PERJANJIAN PENTING, KOMITMEN, DAN

Dalam dokumen ANNUAL REPORT PT BAYAN RESOURCES 13 FINAL (Halaman 194-200)

31 DECEMBER 2013 AND

PIHAK BERELASI 29 RELATED PARTY TRANSACTIONS AND BALANCES

30. PERJANJIAN PENTING, KOMITMEN, DAN

KONTINJENSI (lanjutan) 30. SIGNIFICANT AGREEMENTS, COMMITMENTS AND CONTINGENCIES (continued)

n. Perjanjian penggunaan haulroad n. Agreement for the use of haul road

WBM WBM

Pada tanggal 24 Agustus 2007, WBM mengadakan perjanjian dengan PT Arutmin

Indonesia (“Arutmin”), untuk memperbolehkan

WBM menggunakan jalan pengangkutan batubara di daerah PKP2B Arutmin sehingga WBM memperoleh akses bebas hambatan dalam mengangkut batubara di sepanjang jalan tersebut. Perjanjian ini berlaku hingga berakhirnya PKP2B WBM atau Arutmin, yang mana yang lebih dulu.

On 24 August 2007, WBM entered into an

agreement with PT Arutmin Indonesia (“Arutmin”)

to allow WBM to use a haul road within the Arutmin CCoW area, to provide WBM unimpeded access for transporting coal along the haul road. This agreement valid until the end of the CCoW of WBM or Arutmin, which ever is ealier.

GBP GBP

Pada tanggal 8 Desember 2009, GBP dan PT Diva Kencana Borneo mengadakan perjanjian penggunaan haul road di wilayah GBP. Perjanjian ini berlaku sampai dengan enam tahun.

On 8 December 2009, GBP and PT Diva Kencana Borneo entered into an agreement for

the use of GBP’s haul road. This agreement is

valid for six years.

o. Perjanjian pertambangan batubara di daerah perbatasan bersama

o. Agreement for the mining of coal on the common boundary

Pada tanggal 24 Agustus 2007, WBM dan PT Arutmin Indonesia mengadakan perjanjian pengelolaan pertambangan batubara di perbatasan daerah pertambangan mereka. Perjanjian ini bertujuan untuk memaksimalkan pengambilan cadangan batubara di dekat daerah perbatasan. Perjanjian tersebut mengatur biaya dan kewajiban atas aktivitas penambangan tersebut.

On 24 August 2007, WBM and PT Arutmin Indonesia entered into an agreement for the mining of coal on the common boundary of their mining areas. The purpose of the agreement is to maximise the exploitation of coal reserves near the boundary area. The agreement governs the costs and liabilities which may arise from the mining activities.

p. Iuran kehutanan p. Forestry fee

WBM, GBP, FKP, dan MCM WBM, GBP, FKP and MCM

Berdasarkan Peraturan Pemerintah, seluruh perusahaan yang memiliki aktivitas di dalam area hutan produksi dan hutang lindung namun kegiatannya tidak berhubungan dengan kegiatan kehutanan memiliki kewajiban untuk membayar iuran kehutanan sebesar Rp 1.000.000 sampai Rp 3.000.000 per hektar per tahun. Iuran ini berlaku mulai 2008. WBM, GBP, FKP, dan MCM mengakui iuran ini dengan dasar akrual. Grup berpendapat bahwa tidak ada aktivitas lain yang berhubungan dengan iuran tersebut.

Based on Government Regulations, all companies which have activities in production and protected forest areas which are not related to forestry activities will have an obligation to pay a forestry fee ranging from Rp 1,000,000 to Rp 3,000,000 per hectare annually. This fee is effective from 2008. WBM, GBP, FKP and MCM has recognised this fee on an accrual basis. The Group believes that it does not have other operations subject to this fee.

q. Kewajiban atas IUP Eksplorasi q. Exploration IUP Obligation

Berdasarkan IUP eksplorasi, BAS, DE, TJ, TA, OM, SK, SA, MBE, MEL, dan BKL diwajibkan untuk membayar iuran tetap sesuai ketentuan yang berlaku.

