VALIDATION SHEET
ii
PREFACE
Praise and gratitude the author prays to Allah SWT, because of His blessings and grace, the author was able to complete this Apprenticeship Report.
The Apprenticeship Report was carried out in order to fulfill one of the requirements to complete the study in the D-IV International Business Administration Study Program at State Polytechnic of Bengkalis.
The author realizes that without the help and guidance of various parties, it is very difficult for the author to complete this Apprenticeship Report.
Therefore, the authors would like to thank to :
1. Mr. Johny Custer, ST., MT as Director of State Polytechnic of Bengkalis.
2. Mr. Armada S.T., MT as Deputy Director I State Polytechnic of Bengkalis.
3. Ms. Yunelly Asra, SE., MM as the Head of Business Administration Department at State Polytechnic of Bengkalis.
4. Mr. Hutomo Atman Maulana, S.Pd., M.Si as the Head of the International Business Administration Study Program.
5. Mr. Adrian Irnanda Pratama,S,.Sos.,M.B.A as my Supervisor who has provided guidance and input in the preparation of this Apprenticeship report.
6. All Lecturers of the International Business Administration Study Program.
7. Mr. Ferry and Mr Azwir as head of Planning section, Mr. Riki hardianto as Supervisor of Planning section, Mr. Rum Khalid , Mrs. Yulia ,Mr. pili, Mr. Renita Clara worker in PT PLN Pekanbaru
8. My Father, Mother and my Friends for their prayers and support.
During job training in the PT PLN (Persero) UP3 Pekanbaru , many lessons and knowledge that the writer gained from employees in the office.
Despite all that, the writer also realized there are still many mistakes in the process of writing this report. Therefore, we are happy to accept any suggestions
iii
or input and criticism from readers. Hopefully this report is useful for all interested parties.
Bengkalis, August 2021
Author
iv
TABLE OF CONTENTS
VALIDATION SHEET………..i
PREFACE……….………..ii
TABLE OF CONTENT………iv
LIST OF TABLE..………vi
LIST OF FIGURE..……….vii
CHAPTER I …...1
INTRODUCTION………..1
1.1 Background of the Apprenticeship………....1
1.2 Purpose of the Apprenticeship………...2
1.3 Signification of the Apprenticeship ………..3
CHAPTER II………..4
A GENERAL DESCRIPTION OF THE COMPANY………..4
2.1 Company Activities………4
2.2 Organizational Structure PT PLN (Persero) UP3 Pekanbaru………5
2.3 Vision , Mision and Motto of PT PLN(Persero)………5
2.3.1 Vision………...5
2.3.2 Mision………..5
2.3.3 Motto………5
2.4 Logo PT PLN (Persero)……….5
2.5 Tasks of Each Field………9
CHAPTER III………...12
DESCRTIPTION OF PRACTICAL WORK ACTIVITIES………..12
3.1 Job Description………12
3.2 System and Procedure………..12
3.3 Obstacle and Solution………..17
3.4 Kind and Description of thr Activity………...18
CHAPTER IV………...27
CONCLUSION AND SUGESTION………..…27
v
4.1 Conclusion………...27
4.2 Sugestion……….27
REFERENCES………28
APPENDICES………..29
vi
LIST OF TABLE
Table 2.1 Distribution of ULP at UP3 Pekanbaru………8
Table 3.1Job Training Schedule ……….………..16
Table 3.2 Job Training Report on the First Week (Week 1)………..17
Table 3.3Job Training Report on the Second Week (Week 2)...17
Table 3.4 Job Training Report on the Week 3………...…18
Table 3.5 Job Training Report on the Week 4………...18
Table 3.6 Job Training Report on the Week 5………...19
Table 3.7 Job Training Report on the Week 6………...19
Table 3.8 Job Training Report on the Week 7………...…19
Table 3.9 Job Training Report on the Week 8………...20
Table 3.10 Job Training Report on the Week 9……….20
Table 3.11 Job Training Report on the Week 10………...…21
Table 3.12 Job Training Report on the Week 11………...21
Table 3.13 Job Training Report on the Week 12………...22
Table 3.14 Job Training Report on the Week 13………...22
Table 3.15 Job Training Report on the Week 14………...22
Table 3.16 Job Training Report on the Week 15………...23
Table 3.17 Job Training Report on the Week 16………...23
Table 3.18 Job Training Report on the Week 17………...23
Table 3.19 Job Training Report on the Week 18………...24
Table 3.20 Job Training Report on the Week 19………...…24
vii
LIST OF FIGURE
Figure 2.1 Organizational structure PT PLN (Persero) UP3 Pekanbaru………….5
Figure 2.2 Logo PT PLN (Persero)…….……….6
Figure 2.3 Yellow Rectangle………7
Figure 2.4 Lighting symbol………..7
Figure 2.5 Three Waves Symbol……….8
Figure 2.6 Working Area UP3 Pekanbaru………...8
Figure 3.1 Centralized Service Application (AP2T)...13
Figure 3.2 Temporary Electricity Connection Application Form...14
Figure 3.3 Cooperation Agreement With Owner……….15
Figure 3.4 Voucher Distribution………15
Figure 3.5 Customer Chat………16