gy

GRID SYSTEM OPERATION SUMMARY (SABAH)

FORECAST ACTUAL VARIANCE

Maximum Demand (16th MARCH' 2013) 755 MW 764 MW 1.25%

Maximum  Energy (16th MARCH' 2013)       16.3 MW 15.1 GWh ‐7.36%

Maximum Demand (record high 13th MARCH' 2013) 835 MW 840 MW 0.54%

Prepared by:

Electricity Market Operations

Electricity Supply & Market Regulations Dept.

Energy Commission Malaysia y

27‐Mar‐13

(2)

OPERATION

500MW EAST COAST GRID GENERATION PROFILE ON 16th MARCH' 2013

‐200

‐100 0 100 200 300 400 500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 HOUR

INSTALLED CAPACITY ON LINE CAPACITY

DEMAND OPERATING RESERVE

36512.5 35893.3 34856.9 33457.5 33770.3 34492.2 33256.2 35754.2 37438.8 40845.5 41329.1 40628.5 39443.9 40957.9 40957.8 40019.3 39387.5 41195.6 46152.2 46235.9 44035.7 43390.7 40532 39033 West Cost

WEST COAST GRID OPERATION

0 100 200 300 400 500 600 700 800 900 1000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 MW

HOUR WEST COAST GRID GENERATION PROFILE ON 16th MARCH' 2013

EAST COAST GRID

INSTALLED CAPACITY 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 417.9 ON LINE CAPACITY 72 72 63 63 63 63 63 66 178 190 200.5 200.5 200.5 200.5 193.5 193.5 196.5 196.5 196.5 200.5 197.5 151 123 91 DEMAND 186.59 179.22 169.22 167.61 171.23 176.83 164.08 190.16 229.36 244.03 239.44 235.06 224 238.27 231.7 227.49 221.63 228 244.73 246.4 238.97 225.77 215.86 196.69 OPERATING RESERVE -114.59 -107.22 -106.22 -104.61 -108.23 -113.83 -101.08 -124.16 -51.36 -54.03 -38.94 -34.56 -23.5 -37.77 -38.2 -33.99 -25.13 -31.5 -48.23 -45.9 -41.47 -74.77 -92.86 -105.69

East Cost 12455.2 12650.8 10304.5 11491.3 11540.5 11463.8 11584.9 10763.3 22664.9 24738.8 26891.7 26184 26584.3 26543.7 25715.6 25555.2 24997.6 25517.8 26911.7 26493.2 26875.6 20502.6 18123 13446.4

EAST COAST GRID

WEST COAST GRID

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

INSTALLED CAPACITY 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5 858.5

ON LINE CAPACITY 611 611 611 611 611 611 611 611 611 619 630 630 630 630 630 630 630 673 684 684 651 643 615.5 611

DEMAND 500.2 478.4 465.7 446.6 450.7 460.2 430.9 481.1 503.8 554.2 551.8 548.2 528 552.7 552.7 541.1 527.4 526.5 591.4 592.6 575.9 572.3 555.7 540 OPERATING RESERVE 110.8 132.6 145.3 164.4 160.3 150.8 180.1 129.9 107.2 64.8 78.2 81.8 102 77.3 77.3 88.9 102.6 146.5 92.6 91.4 75.1 70.7 59.8 71

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 

INSTALLED CAPACITY ON LINE CAPACITY

DEMAND OPERATING RESERVE

(3)

Daily Generation Mix Profile 16th March' 2013

72.1%

7.2%

17.1%

3.5%

Gas

Hydro

Distillate

SREP

BIOMASS

30%

70% 62%

Generation Mix Profile for 16th March 2013

Gas           10,953 MWh

Hydro              1,094 MWh Distillate              2,603 MWh

SREP                 537 MWh

DISTILLATE GAS HYDRO

SESB       1 ,341.80 MWh        1 ,567.60 MWh      1 ,070.00 MWh        ‐ MWh

IPP       1 ,261.00 MWh        9 ,385.40 MWh        24. 00 MWh        ‐ MWh

SREP                  ‐ MWh        ‐ MWh MWh        537.30 MWh GENERATION MIX SESB‐IPP‐SREP 16th March' 2013

TOTAL       2 ,602.80 MWh          10,9 53.00 MWh      1 ,094.00 MWh        537.30 MWh

DISTILLATE GAS HYDRO BIOMASS

SESB 9% 10% 7% 0%

60%

IPP 8% 62% 0% 0%

50%

SREP 0% 0% 0% 4%

TOTAL 100% 100% 100% 100%

40%

TOTALLY     15,187.10

DIST (IPP) 8%

DIST (SESB) 9%

SREP 4%

GAS (SESB) 10%

GAS (IPP) 62%

HYDRO (SESB) 7%

HYDRO (IPP) 0%

total 100%

0%

10%

20%

30%

SESB IPP SREP

9% 8%

0%

10%

0%

7%

0% 0%

0% 0% 4%

DISTILLATE GAS HYDRO BIOMASS

Referensi

Dokumen terkait

The wind energy is design by using wind flow from cooling tower while the solar energy is using solar panel to convert sunlight energy to electrical energy.. The main component

- PacificCorp in the US has integrated energy efficiency and demand response into power sector planning through Integrated Resource Planning. • Integrated generation and

13 2.~.~, ~ 13 \3 ~ ALBU M: Kakitangan dan pelajar Institut Biologi Tropika dan Pemuliharaan lBTP Universiti Malaysia Sabah UMS merai~n anak-anak yatim pada majlis penyerahan

Farida M Simanjuntak, SST., M.Kes No NPM Nama Mahasiswa Tanggal & Bulan Pertemuan 27 Feb 23 03 mar 23 06 Mar 23 10 Mar 23 13 Mar 23 17 Mar 23 20 mar 23 24 Mar 23 27 Mar 23 31 mar 23

Department Agen~y SUMMARY OF APPROVED ~UDGET, UTILIZATIO~S, DISBURSEMENTSAND BALANCES BY OBJECT OF EXPE~DITURES As of th~ Quarter Ending Mar~h 31, 2018 : State Universitie~ and

Energy Commission Malaysia 05‐Sep‐12 Highest Maximum Demand 20 June 2012 ACTUAL FORECAST Energy Demand for 4 September

Energy Commission Malaysia 08‐Oct‐12 Highest Maximum Demand 20 June 2012 ACTUAL FORECAST Energy Demand for 7 October

Synchronous Online ZoomLearning Plan Video PresentationAccess to UVCSurvey Completion 27/27 Online Ignasia Yuyun Yunengsih 2 Kamis, 23 Mar 2023 13:30 - 16:00 Content Writing