Pursuant to the Exploration IUP, BAS, DE, TJ, TA, OM, SK, SA, MBE, MEL and BKL shall pay dead rent based on the prevailing regulation.

PT BAYAN RESOURCES Tbk. DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/94 Schedule

CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN

31 DESEMBER 2013 DAN 2012

(Dinyatakan dalam Dolar Amerika Serikat, kecuali dinyatakan lain)

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2013 AND 2012

(Expressed in United States Dollars, unless otherwise stated)

30. PERJANJIAN PENTING, KOMITMEN, DAN KONTINJENSI (lanjutan)

30. SIGNIFICANT AGREEMENTS, COMMITMENTS AND CONTINGENCIES (continued)

r. Penundaaan kegiatan eksploitasi r. Suspension of exploitation activity

Pada tanggal 2 Mei 2013, FKP menerima Surat Persetujuan Perpanjangan Penundaan Kegiatan (suspensi) dari DJMBP terhitung mulai tanggal 27 Oktober 2012 sampai dengan tanggal 26 Oktober 2013 untuk area KW.05PB0108. Sampai dengan tanggal laporan keuangan ini, permohonan perpanjangan dalam proses pengajuan.

On 2 May 2013, FKP received an approval letter for the extension of suspension from the DGMCG which is valid from 27 October 2012 until 26 October 2013 for area KW.05PB0108. As at the date of these financial statements, an extension request is in process.

s. Undang-Undang Pertambangan No. 4/2009 s. Mining Law No. 4/2009

Pada tanggal 16 Desember 2008, Dewan Perwakilan Rakyat Indonesia meloloskan Undang-Undang Pertambangan Mineral dan

Batubara yang baru (“Undang-Undang”), yang

telah disetujui oleh Presiden pada 12 Januari 2009, menjadi UU No. 4/2009. Sistem PKP2B dimana beberapa entitas anak Grup beroperasi sudah tidak tersedia bagi para investor. Meskipun Undang-Undang mengindikasikan PKP2B yang ada, seperti yang dimiliki Grup, akan tetap diberlakukan sampai jangka waktu berakhirnya kontrak, ketentuan peralihan tidaklah jelas dan mengharuskan klarifikasi lebih lanjut dalam peraturan pemerintah yang akan diterbitkan. Terdapat sejumlah permasalahan yang sedang dianalisis pemegang PKP2B, termasuk Grup. Beberapa diantaranya termasuk:

On 16 December 2008, the Indonesian Parliament passed a new Law on Mineral and

Coal Mining (the “Law”), which received the

assent of the President on 12 January 2009, becoming Law No. 4/2009. The CCoW system

under which several of the Group’s subsidiaries

operate will no longer be available to investors. While the Law indicates that existing CCoWs, such as those held by the Group, will be honoured, the transition provisions are unclear, and will require clarification in yet to be issued government regulations. There are a number of issues which existing CCoW holders, including the Group, are currently analysing. Among others these include:

 ketentuan peralihan atas PKP2B. Undang- Undang menjelaskan bahwa PKP2B yang ada akan tetap diberlakukan sampai jangka waktu berakhirnya kontrak. Namun, Undang- Undang juga menetapkan bahwa PKP2B yang ada harus disesuaikan dalam jangka waktu satu tahun terhadap ketentuan Undang-Undang (kecuali untuk penerimaan negara - yang tidak didefinisikan, tetapi diasumsikan termasuk royalti dan pajak); dan

the CCoW transition provisions. The Law notes that existing CCoWs will be honoured until their expiration. However, it also states that existing CCoWs must be amended within one year to conform with the provisions of the Law (other than terms related to State revenue - which is not defined, but presumably includes royalties and taxes); and

 keharusan bagi pemegang PKP2B yang telah memulai aktivitasnya untuk, dalam waktu satu tahun sejak diberlakukannya Undang-Undang, menyerahkan rencana kegiatan pertambangan untuk keseluruhan area kontrak. Jika rencana ini tidak dilaksanakan, area kontrak dapat dikurangi menjadi hanya seluas area yang diperbolehkan untuk Izin Usaha Pertambangan berdasarkan Undang- Undang.

the requirement for CCoW holders which have already commenced some form of activity to, within one year of enactment of the Law, submit a mining activity plan for the entire contract area. If this plan is not fulfilled, the contract area may be reduced to that allowed for licences under the Law.

