rp ) ( Rp )
III. PEMBUATAN KRAN UMUM SISTIM CABANG - 35 UNIT A. Pekerjaan Persiapan
1 Pengukuran dan Pemasangan Bouplank M2 0.17 313,490.00 53,293.30
53,293.30 B. Pekerjaan Tanah
1 Galian tanah M3 0.45 61,507.75 27,678.49
2 Urugan tanah bekas galian M3 0.11 54,625.00 6,008.75
3 Urugan pasir dibawah lantai M3 0.08 487,209.00 38,976.72
72,663.96 C. Pekerjaan Pasangan Batu / Beton
1 Pasangan Pondasi batu kali camp. 1 : 4 M3 0.60 1,350,929.15 810,557.49
2 Pengecoran Tiang Kran Umum
- Bakesting untuk Kolom M2 0.80 348,110.75 278,488.60
- Pembesian Tiang Kran Umum Kg 2.10 20,130.18 42,273.37
- Pembesian untuk Begel Tiang Kran Umum Kg 0.79 20,130.18 15,902.84
- Beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 0.16 1,432,560.75 229,209.72
3 Pengecoran Beton untuk saluran air dan Rabat
- Bakesting untuk Pondasi M2 0.96 195,511.50 187,691.04
- Beton mutu f'c = 7,4 Mpa (K100), slump (12 ± 2) cm, w/c = 0,87 M3 0.12 1,432,560.75 171,907.29
4 Plesteran Kran umum camp. 1 : 4 M2 7.69 79,741.23 613,210.06
5 Pekerjaan Pengecatan Tiang Kran Umum ( 1 Lapis Plamur / Aci ) M2 0.16 28,227.33 4,516.37
6 Pengecatan Kran Umum M2 2.12 28,227.33 59,841.93
2,413,598.71 D. Pekerjaan Pengad. Pemas. Pipa dan Accessories
1 Pengad./Pemas. Pipa GIP dia.20 mm ( inlet / outlet ) M' 6.00 58,673.00 352,038.00
2 Tee Socket GIP dia.20 mm Bh 1.00 38,700.00 38,700.00
3 Knie GIP dia.20 - 90 drt Bh 1.00 38,700.00 38,700.00
4 Nipple dia.20 mm Bh 1.00 43,000.00 43,000.00
5 Water moer dia.20 mm Bh 1.00 40,800.00 40,800.00
6 Sock GIP dia.20 mm Bh 3.00 32,200.00 96,600.00
7 Atap Kran dia.20 mm Bh 2.00 53,000.00 106,000.00
8 Gate Valve Socket dia. 20 mm Bh 1.00 194,500.00 194,500.00
910,338.00
III. PENGUMPULAN
A. Pekerjaan Persiapan Rp 53,293.30
B. Pekerjaan Tanah Rp 72,663.96
C. Pekerjaan Pasangan Batu / Beton Rp 2,413,598.71
D. Pekerjaan Pengad. Pemas. Pipa dan Accessories Rp 910,338.00
URAIAN PEKERJAAN
D. Pekerjaan Pengad. Pemas. Pipa dan Accessories Rp 910,338.00
Rp 3,449,893.96
'= JUMLAH UNTUK 1 KRAN UMUM x 35 Unit Rp 120,746,288.70