• Tidak ada hasil yang ditemukan

Generation And HVAC Test On Insulator (Vulcanized Rubber).

N/A
N/A
Protected

Academic year: 2017

Membagikan "Generation And HVAC Test On Insulator (Vulcanized Rubber)."

Copied!
24
0
0

Teks penuh

(1)
(2)
(3)
(4)
(5)
(6)

lV

ABSTRACT

The High Voltage Construction is a system of components for applications in

high voltage technology. They can be combined to form a test configuration and are

extremely versatile. Test configurations are available which allow the generation of

AC voltages up to 300kV.This project will discuss on the high voltage construction

which allow the generation of AC voltages up to 300KV. This system built with

install each component to form single arrangement can generate till 300 kV which

built according to stages. The equipment which is available in the high voltage lab

will be used to study and develop a high voltage testing procedure. At the end of the

project phase a testing procedure will be develop to be use by the future student.

IEEE standard 4-1995 will be use as reference. The application range for the high

voltage construction covers not only use in high voltage laboratories of technical

universities but also as an industrial test system for routine and type tests on

(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(23)
(24)

Referensi

Dokumen terkait

Tujuan dari penelitian ini adalah aplikasi yang dirancang dapat digunakan oleh pihak jurusan, untuk melihat proses dari bimbingan skripsi teknik elektro yang sedang

Menurut hasil wawancara yang dilakukan dengan pihak perusahaan, perusahaan melakukan pembelian bahan baku setiap tiga bulan sekali karena ingin menjaga agar bahan

mostly employed in foreignization, followed by Ecology, social culture, and. material

 Keadaan ini dapat disebabkan oleh sumbatan 0leh kotoran telinga, gendang telinga robek, infeksi di telinga tengah, kerusakan tulang pendengaran, pilek dll.... GANGGUAN

Jalan Ahmad Yani (Komplek Kantor Gubernur) Email :ulp@kalbarprov.go.id Pontianak - Kalimantan Barat KELOMPOK KERJA BIDANG BARANG (POKJA 13). KANTOR LAYANAN

menyatakan bahwa skripsi saya berjudul “PERBEDAAN PENGARUH LATIHAN BARIER HOP DAN LATERAL BOX PUSH OFF TERHADAP POWER OTOT TUNGKAI PADA SISWA PUTRA

[r]

Proses ini akan muncul karena seorang karyawan yang dalam bekerja didukung suasana di rumah, dia akan bekerja dengan semakin baik karena emosi positif dari