PT Bayan Resources Tbk.

Laporan Tahunan 2013

192

PT BAYAN RESOURCES Tbk. DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/95 Schedule

CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN

31 DESEMBER 2013 DAN 2012

(Dinyatakan dalam Dolar Amerika Serikat, kecuali dinyatakan lain)

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2013 AND 2012

(Expressed in United States Dollars, unless otherwise stated)

30. PERJANJIAN PENTING, KOMITMEN, DAN KONTINJENSI (lanjutan)

30. SIGNIFICANT AGREEMENTS, COMMITMENTS AND CONTINGENCIES (continued)

s. Undang-Undang Pertambangan No. 4/2009 (lanjutan)

s. Mining Law No. 4/2009 (continued)

Diperkirakan para pemegang PKP2B, dengan dukungan dari asosiasi industri pertambangan, akan mempertahankan hak mereka berdasarkan kontrak yang sekarang berlaku. Terdapat kemungkinan bahwa ketentuan arbitrase akan dipakai jika pemerintah mencoba untuk memaksa perubahan ketentuan PKP2B tanpa persetujuan pemegang PKP2B. Grup sedang menganalisa dampak situasi ini terhadap operasinya, dan yakin bahwa tidak terdapat dampak yang signifikan dalam waktu dekat, karena industri pertambangan dan pemerintah bekerjasama untuk menyelesaikan permasalahan- permasalahan yang ada.

It is expected that CCoW holders, with the support of mining industry associations, will vigorously defend their rights under their existing contracts. It is possible that the arbitration provisions of the CCoWs will be invoked if the government attempts to force changes in CCoW terms without the agreement of the contractors. The Group is analysing the impact of this situation on its operations, and believes that there will be no significant impact in the near term, as the industry and the government work towards a consensus on these issues.

Setelah keluarnya Undang-Undang tersebut,

DJMBP menerbitkan Surat Edaran (“SE”) No.

03.E/31/DJB/2009 sehubungan dengan KP yang menjadi dasar operasi FSP, BT, BAS, TA, DE, SK, SA, TJ, OM, MCM, MBE, MEL, dan BKL. Beberapa di antaranya adalah:

Following the issuance of the Law, DGMCG issued Circular Letter No. 03.E/31/DJB/2009 with respect to Mining Rights under which FSP, BT, BAS, TA, DE, SK, SA, TJ, OM, MCM, MBE, MEL and BKL operation. The Circular states that, among others:

 KP yang ada pada saat diberlakukannya Undang-Undang masih berlaku hingga jangka waktu berakhirnya KP tetapi wajib dikonversi menjadi IUP sesuai dengan Undang-Undang, paling lambat 11 Januari 2010.

Mining Rights in force at the time the Mining Law was enacted will remain valid until the expiration of the Mining Right but must be converted to IUP by 11 January 2010 at the latest.

 Tata cara penerbitan IUP akan diterbitkan oleh DJMBP.

The procedures for IUP issuance will be issued by the DGMCG.

 Semua pemilik KP eksplorasi dan eksploitasi diwajibkan untuk menyerahkan rencana aktivitas seluruh KP hingga berakhirnya jangka waktu KP, paling lambat enam bulan setelah disahkannya Undang-Undang, yaitu 11 Juli 2009.

All existing exploration and exploitation Mining Rights holders are required to deliver an activities plan for the whole Mining Right area covering the period until expiration of the Mining Right term, at the latest within six months of the enactment of the new Mining Law, i.e. by 11 July 2009.

Pada bulan Februari 2010, Pemerintah Indonesia mengeluarkan dua peraturan pemerintah, yaitu Peraturan Pemerintah No. 22/2010 dan 23/2010

(“PP No. 22” dan “PP No. 23”), sehubungan

dengan penerapan Undang-Undang Pertambangan No. 4/2009. PP No. 22 mengatur tentang pembentukan area pertambangan melalui sistem IUP yang baru. PP No. 23 memperjelas prosedur untuk memperoleh IUP. PP No. 23 menyatakan bahwa PKP2B yang ada akan tetap diakui oleh Pemerintah, namun demikian perpanjangan atas PKP2B tersebut akan dilakukan melalui penerbitan IUP. PP No. 23 juga mewajibkan agar KP diubah menjadi IUP dalam jangka waktu 3 (tiga) bulan sejak diterbitkannya PP No. 23.

In February 2010, the Government of Indonesia released two implementing regulations for Mining Law No. 4/2009, i.e. Government Regulations

Nos. 22/2010 and 23/2010 (“GR No. 22” and “GR No. 23”). GR No. 22 deals with the establishment

of mining areas under the new Mining Business Licence system. GR No. 23 provides clarifications surrounding the procedures to obtain new IUPs. GR No. 23 indicates that existing CCoWs will be honoured by the Government although any extension of existing CCoWs will be through the issuance of an IUP. GR No. 23 also requires a KP to be converted into an IUP within 3 (three) months of the issuance of GR No. 23.

PT BAYAN RESOURCES Tbk. DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/96 Schedule

CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN

31 DESEMBER 2013 DAN 2012

(Dinyatakan dalam Dolar Amerika Serikat, kecuali dinyatakan lain)

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2013 AND 2012

(Expressed in United States Dollars, unless otherwise stated)

30. PERJANJIAN PENTING, KOMITMEN, DAN KONTINJENSI (lanjutan)

30. SIGNIFICANT AGREEMENTS, COMMITMENTS AND CONTINGENCIES (continued)

s. Undang-Undang Pertambangan No. 4/2009 (lanjutan)

s. Mining Law No. 4/2009 (continued)

Pada tanggal 5 Juli 2010, PP No. 55/2010 dikeluarkan. PP ini untuk mengatur pembinaan dan pengawasan penyelenggaraan usaha pertambangan mineral dan batubara di Indonesia.

On 5 July 2010, GR No. 55/2010 was issued. This GR deals with the guidance and supervision of mineral and coal mining business in Indonesia.

Pada tanggal 10 Januari 2012, Presiden Republik Indonesia mengeluarkan Keputusan Presiden (Keppres No.3/2012) tentang Tim Evaluasi untuk penyesuaian Kontrak Karya dan PKP2B. Tim

Evaluasi (“Tim”) akan dipimpin oleh Menteri

Koordinator Bidang Perekonomian dan didampingi oleh Menteri Energi dan Sumber Daya Alam untuk aktivitas harian. Selain itu, Tim juga dibantu oleh anggota kabinet lainnya (Menteri Keuangan, Menteri Hukum dan Hak Asasi Manusia, Menteri Kehutanan, Badan Koordinasi Penanaman Modal, dan lain-lain).

On 10 January 2012, the President issued a Presidential Decree (Keppres No.3/2012) on

Evaluation Team for Contract of Work (“COW”)

and CCoW. The Evaluation Team ("Team") will be chaired by the Coordinating Minister of Economy and co-chaired by the Minister of Energy and Mineral Resources for its daily activities. The Team is also assisted by the current Cabinet Members (Ministry of Finance, Ministry of Justice and Human Rights, Ministry of Forestry, Indonesia Investment Coordinating Board, et al).

Tugas Tim meliputi: (1) evaluasi ketentuan- ketentuan yang tercantum dalam pasal-pasal Kontrak Karya dan PKP2B; (2) penetapan luas wilayah kerja dan penerimaan negara; dan (3) menetapkan langkah-langkah yang diperlukan untuk pelaksanaan kewajiban pemegang Kontrak Karya dan PKP2B, terhadap pengolahan dan/atau pemurnian mineral dan batubara.

The Team's task consists of the following: (1) evaluating the articles in the COW and CCoW; (2) determine the COW and CCoW areas and state income/revenue; and (3) determine steps to be taken for the implementation of the COW and CCoW holder’s obligations, on the processing

and/or refinery of mineral and coal.

Pada 13 September 2013, KESDM menerbitkan Peraturan No. 27 Tahun 2013 ("Permen 27/2013"), yang merupakan salah satu peraturan pelaksana dari PP 23/2010 dan PP 24/2012, yang menjelaskan tata cara dan penetapan harga divestasi saham, serta perubahan penanaman modal di bidang usaha pertambangan mineral dan batubara.

On 13 September 2013, MOEMR issued Regulation No.27 of 2013 ("GR 27/2013"). GR 27/2013, which is one of the implementing regulations of GR 23/2010 and GR 24/2012, outlining the procedures and determination of share divestment prices and also changes of investment particulars in the mineral and coal mining business.

Permen 27/2013 menjelaskan bahwa seluruh pemegang IUP wajib mengikuti tata cara divestasi, tata cara pembayaran dan mekanisme penetapan harga yang diatur dalam Permen 27/2013 sejak tanggal berlakunya peraturan ini. Grup masih mengalisa dampak Permen 27/2013 terhadap anak perusahaan yang dimiliki melalui KRL.

GR 27/2013 provides that all IUP holders must follow the divestment procedure, payment procedure and pricing mechanism provided in GR 27/2013 from its issuance date. The Group is analysing the impact of GR 27/2013 upon its subsidiaries through KRL.

PT Bayan Resources Tbk.

Laporan Tahunan 2013

194

PT BAYAN RESOURCES Tbk. DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/97 Schedule

CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN

31 DESEMBER 2013 DAN 2012

(Dinyatakan dalam Dolar Amerika Serikat, kecuali dinyatakan lain)

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2013 AND 2012

(Expressed in United States Dollars, unless otherwise stated)

30. PERJANJIAN PENTING, KOMITMEN, DAN KONTINJENSI (lanjutan)

30. SIGNIFICANT AGREEMENTS, COMMITMENTS AND CONTINGENCIES (continued)

s. Undang-Undang Pertambangan No. 4/2009 (lanjutan)

s. Mining Law No. 4/2009 (continued)

Pada tanggal 19 November 2013, Peraturan Menteri No. 32 tahun 2013 terkait dengan izin perdagangan dan pengangkutan yang dikeluarkan Departemen Energi dan Sumber Daya Mineral memperkenalkan sejumlah besar pembatasan atas pemegang izin tersebut, yang antara lain mencakup larangan terhadap pemegang izin untuk mengadakan transaksi dengan pemegang izin lain yang izinnya dikeluarkan otoritas penerbit izin yang sama, serta larangan terhadap pemegang izin untuk tidak melakukan transaksi dengan konsesi batubara PKP2B. Pemohon izin baru dan perpanjangan izin harus menyerahkan sejumlah besar dokumen yang wajib diserahkan sebagai bagian dari proses permohonan, yang antara lain meliputi informasi kepemilikan dan rahasia pihak ketiga. Selain itu, persyaratan agar pemegang izin memperoleh persetujuan lebih dahulu atas semua transaksi hampir tidak memungkinkan pelaksanaan transaksi di pasar spot lokal.

On 19 November 2013, the Minister’s Regulation

No. 32 of 2013 relating to trading and transport licenses issued by the Ministry of Energy and Mineral Resources introduces numerous restrictions on holders of such permits including, among others, the prohibition of permit holders from entering into transactions with other permit holders issued from a common issuing authority and prohibition of a permit holder from entering into a transaction with a CCoW coal concession. New applicants and renewal applicants are faced with a daunting list of documents that are required to be submitted as part of the application process where a number of such documents include proprietary and confidential information of third parties. Additionally, the requirement of a license holder to obtain pre-approval of all transactions makes it almost impossible for any transactions in the local spot market to be done.

Grup kini bekerja sama dengan para penasehatnya, asosiasi industri dan otoritas untuk memahami harapan-harapan pemerintah, berusaha memelihara kepatuhan dan, apabila memungkinkan, meminta kajian materi atas ketentuan peraturan tersebut.

The Group is working closely with its advisors, the industry association and the authorities to understand the expectations of the government, to work on maintaining compliance and where appropriate, to seeking a judicial review of the provisions of the regulations.

t. Peraturan Menteri No. 78/2010 t. Ministerial Regulation No. 78/2010

Pada tanggal 20 Desember 2010, Pemerintah Indonesia mengeluarkan peraturan implementasi atas Undang-Undang Mineral No. 4/2009, yaitu

Peraturan Pemerintah No. 78/2010 (“PP No. 78”)

yang mengatur aktivitas reklamasi dan pasca tambang untuk pemegang IUP-Eksplorasi dan IUP-Operasi Produksi. Peraturan ini memperbarui Peraturan Menteri No. 18/2008 yang dikeluarkan oleh Menteri Energi dan Sumber Daya Mineral pada tanggal 29 Mei 2008.

On 20 December 2010, the Government of Indonesia released an implementing regulation for Mining Law No. 4/2009, i.e. Government

Regulation No. 78/2010 (“GR No. 78”) that deals

with reclamation and post-mining activities for both IUP-Exploration and IUP-Production Operation holders. This regulation updates Ministerial Regulation No. 18/2008 issued by the Minister of Energy and Mineral Resources on 29 May 2008.

Pemegang IUP-Eksplorasi, ketentuannya antara lain, harus memuat rencana eksplorasi di dalam rencana kerja dan anggaran biaya ekplorasinya dan menyediakan jaminan reklamasi berupa deposito berjangka yang ditempatkan pada bank pemerintah.

An IUP-Exploration holder, among other requirements, must include a reclamation plan in its exploration work plan and budget and provide a reclamation guarantee in the form of a time deposit placed at a state-owned bank.

PT BAYAN RESOURCES Tbk. DAN ENTITAS ANAK/AND SUBSIDIARIES

Lampiran 5/98 Schedule

CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASIAN

31 DESEMBER 2013 DAN 2012

(Dinyatakan dalam Dolar Amerika Serikat, kecuali dinyatakan lain)

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS 31 DECEMBER 2013 AND 2012

(Expressed in United States Dollars, unless otherwise stated)

30. PERJANJIAN PENTING, KOMITMEN, DAN KONTINJENSI (lanjutan)

30. SIGNIFICANT AGREEMENTS, COMMITMENTS AND CONTINGENCIES (continued)

t. Peraturan Menteri No. 78/2010 (lanjutan) t. Ministerial Regulation No. 78/2010 (continued)

Pemegang IUP-Operasi Produksi, ketentuannya antara lain, harus menyiapkan (1) rencana reklamasi lima tahunan; (2) rencana pasca tambang; (3) menyediakan jaminan reklamasi yang dapat berupa rekening bersama atau deposito berjangka yang ditempatkan pada bank pemerintah, bank garansi, atau cadangan akuntansi (bila diijinkan), dan (4) menyediakan jaminan pasca tambang berupa deposito berjangka yang ditempatkan di bank pemerintah.

An IUP-Production Operation holder, among other requirements, must prepare (1) a five years reclamation plan; (2) a post-mining plan; (3) provide a reclamation guarantee which may be in the form of a joint account or time deposit placed at a state-owned bank, a bank guarantee, or an accounting provision (if eligible); and (4) provide a post-mine guarantee in the form of a time deposit at a state-owned bank.

Penempatan jaminan reklamasi dan jaminan pasca tambang tidak menghilangkan liabilitas pemegang IUP dari ketentuan untuk melaksanakan aktivitas reklamasi dan pasca tambang.

The requirement to provide reclamation and post- mine guarantees does not release the IUP holder from the requirement to perform reclamation and post-mine activities.

Ketentuan peralihan didalam PP No. 78 menegaskan bahwa para pemegang PKP2B juga wajib mematuhi peraturan ini.

The transitional provisions in GR No. 78 make it clear that CCoW holders are also required to comply with this regulation.

Pada tanggal laporan keuangan konsolidasian ini, GBP, FSP, BT, FKP, TSA, PIK, dan WBM telah membuat jaminan reklamasi untuk periode tertentu (lihat Catatan 30d). Grup telah memasukkan rencana penutupan tambang ke Menteri Energi dan Sumber Daya Mineral dan melanjutkan untuk berdiskusi rencana tersebut.

As at the date of these consolidated financial statements, GBP, FSP, BT, FKP, TSA, PIK and WBM have placed reclamation guarantees for certain periods (refer to Note 30d). The Group has submitted its mine closure plans to the Minister of Energy and Mineral Resources and continues to discuss these plans.